HomeMy WebLinkAbout424 WEST OAK PUD FINAL - 40 92B - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFinal Drainage & Erosion Control Report for Fort Collins, Colorado Prepared for: RICHMOND ASSOCIATES 420 West Oak Street Fort Collins, CO 80521 Prepared by: SHEAR ENGINEERING CORPORATION Project No. 1227-01-92 Date: November, 1992 4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334 F , V DATE '�ieVeaB� C.oN%��,erlS — G'—ffL��o,i lr�z3�SZ IZ2-7-G�-50 2«v�ovs AYE 3 R000 - 13 3S 1 t Z� 1 S�4 Z`d6 Y `63 6 a — 4cw — 4�0 }2�� G' 8 s 5o r�etivc\\e 7� 10 11 4 Ph�ti.,, al- �xtcss �,r,uc w Gc1'c� �lacl 12 44Y44) Zovc,) S'dx1 % - 334� s� = 6,o�6S 6,G9 13 ,a 15 1s \ A) M fv 0 D S IIZ 9b6Z� 0.5�4�oLi = ZZ154Sf:oSoS ss a_sl, � Grtive,\�e� = G.5�3 = 65�4�00) - 2)7) s ? a•6�53 s." b,o ac Gl Che�k� 131 `k = 0, o 17 (A49 C,) _=.c0.5i o.o5 a.u� - IS L 18 19 20 Chc�ke� 03iock — C - 7tic.�'or — l sf = 6.Z-7 s� pvu,a�s (Lsw�) 0: 73 s� ►n, crr���s 21 0.7 3 0 .�.� + G,z� a,z _ '1 7 s�, 6.175 22 110 23 1h0 NO TS GOtlT 1CN� L 24 25 C G,tiS� 51 G,b(O•os + o,ZC13b� 4 6Jis ,og 2 L 26 arcacfive� 28 , CN lT.l V MKS IvC.10.r,�0� 71OU j1} �SSOGI +�i)l.% Pf1EPA(IED BY r�)�11, 2 — 1me.. o� Go,N�,ea�►r�� \e,�\ I e, _ � t, � � t a 5 § pox,. NE. CC12_ o� S�« uoud 94 in1 t O L.L ' Oak �_ 6 6 9 - 10 Elev },�� se`� o.J o� sip r o�� � 1.a. C►�ic = bOUZ. 11 112ci Z. 3 S)New U30 15 16 b '. 1 --p 3 = 'Z4b� Ig3 = 4 3 = L 17 3 ? L = ZOS 18 I2Z t9 SOOZ. — SooO'L 930 20 3 . = 5000.6 - s goo .o - Z a,002� i G•25�o 0;6031 ft = 63) �IU 22` 23 et- f to 24 r •.. sr (,$ Yes 25 G 1 20 27 obJc.�-W1fll10N = IU V - c.rccrcfive m PAGE ^ PREPARED DY ��� . Mo%>A(,)N V�\� G1� (\�V• Asso C'. JJJ I! S Q TrN 44- o \ C C,Q 'N'N Na r') DATE g sae 1 2 CL 1 ` 3 L(, ^ I'UA— 4 5l 7 6 7 S vira,r+nc.r O� �.h\cJ ATle1n1 � ��oWS 8 � /�r 1 /\ rt�r hiloo Ayt i / / Olu I Qioii s \\"�-/ 9,\x —N0 tl� 0 D . � o 2,5 � , 4" 7- ?a - -7.1 10 ' NV'A'OeNC-K` 0.3i 0\97 2, q,(.)7,z: Z,Z 2,03r6/-7 4 12 l _ S INGe. wL i\ ave. '�i� �, e. bmi } rAo 13 \hssUme� \s G\\o 14 c. 4N �1S C u,,� sS o. bo c. � 18 17 GoNc\��c. stu � 18 �\ 1�1G.rctse.. rorvoT� Q„ SIT1� IN carve 1so1J 19 1�h ��, ��S"TUr1G�� GONt�\�1C1V$ 7►\l$ NLrCSS'Z 20 r 21 22 �5 �,\\� 0< L��, �:Gc. .S � p�ri:�1�� hr�,.5 ��,5 M�•1�th12tt� 23 24 NG{c�2_ 1 roJ 1n� fv�ovC G.Fc d —, 25 28 YA,riNcto 27 c.rccraiv^ 23 APPENDIX 2 CHARTS & FIGURES TABLE 3-2 RATIONAL METHOD RUNOFF COEFFICIENTS FOR ZONINGCLASSIFICATIONS TABLE 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS FIGURE 602 TRAVEL T AE VELOCITY FOR RATIONAL METHOD FIGURE 3-1 RAINFALL INTENSITY CURVE FOR FORT COLLINS, COLORADO FIGURE A CHECKER BLOCK DATA " 3.1.6 Runoff Coefficients The runoff coefficients to be used with the Rational Method referred to in Section 3.2 "Analysis Methodology" can be determined based on either zoning classifications or the types of surfaces on the drainage area. Table 3-2 lists the runoff coefficients for the various types of zoning along with the zoning definitions. Table 3-3 lists coefficients for the different kinds of surfaces. Since the Land Development Guidance System for Fort Collins allows land development to occur which may vary the zoning requirements and produce runoff coeffi- cients different from those specified in Table 3-2, the runoff coefficients should not be based solely on the zoning classifications. The Composite Runoff Coefficient shall be calculated using the following formula: C = (!CIA,)/At -t Where C = Composite Runoff Coefficient CI = Runoff Coefficient for specific area A, A, = Area of surface with runoff coefficient of ?;I n = Number of different surfaces to be considered A, =Total area over which C is applicable; the sum of all Ai s is equal to At Table 3-2 RATIONAL METHOD RUNOFF COEFFICIENTS FOR ZONING CLASSIFICATIONS Description of Area or Zoning Coeffident Business: BP, BL......................................................................................... 0.85 Business: BG, HB, C.................................................................................. 0.95 Industrial: IL, IP.......................................................................................... 0.85 Industrial: IG............................................................................................... 0.95 Residential: RE, RLP.................................................................................. 0.45 Residential: RL, ML. RP............................................................................. 0.50 1 Residential: FILM, RMP.............................................................................. 0.60 Residential: RM, MM.................................................................................. 0.65 Residential: RH.......................................................................................... 0.70 Parks, Cemeteries...................................................................................... 0.25 Playgrounds............................................................................................... 0.35 Railroad Yard Areas.......................................:........................................... 0.40 Unimproved Areas...................................................................................... 0.20 Zoning Definitions R-E Estate Residential District — a low density residential area primarily in outlying areas with a minimum lot area of 9,000 square feet. R-L Low Density, Residential District — low density residential areas located throughout the City with a minimum lot area of 6,000 square feet. R-M Medium. Density Residential District — both low and medium density residential areas with a minimum lot area of 6,000 square feet for one -family or two-family dwellings and 9,000 square feet for a multiple family dwelling. R-H High Density Residential District— high density residential areas with a minimum lot area of 6,000 square feet for one -family or two-family dwellings, 9,000 square feet for a multiple family dwelling, and 12.000 square feet for other specified uses. R-P Planned Residential District —designation of areas planned as a unit (PUD) to pro- vide a variation in use and building placements with a minimum lot area of 6,000 square feet. R-L-P Low Density Planned Residential District — areas planned as a unit (PUD) to permit variations in use, density and building placements, with a minumum lot area of 6,000 square feet. MAY 1984 3-3 DESIGN CRITERIA R-M-P Medium Density Planned Residential District — designation for medium density areas planned as a unit (PUD) to provide a variation in use and building placements with a minimum lot area of 6,000 square feet. R-L-M Low Density Multiple Family District — areas containing low density multiple family units or any other use in the R-L District with a minimum lot area of 6,000 square feet for one -family or two-family dwellings and•9,000 square feet for multiple -family dwellings. M-L Low Density Mobile Home District — designation for areas for mobile home parks containing independent mobile homes not exceeding 6 units per acre. M-M Medium Density Mobile Home District — designation for areas of mobile home parks containing independent mobile homes not exceeding 12 units per acre. B-G General Business District — district designation for downtown business areas, including a variety of permitted uses, with minimum lot areas equal to 1/2 of the total floor area of the building. B-P Planned Business District — designates areas planned as unit developments to provide business services while protecting the surrounding residential areas with minumum lot areas the same as R-M. H-B Highway Business District — designates an area of automobile -orientated busi- nesses with a minimum lot area equal to 1 /2 of the total floor area of the building. B-L Limited Business District — designates areas for neighborhood convenience centers, including a variety of community uses with minimum lot areas equal to two times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. I-L Limited Industrial District —designates areas of light industrial uses with a minimum area of lot equal to two times the total floor area of the building not to be less than 20,000 square feet. I-P Industrial Park District —designates light industrial park areas containing controlled industrial uses with minimum lot areas equal to two times the total floor area of the building not to be less than 20,000 square feet. I-G General Industrial District — designates areas of major industrial development. T Transition District — designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 118. