January 30, 2020
Mike Mcbride
MMLA Landscape + Planning
2339 Spruce Creek Dr
Fort Collins, CO 80528
RE: The Odell Wine Project, FDP200001, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of The Odell Wine Project. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email
at tbeane@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/27/2020
01/27/2020: FOR MYLAR: On the site plan, please call out the location where
the 6 foot fence ends and the 4 foot fence begins along the east boundary. Per
code, the 6 foot fence should stop at the "front building line" of the adjacent
building to the east and transition to 4 feet. That said, we would be OK with the
4' fencing turning the corner, extending along just a portion of the side property
line and then transitioning to 6 feet somewhere in the front yard to allow more
screening flexibility, generally as shown on the architectural elevations. If there's
an issue or question, please feel free to reach out to me.
Response: The 6’ privace fence has been pulled north 20’ to align with the edge of the gravel drive.
Comment Number: 2 Comment Originated: 01/27/2020
01/27/2020: FOR MYLAR: Please add a note or callout on the site plan
indicating where trash/recycling facilites are located for the project.
Response: Trash enclosure has been labeled.
2
Comment Number: 3 Comment Originated: 01/30/2020
01/30/2020: Please add a final hydrozone table to the landscape plan.
Response: Hydrozone table has been added to sheet L4
Department: Engineering Development Review
Contact: Morgan Stroud, 970-416-4344, mstroud@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/28/2020
01/28/2020: Development Agreement:
Please submit the information sheet for a Development Agreement to me or in
the next round of review. Once comments from all contributing departments
have been resolved I can put a draft together and have the City Attorneys office
review it. Once the City Attorney's review the draft, I will send it to the applicant
for review. After the draft is accepted by both parties, we can work through the
details for finalizing and getting the Development Agreement recorded at the
County.
Response: Development Agreement information has been submitted.
Comment Number: 2 Comment Originated: 01/28/2020
01/28/2020: For Final Approval:
Please continue to work with Technical Services and me on finalizing the
easement documents for this project.
Response: Easement documents are currently being finalized.
Comment Number: 3 Comment Originated: 01/28/2020
01/28/2020: For Final Approval:
It appears that a new gate is being installed at the driveway to this property off
of Lincoln (Sheet L1 of the site/landscape plans). This gate needs to be moved
out of the right-of-way and the gates for the vehicles and pedestrians can not
swing into the right-of-way.
Response: Gate has been moved out the right-of-way. Gates will swing inward to the property.
Comment Number: 4 Comment Originated: 01/28/2020
01/28/2020: Building Permit:
This project is proposing a fence in the Lincoln Ave right-of-way to match the
existing fence to the west. This will require an encroachment permit. Please
follow this link to find the documents that are required to obtain an
encroachment permit: https://www.fcgov.com/engineering/inspection.php
Response: Revocable Encroachment Permit has been included will be submitted.
Comment Number: 5 Comment Originated: 01/28/2020
01/28/2020: Information Only:
This project will need to obtain an excavation permit to do the work that is
proposed in the right-of-way. Here is a link to that permit:
https://www.fcgov.com/engineering/inspection.php
Response: Noted. Will be provided by Contractor.
3
Comment Number: 6 Comment Originated: 01/28/2020
01/28/2020: For Final Approval:
The fence in front of this property has conflicting details and locations between
the utility plan set and the site/landscape plan. Please adjust the plan sets to
show the same details.
Response: Fence location has been coordinated.
Comment Number: 7 Comment Originated: 01/28/2020
01/28/2020: For Final Approval:
A temporary construction easement will be needed from the neighbor to the
north where the retaining wall and the fire lane will be crossing the property. This
is a private agreement, so we will just need to see the executed agreement.
Response: Executed agreements for the construction and existence of the wall will be provide once
executed.
Comment Number: 8 Comment Originated: 01/29/2020
01/29/2020: For Final Approval:
Please add the following note to the following pages (Utility Plans -
C200,C300,C400,C401; Site/Landscape - L1, L3,):
"Private improvements shown within the rights-of-way are subject to approval of
an encroachment permit."
Response: Note has been added.
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 01/22/2020
01/22/2020: Please provide a calculation for the total disturbed area affected
by this site development and include in the ESC Report. Please address all
comments on the redlined ESC plan and adjust escrow calculation as needed.
Response: The erosion control plan and escrow was updated per staff comments.
Department: Stormwater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL – UNRESOLVED FROM PDP:
The size and capacity of outlet storm pipe need to be confirmed. Specifically:
between the 800 E. Lincoln Pond and the Lincoln Ave public storm system, the
pipe size, capacity, and 100-year flow need to be documented and verified.
