HomeMy WebLinkAboutCAMERA CORNER INC PUD PRELIMINARY AND FINAL - 34 92, A - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWDevelops it Services_
Planning Department
City of Fort Collins
March 5, 1992
Doug and Mary Donaldson
1110 W. Prospect Road
Fort Collins, Co 80526
Dear Mr. & Mrs. Donaldson:
For your information, attached is a copy of the Staff's comments concerning
Colorado Camera Repair presented before the Conceptual Review Team on March 2,
1992.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Kirsten Whetstone
Project Planner
KW/gjt
Attachment
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Transportation Department
._Project Planner
File
281 North College Avenue • P.O. Box W • Fort Collins, CO 80522-0580 • (303) 221-6710
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: March 2, 1992
ITEM: Colorado Camera Repair
APPLICANT: Doug and Mary Donaldson
1110 W. Prospect Road
Fort Collins, CO 80526
LAND USE DATA: .This is a proposal for a camera repair and retail
business in an existing residence located at 1110 W. Prospect Road
at the northwest corner of Prospect and Shields.
COMMENTS:
1. The property is zoned RL,.Low Density Residential. The
proposed use is not an allowable use in the zone and the
project would have to be reviewed as a Planned Unit
Development (PUD). 1.
2. Continue to work with Mark Sears from Engineering to stay
informed about the latest.design schemes for Prospect Road.
The widening project is still in the design stages, but it is
likely that about 18' of the south property and 12' of the
east side will be needed. Depending on future uses to the
south, there could one day be a median in Prospect at this
location.
3. Light and Power will coordinate the undergrounding of power to
your residence with the new street light project at the
intersection.
4. If you are increasing the amount of impervious surface on the
site with additional buildings or paved areas, you will need
to address how the additional storm run-off will be handled.
You will need to show a sketch of the area, drainage patterns,
and where and how storm water flows off the site. If you will
not be increasing the amount of paved area, please submit a
letter addressed to Susan Hayes at the Stormwater Utility,
stating this.
5. If you are required to provide more parking, because the
amount of activity generates the need for additional parking,
then the Stormwater development fee of $5590.00 per acre,
prorated for the amount of new paved area, will apply at the
time of building permit or certificate of occupancy.
6. A neighborhood meeting will be required. I will enclose some
information on neighborhood meetings. Staff can not stress
enough, how important it will be for you to work with the
neighborhood,_.• your neighbors and the Prospect Shields
Neighborhood Group, in particular.
i
7. It will be very important for you to give an accurate
description of your goals, objectives, and future expansion
ideas at the time of the neighborhood meeting and with your
project submittal.
8. Please include a description of your expansion goals, number
of employees you. envision in the future, and the square
footage of your proposed retail area. Your PUD should include
realistic expansion goals about the number of employees and
scale of the business.
9. A traffic study will be required as part of the PUD submittal.
Contact Rita Davis at Transportation for further information
about what the traffic report should entail. It will likely
depend on the level of activity that you envision on the site,.
The traffic study should address the amount of parking that
your business will require.
10. The PUD .will be reviewed against the Business Service Uses
Point Chart of the Land Development Guidance System. I will
include a copy of that chart for your information. If you are
not able to make the 50% level, Staff would either recommend
denial of the project to the Planning and Zoning Board, or you
could request and substantiate a variance. Variance have been
granted in the past. You will be required to address some of
the Energy Conservation Points,'if you fall short of the 50%
without them.
11. A water meter will be required to be installed if the
residence is converted to a business.
12. I will enclose some additional information about submittal
requirements. If you have questions about this, please do not
hesitate to give me a call.