Loading...
HomeMy WebLinkAboutH 25 MULTI FAMILY - PDP200004 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS© 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS © 2019 HERE A PARCEL OF LAND SITUATE IN THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 3 IN TOWNSHIP 6 NORTH AND RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN IN THE CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO AND BEING DESCRIBED AS FOLLOWS: CONSIDERING THE NORTH LINE OF THE NORTHWEST QUARTER OF THE SAID SECTION 3 AS BEARING SOUTH 89° 29' 55" EAST. THE TERMINI OF THE SAID NORTH LINE OF THE NORTHWEST QUARTER OF SECTION 3 BEING MONUMENTED WITH A 3-1/2 INCH ALUMINUM CAP ON A NUMBER 6 REBAR INSCRIBED “COLO DEPT OF TRANSPORTATION-T7N R68W-S33 S34-S4 S3-T6N R68W-1996-PLS 25384” FOR ITS NORTHWEST CORNER (NORTHWEST CORNER OF SAID SECTION 3) AND A 3-1/4 INCH ALUMINUM CAP ON A NUMBER 6 REBAR INSCRIBED “COLO DEPT OF TRANSPORTATION-PLS NO 24307-T7N R68W-S 1/4 34-S3-T6N R68W-POINT NO. 306-2000” FOR ITS NORTHEAST CORNER (NORTH QUARTER CORNER OF SAID SECTION 3). COMMENCING AT THE ABOVE DESCRIBED NORTHWEST CORNER OF THE SAID SECTION 3; THENCE, ALONG THE NORTH LINE OF THE SAID NORTHWEST QUARTER OF SECTION 3, SOUTH 89° 29' 55" EAST A DISTANCE 30.02 FEET TO ITS INTERSECTION WITH THE PROJECTED EAST AND CURRENT RIGHT OF WAY LINE OF STRAUSS CABIN ROAD; THENCE, ALONG THE SAID PROJECTED EAST RIGHT OF WAY LINE, SOUTH 1° 44' 18" EAST A DISTANCE OF 50.86 FEET TO THE INTERSECTION OF THE SAID EAST RIGHT OF WAY LINE OF STRAUSS CABIN ROAD WITH THE CURRENT SOUTH RIGHT OF WAY LINE OF HARMONY AS RECORDED IN RECEPTION 19980049108 AND BEING THE POINT OF BEGINNING. THENCE, ALONG THE SAID SOUTH RIGHT OF WAY LINE OF HARMONY ROAD, THE FOLLOWING THREE (3) COURSES 1. SOUTH 89° 47' 25" EAST A DISTANCE OF 670.81 FEET; 2. SOUTH 89° 18' 55" EAST A DISTANCE OF 245.96 FEET; 3. SOUTH 84° 57' 34" EAST A DISTANCE OF 63.15 FEET; THENCE, DEPARTING FROM THE SAID SOUTH RIGHT OF WAY LINE OF HARMONY ROAD AND ALONG AN EAST LINE OF A PARCEL DESCRIBED IN RECEPTION 201010991, SOUTH 0° 33' 37" EAST A DISTANCE OF 709.85 FEET; THENCE, SOUTH 88° 15' 42" WEST A DISTANCE OF 964.28 FEET TO THE SAID EAST LINE OF STRAUSS CABIN ROAD; THENCE, ALONG THE SAID EAST RIGHT OF WAY LINE STRAUSS CABIN ROAD, NORTH 1° 44' 18" WEST A DISTANCE OF 750.35 FEET TO THE POINT OF BEGINNING. SAID DESCRIBED PARCEL CONTAINS 683,533.64 SQUARE FEET OR 15.692 ACRES, MORE OR LESS (±). PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD COVER SHEET H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C1.0 CJS 19059.02_COVER_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 VICINITY MAP PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD GENERAL CONSTRUCTION NOTES H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C1.1 CJS 19059.02_NOTES_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 “ ” “ ” “ ” “ ” “ ” CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE E. WATER AND SANITARY NOTES 1. ALL WATER AND SANITARY SEWER CONSTRUCTION SHALL BE PERFORMED ACCORDING TO THE FORT COLLINS-LOVELAND WATER DISTRICT AND THE SOUTH FORT COLLINS SANITATION DISTRICT STANDARDS AND SPECIFICATIONS. 2. CONSTRUCTION OF WATER AND SEWER FACILITIES REQUIRE A PRECON MEETING WITH DISTRICT OPERATIONS STAFF PRIOR TO CONSTRUCTION. 3. CONTRACTOR SHALL NOTIFY DISTRICT INSPECTORS PRIOR TO STARTING WORK. 4. CONTRACTOR SHALL CONTACT THE SANITATION DISTRICT FOR SEWER INSPECTION 48 HOURS PRIOR TO CONNECTING TO EXISTING SEWER STUBS. 5. ALL COMMERCIAL DOMESTIC SERVICES REQUIRED A REDUCED PRESSURE BACKFLOW PREVENTION DEVICE. 6. ALL SERVICE LINES SHALL BE A MINIMUM OF (5) FIVE FEET AND A MAXIMUM OF (6) SIX FEET BELOW FINAL GRADE. 7. ALL DISTRICT VALVES SHALL ONLY BE OPERATED BY DISTRICT OPERATIONS STAFF. 8. PIPE PRESSURE AND VACUUM TESTING SHALL BE WITNESSED BY DISTRICT INSPECTORS. WATERLINE BACTERIA TESTS SHALL ALSO BE TAKEN BY DISTRICT INSPECTORS. 9. ONCE THE SYSTEM IS OPERATIONAL AND ALL TESTS HAVE PASSED, CONTRACTOR SHALL REQUEST SUBSTANTIAL COMPLETION WITH A LETTER TO THE DISTRICT THAT INCLUDES THE DOLLAR VALUE OF THE WATER AND SEWER IMPROVEMENTS. 