Loading...
HomeMy WebLinkAboutTHE ODELL WINE PROJECT - FDP200001 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTFebruary 12, 2020 Mr. Matt Simpson City of Fort Collins 700 Wood Street Fort Collins, Colorado 80521 RE: Drainage Memo for Odell Wine Project 824 E. Lincoln Ave., Fort Collins, Colorado Dear Mr. Simpson, The Odell Wine Project, at 824 E. Lincoln Avenue, is a proposed expansion to the brewery operations for the Odell Brewery on 800 E. Lincoln Avenue. The site is currently composed of a steel frame industrial building and hardscape (asphalt and concrete) parking lot with concrete and gravel industrial access. The building is currently used for Odell’s barrel storage. Odell proposes to repurpose the existing building as a wine and beer tasting room. Improvements consists of renovations to the existing building, an outdoor patio, permeable pavers, new sidewalks, and new landscaping. The original drainage report, Storm Drainage Report for Building Addition at the 824 East Lincoln Avenue (Lot 1 Patrick Subdivision), for this project was prepared in September 1995 by Stewart and Associates. Subsequently, a regional detention pond, the East Pond, was constructed on 800 E. Lincoln Avenue to provide detention for both 800 and 824 E. Lincoln Avenue. The East Pond was further revised on April 22, 2013 (Odell Brew House Drainage Letter Report Amendment by Northern Engineering) for the 100-year storm event from both 800 and 824 E. Lincoln Avenue. However, the East Pond was constructed with less than the design volume (Addendum to Final Drainage Certification Memorandum for 2013 Odell Brew House Expansion by Northern Engineering dated February 18, 2014). According to Table 1, the East Pond is short by 1,791 cubic feet. The shortage in volume is caused by the burden on the East Pond from 824 E. Lincoln Avenue. Additional concrete improvements in 2015 resulted in further aggravating the burden on the East Pond. Page 2 Asbuilt Detention Volumes for 800 E. Lincoln Ave. Required Volume1 800 E. Lincoln Ave. 11,118 ft3 824 E. Lincoln Ave. 2,554 ft3 Total 13,672 ft3 Asbuilt Volume1 Permeable Pavers 2,261 ft3 East Pond 9,620 ft3 Total 11,881 ft3 All volumes from Addendum to Final Drainage Certification Memorandum for 2013 Odell Brew House Expansion by Northern Engineering dated 02/18/2014. Table 1: Detention Volumes for 800 E. Lincoln Avenue The project proposes to reduce the overall impervious area of the site by 1,098 square feet. The existing impervious area is 27,036 square feet. The proposed impervious area is 25,939 square feet. However, the historic runoff limitations dictated by the original drainage report, Storm Drainage Report for Building Addition at the 824 East Lincoln Avenue (Lot 1 Patrick Subdivision), and the burden on the East Pond require detention for the project. The project will utilize permeable pavers to address the burden to the East Pond, meet LID requirements, and any additional detention required by the proposed improvements to 824 