February 14, 2020
Response Submitted on March 3, 2020
Greg Oakes
City of FC Park planning and Development
215 N Mason St - 3rd Floor
Fort Collins, CO 80524
RE: Trailhead Neighborhood Park, BDR200002, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Trailhead Neighborhood Park. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
your Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via
email at tbeane@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Spencer Smith, 970-221-6603, smsmith@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/07/2020
02/07/2020: FOR APPROVAL
There are multiple hatch types on the site plan that are not defined in a legend
or called out on the plans. Please define all different hatch patterns.
PP&D Response: Comment addressed
Comment Number: 2 Comment Originated: 02/07/2020
02/07/2020: FOR APPROVAL
It isn't clear what the double line bordering the crusher fine pathway is supposed
to be. Please indicate on the plans what it is proposed to be. PP&D Response: Comment addressed,
noted on plans that this is concrete edging
Comment Number: 3 Comment Originated: 02/07/2020
02/07/2020: FOR APPROVAL
Correct the legal description on the Utility Plan cover sheet to include Lot 1,
Block 9. JVA Response: The legal description on the Utility Plan cover sheet has been corrected to
include Lot 1, Block 9
Comment Number: 4 Comment Originated: 02/07/2020
2
02/07/2020: FOR APPROVAL
The demolition plan needs to show the limits of street cuts for the utility
installations within public right-of-way. Also, does the entire ramp and truncated
domes need to be removed as shown on Wagon Trail? If so, the proposed
plans need to show it being reinstalled. JVA Response: The demolition plan (Sheet C0.5) has been
updated to include the limits of street cuts for the utility installations within public right-of-way. The
demolition plan has also been updated to show leaving the existing ramp and truncated domes.
Comment Number: 5 Comment Originated: 02/07/2020
02/07/2020: FOR APPROVAL
Please show information, text, callouts, etc. when it is pertinent to that specific
plan sheet. For example, I think removing the raptor buffer hatching should not
be shown on the grading and drainage plan. Also, there are numerous utility
callouts that don't need to be on the grading and drainage plan. The horizontal
control plan should probably not have the utility or landscaping information
shown on it. In addition, please make sure that all text and callouts that are
shown on plans is dark enough/heavy enough pen width so that they are clearly
visible and legible. Also, try to locate text so that it is not overlapping other text
or linework that obstructs it (see redlines). JVA Response: Utility Plans have been cleaned up to not
show irrelevant information per sheet. Text has been relocated to prevent any overlapping linework
and text.
Comment Number: 6 Comment Originated: 02/07/2020
02/07/2020: FOR APPROVAL
I think that there need to be some additional contour labels and maybe
additional linework in the surrounding streets on the grading plan (see redlines). JVA Response:
Additional contour labels have been added to the grading plan (C1.0).
Comment Number: 7 Comment Originated: 02/07/2020
02/07/2020: FOR APPROVAL
The crusher fine path extends to the curb and gutter of Greenfields Drive on the
grading and drainage plan. Please revise per the site plan (tie in to back of ex.
walk). Also, the hatch type on the grading and drainage plan shows it as being
concrete. Please make sure your utility plans are consistent with the site plan
and show and call out all improvements consistently.
JVA Response: Utility plans have been updated to not include Landscape material hatching.
Comment Number: 8 Comment Originated: 02/07/2020
02/07/2020: FOR APPROVAL
Please make sure that your detail sheets show City standard details from
LCUASS for all public improvements (curb and gutter, sidewalk, ramps, etc.). JVA Response: Detail
sheets have been updated with LCUASS details for public improvements.
Comment Number: 9 Comment Originated: 02/07/2020
02/07/2020: FOR APPROVAL
Please be consistent with the project name. In some places it appears as one
word: "Trailhead" and others it is two: "Trail Head". The recorded plat and
plans for the subdivision show it as two words: "Trail Head".
JVA Response: The Cover Sheet has been updated to show “Trail Head” as two words.
Comment Number: 10 Comment Originated: 02/07/2020
02/07/2020: INFORMATION ONLY
Please see redlines for additional comments.
JVA Response: Noted
3
Comment Number: 11 Comment Originated: 02/12/2020
02/12/2020: If off-street parking areas are going to be proposed along any of
the surrounding local streets, it is likely that the City will need to have
appropriate public access or parking alignments dedicated by separate
instrument. Alignments are similar to easements and are processed/dedicated
through the City Real Estate Services department.
