HomeMy WebLinkAboutBEST BUY EXPANSION MAJOR AMENDMENT AND REPLAT - 29 92B - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSMarch 29, 2000 Ted Shepard Chief Planner City of Fort Collins 281 North College Avenue PO Box 580 Fort Collins Colorado 80522-0580 Dear Ted, Remodel and Expansion; Best Buy, 4040 South College, Fort Collins, Colorado. We are pleased to submit Best Buy, Nolte Engineering and MBH Architects answers to the City comments dated 2.23.00 for the above store. 1. In the preparation of these amendments, we have taken into account local codes and guidelines including: the Land Use Code of the City of Fort Collins, December 1998 edition; the Design Standards and Guidelines for Large Retail Establishments and the General Development Standards for Fort Collins. 2. Nolte Engineering and MBH have answered point by point all the comments from the different departments of the City of Fort Collins and Poudre County Fire Department. 3. MBH has answered point by point the 28 items from the Current Planning Department. 4. We have included our statement of compliance with aspects of the City of Fort Collins Guidelines for large retail establishments. 5. We are returning all redlined sheets from the City of Fort Collins. 6. The amended drawing submission is as follows: Site Plans 17 copies of b and w plans from MBH and from Nolte Associates, Civil Engineers. Landscape Plans 14 copies from Nolte Associates. Architectural Elevations 1 set of colored elevations from MBH Architects on 11x17 4 sets of b and w elevations from MBH Architects Platt Boundary Survey 14 copies from Nolte Associates Drainage Report 3 copies of the reportfrom Nolte Associates Traffic/Transportation Study 5 copies from Matt Delich Associates Utilities Plan 9 copies from Nolte Associates Zoning As before: The parcels are zoned C, Commercial under the new Land Use Code adopted in March of 1997. I JYBEMiE_ F3,' McNulty 6riskman Heath 1115 Atlantic Avenue Alameda, CA 34561 Tel 516-665-8653 fax 516-865-1611 The structure is over 25,000 s f . As far as the extension and remodeling will allow, we are complying Jahn McNulty, Architect with the City's Standards and Guidelines for Large Retail Establishments. Shawn Alexander, Architect \VNBHIIIVOLI \ADMINIBEST BUY\19240\LETTER\LEITER TD TED S FT COLLINS. MARCH 29.DOC Dennis Heath, Architect Planning Objectives As before: In designing the modifications to this store and the surrounding site we have been sympathetic to the local topography and to the existing surrounding buildings. The colors and materials used in the expansion of the building are to match those of the existing store. We have sought to improve the linear appearance of the big box store by creating more varied elevations which incorporate: a new truck dock, a truck dock screen wall, a new front entrance with a variable height and width element, the new fascia. Specific Areas of Attention As discussed previously, Best Buy wish to apply for a parking variance to 4.75 per 1000 sf of retail store. We will be submitting additional written material in time for City review prior to the public hearing on 5.18.00. All other items remain unchanged from our original submission. Sincerely, *P, MBH Architects Andrew Golland, Project Manager. CC Best Buy Mike Klein, Architectural Project Manager. MBH Joseph Smart, Partner Rebecca Ross -Daniels, Director ARCH t TEC'T8 March 29, 2000 Project Development Plan Check Comments and Responses To: Ted Shepard, Chief Planner City of Fort Collins Current Planning Department PO Box 580 Fort Collins, CO 80522-0580 From: Andrew Golland, Project Manager MBH Architects Re: Best Buy 4040 South College Fort Collins, Colorado MBH Project No. 19240/3B The following are responses to Plan Check comments received on February 23, 2000. Revised drawings will be indicated by a 2� and a bubbled enclosure. Current Planning Comments Ref. Letter February 23, 2000, Ted Shepard to Andrew Golland of MBH Architects Item Comments Sheet Corrected 1 Concern over architectural design of the building... Planning Department will not accept such a radical departure from the established character of the Marketplace PUD shopping Center MBH and their clients, Best Buy, have redesigned the exterior of the building to comply with the concerns of the Current Planning Department. More elements have been added complying with the City Big Box Retail Store Guidelines. Notably, the front elevation (west) now has a new symetrical design. Flanking Towers are positioned either side of the entrance. There are pilasters breaking up the walls and a new canopy over the sidewalk linking A 6 the west and north car parks. 2 The Blue Dryvit Panzer Mesh and black painted cmu shall not be used as fascia treatment. The new entrance way and fascia complies with this City request. Please see our attached statement concerning adherence A 6 to City of Fort Collins: Design Standards and Guidelines for Large Retail Establishments. Plan Check Response Best Buy Ft Collins CO March 29, 2000 Page 2 of 4 3 The north fagade and a portion of the east fagade does not comply with the Variation in massing... Please see our attached statement concerning adherence to City of Fort Collins: Design Standards and Guidelines A 6 for Large Retail Establishments. 4 Proposed addition to the existing building does not comply with ...Fagade Treatment... Please see our attached statement concerning adherence to City of Fort Collins: Design Standards and Guidelines for Large Retail Establishments. 