HomeMy WebLinkAboutMONTAVA PHASES 1A AND 1B - PDR200003 - SUBMITTAL DOCUMENTS - ROUND 1 - ODPPreliminary Design Review Agenda
Schedule for 03/25/20
281 Conference Room A
Applicant Info
Wednesday, March 25, 2020
Time Project Name Project Description
8:30
Montava Phases
1a & 1b
PDR200003
Max Moss
(512) 507-5570
max@hf2m.com
Planner: Meaghan Overton
Engineer: Marc Virata
DRC: Tenae Beane
This is a request to develop Phases 1a & 1b of the Montava
PUD Master Plan. Phase 1a is anticipated to include
approximately 200 units in the southwest portion of the PUD
Master Plan area (parcel # 8832000905), and Phase 1b
would include the planned Farm (parcel # 8833000001). The
project is roughly bound by Vine Dr on the south, Turnberry
Rd on the west, the Budweiser brewery on the east and
Richards Lake Rd on the north. The site for Phase 1a is
within the Low Density Mixed Use (LMN) zone district and
Transect T4 of the PUD Master Plan, and the site for Phase
1b is within the Industrial (I) zone district and Transect T2 of
the PUD Master Plan. The proposed project for Phase 1a is
subject to a Basic Development Review, and the project for
Phase 1b is subject to a Type 1 (Administrative) Review.