Loading...
HomeMy WebLinkAboutGUARDIAN SELF STORAGE - PDP190020 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANS (2)& )+342-*/ '0.1*/6 ED9<9DH @<1>C 6?B 7E1B491> CD?B175 6?BD 3?<<9>C 1 B5@<1D ?6 <?D * 1>4 DB13D 1' 49C3?E>D D9B5 1D 6?CC9< 3B55; <?31D54 9> D85 C?ED8G5CD AE1BD5B ?6 C53D9?> *' D?G>C89@ . >?BD8' B1>75 .0 G5CD ?6 D85 .D8 @B9>39@1< =5B9491> 39DH ?6 6?BD 3?<<9>C' 3?E>DH ?6 <1B9=5B' CD1D5 ?6 3?<?B14? 4535=25B +)*0 :B 5>79>55B9>7' <<3 :B 5>79>55B9>7' <<3 :B 5>79>55B9>7' <<3 7E1B491> CD?B175 6?BD 3?<<9>C <<3 (>FJ C< +CDF (C@@>BE& (C@CD8:C 43,-,37 0-'. '001/5'- (>FJ *B=>B;;D )8F; 68F;D % 68EF;I8F;D 4F>@>FJ )8F; 2FCDAI8F;D 4F>@>FJ )8F; 08D?E % 1;9D;8F>CB )8F; 3D8<<>9 *B=>B;;D )8F; *BH>DCBA;BF8@ 0@8BB;D )8F; )8F; (/05 5,*4%3 5>79>55B%C CD1D5=5>D G<9 69A7<@5E> HF98 =F A;F @BAH@9AG NL .*+O' 69=A; 5 -)/O 6E5FF 8=F> FG5@C98 NA;F L.*+ +32.O F9G =A 5 8E=??98 <B?9 =A F5A8FGBA9' J=G< 5 CH6?=F<98 9?9I5G=BA B: .31+)30 A5I8 22) 45C=?>5 1B389D53DC :B 5>79>55B9>7' <<3 65F=F B: 695E=A;4 G<9 J9FG ?=A9 B: G<9 FBHG<J9FG BA9(DH5EG9E B: F97G=BA +' GBJAF<=C 0 ABEG<' E5A;9 03 J9FG B: G<9 0G< CE=A7=C5? @9E=8=5A' 69=A; @BAH@9AG98 5G G<9 FBHG<J9FG 7BEA9E 6L 5 -),/$ 5?H@=AH@ 75C FG5@C98 $?F ,*010$ =A 5 E5A;9 6BK 5A8 5G G<9 J9FG DH5EG9E 7BEA9E 6L 5 ,)/$ 5?H@=AH@ 75C FG5@C98 ?F +100. +32/ =A 5 E5A;9 6BK' 695E=A; A**Q-2&,0$9 5F E9:9E9A798 GB 7B?BE58B FG5G9 C?5A9 ABEG< MBA9) L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06404-.:J*:+Q`T) :Z_R[ GURR]) ./,.-,/-.6 57-57.- 8A) =: Add signature blocks for: Fort Collins Loveland Water District South Fort Collins Sanitation District Fort Collins Utilities Comments PDP Rnd 1 1-7-2020 Matt Simpson JR Response: Addressed ` (>FJ C< +CDF (C@@>BE& (C@CD8:C 43,-,37 0-'. '001/5'- (>FJ *B=>B;;D )8F; 68F;D % 68EF;I8F;D 4F>@>FJ )8F; 2FCDAI8F;D 4F>@>FJ )8F; 08D?E % 1;9D;8F>CB )8F; 3D8<<>9 *B=>B;;D )8F; *BH>DCBA;BF8@ 0@8BB;D )8F; )8F; -8D>A;D (CGBFJ& (C@CD8:C 43,-,37 0-'. '001/5'- -8D>A;D (CGBFJ *B=>B;;D )8F; & )+342-*/ '0.1*/6 L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06604-.@>+Q`T) =: >RYR[OX BZ]R\) ./,.-,/-.6 57-67/5 8A) =: & )+342-*/ '0.1*/6 (>FJ C< +CDF (C@@>BE& (C@CD8:C 43,-,37 0-'. '001/5'- (>FJ *B=>B;;D )8F; 68F;D % 68EF;I8F;D 4F>@>FJ )8F; 2FCDAI8F;D 4F>@>FJ )8F; 08D?E % 1;9D;8F>CB )8F; 3D8<<>9 *B=>B;;D )8F; *BH>DCBA;BF8@ 0@8BB;D )8F; )8F; -8D>A;D (CGBFJ& (C@CD8:C 43,-,37 0-'. '001/5'- -8D>A;D (CGBFJ *B=>B;;D )8F; L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06604-.@>+Q`T) >RYR[OX BZ]R\) ./,.-,/-.6 57-6716 8A) =: Update to current Fort Collins Erosion Control Notes. Appendix F of FCSCM: https://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/stormwater-criteria JR Response: Addressed & )+342-*/ '0.1*/6 (>FJ C< +CDF (C@@>BE& (C@CD8:C 43,-,37 0-'. '001/5'- (>FJ *B=>B;;D )8F; 68F;D % 68EF;I8F;D 4F>@>FJ )8F; 2FCDAI8F;D 4F>@>FJ )8F; 08D?E % 1;9D;8F>CB )8F; 3D8<<>9 *B=>B;;D )8F; *BH>DCBA;BF8@ 0@8BB;D )8F; )8F; -8D>A;D (CGBFJ& (C@CD8:C 43,-,37 0-'. '001/5'- -8D>A;D (CGBFJ *B=>B;;D )8F; L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06604-.@>+Q`T) C_R[OXX @RTRYQ) ./,.-,/-.6 57.-7-6 8A) =: & )+342-*/ '0.1*/6 L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06404-.C<:.*:+Q`T) <a :ZYQV]VZY\ DXOY) ./,.