E. Lincoln Avenue (Odell Wine Project). According to the original drainage report, Storm Drainage Report for Building Addition at the 824 East Lincoln Avenue (Lot 1 Patrick Subdivision), 0.67 acres of the project site was limited to a runoff of 0.5 cfs and the remaining 0.32 acres was allowed to flow undetained into Lincoln Avenue. An analysis of the Historic Basins (see attached Historic Hydrological Calculations), while maintaining the historic flowrates per the original drainage report, results in an allowable 100-Year release rate of 3.70 cfs for the entire site. The permeable pavers for 824 E. Lincolne Avenue (Odell Wine Project) will have a release rate of 1.19 cfs. A detention volume of 2,251 cubic feet will be required to maintain a runoff of less than 3.70 cfs for the entire site. The project was divided into four (4) onsite and five (5) offsite proposed drainage basins further described below. Basin A-1, located within the front half of the site, consists of that portion of the project that drains into the proposed permeable pavers. Basin A-2, located in the back half of the site, consists of that portion of the project that will continue to drain into the East Pond on 800 E. Lincoln Avenue. Basin B consists of a tiny sliver of landscaping along the front that drains into the existing storm sewer in Lincoln Avenue. Basin C consists of the northeast corner of the project that drains onto the neighboring property to the east. Except for some curb and Page 3 gutter to help facilitate drainage within Basin A-1, the project site does not alter the historic drainage patterns. Runoff from Basins A-2, B, and C will flow undetained, but there is 763 cubic feet within the East Pond available to Basin A-2. Runoff from Basin A-1 will flow into the proposed permeable pavers. The permeable pavers will meet the project’s detention and LID requirements. The project site will conform with the requirement to treat a minimum of 50% of new impervious area using permeable pavers. The hillside along the north property line, located within offsite basins OS-1 and OS-2, is a significant source of offsite drainage impacting the site. Basins OS-1 and OS-2 are divided on whether the flow towards the east or west property lines. The project proposes a swale along the north property line to redirect drainage in OS-1 and OS-2, from impacting the permeable pavers in Basin A-1, into an existing 15” storm sewer along the west property line. Additional offsite basins (OS-3, OS-4, and OS-5) include those portions of the project located within the Lincoln Avenue right-of-way or 800 E. Lincoln Avenue. The Odell Wine Project will reduce the burden on the East Pond for 800 E. Lincoln Street. Upon completion of the permeable pavers for Odell Wine Project, the East Pond for 800 E. Lincoln Street will be in compliance with City of Fort Collins stormwater regulations. In addition, the Odell Wine Project will maintain the historic runoffs per Storm Drainage Report for Building Addition at the 