Loading...
HomeMy WebLinkAboutSTRAUSS CABIN CHURCH - BDR200003 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDRAINAGE LETTER STRAUSS CABIN CHURCH SUBDIVISION FORT COLLINS, CO 1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com February 25, 2020 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE.: STRAUSS CABIN CHURCH SUBDIVISION FORT COLLINS, COLORADO PROJECT NUMBER: U19035 Dear Staff, United Civil Design Group, LLC. is pleased to submit this Drainage Letter for the Strauss Cabin Church Subdivision site in Fort Collins, Colorado. In general, this summary serves to document the stormwater impacts associated with the proposed site improvements. SITE LOCATION AND PROJECT DESCRIPTION The Strauss Cabin Church Subdivision site (referred herein as ”the site”) is situated in the Southwest Quarter of Section 3, Township 6 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, Larimer County, State of Colorado. More specifically, the site is located immediately east of Strauss Cabin Road, just north of the intersection with Big Dipper Drive and just south of the intersection with Rock Creek Drive. The planned development for the site will consist of the following:  The construction of a 225 sf addition to the existing building.  The construction of a fire hydrant and new water service on the site.  The construction of sidewalk in front of the building addition, replacing existing asphalt parking area. HYDROLOGIC CRITERIA City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, provided by Figure RA-16 of the Fort Collins Stormwater Criteria Manual, are utilized for all hydrologic computations related to the site in its existing/historic and proposed conditions. Since this site is relatively small and does not have complex drainage basins, the peak flow rates for design points have been calculated based on the Rational Method as described in the Urban Storm Drainage Criteria Manual (USDCM) and the City of Fort Collins Stormwater Criteria Manual (FCSCM) with storm duration set equal to the time of concentration for each sub- basin. This method was used to analyze the developed runoff from the 2-year (minor) and the 100-year (major) storm events. The Rational Method is widely accepted for drainage design involving small drainage areas (less than 160 acres) and short time of concentrations. Runoff coefficients are assumed based on impervious area and are given in the Appendices. EXISTING CONDITIONS Hydrology The site, located within the McClellands Drainage Basin, is approximately 1.82 acres and currently consists of two buildings housing the Mountain Life Church, a paved parking lot, associated utilities, and drainage infrastructure. The existing site is divided into two basins in existing drainage patterns, generally delineated as the parking lot on the west side of the building and the remainder of the site including the building, eastern parking area, and landscaped areas. The eastern basin currently drains via overland flow to the Fossil Creek Inlet Canal immediately east of the site. The western basin drains to a roadside ditch along the east side of Strauss Cabin Road. This roadside ditch appears to drain south along Strauss Cabin Road and ultimately to the Fossil Creek Inlet Canal. Floodplain The site is not located within a FEMA or City-regulatory floodway or floodplain. DRAINAGE LETTER STRAUSS CABIN CHURCH SUBDIVISION