This is a request to develop Phases 1a & 1b of the Montava PUD Master Plan. Phase la is anticipated to
include approximately 200 units in the southwest portion of the PUD Master Plan area (parcel #
8832000905), and Phase 1b would include the planned Farm (parcel # 8833000001). The project is
roughly bound by Vine Dr on the south, Turnberry Rd on the west, the Budweiser brewery on the east
and Richards Lake Rd on the north. The site for Phase 1a is within the Low Density Mixed Use (LMN)
zone district and Transect T4 of the PUD Master Plan, and the site for Phase lb is within the Industrial (1)
zone district and Transect T2 of the PUD Master Plan. The proposed project for Phase 1a is subject to a
Basic Development Review, and the project for Phase 1b is subject to a Type 1 (Administrative) Review.
Address: N/A
Parcel #: 8832000905; 8833000001
Future access will be taken from Mountain Vista Drive to the south, and Richards Lake Road to the
north.
The site for Phase 1a is within the Low Density Mixed Use (LMN) zone district and Transect T4 of the
PUD Master Plan, and the site for Phase lb is within the Industrial (1) zone district and Transect T2 of the
PUS Master Plan.
The proposed project for Phase 1a is subject to a Basic Development Review, and the project for Phase
1b is subject to a Type 1 (Administrative) Review.
Current Use: Vacant/Farmhouse
Proposed Use: Single-family, Two-family, and Multi -family dwelling/Agricultural Activities
The project is roughly bound by Vine Dr on the south, Turnberry Rd on the west, the Budweiser brewery
on the east and Richards Lake Rd on the north.