824 East Lincoln Avenue (Lot 1 Patrick Subdivision). Don’t hesitate to contact me at 970.568.5408 or fred@northernengineering.com. LID Treatment from Permeable Pavers: Impervious Area Requiring LID (2015): 1,573 ft2 Impervious Area Requiring LID (2020): 7,215 ft2 Impervious Area Requiring LID (Total): 8,788 ft2 Impervious Area Receiving of LID: 9,040 ft2 Pavers Surface Area: 2,986 ft2 Runon Ratio: 3.0 Page 4 Sincerely, Northern Engineering Services, Inc. I hereby attest this report for the final drainage design for the Odell Wine Project was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others. Registered professional engineer must affix their seal with signature and date. Frederick S. Wegert, PE Project Engineer Attachments: Hydrology Calculations LID & Permeable Paver Calculations Inlet Calculations East Pond Drainage Certifications Drainage Exhibit cc: Michael McBride, MMLA; Rebecca Spears, RB+B Architects 2/12/202 0 Runoff Coefficient1 Percent Impervious1 0.95 100% 0.95 90% 0.80 80% 0.50 40% 0.10 2% 0.20 2% Basin ID Basin Area (sq.ft.) Basin Area (acres) Asphalt, Concrete (acres) Rooftop (acres) Recycled Asphalt (acres) Gravel (acres) Lawns, Sandy Soil, Flat Slope < 2% (acres) Lawns, Clayey Soil, Flat Slope < 2% (acres) Percent Impervious C2*Cf Cf = 1.00 C5*Cf Cf = 1.00 C10*Cf Cf = 1.00 C100*Cf Cf = 1.25 HA 24,980 0.573 0.145 0.139 0.000 0.194 0.000 0.10 61% 0.67 0.67 0.67 0.84 HB 18,275 0.420 0.116 0.083 0.000 0.083 0.000 0.14 54% 0.61 0.61 0.61 0.77 HOS1 7,579 0.174 0.000 0.000 0.000 0.000 0.000 0.17 2% 0.20 0.20 0.20 0.25 HOS2 1,519 0.035 0.000 0.000 0.000 0.000 0.000 0.03 2% 0.20 0.20 0.20 0.25 HOS3 1,202 0.028 0.006 0.000 0.000 0.000 0.000 0.02 22% 0.35 0.35 0.35 0.44 HOS4 1,300 0.030 0.000 0.000 0.000 0.021 0.000 0.01 29% 0.42 0.42 0.42 0.52 Lawns and Landscaping: 2) Composite Runoff Coefficient adjusted per Table 3.2-3 of the Fort Collins Stormwater Manual (FCSM). Lawns, Clayey Soil, Flat Slope < 2% USDA SOIL TYPE: C Lawns, Sandy Soil, Flat Slope < 2% Composite Runoff Coefficient2 1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM. HISTORIC RUNOFF COEFFICIENT CALCULATIONS Asphalt, Concrete Rooftop Recycled Asphalt Gravel Odell Wine F. Wegert February 12, 2020 Project: Project: Calculations By: Date: Length (ft) Elev Up Elev Down Slope (%) Ti 2-Yr (min) Ti 10-Yr (min) Ti 100-Yr (min) Length (ft) Elev Up Elev Down Slope (%) Velocity (ft/s) Tt (min) Length (ft) Elev Up Elev Down Slope (%) Velocity (ft/s) Tt (min) Max. Tc 2-Yr (min) Tc 2-Yr (min) Max. Tc 10-Yr (min) Tc 10-Yr (min) Max. Tc 100-Yr (min) Tc Tc2 Tc10 Tc100 C2 C10 C100 I2 (in/hr) I10 (in/hr) I100 (in/hr) Q2 (cfs) Q10 (cfs) Q100 (cfs) ha HA 0.573 11.16 11.16 7.77 0.67 0.67 0.84 2.13 3.63 8.59 0.82 1.40 4.14 a1 HB 0.420 5.18 5.18 5.00 0.61 0.61 0.77 2.85 4.87 9.95 0.73 1.25 3.20 hos1 HOS1 0.174 8.48 8.48 8.14 0.20 0.20 0.25 2.40 4.10 8.38 0.08 0.14 0.36 a3 HOS2 0.035 6.23 6.23 5.89 0.20 0.20 0.25 2.67 4.56 9.63 0.02 0.03 0.08 hos3 HOS3 0.028 7.05 7.05 6.24 0.35 0.35 0.44 2.52 