FORT COLLINS, CO 1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com IMPROVED CONDITIONS The proposed site improvements include a new fire hydrant on site, reconfigured sidewalk, a building expansion of approximately 225 feet and an addition of a second floor to an existing building. Nearly all the proposed improvements involve the removal and replacement of existing impervious surfaces, resulting in an increase of impervious area of 245 square-feet on site. The table below summarizes the hydrologic impact associated with the proposed site improvements relative to existing conditions. Refer to the Drainage Plan and Hydrology calculations attached for additional improvements. HYDROLOGIC SUMMARY TABLE Existing Proposed Overall Area (acre) 1.82 1.82 *Roof (sf) 4,062 4,479 *Asphalt (sf) 26,676 26,340 *Concrete (sf) 7,487 7,494 *Gravel (sf) 275 275 *Landscape (sf) 40,901 40,813 % Imperviousness 47.9% 47.9% Composite C2 0.59 0.59 Composite C100 0.73 0.74 Q2 (cfs) 3.05 3.06 Q100 (cfs) 12.72 12.75 Runoff flows for the improved condition remain largely unchanged from existing conditions. Drainage patterns are unchanged with the roof, eastern parking lot, and landscape areas draining east to the Fossil Creek Inlet Canal and the western parking lot draining to the roadside ditch on the east side of Strauss Cabin Road. DETENTION & WATER QUALITY The total site increase of impervious area is 245 square feet. This area includes the proposed building addition and reconfigured sidewalks. Due to the minimal impacts related to the site’s overall increase in imperviousness (i.e. less than 1,000 sf), the site improvements are exempt of detention and water quality requirements per City of Fort Collins criteria. LOW IMPACT DEVELOPMENT (LID) In February 2013, City Council adopted the LID policy and criteria. Due to the minimal impacts related to the site’s overall increase in imperviousness (i.e. less than 1,000 sf), the site improvements are exempt of LID requirements per City of Fort Collins criteria. EROSION CONTROL Erosion control, both temporary and permanent, is a vital part of any development project. For this project, the site disturbance is less than 1 acre; therefore, a CDPHE Stormwater Management Plan (SWMP) is not required. However, comprehensive erosion control measures are included with the site improvements. Refer to the Utility Plans for additional information. CONCLUSIONS The drainage system proposed within this Drainage Letter provides adequate conveyance of the developed stormwater runoff from the proposed improvements to existing drainageways adjacent to the site. A minor increase in the overall imperviousness is proposed with the site improvements; however, existing drainage patterns are unchanged and the added impervious area is less than 1,000 square feet, meaning the project is exempt from City of Fort Collins detention, water quality, or LID requirements per City criteria. DRAINAGE LETTER STRAUSS CABIN CHURCH SUBDIVISION FORT COLLINS, CO 1501 ACADEMY CT. STE 203 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com We understand that review by the City of Fort Collins to assure general compliance with standardized criteria contained in the Fort Collins Stormwater Criteria Manual (FCSCM). This summary was prepared in compliance with technical criteria set forth in both the Urban Drainage and Flood control District (UDFCD) Urban Storm Drainage Criteria Manual and the FCSCM. If you should have any questions or comments as you review this drainage summary, please feel free to contact us at your convenience. Sincerely, United Civil Design Group, LLC Kevin Brazelton, P.E. Principal APPENDICES APPENDIX A – Hydrologic Calculations APPENDIX B – Drainage Exhibits APPENDIX A HYDROLOGIC CALCULATIONS RUNOFF COEFFICIENTS AND % IMPERVIOUS Strauss Cabin Church Subdivision, Fort Collins, CO Basin Design Pt. Composite NRCS Soil Total Total Roof (1) Asphalt Concrete (1) Gravel (1) Lawns (1) Imperviousness Type C 2 C 100 %I = 90% %I = 100% %I = 90% %I =40% %I=2% (%I) acres sf sf sf sf sf sf EX-WEST EX-WEST 0.54 23,598 1,481 18,462 1,641 - 2,014 90.3% C/D 0.89 1.00 EX-EAST EX-EAST 1.28 55,803 2,581 8,215 5,846 275 38,887 29.9% B 0.46 0.57 - - - - - 1.82 79,401 4,062 26,676 7,487 275 40,901 47.9% 0.59 0.73 Basin Design Pt. Composite NRCS Soil Total Total Roof (1) Asphalt Concrete (1) Gravel Lawns (1) Imperviousness Type C2 C100 acres sf %I = 90% %I = 100% %I = 90% %I =40% %I=2% (%I) sf sf sf sf sf PR-WEST PR-WEST 0.54 23,598 1,550 18,335 1,632 - 2,081 90.0% C/D 0.89 1.00 PR-EAST PR-EAST 1.28 55,803 2,929 8,006 5,862 275 38,733 30.1% B 0.46 0.58 - 0.00 - - - - 1.82 79,401 4,479 26,340 7,494 275 40,813 47.9% 0.59 0.74 Notes: (1) Recommended % Imperviousness Values per USDCM Volume 1, Table 6-3. (2) Runoff C is based on %I and NRCS soil group per UDFCD Volume 1, Table 6-4. Proposed Total Composite Runoff Coefficients Areas (2) Existing Basins Proposed Basins Existing Total Areas Composite Runoff Coefficients (2) Date: 2/17/2020 P:\U19035 - Strauss Cabin Church\Reports\Drainage\Calculations\U19035-Drain Calcs Updated 2-YEAR TIME OF CONCENTRATION Strauss Cabin Church Subdivision, Fort Collins, CO Basin Design Pt. Area C(1) Length Slope ti (2) Length Slope Cv Velocity (3) tt (4) Check tc? Total Length tc (5) acres ft % min ft % fps min min Urban? ft min min EX-WEST EX-WEST 0.54 0.89 105 3.5% 2.6 15 1.0% 20 2.0 0.1 2.7 Yes 120 11 5.0 EX-EAST EX-EAST 1.28 0.46 70 10.0% 4.5 0 20.0% 10 4.5 0.0 4.5 Yes 70 10 5.0 Basin Design Pt. Area C(1) Length Slope ti (2) Length Slope Cv Velocity (3) tt (4) Check tc? Total Length tc (5) acres ft % min ft % fps min min Urban? ft min min PR-WEST PR-WEST 0.54 0.89 105 3.5% 2.6 15 1.0% 20 2.0 0.1 2.7 Yes 120 11 5.0 PR-EAST PR-EAST 1.28 0.46 70 10.0% 4.5 0 20.0% 10 4.5 0.0 4.5 Yes 70 10 5.0 Notes: (1) C=Cx*Cf (2)ti = [1.87(1.1-CxCf)L1/2]/S1/3, S= slope in %, L=length of overland flow (300' max) (3)V=CvS0.5, S=watercourse slope in ft/ft, UDFCD Equation RO-4 (4)tt=L/(V*60 sec/min) (5)tc check (for urban or developed areas only) = total length/180 + 10 (6)min tc = 5 min Existing Basins Travel/Channelized Time of Flow (tt) ti+tt tc Check for Urbanized Basins Final tc (6) Proposed Basins Travel/Channelized Time of Flow (tt) ti+tt tc Check for Urbanized Basins Final tc (6) Date: 2/17/2020 P:\U19035 - Strauss Cabin Church\Reports\Drainage\Calculations\U19035-Drain Calcs Updated 100-YEAR TIME OF CONCENTRATION Strauss Cabin Church Subdivision, Fort Collins, CO Basin Design Pt. Area C(1) Length Slope ti (2) Length Slope Cv Velocity (3) tt (4) Check tc? Total Length tc (5) acres ft % min ft % fps min min Urban? ft min min EX-WEST EX-WEST 0.54 1.00 105 3.5% 1.2 15 1.0% 20 2.0 0.1 1.3 Yes 120 11 5.0 EX-EAST EX-EAST 1.28 0.57 70 10.0% 3.7 0 20.0% 10 4.5 0.0 3.7 