This will include the outflow rate from the 800 E. Lincoln - East Pond. See
redlined plans for more information.
Response: The storm line was confirmed to be an 18” RCP.
Comment Number: 3 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Drainage Report - Please update the surface type impervious values in the
4
drainage report to be consistent with the FCSCM. See comments on Drainage
Report for more information.
Response: The hydrologic calculations were updated per staff comments.
Comment Number: 4 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Drainage Report - Please double check the invert elevations for the detention
orifice calculation against the Utility Plans.
Response: The orifice detail was updated to match the drainage report.
Comment Number: 5 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
See redlines in the Drainage Report for minor comments and clarification of
written comments. I encourage you to reach out to me with any questions.
Response: The drainage report was updated per Staff redlines.
Comment Number: 7 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
On the Drainage Plan, please provide a Drainage basin summary table (basin,
area, C, Q2, Q100) and Detention pond summary table (WSEL100, detention
release rate, volume).
Response: The tables were added to the drainage plan.
Comment Number: 8 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Drainage Plan – Update the flow arrows and the existing drainage plan.
Remove any proposed components from the existing drainage plan
Response: The drainage plan was updated per staff comments.
Comment Number: 9 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Utility Plans - The plans propose to remove an existing storm inlet, on the south
side of the project, and replace with a cleanout. Please abandon the inlet
instead. The storm pipe can be flow-filled to the manhole.
Response: Inlet note was revised to be abandoned per staff comments.
Comment Number: 10 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Utility Plans - Please provide more information about what is going to happen to
the existing storm pipe and manhole on the north side of the project. See
redlines for more information.
Response: Design info is provided on Sheet C300. No changes are proposed to the existing manhole
other than potential rim elevation changes.
Comment Number: 11 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Utility Plans - The proposed underdrain pipe is too close to a proposed tree.
This is located on the west side of the project. 10-feet minimum separation is
5
required. Please update plans to provide this separation.
Response: The underdrain was moved away from the tree per staff comments.
Comment Number: 12 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Utility Plans - The City does not want an exfiltration discharge basin into the
paver storage base. This is located near the southwest corner of the existing
building. Instead of piping this runoff, can these flows be directed onto the
pavers surface? See redlined plans for more information.
Response: Exfiltration into the discharge basin was removed.
Comment Number: 13 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Utility Plans - Please remove all perforated drain basins in the stormwater
details. The City would like these to be solid structures. See redlined plans for
more information.
Response: Perforated drain basins were removed per staff comments.
Comment Number: 14 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Utility Plans - Check the detention orifice size between the plans and the
drainage calculations. Please update so they are consistent.
Response: The orifice detail was updated to match the drainage report.
Comment Number: 15 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Utility Plans – The plans show a proposed offsite retaining wall, north of the
property. Please show top-of-wall and bottom-of-wall elevations on the Grading
Plans. The wall may require an easement. Please coordinate with Engineering
on any requirements for this wall.
Response: Retaining wall height is provided on the utility plans. Retaining wall design is provided on the
landscaping plans.
Comment Number: 16 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
See redlines on Utility Plans for minor comments and clarification of written
comments. I encourage you to reach out to me with any questions.
Response: Utility plans were updated per staff redlines.
Comment Number: 17 Comment Originated: 01/29/2020
01/29/2020: FOR INFORMATION:
*New Comment*
Regarding erosion control notes, both the LCUASS notes (Appendix E-2) and
the Fort Collins Stormwater Criteria Manual notes (Appendix F) should be on
the plans.
Response: Erosion control notes from FCSCM were added to the utility plans.
6
Comment Number: 18 Comment Originated: 01/29/2020
01/29/2020: FOR INFORMATION:
*New Comment*
This project will require stormwater development review fee to be paid before
issuance of the building permit (B1916990 Renovation). This fee is estimated
at $621.
Response: Noted
Department: Water-Wastewater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Upsizing of the existing 3/4-inch water service may not occur within 5-feet of the
water meter. Please adjust plan linework and notes.
Response: Water service was increased per MEP to provide required demands and pressure while
allowing 5 feet within the meter to remain as ¾ inch.
Comment Number: 2 Comment Originated: 01/28/2020
01/28/2020: FOR FINAL APPROVAL:
For this project, we will allow both buildings to be served from the existing water
and sewer service (the existing 'building' is being separated by the removal of
an enclosed walkway). This is an exception and not a precedence for what we
will permit elsewhere. The applicant will need to sign a covenant agreement
that states the property cannot be subdivided in manner that would place these
buildings on separate lots.
