May 14, 1992
John Giuliano
Giuliano & Father Construction
1708 E. Lincoln
Fort Collins, CO 80524
Dear John:
For your information, attached is a copy of the Staff's comments concerning Hill
Pond, East of Sundering, South of Spring Creek, presented before the Conceptual
Review Team on May 11, 1992.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Ted Shepard
Senior Planner
TS/gjt
Attachment
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Transportation Department
Project Planner
File
28"1 :Forth College Avenue • P.O. Box ';80 • Fort Collins, CO 80322-0;50 • (303) 22I-h73l)
CONCEPTUAL
REVIEW
STAFF
COMMENTS
MEETING DATE: May
11, 1992
ITEM: Hill Pond, East of Sundering, South of Spring Creek
APPLICANT: John Giuliano, Giuliano and Father Construction, 1708
East Lincoln, Fort Collins, CO. 80524
LAND USE DATA: Request for 114 single family lots on 35 acres.
Lot sizes are approximately 65' x 110' and sized for detached
homes. Approximately.76% of the lots are within the standards
required for solar orientation. Site is east of Sundering
Townhomes and south of Spring Creek. Spring Creek Trail is
adjacent on the east and north.
COMMENTS:
1. Electrical power is available from a vault in Hill Pond Road
on the west. This power can be extended from west to east as
each phase of development occurs. If development is not
phased from west to east, there may be problems in providing
electrical power. .Normal development charges will apply.
2. Water is available from the west. Sewer is available on the
east. There is a sewer line on the northwest but there may be
a capacity problem and this line may not be available. The
preferred sewer is the line on the east.
3. The Poudre Fire Authority is concerned about providing the
required second point of access. Until the property to the
east and south (C.S.U.R.F.) develops; there may a limit as to
how many homes can be served by a single point of access.
Please consult with Warren Jones, Poudre Fire Authority, 221-
6570, to discuss the options available based on the short term
condition of a single point of access.
4. The standard hydrant spacing will be required as will minimum
water flow requirements, and standard street widths in order
to meet the Fire Code.
5. Future local street access to the east, to Centre Avenue, will
provide good internal access to Prospect Road and Drake Road
without impacting Shields Street.
6. For your information, if the connection is made through the.
C.S.U.R.F. property to the intersection of Shields and Rolland
Moore Park access drive, then the Shields/Shire Court
intersection may be closed off. This closure is part of the
development agreement with Sundering Townhomes.
7. A temporary turn -around for emergency equipment may, be
required before a building permit could be issued on Lot 108.
8. A standard utility plan and development agreement will be
required.
9. The Street Oversizing Fee for single family homes is $584 per
dwelling unit, payable at the time of building permit
issuance.
10. A traffic impact analysis will be required. The traffic
consultant should check with the Transportation Department to
get accurate data on background traffic volume. The study
should assess the traffic impact of the proposed development
on the intersections with Shields Street. The future
connection to the Shields/Rolland Moore intersection, through
C.S.U.R.F. property, is a critical element that will help
alleviate uncontrolled intersections on Shields. Street.
Improvements identified to mitigate the impacts of the project
may be required to be designed and constructed.
11. Please be aware that C.S.U.R.F. is planning on constructing a
bicycle/pedestrian path east of the site. This path will
approximate the future alignment of Centre Avenue and is
designed to provide convenient, safe, non -vehicular access to
the C.S.U. campus. It is hoped that this path will attract
non -vehicular trips from Collins West and Cimarron Square
Apartments. This link to campus could be an asset to the
proposed project. Please coordinate with C.S.U.R.F. on
gaining access to this path.
12. The connection to the C.S.U.R.F. path should be a separate
bicycle/pedestrian path, and not share pavement with the
proposed local street that will tie into future Centre Avenue.
13. The site is located in the Spring Creek Drainage Basin. The
Drainage Fees in this basin are $1,691 per developed acre.