Yes 70 10 5.0 Basin Design Pt. Area C(1) Length Slope ti (2) Length Slope Cv Velocity (3) tt (4) Check tc? Total Length tc (5) acres ft % min ft % fps min min Urban? ft min min PR-WEST PR-WEST 0.54 1.00 107 3.5% 1.2 15 1.0% 20 2.0 0.1 1.4 Yes 122 11 5.0 PR-EAST PR-EAST 1.28 0.58 70 10.0% 3.7 0 20.0% 10 4.5 0.0 3.7 Yes 70 10 5.0 Notes: (1) C=Cx*Cf (2)ti = [1.87(1.1-CxCf)L1/2]/S1/3, S= slope in %, L=length of overland flow (300' max) (3)V=CvS0.5, S=watercourse slope in ft/ft, UDFCD Equation RO-4 (4)tt=L/(V*60 sec/min) (5)tc check (for urban or developed areas only) = total length/180 + 10 (6)min tc = 5 min Existing Basins Travel/Channelized Time of Flow (tt) ti+tt tc Check for Urbanized Basins Final tc (6) Proposed Basins Travel/Channelized Time of Flow (tt) ti+tt tc Check for Urbanized Basins Final tc (6) Date: 2/17/2020 P:\U19035 - Strauss Cabin Church\Reports\Drainage\Calculations\U19035-Drain Calcs Updated RATIONAL METHOD PEAK RUNOFF Strauss Cabin Church Subdivision, Fort Collins, CO Basin Design Pt. Area 2-Year 100-Year acre tc tc C2 C100 I2 I100 Q2 Q100 min min in/hr in/hr cfs cfs EX-WEST EX-WEST 0.54 5 5 0.89 1.00 2.85 9.95 1.37 5.39 EX-EAST EX-EAST 1.28 5 5 0.46 0.57 2.85 9.95 1.68 7.33 3.05 12.72 Basin Design Pt. Area 2-Year 100-Year acre tc tc C2 C100 I2 I100 Q2 Q100 min min in/hr in/hr cfs cfs PR-WEST PR-WEST 0.54 5 5 0.89 1.00 2.85 9.95 1.37 5.39 PR-EAST PR-EAST 1.28 5 5 0.46 0.58 2.85 9.95 1.69 7.36 3.06 12.75 Existing Basins Totals Totals Peak Discharge Proposed Basins Runoff Coefficients Rainfall Intensity Peak Discharge RunoffIntensity Coefficients Rainfall Date: 2/17/2020 P:\U19035 - Strauss Cabin Church\Reports\Drainage\Calculations\U19035-Drain Calcs Updated APPENDIX B DRAINAGE EXHIBITS STRAUSS CABIN ROAD LIMITS OF DISTURBANCE FFE=4894.00 LIMITS OF DISTURBANCE EAST 1.28 0.46 0.58 WEST 0.54 0.89 1.00 3.7% 5.7% 4.5% 3.0% 2.0% 1.2% 3.5% 10.1% 5.7% 7.7% 1.4% 6.5% 25.1% 12.0% 2.3% 3.2% 32.2% 33.3% 34.3% 31.3% 22.4% 15.8% 12.5% 22.9% 5.4% 2.5% 45.0% 37.5% 4.3% 1.5% EXISTING DRAINAGE SWALE FOSSIL CREEK INLET CANAL FOSSIL CREEK CONCEPTS, LLC 02/25/2020 U19035 1" = 30' 1" = N/A STRAUSS CABIN CHURCH SUBDIVISION NORTH 2/17/2020 10:29:52 AM P:\U19035 - STRAUSS CABIN CHURCH\CADD\ET\DRAINAGE PLAN.DWG DRAINAGE PLAN KRB JRS 1 1 DRAINAGE PLAN 0 30' 60' SCALE: 1" = 30' 15' 1 LOT LINE PROPERTY BOUNDARY RIGHT OF WAY EASEMENT CENTERLINE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR LIMITS OF DISTURBANCE LEGEND EXISTING CURB & GUTTER ASPHALT PAVEMENT CONCRETE PAVEMENT OR SIDEWALK SITE NOTES 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, SIDEWALKS, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR GRADING X.XX XX.X X.XX X BASIN DESIGNATION BASIN AREA (ACRE) 5 - YR RUNOFF COEFF. 100 - YR RUNOFF COEFF. FLOW DIRECTION DP DESIGN POINT D1 PREPARED FOR: JOB NUMBER SHEET NUMBER OF SHEETS DATE SUBMITTED: The engineer preparing these plans will not be responsible for, or liable for, unauthorized changes to or uses of these plans. All changes to the plans must be in writing and must be approved by the preparer of these plans. NO. BY DATE CAUTION REVISIONS: VERTICAL: HORIZONTAL: SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 1501 Academy Ct. Ste. 203 Fort Collins, CO 80524 (970) 530-4044 www.unitedcivil.com Civil Engineering & Consulting PROJ. MGR: DRAWING NAME: PATH: DATE: TIME: DESIGNER: UNITED CIVIL Design Group LLC