**Update: The covenant agreement form will be filled out by Utilities and sent to
the applicant at FDP round 2 for review. This will need to be signed by the
applicant and filed with the County. I have included the blank template of the
covenant agreement with the redlines. Please review and let us know if there
are any issues or objections. Any questions on this can be directed to Jill White
at UtilityFees@fcgov.com.
Response: Executed covenant agreement will be provided.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: Construction Drawings
Comment Number: 23 Comment Originated: 01/27/2020
1/27/2020: FOR FINAL APPROVAL – UNRESOLVED:
Continued:
Please show trees that are proposed to be removed with a X over the symbol
on the Civil Plans. This must be done for final approval.
1/14/2020: FOR FINAL APPROVAL – UNRESOLVED:
Continued:
Thank you for adding the City Tree Protection Notes to the Civil Drawings.
However, trees that are proposed to be removed are still not shown to be
7
removed with a X over the symbol.
01/27/2020:
Response: Utility plans were updated per staff comments.
Topic: General
Comment Number: 28 Comment Originated: 01/27/2020
1/27/2020: DEVELOPMENT AGREEMENT
Development Agreement language will be provided to the City Engineer.
Response: Noted
Comment Number: 30 Comment Originated: 01/28/2020
1/28/2020: FOR FINAL APPROVAL
On sheet C100 of the Civil Plans, please edit the note near the street tree in the
right of way to say: EXISTING TREE TO BE RELOCATED BY CITY
FORESTRY. Please include this same note on the landscape plans as well.
Response: Utility plans were updated per staff comments.
Topic: Landscape Plans
Comment Number: 26 Comment Originated: 01/27/2020
1/27/2020: FOR FINAL APPROVAL – UNRESOLVED
Continued:
In the Existing Tree Removal Feasibility Letter, please include the specific tree
numbers that are proposed to be removed.
1/14/2020: FOR FINAL APPROVAL - UPDATED
Continued:
In the Existing Tree Removal Feasibility Letter, please include the tree numbers
that are proposed to be removed.
11/21/2019: FOR FINAL APPROVAL
Please submit an updated Existing Tree Removal Feasibility Letter that
accounts for TR-9.
Response: Tree Removal Feasibility Letter has been updated.
Comment Number: 27 Comment Originated: 01/27/2020
1/27/2020: FOR FINAL APPROVAL
There are only 9 proposed mitigation trees shown on the landscape plan. 11
are required. Please provide two additional mitigation trees on the plans –
labeled in both the plant list and on the landscape plans.
Response: Additional mitigation trees have been labeled on the plant list.
Comment Number: 29 Comment Originated: 01/27/2020
1/27/2020: FOR FINAL APPROVAL
Is the tree table still being proposed around the existing Austrian Pine? The
detail was removed from the site/landscape plan. Please include this detail on
the plans if it is still proposed.
Response: Tree table has been removed.
8
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 01/22/2020
01/22/2020: Prior fire department comments related to site planning have been
resolved. I appreciate all the hard work. There are no comments at this time.
Remember to submit a separate permit application to PFA at time of plans
review.
Response: Noted
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/28/2020
01/28/2020: Information:
Thank you for working with us during the PDP stage of the process. It is my
understanding that the electric service and facility locations are not intended to
be changed as part of the project. If this has changed, please let me know.
Response: Noted
Department: Environmental Planning
Contact: Kelly Smith, ksmith@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/27/2020
01/27/2020: no further comments
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Please revise the Benchmark Statement as marked. See redlines.
Response: Utility plans were updated per staff redlines.
Comment Number: 6 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
There are sheet numbering issues. See redlines.
Response: Utility plans were updated per staff redlines.
Comment Number: 7 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
All Basis Of Bearings statements must match on all sheets.
Response: Utility plans were updated per staff redlines.
Comment Number: 8 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
9
All Benchmark Statements must match on all sheets.
Response: Utility plans were updated per staff redlines.
Comment Number: 9 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Response: Utility plans were updated per staff redlines.
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
There are sheet numbering issues. See redlines.
Response: Utility plans were updated per staff redlines.
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Please revise the sub-title as marked. See redlines.
Response: Utility plans were updated per staff redlines.
Comment Number: 2 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
Some of the sheet titles in the sheet index do not match the sheet titles on the
noted sheets. See redlines.
Response: Utility plans were updated per staff redlines.
Comment Number: 3 Comment Originated: 01/27/2020
01/27/2020: FOR FINAL APPROVAL:
There are sheet numbering issues. See redlines.
Response: Utility plans were updated per staff redlines.