PP&D Response: We have discussed this with Kerri Allison from Real Estate and an alignment will
be implemented as the plat is closer to final completion.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/11/2020
02/11/2020: FOR FINAL
Greenfields Drive was recently restriped to include parking. Please show an
exhibit that includes this parking, including details (signs and markings) on
needed handicapped parking space(s).
JVA Response: Additional survey was conducted to include the new striping for parking. Parking
will be utilized in the restriped Greenfield Drive with added ADA parking area. All Utility Plan sheets
have been updated to show this information.
Comment Number: 2 Comment Originated: 02/11/2020
02/11/2020: FOR FINAL
The Landscape plans and civil plans seem to show different landscaping.
Please be cautious about trees in close proximity to intersections due to sight
distance. Especially Greenfields / Yule Trail (sheet 3.0 on Civil plans)
PP&D Response: Comment addressed. The plans have been coordinated and proposed trees have
been relocated or removed for site distances.
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 02/06/2020
02/06/2020: FOR FINAL APPROVAL
The site disturbs more than 10,000 sq. ft. and/or meets the criteria for a need
for Erosion and Sediment Control Materials to be submitted.
The erosion control requirements are located in the Stormwater Design Criteria
in Chapter 2 Section 6.0 a copy of the requirements can be found at
www.fcgov.com/erosion These Erosion Control Materials should be submitted
at about 80% final construction plans and should allow about a month lead time
to submit the materials get an adequate review of the materials, of note these
reviews can take one
or two iterations to ensure that the Erosion Control Materials on this project
meet the City Criteria. To prevent delays please plan accordingly as projects
are not allowed to go to construction until erosion control materials meet the City
Criteria.
FOR FINAL APPROVAL:
Please submit an Erosion Control Plans to meet City Criteria.
FOR FINAL APPROVAL:
Please submit an Erosion Control Report to meet City Criteria.
FOR INFORMATION ONLY:
4
Based upon the area of disturbance, State permits for stormwater will be
required since the site is over an acre and should be pulled before construction
activities begin.
FOR FINAL APPROVAL:
The SWMP Report seems to be using the 2011 standards please make sure to
follow the 2019 ESC standards as in the City's Stormwater criteria and include
all relevant sections. A Final Erosion Control Report will be needed prior to
approval of the BDR, which in this case will be equivalent to an FDP level
review. Please address all redlines on the submitted Erosion and Sediment
Control Plan. JVA Response: The SWMP Report has been updated to include all relevant
information. Redlines have been address. Final Drainage and Erosion Control Report has been
updated.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 02/10/2020
02/10/2020: Please provide a detailed grading plan documenting the grading
for the site and a complete Drainage Plan documenting sub-basins and
drainage paths. JVA Response: Detailed Grading sheets have been added (C1.1-1.4) to the Utility
Plans. A complete Drainage Plan documenting sub-basins and drainage paths has been included in
the DrainageReport.
Comment Number: 3 Comment Originated: 02/10/2020
02/10/2020: Please design the proposed rain garden into the site. Please
show the location and all appurtenances and connection into the storm sewer
system. JVA Response: Per our Drainage Plan we will not be providing a raingarden and LID
treatment will be provided through grass buffers and swales. Drainage Plans and Report have been
updated.