-,/-.6 57.07-4 8A) =: What is going to happen with this irrigation/ drainage structure? Label size of existing pipe Are there storm pipes here? Will this MH be removed & replaced? Or modified? JR Response: The existing irrigation structure is to be removed. JR Response: existing pipe will be removed or plugged as needed. There will be proposed storm sewer under sidewalk to capture offsite flows. JR Response: The MH will be modified. JR Response: Addressed & )+342-*/ '0.1*/6 (>FJ C< +CDF (C@@>BE& (C@CD8:C 43,-,37 0-'. '001/5'- (>FJ *B=>B;;D )8F; 68F;D % 68EF;I8F;D 4F>@>FJ )8F; 2FCDAI8F;D 4F>@>FJ )8F; 08D?E % 1;9D;8F>CB )8F; 3D8<<>9 *B=>B;;D )8F; *BH>DCBA;BF8@ 0@8BB;D )8F; )8F; &)%(&' ,-+ * * * * * L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06404-.>=-.*:+Q`T) >[OQVYT DXOY) ./,.-,/-.6 57.07/4 8A) =: Update to LOMR floodplain line work. Please label flowline slope around the curb return. Please label flowline slope here Provide more detail about intersection design. Intersection design needs to match routing of stormwater flows. Label slope here If stormwater overtops the roadway here (clogged inlet, or any other reason), where will the overflows go? What is the flow path for excess surface flows to leave the site? check slope label and arrow Please provide piped rundown to sand filter invert. It may be advantageous to place a stormwater inlet here. JR Response: Inlet added and piped to east inlet JR Response: Emergency overflow path added, it goes to the SE corner of the site. JR Response: Addressed JR Response: Addressed JR Response: Addressed JR Response: Noted JR Response: Addressed JR Response: Addressed JR Response: Addressed & )+342-*/ '0.1*/6 (>FJ C< +CDF (C@@>BE& (C@CD8:C 43,-,37 0-'. '001/5'- (>FJ *B=>B;;D )8F; 68F;D % 68EF;I8F;D 4F>@>FJ )8F; 2FCDAI8F;D 4F>@>FJ )8F; 08D?E % 1;9D;8F>CB )8F; 3D8<<>9 *B=>B;;D )8F; *BH>DCBA;BF8@ 0@8BB;D )8F; )8F; &)%(&' ,-+ * * * * * L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06404-.IH-.*:+Q`T) I]VXV]b DXOY) ./,.-,/-.6 57.3722 8A) =: Is the ex. irrigation structure to be removed? Where will the water go that is in this pipe? How will this connection be made? Will the existing structure be replaced or drilled? This pipe will need to be in a permanent 20-foot drainage easement. Please confirm this exists or provide a easement dedication. A TCE or agreement with the property owner will be needed for this Remove this note. For this project, note 'public' or 'private' on the profile drawings. Check service separation req's with FCLWD/ SFCSD Is this a storm inlet? Please provide more detail about how the pipe gets to the downstream inlet structure Is this a storm inlet? Where does the pipe go? Pipe linework missing Label pipe size Is the ex gas to be relocated? Do you have a SSMH depth/ invert el. here? Can the SS service avoid conflict with the Pr Storm? Label drainage easement line (typ.) Where will the water meter and curb stop be located? Is this ex. gas line going to be relocated? The FCSCM requires 10-feet of separation from other utilities. Is this F.O. going to be relocated? Are these in conduit or a duct bank? New Storm needs 10-ft clear. Is this an existing or proposed easement? Please label. This pipe will need to be in a permanent easement. For construction, there will need to be a TCE or an agreement with the property owner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`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06404-.;F-.*:+Q`T) ;[OVYOTR DXOY) ./,.