Loading...
HomeMy WebLinkAboutSTRAUSS CABIN CHURCH - BDR200003 - SUBMITTAL DOCUMENTS - ROUND 1 - DESIGN NARRATIVEDesign Narrative Strauss Cabin Church Renovation and Addition to Existing Building – Basic Development Review and Subdivision Plat February 25, 2020 This application is a request to build a small addition to the existing counseling services located at the place of worship located at 5236 Strauss Cabin Road (parcel #8603000913). There are two existing structures, a two-story building with a one-story building immediately to its south. The proposed addition would connect the two buildings and add a second story to the south building to better accommodate and expand the existing counseling services provided. Planned changes to the existing site are limited to those areas immediately adjacent to the planned expansion to accommodate the reconfigured building entrance. Use and Anticipated Traffic Impacts Prior to the owner’s purchase of the church property at 5236 Strauss Cabin Road, Mountain Life Church owned the property. They had approximately 150-170 people attend at each of two church services (maxing out the sanctuary) on Sunday mornings. They sold the property to the current owner in 2017, because they'd outgrown the location. They have now merged with the church at Drake & Lemay, with a new name for both congregations - Clearwater Church. The site's current use is for smaller church gatherings that occur on the weekend, primarily on Sunday. There are 3 relatively newly formed church congregations renting the space, and they currently have a range of 10-50 people at each. The other current use is Light of the Rockies, which is a Christian counseling office. We currently have 8 counseling offices, and most counselors stay for 7-10 hours in their office, 3-4 days per week (primarily Monday through Thursday). In the 8 counseling offices, counselors are typically seeing one person at a time. Most counseling sessions last 1 hour, but in some instances (trauma work) the counselors see the client for a 2-hour session. If the offices were filled every hour, it would typically mean one client vehicle per office. We estimate approximately 20% of the client sessions might have 2 vehicles (for couple's counseling, etc. - where the clients are coming from different locations). The clients also tend to stop by the front desk to check in or out, and so the clients tend to dribble in and out the door slowly. They take turns at the front desk - either before or after their sessions, meaning that their arrival and departure from the site is somewhat staggered in time. Our office manager said that the peak hours for volume of clients usually happens between 11am -3pm. Additionally, we typically have 2-3 office staff at the counseling center, each one of whom stays for around 6-8hrs. The current facility is 6,648 square feet (~2500 square feet for the church sanctuary, ~2500 square feet for the counseling offices, and ~1000 square feet for an auxiliary building). We are planning to build an addition with 1,662 square feet, that would allow for 4 more counseling offices to be created, and subsequently 4 more counseling sessions to happen at each hour. In summary, the expansion may generate up to an additional 4 vehicles per hour, even if every hour was full in the new proposed counseling offices. We don't expect a large impact on the road and the local vehicular traffic. This information was provided to the City’s Traffic Engineering Department following our Conceptual Review meeting. Given that the current use (counseling and small church services) is typically lower than what was previously being seen (large church services), and the proposed expansion is nominal, further traffic review/study has been waived for this Basic Development Review application. Public Improvements Subsequent to our Conceptual Review meeting, we also met with the Engineering Department. Since the current building change is quite small, they have requested dedication of right-of-way along Strauss Cabin Road with this application, but no roadway improvements or subsequent reconfiguration of the existing site and parking are being required at this time. A Subdivision Plat has been included with the BDR submittal to accommodate dedication of the planned road right-of-way. A development agreement is anticipated outlining the triggers for future roadway and site improvements. Existing Zoning – Urban Estate (UE) Conceptual Review meeting date – July 25, 2019 Property Owners: Fossil Creek Concepts, LLC c/o Rob and Chris Bassett