Loading...
HomeMy WebLinkAboutMONTAVA PHASES 1A AND 1B - PDR200003 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVE03/25 Descriptions 8:30 Montava Phases la & 1b PDR200003 Planner: Meaghan Overton Engineer: Marc Virata DRC: Tenae Beane Applicant Info: Max Moss (512) 507-5570 max@hf2m.com This is a request to develop Phases 1a & 1b of the Montava PUD Master Plan. Phase la is anticipated to include approximately 200 units in the southwest portion of the PUD Master Plan area (parcel # 8832000905), and Phase 1b would include the planned Farm (parcel # 8833000001). The project is roughly bound by Vine Dr on the south, Turnberry Rd on the west, the Budweiser brewery on the east and Richards Lake Rd on the north. The site for Phase 1a is within the Low Density Mixed Use (LMN) zone district and Transect T4 of the PUD Master Plan, and the site for Phase lb is within the Industrial (1) zone district and Transect T2 of the PUD Master Plan. The proposed project for Phase 1a is subject to a Basic Development Review, and the project for Phase 1b is subject to a Type 1 (Administrative) Review. Address: N/A Parcel #: 8832000905; 8833000001 Future access will be taken from Mountain Vista Drive to the south, and Richards Lake Road to the north. The site for Phase 1a is within the Low Density Mixed Use (LMN) zone district and Transect T4 of the PUD Master Plan, and the site for Phase lb is within the Industrial (1) zone district and Transect T2 of the PUS Master Plan. The proposed project for Phase 1a is subject to a Basic Development Review, and the project for Phase 1b is subject to a Type 1 (Administrative) Review. Current Use: Vacant/Farmhouse Proposed Use: Single-family, Two-family, and Multi -family dwelling/Agricultural Activities The project is roughly bound by Vine Dr on the south, Turnberry Rd on the west, the Budweiser brewery on the east and Richards Lake Rd on the north.