4.31 9.31 0.02 0.04 0.11 a5 HOS4 0.030 5.00 5.00 5.00 0.42 0.42 0.52 2.85 4.87 9.95 0.04 0.06 0.15 HISTORIC DIRECT RUNOFF COMPUTATIONS Intensity Flow Odell Wine F. Wegert February 12, 2020 Project: Calculations By: Overland Flow, Time of Concentration: Gutter/Swale Flow, Time of Concentration: Date: Rational Equation: Q = CiA (Equation 6-1) Design Point Basin Area (acres) Runoff C Tt = L / 60V (Equation 6-4 per MHFD) Tc = Ti + Tt (Equation 6-2 per MHFD) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ Intensity, I from Fig. 3.4.1 Fort Collins Stormwater Manual Tc (Min) } (Equation 6-4 per MHFD) 𝑇𝑖 = 1.87 1.1 − 𝐶 ∗ 𝐶𝑓 𝐿 𝑆 ൗ 1 3 (Equation 3.3-2 per Fort Collins Stormwater Manual) Page 1 of 1 Runoff Coefficient1 Percent Impervious1 0.95 100% 0.95 90% 0.50 40% 0.50 40% 0.10 2% 0.20 2% Basin ID Basin Area (sq.ft.) Basin Area (acres) Asphalt, Concrete (acres) Rooftop (acres) Gravel (acres) Pavers (acres) Lawns, Sandy Soil, Flat Slope < 2% (acres) Lawns, Clayey Soil, Flat Slope < 2% (acres) Percent Impervious C2*Cf Cf = 1.00 C5*Cf Cf = 1.00 C10*Cf Cf = 1.00 C100*Cf Cf = 1.25 A-1 23,328 0.536 0.230 0.126 0.032 0.066 0.000 0.08 72% 0.75 0.75 0.75 0.94 A-2 11,103 0.255 0.068 0.045 0.032 0.000 0.000 0.11 48% 0.57 0.57 0.57 0.71 B 532 0.012 0.000 0.000 0.000 0.000 0.000 0.01 2% 0.20 0.20 0.20 0.25 C 8,292 0.190 0.004 0.049 0.013 0.000 0.000 0.12 29% 0.43 0.43 0.43 0.54 OS-1 7,579 0.174 0.016 0.000 0.000 0.000 0.000 0.16 11% 0.27 0.27 0.27 0.34 OS-2 1,519 0.035 0.000 0.000 0.000 0.000 0.000 0.03 2% 0.20 0.20 0.20 0.25 OS-3 729 0.017 0.000 0.000 0.000 0.000 0.000 0.02 2% 0.20 0.20 0.20 0.25 OS-4 474 0.011 0.007 0.000 0.000 0.000 0.000 0.00 63% 0.67 0.67 0.67 0.83 OS-5 1,291 0.030 0.005 0.000 0.000 0.010 0.000 0.01 32% 0.43 0.43 0.43 0.54 A-B 34,963 0.803 0.298 0.171 0.065 0.066 0.000 0.20 63% 0.69 0.69 0.69 0.86 Pavers 43,774 1.005 0.326 0.171 0.065 0.076 0.000 0.37 54% 0.61 0.61 0.61 0.77 A-OS1 62,456 1.434 0.410 0.215 0.097 0.076 0.000 0.64 48% 0.56 0.56 0.56 0.70 C-OS2 9,811 0.225 0.004 0.049 0.013 0.000 0.000 0.16 25% 0.39 0.39 0.39 0.49 DEVELOPED RUNOFF COEFFICIENT CALCULATIONS Asphalt, Concrete Rooftop Gravel Pavers Odell Wine F. Wegert February 12, 2020 Project: Calculations By: Date: Character of Surface Project: Calculations By: Date: Length (ft) Elev Up Elev Down Slope (%) Ti 2-Yr (min) Ti 10-Yr (min) Ti 100-Yr (min) Length (ft) Elev Up Elev Down Slope (%) Velocity (ft/s) Tt (min) Length (ft) Elev Up Elev Down Slope (%) Velocity (ft/s) Tt (min) Max. Tc 2-Yr (min) Tc 2-Yr (min) Max. Tc 10-Yr (min) Tc 10-Yr (min) Max. Tc 100-Yr (min) Tc Tc2 Tc10 Tc100 C2 C10 C100 I2 (in/hr) I10 (in/hr) I100 (in/hr) Q2 (cfs) Q10 (cfs) Q100 (cfs) a-1 A-1 0.536 9.91 9.91 5.86 0.75 0.75 0.94 2.26 3.86 9.63 0.91 1.56 4.86 a-2 A-2 0.255 11.64 11.64 10.79 0.57 0.57 0.71 2.09 3.57 7.57 0.30 0.52 1.37 b B 0.012 5.69 5.69 5.39 0.20 0.20 0.25 2.76 4.72 9.95 0.01 0.01 0.03 c C 0.190 10.13 10.13 9.07 0.43 0.43 0.54 2.21 3.78 8.03 0.18 0.31 0.82 os-1 OS-1 0.174 8.02 8.02 7.57 0.27 0.27 0.34 