Since the site is so close to Spring Creek, there will be no
onsite stormwater detention required.
14. As per discussions with Stormwater Utility, there may be a
need for a storm sewer system to convey flows north to the
creek.
15. Lots on the north may presently be located within either the
100-year floodway or floodplain according to the maps of the.
Federal Emergency Management Agency. If this is the case,
then homes on these lots may need to be elevated and
floodproofed in order to be eligible for insurance. There is
a possibility that this delineated area of floodway and
floodplain may be modified and the maps adjusted based on
upstream improvements. Until the official F.E.M.A. maps are
amended, the City of Fort Collins must abide by the strict
elevation and floodproofing requirements. Please consult with
r
Glen Schlueter, Stormwater Utility, 221-6589, for complete
details on this issue.
16. The berm along the'north property line is considered a levy by
F.E.M.A. As such, there are certain federal rules and
regulations that must be observed before there can be any
modification. Again, please consult with Glen Schlueter for
details on the federal requirements.
17. There may a requirement that the storm sewer system may have
to be sized to accept flows from Sundering Townhomes.
18. Parks and Recreation would like to have an access to the trail
for maintenance purposes. A good location for this would be
in the area of Lot 108. The access should be 20 feet wide.
For more detail on this request, please refer to Craig
Foreman, Parks and Recreation Department, 221-6640.
.19. The Parks and Recreation Department has legal descriptions for
the trail where it goes to the east. This may be helpful as
you plan the local street connection to Centre Avenue and the
trail connection.
20. The Parkland Development Fee is $625 per unit, payable at the
time of building permit issuance.
21. Please consult with John McCoy, property owner to the
northwest, regarding access.
22. The subdivision seems to turn its back on the major land form
(Spring Creek) and the primary amenity (Spring Creek Trail).
These two features combine to make this an unusual setting
unique in Fort.Collins. The plan could benefit from opening
up the layout to allow for view and access so all future
residents of the project can enjoy the unique features of the
area. The continuous row of rear yards and fences along the
Spring Creek corridor appears unimaginative and repetitious.
It is suggested that this northern area be reconfigured and
that curving the local streets be considered as an alternative
to the straight, 1,200 feet long street section.
23. Please keep in mind that the Spring Creek Trail provides
offstreet access to Rolland Moore Park, Spring Creek Park,
Edora Park, and Epic Center. Similarly, the C.S.U.R.F. bike
path has the potential of creating a commuter trip to the
heart of the C.S.U. campus shorter in duration than a
vehicular trip, if one includes parking and the time,it takes
to get from the car to the building. The plan should strive
to take advantage of these characteristics.
24. Please note the three following policies in the City of Fort
Collins Land Use Policies Plan:
Policy #91: "The City should protect the scenic and
recreational value of the City's lakes, rivers and streams
from encroachment by incompatible uses."
Policy #92: "Adequate public access to the City's lakes,
rivers, and streams should be maintained."
Policy #49: "The Cities Land Use Policies Plan shall be
directed toward minimizing the use of private automobiles and
toward alleviating and mitigating the air quality impacts of
concentrated use of automobiles."
The subdivision will be reviewed and evaluated for how these
policies are implemented. Conceptually, the plan does not
demonstrate sensitivity to or take advantage of the Spring
Creek and the Spring Creek Trail.
25. If the preliminary plat does not include adjoining property in
the same ownership, a development plat shall also be required
which shall show the entire adjoining property owned by the
developer and shall designate proposed land use, suggested
street layout, major land forms and natural drainage courses.
Twenty copies of such development plan shall be provided. The
scale for such development plan shall be the same as that
required for a preliminary plat.
26. The Department of Natural Resources would like to coordinate
an onsite visit with the wetland consultant and the
representative of the Army Corps of Engineers. Please
coordinate with Rob Wilkinson, 221-6600, for the exact date
and time.
27. A neighborhood information meeting will be required.