Loading...
HomeMy WebLinkAboutLITTLE CAESARS PUD PRELIMINARY - 28 92 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY (2)ui of W x H MEMORANDUM o To: Tony Fonte, Little Caesars a Al Hauser, Architecture One 10 Fort Collins Staff CD From: •Matt Delich Date: May 4, 1992 Subject: Little Caesars traffic study (File: LTLCMEMI) This memorandum is the preliminary traffic study submittal for the proposed Little Caesars Pizza Restaurant located at the Horsetooth/Mitchell (future) intersection in Fort Collins. The site will also include a small office building which will be used by Little Caesars office staff (4- 5 employees) and occasionally to conduct new employee training. Peak hour (noon/afternoon) traffic counts were obtained in April 1992. These are shown on the attached work sheet. Also shown on this work sheet are the 1989 peak hour traffic counts at the College/Horsetooth and Horsetooth/JFK intersections. Comparison of the peak hour traffic indicates that traffic volumes have been fairly stable on Horsetooth Road over the past three years. Observation during traffic counting indicated the left - turn exits from both the Square and the office building on the south side of Horsetooth Road occasionally experienced long Z delays. This was primarily caused by the release of vehicles °; at the College and JFK signals. There were some periods when Z there was virtually no delay. The wide left -turn lane (21 z feet) on Horsetooth Road was often used as a refuge area in Ui making a two stage left -turn exit. I have reviewed the preliminary site plan. I have made Z some geometric suggestions which are probably reflected on the O site plan submitted on May 4, 1992. The property to the west is currently vacant. Access is shown on the Little Caesars o site plan to this property. The traffic study will reflect v a use on this site that will give a reasonable expectation of traffic associated with this property. cc C In the short range future, it is expected that Mitchell U. Drive will not be extended south of the irrigation canal. The cc long range analyses reflect completion of Mitchell Drive. ~ Mitchell Drive will primarily serve as a recirculation street, serving the properties which "front" on College Avenue. These properties are/will have limited turn access from/to College Avenue due to the center raised median. K,R It is my understanding that the proposed Little Caesars is considered to be a "Preliminary Submittal." Therefore, there will be ample time to submit the traffic study in a few weeks and still allow enough time for review and comment by city staff. City planning staff granted a late submittal of the traffic study. � 2 �z �Qp21� 211 (QqZ I -Ioc1,j30 i o— do j i cM 60 4 N M LD ZS52/Ziv3 dc--<o�3/�0�3 J �Z Z 30/01 �! —�'i 1 �° 4 S /3 t4oiesETuoTN 3431¢38 "D � a� `9 &33/7(,3—''� 13�19 N 2o�/Z z Z -� N - �. N G-7 7 7 d-' u I OFFIG -- i Sak UAf—