HomeMy WebLinkAboutFORT COLLINS MONTESSORI SCHOOL - FDP200002 - DOCUMENT MARKUPS - ROUND 2 - DRAINAGE REPORTPrepared For:
Hauser Architects, P.C.
3780 East 15th Street, Suite 201
Loveland, CO 80538
970-669-8220
Prepared By:
Coffey Engineering & Surveying, LLC
4045 St. Cloud Drive, Suite 180
Loveland, CO 80538
970-622-2095
Project No. 2259.03
December 17, 2019
FINAL DRAINAGE REPORT
FORT COLLINS MONTESSORI SCHOOL
LOT 1, MONTESSORI SUBDIVISION
FORT COLLINS, CO 80526
PAGE | 1
Fort Collins Montessori School
FINAL DRAINAGE REPORT
ENGINEER’S CERTIFICATION
I hereby certify that this Final Drainage Report for the design of stormwater management
facilities for the Fort Collins Montessori School site was prepared by me, or under my direct
supervision, in accordance with the provisions of the City of Fort Collins Stormwater Criteria
Manual for the owners thereof.
Troy W. Campbell, P.E.
Registered Professional Engineer
State of Colorado No. 41159
PAGE | 9
H. Modifications of Criteria
There are no modifications or variances requested in connection with the design of the
stormwater management for the Fort Collins Montessori School development.
IV. DRAINAGE FACILITY DESIGN
I. General Concept
The storm drainage system is designed to safely convey developed storm flows by sheet
flow, pipe flow, concentrated swale and gutter flow to the rain gardens and detention pond.
The design worksheets included in the Appendices to this Final Drainage Report present
details of the hydrologic and hydraulic calculations pertinent to the design of the on-site
storm drainage system. A drainage plan, showing the proposed development of the site and
developed drainage patterns is included in the map pocket following the Appendices.
J. Specific Details
The site will utilize on-site detention ponds and rain gardens. Runoff will enter the
detention system through proposed rain gardens and PVC pipes. Three rain gardens are
provided on-site. The rain gardens were sized based on full build out of Phase II of
development. Phase II was split into four drainage basins. Three of these basins are treated
with water quality, totaling 80% of the new impervious area. The proposed detention ponds
have a capacity of approximately 28,872 cubic feet. The required detention for the site is
27,626 cubic feet. The detention pond will drain through an outlet structure with a release
rate of 1.36 cfs. The 100-year release rate was based off the 2-year historic flow rate. The
proposed detention pond will have three controlled release rates. The detention pond has a
water quality volume of 3,135 cubic feet and a release rate of 0.07 cfs through two 1”
orifices at 1’ intervals. Runoff exceeding the water quality elevation of 5086.0 will flow
through a grated lid into the 18” outlet pipe. This pipe will be covered by a restrictor plate to
control the release rate to 1.36 cfs. Runoff greater than a 100-year event will exit the
detention pond through an emergency spillway at a rate no greater than the 100-year
developed flow. The 100-year WSEL is 5088.60’ with 1’ of freeboard provided.
V. CONCLUSIONS
K. Compliance with Standards
The drainage design for the Fort Collins Montessori School Site follows the requirements of
the Fort Collins Stormwater Criteria Manual as well as the City’s floodplain regulations.
Imperviousness
Fort Collins Montessori School LID
Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Percent
(I = 100) (I = 100) (I = 40) (I = 90) (I = 2) (acres) Imperviousness
- LID1 0.32 0.08 0.00 0.14 0.18 0.72 74%
- LID2 0.27 0.13 0.07 0.38 1.10 1.95 41%
- LID4 0.20 0.06 0.00 0.15 0.23 0.64 62%
0.25 0.10 0.00 0.07 0.17 0.59 71%
Notes: Values from Fort Collins Stormwater Criteria Manual Table 4.1-3
WQCV1 0.235447872 WQCV1 0.2354479
WQCV2 2.994849 WQCV2 0.1459833
WQCV4 0.200261632 WQCV4 0.194434
V1 0.0169522 738.4398699
V2 0.0284667 1240.011245