-,/-.6 57/-7-3 8A) =: ~34 cfs? Can this water turn the corner onto Snead? Q100 = 44 cfs Q100 = 64 cfs Q100 = 46 cfs Where did other flow from DP 2 go? Q100 pipe = 8 cfs Q100 = 14 cfs Q100 = 9 cfs q100 = 3 cfs Q100 = 72 cfs For the Sand Filter: Please note the WQCV (CF) and the WQCV water surface elev. Please note the 100-year WSEL for peakflows routed through sand filter outlet. It may be advantageous to place a stormwater inlet here. JR Response: See revised calculations. JR Response: WQCV and WSEL added to plan. 100 year WSEL added to plan. JR Response: The system becomes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`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06404-.@?;*:+Q`T) @?; DXOY) ./,.-,/-.6 57/0711 8A) =: This exhibit is great! Thank you! JR Response: noted, thank you. & )+342-*/ '0.1*/6 (>FJ C< +CDF (C@@>BE& (C@CD8:C 43,-,37 0-'. '001/5'- (>FJ *B=>B;;D )8F; 68F;D % 68EF;I8F;D 4F>@>FJ )8F; 2FCDAI8F;D 4F>@>FJ )8F; 08D?E % 1;9D;8F>CB )8F; 3D8<<>9 *B=>B;;D )8F; *BH>DCBA;BF8@ 0@8BB;D )8F; )8F; &)%(&' ,-+ * * * * * L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06404-.<F*:+Q`T) <[Z\VZY :ZY][ZX DXOY) ./,.-,/-.6 57/3723 8A) =: & )+342-*/ '0.1*/6 (>FJ C< +CDF (C@@>BE& (C@CD8:C 43,-,37 0-'. '001/5'- (>FJ *B=>B;;D )8F; 68F;D % 68EF;I8F;D 4F>@>FJ )8F; 2FCDAI8F;D 4F>@>FJ )8F; 08D?E % 1;9D;8F>CB )8F; 3D8<<>9 *B=>B;;D )8F; *BH>DCBA;BF8@ 0@8BB;D )8F; )8F; C>514 3< @B?69<5 CD1 *)&))()) D? *,&+/(-* L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\N06404-.G?-.+Q`T) G][RR] D&D) ./,.-,/-.6 570-7-0 8A) =: & )+342-*/ '0.1*/6 (/05 5,*4%3 L7N064----+OXXN06404-.N;[O`VYT\NGURR] ;`T\ND[RX D;D* I]VXV]b DXOY\NSZ\\VX P[RRW [VTU] ]^[Y+Q`T) /1a03 :ZY\][^P]VZY) ./,.-,/-.6 570/7.0 8A) =: inundated in the 100-year event causing all the runoff to bypass the inlet. JR Response: Flowmaster was used to evaluate the capacity of the half roadway section. The road has the capacity for the turn. At the point where the road intersects, Fossil Creek Pkwy is on'y at 0.5% slope. Additional grades have been added to the grading plan to show more detail at this intersection. Check for bend in pipe alignment here This offsite work will require a Temporary Construction Easement (TCE). This pipe will not need a permanent easement. FOR INFORMATION: Another option to consider is to run a storm drain system around the west and south sides of the site. This route would have less separation issues with trees and other wet utilities. The storm line needs 10-ft (min) separation from the water line. JR Response: The existing irrigation structure will be removed and stormwater will be collected from the north and piped. JR Response: the pipe was moved to ROW . JR Response: there are no longer and offsite proposed improvemtns. JR Response: yes, the ex. gas will be relocated by others JR Response: noted, the contractor said this alignment would be too expensive. JR Response: Addressed JR Response: addressed, sanitary service shown on storm plan and profile JR Response: Addressed JR Response: yes, the existing gas line will be relocated by others JR Response: yes, piped to south and then west to pond, linetype revised. JR Response: Addressed, 5' of seperation JR Response: Addressed JR Response: yes, piped to notrh and then west to pond, linetype revised. JR Response: Addressed JR Response: only a small portion is less than 10' if needed the waterline can be relocated. JR Response: the existing pipe to the proposed inlet will be kept so a TCE is not needed. JR Response: Addressed JR Response: FO to be relocated