Comment Number: 4 Comment Originated: 02/10/2020
02/10/2020: Please document the assumed impervious area from the
approved Trailhead Drainage Report for the proposed park site area and show
that the proposed improvements are equal to or less than the originally
assumed impervious area. This should be documented in the text of the
proposed Drainage Report. JVA Response: The Drainage Report has been updated to include this
requested information.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/10/2020
02/10/2020: This site is not served by City of Fort Collins Utilities. JVA Response: Noted
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/06/2020
02/06/2020: There is currently no electrical service to the site. There is an
existing 4” conduit at the southern corner at the intersection of Roaring Creek
5
Drive and Yule Trail Drive that is capable to provide single phase power to the
site. There is also single-phase power on the western side of Wagon Trail
Road, but this would require crossing Wagon Trail Road to service the site. PP&D Response: Noted
Comment Number: 2 Comment Originated: 02/06/2020
02/06/2020: Transformer location will need to be coordinated with Light &
Power. Transformers must be placed within 10 ft of a drivable surface for
installation and maintenance purposes. The transformer must also have a front
clearance of 10 ft and side/rear clearance of 3 ft minimum. When located close
to a building, please provide required separation from building openings as
defined in Figures ESS4 - ESS7 within the Electric Service Standards. Please
show proposed transformer location on the Utility Plans. PP&D Response: After conducting a
conference call on 2/24 with the Electrical Engineer, Architect, COFC L&P, and PP&D the
transformer location and electrical line has been located. See Electrical Site Plan
Comment Number: 3 Comment Originated: 02/06/2020
02/06/2020: Electric meter locations will need to be coordinated with Light and
Power Engineering. Reference Section 8 of our Electric Service Standards for
electric metering standards. A link has been provided below. PP&D Response: Noted
https://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStanda
rds_FINAL_18November2016_Amendment.pdf
Comment Number: 4 Comment Originated: 02/06/2020
02/06/2020: Commercial service information form (C-1 form) and a one-line
diagram for all commercial meters will need to be completed and submitted to
Light & Power Engineering for review prior to Final Plan. A link to the C-1 form
is below: PP&D Response: Noted
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 5 Comment Originated: 02/06/2020
02/06/2020: Please contact Tyler Siegmund with Light & Power Engineering if
you have any questions at (970) 416-2772. Please reference our policies,
construction practices, development charge processes, electric services
standards, and fee estimator at PP&D Response: Noted
http://www.fcgov.com/utilities/business/builders-and-developers
Comment Number: 6 Comment Originated: 02/06/2020
02/06/2020: Please show proposed electrical route on the utility plans per the
redline provided by Light and Power Engineering.
JVA Response: Utility Plans have been updated to include the proposed electrical route.
Department: Environmental Planning
Contact: Kelly Smith, ksmith@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/31/2020
01/31/2020: Thank you for providing a photometric plan. It looks as though the
plan is calculating interior lighting as well as exterior. The photometric should
only be calculating exterior lighting. Please modify the plan to only calculate
exterior lighting to the extent of light impacts (to where foot candles are 0)
Comment Number: 2 Comment Originated: 01/31/2020
01/31/2020: Please ensure wall mounted light fixtures are down directional and
fully shielded. PP&D Response: Comment addressed
Comment Number: 3 Comment Originated: 01/31/2020
6
01/31/2020: Reminder: Prior to construction, a nesting survey will need to be
conducted by a qualified wildlife biologist or ecologist to determine whether the
raptor nest is still active. PP&D Response: Comment will be addressed prior to construction and
documented.
Comment Number: 4 Comment Originated: 01/31/2020
01/31/2020: Please remove the note on the landscape plans related to the
Natural Habitat Buffer Zone. There is no NHBZ on this project.
PP&D Response: Comment addressed and sheet BZ100 has been removed from the submittal per
email correspondence with Kelly on 3/1
Comment Number: 5 Comment Originated: 01/31/2020
01/31/2020: Please include the following note on the landscape plan:
"NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING
SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A
PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A
NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE
PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY
ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY
WILL COORDINATE WITH RELEVANT STATE AND FEDERAL
REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL
RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY."
PP&D Response: Comment addressed
Department: Forestry
Contact: Nils Saha, nsaha@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 02/10/2020
02/10/2020:
Please fix the auger distance chart under the Tree Protection Notes.
PP&D Response: Comment addressed
Comment Number: 2 Comment Originated: 02/10/2020
02/10/2020: Please fix the following on M100:
-The mitigation values for trees #60 and #61 are switched. The mitigation value
for tree #60 (3” catalpa in fair condition should be 1; mitigation for 3” dead
linden should be 0) PP&D Response: Comment addressed
-While mitigation trees are not required for ash trees under 8,” forestry still
requires that these trees are replaced 1 for 1. Please update the inventory table
to show “1 for 1 replacement” in the mitigation column for these trees. The
proposed plant list is adequate, and no additional trees are required. PP&D Response: Comment
addressed
Comment Number: 3 Comment Originated: 02/10/2020
02/10/2020: List the percentage of each tree species used and check for
compliance with the minimum species diversity standard LUC 3.2.1 D3.
Number of trees on site Maximum percentage of any one species
10-19 50%
20-39 33%
40-59 25%
60 or more 15%
PP&D Response: Comment addressed
The number of prairie sentinel hackberries proposed exceeds the maximum
7
percentage.
PP&D Response: Noted
Comment Number: 4 Comment Originated: 02/10/2020
02/10/2020:
Approximately 50 percent of all trees proposed should be canopy shade trees,
per LUC 3.2.1.
