March 05, 2020
Mike Mcbride
MMLA Landscape + Planning
2339 Spruce Creek Dr
Fort Collins, CO 80528
RE: The Odell Wine Project, FDP200001, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of The Odell Wine Project. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email
at tbeane@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Morgan Stroud, 970-416-4344, mstroud@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/28/2020
02/28/2020: Development Agreement - Updated:
Thank you for providing the information sheet back to me. Once all the other
departments have what they need to draft language for the Development
Agreement, I will be able to compile a draft for the City Attorneys Office to
review, and then to the applicant team to review.
01/28/2020: Development Agreement:
Please submit the information sheet for a Development Agreement to me or in
the next round of review. Once comments from all contributing departments
have been resolved I can put a draft together and have the City Attorneys office
review it. Once the City Attorney's review the draft, I will send it to the applicant
for review. After the draft is accepted by both parties, we can work through the
details for finalizing and getting the Development Agreement recorded at the
County.
Response: Noted.
2
Comment Number: 2 Comment Originated: 01/28/2020
02/28/2020: For Final Approval - Updated:
I have sent the redlined deeds of dedication to the City Attorney's office for
review, and technical services is finalizing the review of the legal documents. I
will update the applicant on when these steps are complete and next steps from
there.
01/28/2020: For Final Approval:
Please continue to work with Technical Services and me on finalizing the
easement documents for this project.
Response: Noted.
Comment Number: 4 Comment Originated: 01/28/2020
01/28/2020: Building Permit:
This project is proposing a fence in the Lincoln Ave right-of-way to match the
existing fence to the west. This will require an encroachment permit. Please
follow this link to find the documents that are required to obtain an
encroachment permit: https://www.fcgov.com/engineering/inspection.php
Response: Noted.
Comment Number: 5 Comment Originated: 01/28/2020
01/28/2020: Information Only:
This project will need to obtain an excavation permit to do the work that is
proposed in the right-of-way. Here is a link to that permit:
https://www.fcgov.com/engineering/inspection.php
Response: Noted.
Comment Number: 7 Comment Originated: 01/28/2020
01/28/2020: For Final Approval:
A temporary construction easement will be needed from the neighbor to the
north where the retaining wall and the fire lane will be crossing the property. This
is a private agreement, so we will just need to see the executed agreement.
Response: Noted.
Comment Number: 8 Comment Originated: 01/29/2020
02/28/20: For Final Approval - Updated:
Thank you for providing the note on the utility plan sheets. Please add the note
to the Site/Landscaping set as well. Preferably the cover sheet and overall site
plan sheet.
01/29/2020: For Final Approval:
Please add the following note to the following pages (Utility Plans -
C200,C300,C400,C401; Site/Landscape - L1, L2,):
"Private improvements shown within the rights-of-way are subject to approval of
an encroachment permit."
Response: Note has been added to sheets L1, L2 and L4.
Department: Water-Wastewater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/28/2020
03/02/2020: FOR BUILDING PERMIT:
Please review and execute the provided covenant agreement for 1 service line
connecting to two buildings. Feel free to contact me with any questions.
3
01/28/2020: FOR FINAL APPROVAL:
For this project, we will allow both buildings to be served from the existing water
and sewer service (the existing 'building' is being separated by the removal of
an enclosed walkway). This is an exception and not a precedence for what we
will permit elsewhere. The applicant will need to sign a covenant agreement
that states the property cannot be subdivided in manner that would place these
buildings on separate lots.
**Update: The covenant agreement form will be filled out by Utilities and sent to
the applicant at FDP round 2 for review. This will need to be signed by the
applicant and filed with the County. I have included the blank template of the
covenant agreement with the redlines. Please review and let us know if there
are any issues or objections. Any questions on this can be directed to Jill White
at UtilityFees@fcgov.com.
Comment Number: 4 Comment Originated: 03/03/2020
03/03/2020: FOR INFORMATION:
Thank you for providing the water service sizing memo and calculations. The
existing water service appears to be sufficient for the proposed uses.
Response: Executed covenant agreement will be provided.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 2 Comment Originated: 03/02/2020
03/02/2020: FOR FINAL APPROVAL
SECURITY GATES
Details of the security gate required. The installation of security gates across a
fire apparatus access road shall be approved by the fire chief. Where security
gates are installed, they shall have an approved means of emergency
operation. The security gates and the emergency operation shall be maintained
operational at all times (IFC 503.6).
> IFC D103.5: Gates securing fire apparatus access roads shall comply with all
of the following criteria:
1. The minimum gate width for vehicle access shall be 20 feet.
2. Gates shall be of the swinging or sliding type.
3. Construction of gates shall be of materials that allow manual operation by
one person.
4. Gate components shall be maintained in an operative condition at all times
and replaced or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices shall
be approved by the fire code official. Gates must have a Knox Gate Key Switch
that fits the Knox Key system for Poudre Fire Authority.
6. Gate design and locking device specifications shall be submitted for
approval by the fire code official prior to installation.
7. Electric gate operators, where provided, shall be listed in accordance with
UL 325 and have a means of emergency, manual operation during power
loss.
8. Gates intended for automatic operation shall be designed, constructed and
4
installed to comply with the requirements of ASTM F 2200.
Response: Vehicle Gate detail has been provided on Sheet L2. The gate will not be locked.
Comment Number: 3 Comment Originated: 03/02/2020
03/02/2020: INFORMATION ONLY
Add premise address to new monument sign, posted with a minimum of
eight-inch numerals on a contrasting background.
Response: Additional sign details will be provided in the sign permit.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 01/27/2020
03/04/2020: FOR FINAL APPROVAL-UPDATED:
There are sheet numbering issues. See redlines.
01/27/2020: FOR FINAL APPROVAL:
There are sheet numbering issues. See redlines.
Response: Redlines have been addressed.
Comment Number: 9 Comment Originated: 01/27/2020
03/04/2020: FOR FINAL APPROVAL-UPDATED:
There are line over text issues. See redlines.
01/27/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Response: Redlines have been addressed.
Comment Number: 10 Comment Originated: 03/04/2020
03/04/2020: FOR FINAL APPROVAL:
There are cut off text issues. See redlines.
Response: Redlines have been addressed.
Topic: Easements
Comment Number: 11 Comment Originated: 03/04/2020
03/04/2020: FOR FINAL APPROVAL:
There are some issues to be corrected. See redlines.
Response: Redlines have been addressed.