TO: City of Fort Collins Planning DATE: 05/02/00
281 North College Avenue
Fort Collins, CO PROJECT: Best Buy
ATTN: Ted Shepard NOLTE JOB # : FC0114
The Following Items Are Being Forwarded:
111em
® Attached
via Courier
Quantity
Water/Wastewater, Engineering, Stormwater & Mapping Redlines
1 EA
Plat
4
Drainage Report
2
Redlined Drainage Report
1
Memo -Trans. Planning, PFA, Water/Wastewater, Engineering
1 EA
Memo-Stormwater
1
Landscape Plan Package w/transmittal
I
Utility Plans
4
MBH Architects Package w/transmittal
1
Remarks:
For Your
As
For Your
Use
Requested
Review
®
❑
®
❑
❑
®
❑
®
❑
®
❑
®
❑
M
❑
C.C.: By: Robwl W. Van UffOoh
MEMORANDUM
TO: City of Fort Collins
FROM: Robert W. Van Uffelen / Nolte J�
Andrew Golland / MBH 4'
SUBJECT: Response to City Comments 3/29/00
Transportation Planning:
DATE:
BEYOND ENGINEERING
May 2, 2000
PROJ #: FC0114 / Nolte
19240 / MBH
Existing sidewalks acceptable on site... -Comment acknowledged.
Why were two pedestrian crossing... -There is not an existing sidewalk at the southeast corner of
this intersection.
Pedestrian connection to... -The current configuration works well as a directive of pedestrian
traffic. The sidewalk/ramp if moved northerly would become north/south directed and would
intersect the northerly drive at an angle that is not desirable. This design team desires the current
design.
Parking ratio per square... -Please refer to comments from.MBH Architects.
If stormwater detention is the primary... -The existing parking lot is established within past and
current design guidelines. The existing stall depth and drive aisle width meets current standards.
Additional space is not available for re -striping. 19' parking spaces can not be re -striped into 2-
17' parking spaces and allow a pedestrian walkway. The 4' gained is used by vehicle overhang.
n:\fcOI 14\documents\word\memo trans 5-2-OO.doc
B E Y O N D E N G I N E E R I N G
MEMORANDUM
TO: City of Fort Collins DATE: May 2, 2000
u
FROM: Robert W. Van Uffelen / NolteV PROJ #: FC0114 / Nolte
Andrew Golland / MBH Architects 19240 / MBH
SUBJECT: Response to City Comments 3/29/00
Poudre Fire Authority:
Required Access — A fire lane was noted on the previous submittal on the plat and horizontal
control plan. It was also labeled as an emergency access easement.
Address Numerals —Comment acknowledged.
Hazardous Materials —Comment acknowledged.
Water Supply — As noted at last submittal, a plan was forwarded to Ron Gonzales for review.
Ron indicated by voice -message that the existing hydrants were acceptable.
Sprinkler Requirements — Building is sprinklered.
n:\fc0114\documents\word\memo pfa 5-2-OO.doc
BEYOND ENG IN EERING
MEMORANDUM
TO: City of Fort Collins DATE: May 2, 2000
FROM: Robert W. Van Uffelen / Nolte V PROJ #: FC0114 / Nolte
Andrew Golland / MBH 0 19240 / MBH
SUBJECT: Response to City Comments 3/29/00
Water & Wastewater:
Provide a 20' easement... - Existing mains were within a blanket easement. Specific 20'
easement added as requested.
Maintain the required landscape... Landscape plans revised.
Maintain 10 feet separation... - Utility plan revised.
Provide an enlarged detail...- Utility plan revised.
Our records indicate... - Utility plan revised. Note of abandonment on plans previously with
removal of valve.
n:\fc0114\documents\word\memo water 3-29-OO.doc
MEMORANDUM
TO: City of Fort Collins
FROM: Robert W. Van Uffelen / Nolte`
Andrew Golland / MBH
SUBJECT: Response to City Comments 3/29/00
Engineering:
DATE:
BEY ON D E N G IN E E R ING
May 2, 2000
PROJ #: FC0114 / Nolte
19240 / MBH
Letters of intent...- As indicated by planning, letters will be provided prior to Public Hearing
with actual easements being completed by issuance of permits.
TIS...-It is assumed the TIS report previously submitted will be provided for your review. Eric
Bracke was contacted early in this design process and approved the location of the entrance
drives on JFK. Please contact Eric.
Plat Comments... - Addressed by separate memo.
Utility Plan General Notes... - Revisions made on Cover Sheet.