10.AS-BUILTS SHALL BE SUBMITTED IN PDF AND DWG TO THE DISTRICT FOR FINAL APPROVAL. HARMONY ROAD STRAUSS CABIN ROAD 0 50 SCALE: 1" = 50' 50 25 100 PRELIMINARY DEVELOPMENT PLAN NORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD EXISTING CONDITIONS AND DEMO PLAN H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C2.0 CJS 19059.02_EX_SITE_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE FIBER OPTIC VAULT 24" RCP INV=4845.5 15" STEEL INV=4845.8 ELECTRICAL CABINET DRAIN CHASE DRAIN CHASE FIBER OPTIC VAULT 0 40 SCALE: 1:40_XREF 40 20 80 PRELIMINARY DEVELOPMENT PLAN NORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD OVERALL GRADING PLAN H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C3.0 CJS 19059.02_GRAD_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE FIBER OPTIC VAULT 24" RCP INV=4845.5 15" STEEL INV=4845.8 ELECTRICAL CABINET DRAIN CHASE DRAIN CHASE FIBER OPTIC VAULT 0 40 SCALE: 1:40_XREF 40 20 80 PRELIMINARY DEVELOPMENT PLAN NORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD OVERALL UTILITY PLAN H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C4.0 CJS 19059.02_UTIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE 0.22 B-6 0.40 0.49 0.33 B-1 0.81 1.00 0.87 B-5 0.79 0.99 0.36 B-2 0.85 1.00 0.34 B-3 0.77 0.96 1.40 B-4 0.62 0.76 0.19 B-10 0.87 1.00 0.43 B-11 0.81 1.00 1.12 B-9 0.66 0.82 0.69 B-13 0.72 0.91 0.38 B-7 0.76 0.95 0.69 B-8 0.70 0.87 0.45 B-14 0.81 1.00 0.35 B-15 0.65 0.78 0.44 B-12 0.88 1.00 0.51 PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD EROSION CONTROL NOTES H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C6.0 CJS 19059.02_DETAIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 “ ” “ ” CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD EROSION CONTROL DETAILS H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C6.1 CJS 19059.02_DETAIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD EROSION CONTROL DETAILS H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C6.2 CJS 19059.02_DETAIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD EROSION CONTROL DETAILS H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C6.3 CJS 19059.02_DETAIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE TRAIC RATED CEANOT -15 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD CONSTRUCTION DETAILS H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C7.0 CJS 19059.02_DETAIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD CONSTRUCTION DETAILS H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C7.1 CJS 19059.02_DETAIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 STANDARD CONCRETE NOTES CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD CONSTRUCTION DETAILS H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C7.2 CJS 19059.02_DETAIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD CONSTRUCTION DETAILS H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C7.3 CJS 19059.02_DETAIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PRELIMINARY DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD CONSTRUCTION DETAILS H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C7.4 CJS 19059.02_DETAIL_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 OS-1 0.31 0.39 4.19 OS-3 0.20 0.25 2.43 OS-2 0.21 0.25 0.31 OS-4 0.48 0.52 0 50 SCALE: 1:50_XREF 50 25 100 PRELIMINARY DEVELOPMENT PLAN NORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION HARMONY & STRAUSS CABIN ROAD DRAINAGE PLAN H-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, CO C5.0 CJS 19059.02_DRAIN_PROD.DWG ICS 2/19/20 1ST PDP SUBMITTAL - - - - - - - - - - - - - - 19059.02 C2 C100 BASIN # AREA C2 = 2 YR RUNOFF COEFFICIENT C100 = 100 YR RUNOFF COEFFICIENT PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE NORTH SCALE: NTS CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. District Engineer Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT BASIS OF BEARINGS AND LINEAL UNIT DEFINITION ASSUMING THE NORTH LINE OF THE NORTHWEST QUARTER OF SECTION 3, T.6N., R68W., AS BEARING N89°46'58"W AS MONUMENTED AS SHOWN ON THIS PLAT, BEING A GRID BEARING OF THE COLORADO STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICAN DATUM 1983/2011, A DISTANCE OF 2640.37 FEET WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO. N89°46'58"W 2640.37' THE LINEAL DIMENSIONS AS CONTAINED HEREIN ARE BASED UPON THE "U.S. SURVEY FOOT."