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt................................................................................................ 0.95 Concrete............................................................................................. 0.95 Gravel................................................................................................. 0.50 Roofs ................. ....................................................... 0.95 Lawns, Sandy Soil: Flat<2%............................................................................................. Average2 to 7%.................................................................................. Steep>7%.......................................................................................... Lawns, Heavy Soil: Flat<2%............................................................................................. Average2 to 7%.................................................................................. Steep>7%......... :................................................................................ 0.10 0.15 0.20 0.20 0.25 0.35 MAY 1984 3-4 DESIGN CRITERIA FIGURE 602 d TRAVEL TIME VELOCITY FOR RATIONAL METHOD so 30 t- 20 ki 1 MM0111111WA 31111 M ME11111 M oil!It■■� • r I •I I� I' �t►�ttIII�I�ttllttt' �tttlttl�tltt■■� ���I III ■I.���/�����■■■�� .2 .3 .5 1• 2 3 s 10 20 VELOCITY IN FEET PER SECOND WRC. EN0. REFERENCE: `Urban Hydrology. For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. This can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). Tc =1.87 (1.1 — CC,) D 112 S Where Tc = Time of Concentration, minutes S = Slope of Basin, % C = Rational Method Runoff Coefficient D = Length of Basin, feet C, = Frequency Adjustment Factor Time of concentration calculations should reflect channel and storm sewer velocities as well as overland flow times. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of .the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. Table 3-4 RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS Storm Return Period Frequency Factor (years) q 2to 10 1.00 11 to25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times Cl shall not exceed 1.00 3.2 Analysis Methodology The methods presented in this section will be instituted for use in the determination and/or verification of runoff at specific design points in the drainage system. These methods are (1), the Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods, such as SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where applicable, drainage systems proposed for construction should provide the minimum protection as determined by the methodology so mentioned above. 3.2.1 Rational Method For drainage basins of 200 acres or less, the runoff may be calculated by the Rational Method, which is essentially the following equation: Q = C,CIA Where Q = Flow Quantity, cis A = Total Area of Basin, acres Cf = Storm Frequency Adjustment Factor (See Section 3.1.8) C = Runoff Coefficient (See Section 3.1.6) 1 = Rainfall Intensity, inches per hour (See Section 3.1.4) 3.2.2 Colorado Urban Hydrograph Procedure For basins larger than 200 acres, the design storm runoff should be analyzed by deriving synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph Procedure be used for such analysis. This procedure is detailed in the Urban Storm Drainage Criteria Manual, Volume 1, Section 4. MAY 1984 3-5 DESIGN CRITERIA No Text SECTION 3. HYDROLOGY STANDARDS 3.1 General Design Storms All drainage systems have to take into consideration two separate and distinct drainage problems. The first is the initial storm which occurs at fairly regular intervals, usually based on the two to ten-year storm, depending on land use. The runoff from this type of storm is considered the "nuisance flow". The second is the major storm which is usually based on an infrequent storm, such as the 100-year storm. In some instances the major storm routing will not be the same as the initial storm. In this case, a complete set of drainage plans shall be submitted for each storm system. 