V4 0.0124438 542.050838
Design Point Basin (s)
LID
RJP Rational Method Flow LID Calculations.xlsx 12/12/2019
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd = ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.10 0.54 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
0.00 5083.60 (input) 0 0.000 0.000
0.40 5084.00 0.00 0.00 263 53 0.006 0.001
0.90 5084.50 0.00 0.00 856 332 0.020 0.008
1.40 5085.00 0.00 0.00 1,384 892 0.032 0.020
1.90 5085.50 0.00 0.00 2,211 1,791 0.051 0.041
2.40 5086.00 0.00 0.00 3,163 3,135 0.073 0.072
2.90 5086.50 0.00 0.00 4,227 4,982 0.097 0.114
3.40 5087.00 0.00 0.00 6,749 7,726 0.155 0.177
3.90 5087.50 0.00 0.00 10,528 12,045 0.242 0.277
4.40 5088.00 0.00 0.00 15,591 18,575 0.358 0.426
5.00 5088.60 0.00 0.00 18,733 28,872 0.430 0.663 100-YR
5.50 5089.10 0.00 0.00 21,373 38,899 0.491 0.893
6.00 5089.60 0.00 0.00 30,400 51,842 0.698 1.190
STAGE-STORAGE SIZING FOR DETENTION BASINS
Fort Collins Montessori School
Check Basin Shape
Detention Pond System
Detention Pond Outlet Design File_v2.35.xls, Basin 12/12/2019, 3:13 PM
Project:
Basin ID:
WQCV Design Volume (Input):
Catchment Imperviousness, Ia = 50.0 percent
Catchment Area, A = 4.29 acres Diameter of holes, D = 1.000 inches
Depth at WQCV outlet above lowest perforation, H = 2 feet Number of holes per row, N = 1
Vertical distance between rows, h = 12.00 inches OR
Number of rows, NL = 2.00
Orifice discharge coefficient, Co = 0.60 Height of slot, H = inches
Slope of Basin Trickle Channel, S = 0.010 ft / ft Width of slot, W = inches
Time to Drain the Pond = 40 hours
Watershed Design Information (Input): 2.4
Percent Soil Type A = 0 %
Percent Soil Type B = 100 %
Percent Soil Type C/D = 0 %
Outlet Design Information (Output):
Water Quality Capture Volume, WQCV = 0.229 watershed inches
Water Quality Capture Volume (WQCV) = 0.082 acre-feet 0.00
Design Volume (WQCV / 12 * Area * 1.2) Vol = 0.098 acre-feet
Outlet area per row, Ao = 0.62 square inches
Total opening area at each row based on user-input above, Ao = 0.79 square inches
Total opening area at each row based on user-input above, Ao = 0.005 square feet
3
Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 ΣΣΣΣ
5083.60 5084.60 Flow
5083.60 0.0000 0.0000 0.00
5084.00 0.0166 0.0000 0.02
5084.50 0.0249 0.0000 0.02
5085.00 0.0362 0.0249 0.06
5085.50 0.0407 0.0311 0.07
5086.00 0.0407 0.0311 0.07
5086.50 0.0447 0.0362 0.08
5087.00 0.0484 0.0407 0.09
5087.50 0.0519 0.0447 0.10
5088.00 0.0551 0.0484 0.10
5088.60 0.0587 0.0525 0.11
5089.60 0.0643 0.0587 0.12
Central Elevations of Rows of Holes in feet
Collection Capacity for Each Row of Holes in cfs
STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET
Fort Collins Montessori School
Detention Pond System
Detention Pond Outlet Design File_v2.35.xls, WQCV 12/12/2019, 3:14 PM
Project:
Basin ID:
Design Information (input):
Bottom Length of Weir L = 18.00 feet
Angle of Side Slope Weir Angle = 45.00 degrees
Elev. for Weir Crest EL. Crest = 5,088.60 feet
Coef. for Rectangular Weir Cw = 2.50
Coef. for Trapezoidal Weir Ct = 2.20
Calculation of Spillway Capacity (output):
Water Rect. Triangle Total Total
Surface Weir Weir Spillway Pond
Elevation Flowrate Flowrate Release Release
ft. cfs cfs cfs cfs
(linked) (output) (output) (output) (output)
5083.60 0.00 0.00 0.00 0.00
5084.00 0.00 0.00 0.00 0.00
5084.50 0.00 0.00 0.00 0.00
5085.00 0.00 0.00 0.00 0.00
5085.50 0.00 0.00 0.00 0.00
5086.00 0.00 0.00 0.00 0.00
5086.50 0.00 0.00 0.00 0.00
5087.00 0.00 0.00 0.00 0.00
5087.50 0.00 0.00 0.00 0.00
5088.00 0.00 0.00 0.00 0.00
5088.60 0.00 0.00 0.00 0.00
5089.10 15.91 0.39 16.30 16.30
5089.60 45.00 2.20 47.20 47.20
STAGE-DISCHARGE SIZING OF THE SPILLWAY
Fort Collins Montessori School
Detention Pond System
Detention Pond Outlet Design File_v2.35.xls, Spillway 12/12/2019, 3:15 PM
LID REQUIREMENTS
TOTAL IMPERVIOUS AREA ON SITE 93,654 SQ FT