PP&D Response: Comment addressed
Comment Number: 5 Comment Originated: 02/10/2020
02/10/2020: Please provide an “Existing Tree Removal Feasibility Letter” for
City Forestry staff to review. Proposals to remove significant existing trees must
provide a justification letter detailing the reason for tree removal. This is
required for all development projects proposing significant tree removal
regardless of the scale of the project. The purpose of this letter is to provide a
document of record with the project’s approval and for the City to maintain a
record of all proposed significant tree removals and justifications. Existing
significant trees within the project’s Limits of Disturbance (LOD) and within
natural area buffer zones shall be preserved to the extent reasonably feasible.
Streets, buildings and lot layouts shall be designed to minimize the disturbance
to significant existing trees.
(Extent reasonably feasible shall mean that, under the circumstances,
reasonable efforts have been undertaken to comply with the regulation, that the
costs of compliance clearly outweigh the potential benefits to the public or would
unreasonably burden the proposed project, and reasonable steps have been
undertaken to minimize any potential harm or adverse impacts resulting from
noncompliance with the regulation.) Where it is not feasible to protect and retain
significant existing tree(s) or to transplant them to another on-site location, the
applicant shall replace such tree(s) according to City mitigation requirements.
PP&D Response: Comment addressed, and the letter was sent to Forestry on 2/16/2020
Comment Number: 6 Comment Originated: 02/11/2020
2/10/2020:
Please provide a detail for the activity decks. Forestry has some concerns
about building the decks around the trunks of two of the existing trees. It will be
worthwhile to take another look at the specific trees around which the decks are
proposed and determine how much pruning may be required to accommodate
the decks.
PP&D Response: Comment addressed. The Activity Decks have been removed from the project.
After laying out the “Pine Walk” in the field and doing a field review with Forestry staff on 2/27, the
walk was shifted 8’ total north of it’s current location to be completely outside all critical zones and
mostly outside or the tree canopies to avoid major pruning.
Comment Number: 7 Comment Originated: 02/11/2020
02/11/2020:
Please include the tree inventory and the Tree Protection Notes on the demo
plans.
JVA Response: The Demo Sheet (Sheet C0.5) has been updated to include the tree inventory and
Tree Protection Notes.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
8
Comment Number: 01 Comment Originated: 02/11/2020
02/11/2020: Poudre Fire Authority has no comment on this proposed site plan. PP&D Response: Noted
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 02/10/2020
02/10/2020: Each structure will require a building permit and review. PP&D Response: Noted
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 6 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines. PP&D Response: Comment addressed
Comment Number: 7 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
There are text over text issues. See redlines. PP&D Response: Comment addressed
Topic: Construction Drawings
Comment Number: 8 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
Please revise the legal description in the sub-title. See redlines. JVA Response: Noted
Comment Number: 9 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
Please revise the Benchmark Statement as marked. See redlines. JVA Response: Noted
Comment Number: 10 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines. JVA Response: Noted
Comment Number: 11 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines. JVA Response: Noted
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
Please revise the legal description as marked. See redlines. PP&D Response: Comment addressed
Comment Number: 5 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines. PP&D Response: Comment addressed
Topic: Site Plan
Comment Number: 1 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
Please revise the legal description as marked. See redlines. PP&D Response: Comment addressed
Comment Number: 2 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
9
There are line over text issues. See redlines. PP&D Response: Comment addressed
Comment Number: 3 Comment Originated: 02/12/2020
02/12/2020: FOR FINAL APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines. PP&D Response: Comment addressed
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/30/2020
01/30/2020: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
PP&D Response: Comment addressed
Contact: Randy Siddens, ELCO, 970-493-2044, randys@elcowater.org,
Topic: General
Comment Number: 2 Comment Originated: 02/11/2020
02/11/2020: See attached sheets for ELCO redlines. JVA Response: ELCO Redlines have been
addressed.
Department: Outside Agencies
Contact: Brian Zick, Boxelder, brianz@boxeldersanitation.org,
Topic: General
Comment Number: 3 Comment Originated: 02/12/2020
02/12/2020: Provide Boxelder Sanitation District Standard Notes and Details
on drawings. JVA Response: Utility Plans have been updated to include Boxelder Sanitation District
Standard Notes and Details.
Contact: Don Kapperman, Comcast, 970-567-0245,
Topic: General
Comment Number: 1 Comment Originated: 01/30/2020
01/30/2020: Comcast does not have any issues.
PP&D Response: Noted