3.1.1 Initial Storm Provisions As stated before, the initial storm shall be based on the two to ten-year storm. The objectives of such drainage system planning are to minimize inconvenience, to protect against recur- ring minor damage and to reduce maintenance costs in order to create an orderly drainage system at a reasonable cost for the urban resident. The initial storm drainage system may in- clude such facilities as curb and gutter, storm sealer and open drainageways, and detention facilities. 3.1.2 Major Storm Provisions The major storm shall be considered the 100-year storm. The objectives of the major storm planning are to eliminate substantial property damage or loss of life. Major drainage systems may include storm sewers, open drainageways, and detention facilities. The correlation between the initial and major storm system shall be analyzed to insure a well coordinated drainage system. 3.1.3 Storm Frequency The initial and major storm design frequencies shall not be less than those found in the fol- lowing table: Table 3-1 DESIGN STORM FREQUENCIES Design Storm Retum Period Land Use or Zoning Initial Storm Major Storm Residential: (RE, RL, RLP, RP, ML, RM, RMP, FILM, MM, RH)...................................................................... 2-year 100-year Business: (BG, BL, BP, HB, C, IL, IP, IG).............................................. 10-year 100-year Public Building Areas............................................................... 10-year 100-year Parks, Greenbelts, etc.............................................................. 2-year 100-year Open Channels & Drainageways............................................. — 100-year Detention Facilities................................................................... — 100-year t See Table 3-2 for zoning delinitions. 3.1.4 Rainfall Intensities The rainfall intensities to be used in the computation of runoff shall be obtained from the Rainfall Intensity Duration Curves for the City of Fort Collins, included in these specifications as Figure 3.1. 3.1.5 Runoff Computations Storm Runoff computations for both the initial and major storm shall comply with the criteria set forth in Section 3.2 "Analysis Methodology." All runoff calculations made in the design of both initial and major drainage systems shall be included with the storm drainage plans in the form of a Drainage Report. Reports submitted for approval should have a typed narrative with computations and maps in a legible form. MAY 1984 3-1 DESIGN CRITERIA May 3, 1993 Project No: 1227-01-92 W. Glenn Schlueter City of Fort Collins Storm Water Utility 235 Mathews Street Ft. Collins, Colorado 80524 Re: Drainage analysis for Mountain Oak Neighborhood; Old Town Basin Ft. Collins, Colorado. Dear Glenn, We have completed the revisions to the calculations and clarified the drainage and erosion control exhibit as you suggested. They are attached for your review and approval. It is understood that City inspectors may require clean up or some other appropriate measures should erosion become a problem. A copy of my November 27, 1992 letter to you is also attached, which states our original conclusions. The revisions to the calculations and other clarifications still indicate a negligible increase in runoff and therefore the original conclusion stands. If you have any questions, please feel free to call me at 226-54334. Thank you for your sup,gesdons-apd attention in this matter. Brian W. Shear, PE--' Shear Engineering Corporation BWS / jmb cc: Don Richmond 4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334 61 we 0 VI L , G -I, -" . AW, I w. Uvi Ail WAMW . -44 - 00. "not. 542 itj CITY OF FORT COLLINS, COLORADO UTILITY .PLAN APPROVAL 'PROVED i DIRECTOR OF EN ;INEERINC GATE I -IECKED BY THE W.4T-,R f, sCIVEtt untttY car Q � o v _ z W J. o _J lU W � � z o, Q "a a CC v p � I ! IWI'•"III lino �: PYRIGM' PRAWN e�' Cr•ECKED 'AVPRDVED DATE z w=)HK 97-c3 ORMEr- November 27, 1992 Project No: 1227-01-92 Mr. Glenn Schlueter City of Fort Collins Storm Water Utility 235 Mathews Street Ft. Collins, Colorado 80524 Re: Drainage Analysis for Mountain -Oak Neighborhood; Old Town Basin Fort Collins, Colorado Dear Mr. Schlueter, We have completed a drainage analysis for Mountain - Oak Neighborhood situated in the Old Town Drainage Basin, Ft. Collins, Colorado. It is our understanding that the proposed development plan consists of the following: 1. Removal of two (2) out structures. 