Loading...
HomeMy WebLinkAboutHILL POND EAST SUBDIVISION PRELIMINARY - 35 92 - CORRESPONDENCE - DRAINAGE REPORTSiEWART9,06SOCIATES Consulting Engineers and Surveyors June 29, 1992 Mr. G1en.,Schlueter Storm Drainage Utility P.O. Box 580 Fort Collins, Colorado 80522 Dear Glen: RE: Hill Pond East Preliminary Drainage Report -Ttf l _ F �Z In order to comply with some of the City's planning concerns, we are currently revising the original preliminary street design by moving the north street to abut against the existing bike trail. This requires us to reconfigure the whole site. We are hoping to have the redesign completed today. Because of the redesign, we will not have the revised preliminary drainage report completed today, June 29, 1992, as we originally indicated. The revised subdivision will be designed to handle offsite flows from Hill Pond and Thundering Townhomes from the west and historic flows from the property to the south. All drainage will still be to Spring Creek. The 100—year existing flood plain will be shown on the preliminary layout. The existing wetlands on the west side of the property will remain and may be used as a detention area from offsite flows. If you have any questions regarding this site or need more information, please let me know. Sincerely, Franklin D. Blake, P.E. & L.S. Secretary/Treasurer jrr James H. Stewart and Associates, Inc. 214 N. Howes Street P0. Box 429 Ft. Collins, CO80522 303/482-9331