REQUIRED TREATMENT AREA (75%) 70,240 SQ FT
TOTAL IMPERVIOUS AREA TREATED BY
LID
75,358 SQ FT
(80%)
BASIN 1 BASIN 2 BASIN 3 BASIN 4
AREA (ACRES) 0.72 1.95 0.59 0.64
IMPERVIOUS AREA (ACRES) 0.54 0.78 0.42 0.41
PERCENT IMPERVIOUS (%) 74 41 71 62
PERCENT OF IMPERVIOUS AREA (%) 25.1 36.3 19.5 19.1
REQUIRED WQCV (INCHES) 0.235 0.146 - 0.194
LID VOLUME REQUIRED (CU. FT.) 738 1240 - 542
LID VOLUME PROVIDED (CU. FT.) 774 1332 - 576
REQUIRED FLAT AREA (SQ. FT) 464 697 - 346
PROVIDED FLAT AREA (SQ. FT) 508 1190 - 378
BASIN SUMMARY
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Dec 11 2019
Equalizer Pipe-Dentention Pond 2 to Detention Pond 1
Invert Elev Dn (ft) = 5086.20
Pipe Length (ft) = 55.00
Slope (%) = 0.00
Invert Elev Up (ft) = 5086.20
Rise (in) = 18.0
Shape = Circular
Span (in) = 18.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Culvert
Culvert Entrance = Smooth tapered inlet throat
Coeff. K,M,c,Y,k = 0.534, 0.555, 0.0196, 0.9, 0.2
Embankment
Top Elevation (ft) = 5089.60
Top Width (ft) = 24.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 6.60
Qmax (cfs) = 6.60
Tailwater Elev (ft) = (dc+D)/2
Highlighted
Qtotal (cfs) = 6.60
Qpipe (cfs) = 6.60
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 4.20
Veloc Up (ft/s) = 3.73
HGL Dn (ft) = 5087.45
HGL Up (ft) = 5087.72
Hw Elev (ft) = 5087.82
Hw/D (ft) = 1.08
Flow Regime = Inlet Control
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Dec 11 2019
Equalizer Pipe-Detention Pond 3 to Detnetion Pond 1
Invert Elev Dn (ft) = 5084.60
Pipe Length (ft) = 83.00
Slope (%) = 0.23
Invert Elev Up (ft) = 5084.79
Rise (in) = 18.0
Shape = Circular
Span (in) = 18.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Culvert
Culvert Entrance = Smooth tapered inlet throat
Coeff. K,M,c,Y,k = 0.534, 0.555, 0.0196, 0.9, 0.2
Embankment
Top Elevation (ft) = 5089.60
Top Width (ft) = 25.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 5.13
Qmax (cfs) = 5.13
Tailwater Elev (ft) = (dc+D)/2
Highlighted
Qtotal (cfs) = 5.13
Qpipe (cfs) = 5.13
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 3.42
Veloc Up (ft/s) = 4.82
HGL Dn (ft) = 5085.79
HGL Up (ft) = 5085.66
Hw Elev (ft) = 5086.08
Hw/D (ft) = 0.86
Flow Regime = Inlet Control
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Dec 11 2019
Equalizer Pipe-Detention Pond 4 to Detention Pond 1
Invert Elev Dn (ft) = 5084.61
Pipe Length (ft) = 440.00
Slope (%) = 0.40
Invert Elev Up (ft) = 5086.36
Rise (in) = 18.0
Shape = Circular
Span (in) = 18.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Culvert
Culvert Entrance = Smooth tapered inlet throat
Coeff. K,M,c,Y,k = 0.534, 0.555, 0.0196, 0.9, 0.2
Embankment
Top Elevation (ft) = 5089.60
Top Width (ft) = 100.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 6.92
Qmax (cfs) = 6.92
Tailwater Elev (ft) = (dc+D)/2
Highlighted
Qtotal (cfs) = 6.92
Qpipe (cfs) = 6.92
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 4.37
Veloc Up (ft/s) = 5.42
HGL Dn (ft) = 5085.87
HGL Up (ft) = 5087.38
Hw Elev (ft) = 5087.89
Hw/D (ft) = 1.02
Flow Regime = Inlet Control
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Friday, Dec 13 2019
Equalizer Pipe-Dentention Pond 1 to Spillway
Invert Elev Dn (ft) = 5086.20
Pipe Length (ft) = 55.00
Slope (%) = 0.00
Invert Elev Up (ft) = 5086.20
Rise (in) = 18.0
Shape = Circular
Span (in) = 18.0
No. Barrels = 1
n-Value = 0.013
Culvert Type = Circular Culvert
Culvert Entrance = Smooth tapered inlet throat
Coeff. K,M,c,Y,k = 0.534, 0.555, 0.0196, 0.9, 0.2
Embankment
Top Elevation (ft) = 5089.60
Top Width (ft) = 24.00
Crest Width (ft) = 20.00
Calculations
Qmin (cfs) = 16.62
Qmax (cfs) = 16.62
Tailwater Elev (ft) = (dc+D)/2
Highlighted
Qtotal (cfs) = 16.62
Qpipe (cfs) = 16.62
Qovertop (cfs) = 0.00
Veloc Dn (ft/s) = 9.46
Veloc Up (ft/s) = 9.40
HGL Dn (ft) = 5087.67
HGL Up (ft) = 5088.99
Hw Elev (ft) = 5089.28
Hw/D (ft) = 2.06
Flow Regime = Inlet Control