Loading...
HomeMy WebLinkAboutMONTAVA PHASES 1A AND 1B - PDR200003 - SUBMITTAL DOCUMENTS - ROUND 1 - ODPPreliminary Design Review Agenda Schedule for 03/25/20 281 Conference Room A Applicant Info Wednesday, March 25, 2020 Time Project Name Project Description 8:30 Montava Phases 1a & 1b PDR200003 Max Moss (512) 507-5570 max@hf2m.com Planner: Meaghan Overton Engineer: Marc Virata DRC: Tenae Beane This is a request to develop Phases 1a & 1b of the Montava PUD Master Plan. Phase 1a is anticipated to include approximately 200 units in the southwest portion of the PUD Master Plan area (parcel # 8832000905), and Phase 1b would include the planned Farm (parcel # 8833000001). The project is roughly bound by Vine Dr on the south, Turnberry Rd on the west, the Budweiser brewery on the east and Richards Lake Rd on the north. The site for Phase 1a is within the Low Density Mixed Use (LMN) zone district and Transect T4 of the PUD Master Plan, and the site for Phase 1b is within the Industrial (I) zone district and Transect T2 of the PUD Master Plan. The proposed project for Phase 1a is subject to a Basic Development Review, and the project for Phase 1b is subject to a Type 1 (Administrative) Review.