January 03, 2020
Tom Johnson
31878 Del Obispo St # 118-454
San Juan Capistrano, CA 92675
RE: Summitview Church - Wireless Telecommunication Facility, FDP190022, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Summitview Church - Wireless Telecommunication Facility. If
you have questions about any comments, you may contact the individual commenter or
direct your questions through your Development Review Coordinator, Brandy Bethurem
Harras via phone at 970-416-2744 or via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
11 /13/2019: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Comment Number: 2
11 /13/2019: INFORMATION:
As part of your next submittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable.
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fc og v.com
Topic: General
Comment Number: 2
12/31/2019: FOR FINAL APPROVAL - UPDATED:
Planning staff acknowledges that the ash trees will be removed as
recommended by City Forestry. Please plant the proposed Southwestern White
Pine in the location of the removed ash trees. The remaining tree should be
placed in front of the monopine in between the sidewalk and the proposed structure.
Response: Please see revised showing the updated tree placement.
11/11/2019: FOR FINAL APPROVAL:
On sheet Al there are some inconsistencies with the Landscape Plan. Please
update table to reflect that no trees will be removed. Since the ash trees will
remain, please locate the three Southwestern White Pine trees in front of
existing ash trees - between the property line and the proposed facility. This will
require updates to Landscape and Site Plan.
Comment Number: 4
12/31/2019: FOR FINAL APPROVAL - UPDATED:
The engineering letter was submitted by the applicant and presented to the
hearing officer prior to hearing. Though staff supported the letter, the hearing
officer determined that the letter did not adequately address the requirement
demonstrating that the facility would collapse rather than topple. This project
cannot be approved without a signed letter stating this. If this cannot be
provided, the applicant can change the plan so that the facility meets the
required 1:1 setback or reduce the height of the monopine to meet the setback
requirements in its current location.
If unable to provide a letter as previously mentioned or change the site plan, the
applicant can submit a Modification of Standard application to seek relief from
the standard. The modification request would be subject to a Type 1 hearing.
Response: Unresolved and still pending resolution. This will continue to be worked on while the review of
this update is completed.
11/11/2019: FOR FINAL APPROVAL:
As a condition of approval the applicant was required to submit to the City, a
letter signed by a licensed engineer indicating the proposed structure has been
designed to collapse rather than topple prior to final plan approval . Please
provide this documentation at your next submittal.
Comment Number: 5
12/31/2019: FOR FINAL APPROVAL - UPDATED:
The meter and disconnect switch is still located outside of the equipment
enclosure. Please correct prior to final approval.
Response: Please see attached revised plans with new meter location.
2
Response:
11/11/2019: FOR FINAL APPROVAL:
Please locate all meters and disconnect switches on the inside of the
equipment enclosure.
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrews@fcqov.com
Topic: General
Comment Number: 2
11 /06/2019: INFORMATION:
A sidewalk permit will be needed for the ramp construction. Please see the
following website for application and more information:
https://www.tcgov.com/engineering/inspection.php
See attached completed application.
Contact: Morgan Stroud, 970-416-4344, mstroud@fcgov.com
Topic: General
Comment Number: 1
11/06/2019: FOR FINAL APPROVAL -UNRESOLVED:
Please submit deeds and legal exhibits along with review fees for all
easements to be dedicated to your Development Review Coordinator
- the exhibits will be reviewed by City Staff prior to approval. Deed templates and
more information on the dedication process can be found at:
https://www.fcgov.com/engineering/devrev.php. Please note that the deeds need to be certified
by a Colorado attorney and that recording fees will be required at the time of recording.
Response: These are still pending final review and approval by the City.
Comment Number: 3
12/31/2019: FOR FINAL APPROVAL:
Please use LCUASS drawing 1606 for the handicap ramp replacement in the
right-of-way. Here is a link to that detail:
https://www.larimer.org/sites/defaulVfiles/apdxa 1601 2501 pdf
Response: Please see updated plans.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcqov.com
Topic: General
Comment Number: 8
12/31/2019: FOR FINAL APPROVAL— UNRESOLVED
Some redline comments from round 1 are yet to be addressed.
Response: see updated plans that include the redlines from forestry.
11/6/2019: INFORMATION ONLY
i
Forestry redlines provided.
Topic: Landscape Plans
Comment Number: 5
12/31/2019: FOR FINALAPPROVAL—UNRESOLVED
Thank you for updating the note. However, the ash trees are still shown on the
proposed landscape plan. Please refer to the redlines provided in round 1/comment below.
Response: This has been updated. Please see revised plans.
11/6/2019: FOR FINAL APPROVAL — UNRESOLVED
This has not been resolved. The two ash trees are still shown to be retain and
protected on several sheets. Place a X over these two tree symbols and update
the note to read "EXISTING GREEN ASH TREES TO BE REMOVED AND
MITIGATED. The landscape plans will not be approved until these changes are
made. Refer to Forestry redlines if further clarification is needed.
6/11/2019: FOR FINAL APPROVAL
On several pages, the two existing Ash trees that are proposed to be removed
are still shown on the landscape plan. If you wish to keep the Ash trees symbols
on the plan, that is fine, but please place a X over the symbol and update the
note to read "EXISTING GREEN ASH TO BE REMOVED AND MITIGATED".
Please note that this should be consistent among all landscape sheets. Please reference Forestry redlines.
Comment Number: 7
12/31/2019: FOR FINAL APPROVAL-UNDRESOLVED
No comment response was provided by the applicant. Has this been coordinated?
Response: This has been updated.
11/6/2019: FOR FINAL APPROVAL — UNRESOLVED
No comment response was provided by the applicant.
6/11/2019: FOR FINAL APPROVAL
Please confirm with project planner, Kai Kleer, but I believe that the (3)
southwestern white pines should be surrounding the monopine to act as a natural buffer and
provide screening. Please note that this should be consistent among all landscape sheets.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1
12/24/2019: FOR FINAL APPROVAL -UNRESOLVED:
All plan sheets must be 24"06".
Response: These plans are in 2436 format.
11/07/2019: FOR FINAL APPROVAL:
All plan sheets must be 24"x36".
4
Comment Number: 2
12/24/2019: FOR FINAL APPROVAL -UNRESOLVED:
All plan sets are required to add a legal description to the cover sheet. Please
feel free to contact us to discuss.
Response: Per Jeff County, this condition has been met and the legal is on the T-Sheet
11/07/2019: FOR FINAL APPROVAL:
Please add a legal description for the property where this equipment is located to sheet T1.
Comment Number: 3
12/24/2019: FOR FINAL APPROVAL -UNRESOLVED:
Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines.
Response: Corrected.
11/07/2019: FOR FINAL APPROVAL:
Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines.
Comment Number: 4
12/24/2019: FOR FINAL APPROVAL -UNRESOLVED:
Some of the sheet numbers in the sheet index do not match the sheet numbers
on the noted sheets. See redlines.
Response: Corrected
11/07/2019: FOR FINAL APPROVAL:
Some of the sheet numbers in the sheet index do not match the sheet numbers
on the noted sheets. See redlines.
Comment Number: 5
12/24/2019: FOR FINAL APPROVAL -UNRESOLVED:
There are line over text issues. See redlines.
Response: Corrected.
11/07/2019: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 3
01 /03/2020: INFORMATION:
Thank you for submitting your C-1 form and clarifying your proposed electric
service route. Light and Power does not have anything further to request.
9