2. Construction of a 4-car garage behind the existing residence / office located at 420 West Oak Street. 3. One new residence on the remaining open lot in the block. 4. An addition on to an existing residence / office at 420 West Oak Street. 5. An access drive parking area for the proposed garage constructed using checker blocks. The purpose of the checker blocks is to provide more pervious surface area in the drive / parking ( lot than a typical paved lot would provide. The blocks also provide a more aesthetically pleasing parking lot which will help to improve the residential atmosphere of the neighborhood. Our calculations have shown that there is negligible increase in runoff from the block due to the proposed improvements. Due to the size of the contributing area studied (2.2 acres), the runoff, both historical and developed, is minimal and would have absolutely no impact on the Old Town Basin. Detention facilities would not be justified for this situation. If you have any questions, please feel rcj a to call at 226-5334 Sincerely, Brian W. Shear, P.E. Shear Engineering Corporation BWS / jmb cc: Don Richmond 4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334 Summary of Flows C2,C,o/C„o TC I2,I,d,00 A Mt-,,- ,.ate Q2,Q,4/Q,00 Mg HISTORICAL 0.37/0.47 10 2.5/4.4/7.2 2.2 2.0/3.6/7.4 DEVELOPED 0.40/0.50 10 2.5/4.4/7.2 2.2 2.2/3.9/7.9 APPENDIX 1 HYDROLOGIC CALCULATIONS V3, ov,J` 12 1 r 13-S} :of c .3w"Il —V V a..,+,v V• .+,� • v J ION 6v VV. VhR Sit 18 .. C. Nd��YY�� "�i.. 17 1 fon. t F �fti,lN3 IhW N$ {'oo �or r. Oki,* 18 r': ..' s.tX4-���� 19 20 : Le, c r,vew ` or 11'.rv�,ca cam w�ve. 21 22 23 24 --- 25 2s 27. crccufcvc* 28 EN 1 \L�l6d1D'�o` PREPARED BY ``\\ `` 1 �pVnl��.TrV �h�� NE1.ar�p1]Y�000\ �55oG. DATE ,,)M) Z ItZ�-61- 5Z f to 2 3 a 3 6�vtivD�r CGe,F \r.\ •�\'s tk�r, ro6,-, ��.b��, 3-2�3-3°!- 3-4 5 6 t aes� � s�o,r m �ieyuc�yc�e.s `�a�t3"�l 7 1 EX�SI 0_rAs 8 L �C.. SUb t�lSlnl GO,vS�SI� Gf YtSIOtN��h1 �uEC5510�1+�` 9 10 h'.$),-4 Ate, 1GWNW .Or ftivc�1i� t��r� 11 df�Uevy, �NG\UNr� 12 13 14 \\ \ Py 0 JSetK Cor1q���cN6 15 two o �i� cx\s�»n oJ% sA f%)2N ms WAN %. rf mo\)tx 16 h 9 Gtir tires e. 15 ro )A C\eVW\N�\ �i¢ coNs�YJc��enl 17 U k accq-ss �cwc tD he. c.on)s�C\JIC\. Pe 51N!� 16 (%-e—v' cr 04ks LANtAey- o aN A ) N �Q- rt.-SNAR-A�\'A 19 N_ckUrQ. _ _0'T_ -L% e.- Cnrt�, 20� gjq%- IS I)(ao5ed\\ 21 22 23 6Y14 (1 . a-')ccN� rv.au�F 24 \\ 7sre,.. ��. s v� bps\ N N d�',✓ : T�e 5��� GS zo�cA 25 ZOO\ne, pie. O.-�O 0,-70 0 Lbe- Z, IU �F 10U�r s� or,.,s t'cs ci�ua,),� 26 27 eAcccc�iv� 28 PAGE 1J"l�V���11f,I GAX t)t,,AaAa4 IISSGC. PAEPAnEDBY M460 or DATE 1))as )5•Z 0 2 A> 3 _ 4Gx 21g) = �i5 520 = 2.zuZ 5 �, v,cvs A �e C x,S�•, r 2,o4lu tlUt10 ilo +q(a+ �6'� � 7 \ -3114) lo(lu+)o,Zp 8 = 4 (4-Z s 9 2-) Y10A6u = 1560 +1c31 4 �00 Ig;C F3Lotdo03�00 }b33 �`3313�u 10 3 + 4Z5 + 1310 } louo � L•?o F L91� 12 3 PZ+-�'.�i. PrYe..S �CSSu�•neJ� T�O�SU� Grtivt�1P�,ve*I\ I•LUUa 3GG•}Z.OU = �70U �.. 13 14 O / � Ur,v�,�Cc., �1r \��/� ►I�X15� 1yC33i' ��5� Sf 15 1s '�ok..\ 6.4(.71 s,, rj '7- _ �— 17 � hvc�� tovv �x,si',n \ �G.S�3� a 9 - •4�U6 = 18 1 19 20 21 (( r( \ �UT�1D`C �UC'CilGl<N� �C.J 22 C ti, \ = 6 C = U.2 C o ai 23 WO } f � -TWO I r 3 pry _CIYf +i13 6.2)+0,373`5 24 Z. Z 2.Z — 25 G 6,�U 26 Clwz zsx 0,32 = 27 crccufivc 28 r� a I he. --- - .. ___.... _.. _. ...__ ..._ . _ _ . • _ _. erg, p�f c- PAGE OA1 (�Sbar/ldV� AS,SD Cj LET 16N PBEPAREDBY 4- , G! ' hG.T be 0� C�CG�2✓ �ID G� DATE , ZTI- 2 3 q3 4 5 -- — - 7 A, a s 1Jhh Z�/�X Z41, G}�t.c..kcr �`O P'�1 IY/ N Gf i.. ',y C. 10 n� Itti� �1.iSX�1 - �i7�1S ►�,04 12 CS"� 1, k l = y1.Z% ( 13 14 15 �76 1 I99 c 3`I s w = G.Z-7 sit 16 X 17 18 ` C ON \ 19 �1•eY�. is G % L. 7 S � Pe ry 1 aus S v rf ac` 20 aN � 0.13 S� 1TM,�cry,oyS 21 22 C eervIoos = G .ZU 23 C ►+��rvlouS c 6•�5 24 25 28 6,14?;7 s��_o.-?� 27 cxccttfive 2C