5 Building fails to comply with the standard requiring a recognizable top. This is a major amendment to an existing building. MBH and Best Buy have added elements where appropriate, including pilasters that run up above the existing wall height. For all other information please see our attached statement concerning adherence to City of Fort Collins: Design Standards and Guidelines for Large Retail Establishments. 6 The Major Amendment includes add. Parking to a total of 203 spaces. Equating to 4,75 per 1,000 s f. This exceeds the allowable maximum. Best Buy wish to apply for a variance. Please see attached letter Dated 3.29.00 from MBH. 7 Proposed lighting on the site plan is excessive. We have altered the lighting to respect the levels required by the City. Parking lot lighting will be introduced to match existing levels 8 Flood lighting of the front elevation is prohibited. We have eliminated this lighting. There will be increased lighting only at the entrance and for the Best Buy sign over the entrance, to be approved. 9 Truck dock lighting We have provided two shielded fixtures similar to those on the walls of the existing building. 10 Wall Pack Specification These are to be down directional and will feature sharp cut-off fixtures 11 The sidewalk connection from KFK Pkwy to the store should be straight and separated 6-8 ft from the curb. We have separated the sidewalk from the curb as required and straightened it slightly. However we feel it is appropriate here to have a slight curve to fit in with the \\MBHII\VOL1\ADMIN\BEST BUY\19240\EXHIBITS\19240 PROJECT DEVELOPMENT PLAN CHECK COMMENTS RESPONSE 3.22.00.DOC Plan Check Response Best Buy Ft Collins CO March 29, 2000 Page 3 of 4 natural flavor of the pedestrian plaza, to enhance it and to make it the approach from JFK more attractive. AS 1 12 New sidewalk to the north to the west side of the new parking lot. We have provided this. The ramp and crosswalk will be detailed to align with the entrance to the Sportscaster AS 1 restaurant. 13 Street Trees on JFK The specification is upgraded to comply with the City request. We are showing the street lights as requested. 14 Accurate numbers of trees on South Property line. These are now shown. 15 No gaps in shrubs along truck screen wall There are no gaps. 16 203 Parking spaces require 7 handicap stalls We have added 2 to make 7. AS 1 17 Pallets and Miscellaneous outside storage to be hidden. The expanded store provides for internal storage of A pallets in an expanded receiving area. In additon, the new enlarged compactor, connected to the building, provides over fifty percent more refuse capacity for cardboard. This remodel has been planned to avoid the unsightly external storage referred to above. 18 Bike Rack position This is indicated at the south end of the building fa ade. AS 1 19 Monument Sign to JFK Detail provided on site plan to requirements of City and AS 1 similar to the one already in place on College. 20 Relabel Sheets MBH have relabelled the sheets as requested. 21 Sheet AS 1 improved: C S is cover sheet. CS 1 A AS 1 is now the cover sheet and has a large title in the AS 1 lower right corner. AS 2 B A Building Ownership signature block has been added AS 1 with a notary block. C We have included a City Approval Block AS 1 D We have provided a legal description CS 1 E A Legend is included F Standard notes have been added. AS 1 AS 2 \\MBHII\VOL1\ADMIN\BEST BUY\192400HIBITS\19240 PROJECT DEVELOPMENT PLAN CHECK COMMENTS RESPONSE 3.22.00.DOC Plan Check Response Best Buy Ft Collins CO March 29, 2000 Page 4 of 4 G There is a sheet index CS 1 H The project data has been expanded using the PUD information. I All documents are presented as full size sheets and ALL scales are indicated. J Existing curb cuts to the Postal Service site are indicated. AS 1 K New and existing sidewalks are labelled and the crosswalk to the southerly Savers store is shown. AS 1 L Exisiting and proposed parking stalls have been indicated. AS 1 M Typical parking stall dimensions are shown. AS 2 N Parking spaces have been numbered per row. AS 1 0 On the new parking lot dimensions of the parking stalls AS 1 AS 2 are shown. P Head in parking behind the retail bldg in Fountainhead AS 1 AS 2 shown with dimensions. 22 A. Treatment of existing landscape is noted as is the distinction between exisiting and proposed. B. Notes have been added. C. Transplanted Austrian Pine numbers have been checked. D. Shrub bed added. 23 A. Drawings have been prepared to scales which are all indicated. B. Signage is removed from the b and w elevations and a separate signage application will be made. C. EXISTING and NEW elevations are marked. D. Elevations have been numbered W, E, S, N. E. Common color descriptions have been added to the material legend. F. Where applicable, CMU is labeled TO MATCH EXISTING. 24 Comment Sheets have been individually answered for Engineering, Stormwater, Water/Wastewater, Mapping and Drafting, Street Oversiling and transportation Planning Departments. 25 Comment Sheets have been individually answered for Landscape Plans from the Dept of Natural Resources. 26 Comment Sheets have been individually answered for Poudre Fire Authority. 27 Redlined plans have been individually answered and are returned. 28 Maintenance of existing landscaping and irrigation is being included as part of this expansion scheme. Andrew Golland, MBH Architects 3.29.00 \\MBHIIWOL1\ADMIN\BEST BUY\1924O\EXHIBITS\19240 PROJECT DEVELOPMENT PLAN CHECK COMMENTS RESPONSE 3.22.00.DOC