2.40 4.10 8.59 0.11 0.19 0.50 os-2 OS-2 0.035 6.23 6.23 5.89 0.20 0.20 0.25 2.67 4.56 9.63 0.02 0.03 0.08 os-3 OS-3 0.017 5.00 5.00 5.00 0.20 0.20 0.25 2.85 4.87 9.95 0.01 0.02 0.04 os-4 OS-4 0.011 5.00 5.00 5.00 0.67 0.67 0.83 2.85 4.87 9.95 0.02 0.04 0.09 os-5 OS-5 0.030 5.00 5.00 5.00 0.43 0.43 0.54 2.85 4.87 9.95 0.04 0.06 0.16 a-1 A-B 0.803 10.35 10.35 7.04 0.69 0.69 0.86 2.21 3.78 8.80 1.22 2.08 6.07 a-1 Pavers 1.005 11.39 11.39 8.93 0.61 0.61 0.77 2.13 3.63 8.21 1.31 2.24 6.32 a-1 A-OS1 1.434 10.87 10.87 9.92 0.56 0.56 0.70 2.17 3.71 7.88 1.75 2.99 7.95 c C-OS2 0.225 6.85 6.85 6.19 0.39 0.39 0.49 2.60 4.44 9.31 0.23 0.39 1.03 Runoff C Tt = L / 60V (Equation 6-4 per MHFD) Tc = Ti + Tt (Equation 6-2 per MHFD) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ Intensity, I from Fig. 3.4.1 Fort Collins Stormwater Manual Tc (Min) Combined Basins DEVELOPED DIRECT RUNOFF COMPUTATIONS Intensity Flow Odell Wine F. Wegert February 12, 2020 Project: Calculations By: Overland Flow, Time of Concentration: Gutter/Swale Flow, Time of Concentration: Date: Rational Equation: Q = CiA (Equation 6-1) Design Point Basin Area (acres) } (Equation 6-4 per MHFD) 𝑇𝑖 = 1.87 1.1 − 𝐶 ∗ 𝐶𝑓 𝐿 𝑆 ൗ 1 3 (Equation 3.3-2 per Fort Collins Stormwater Manual) Page 1 of 1 X X X X X RD RD X X ROOFTOP CONCRETE ASPHALT GRAVEL SURFACE AREA (SF) % IMPERV. IMPERV. AREA (SF) 9,645 8,645 2,711 12,070 100% 100% 100% 50% 6,035 TOTALS 43,255 TOTAL= 27,036 ROOFTOP CONCRETE PAVERS GRAVEL SURFACE AREA (SF) % IMPERV. IMPERV. AREA (SF) 11,726 2,986 3,383 100% 100% 50% 50% TOTALS 43,255 TOTAL= 25,939 EXISTING PROPOSED 1,692 1,448 P:\100-020\DWG\DRNG\100-020_IMPV.DWG 824 E. LINCOLN AVENUE FORT COLLINS COLORADO Fort Collins: 301 N. Howes St., Ste. 100, 80521 Greeley: 820 8th Street, 80631 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DESCRIPTION EXISTING VS. PROPOSED IMPERVIOUS AREA DRAWN BY F. WEGERT DATE Project: Calc. By: Date: sq. ft. acres HA 24,980 0.57 0.82 1.40 4.14 Basin HA limited to 0.5 cfs per Storm Drainage Report for Building Addition at the 824 East Lincoln Avenue (Lot 1 Patrick Subdivision) prepared by Stewart and Associates dated September 14, 1995. HB 18,275 0.42 0.73 1.25 3.20 Basin HB was released undetained per Storm Drainage Report for Building Addition at the 824 East Lincoln Avenue (Lot 1 Patrick Subdivision) prepared by Stewart and Associates dated September 14, 1995. Total 43,255 0.99 1.23 1.75 3.70 Release rate from HA is limited to 0.5 cfs. sq. ft. acres A-1 23,328 0.54 0.91 1.56 4.86 Detention required A-2 11,103 0.25 0.30 0.52 1.37 Will be release undetained. However, basin flows into East Pond on 800 East Lincoln Avenue. B 532 0.01 0.01 0.01 0.03 Will be release undetained C 8,292 0.19 0.18 0.31 0.82 Will be release undetained Total 43,255 0.99 1.40 2.40 7.08 sq. ft. acres A-1 23,328 0.54 1.01 1.19 1.19 Orifice plate in permeable pavers outlet will limit flow to 1.19 cfs. A-2 11,103 0.25 0.30 0.52 1.37 Will be release undetained. However, basin flows into East Pond on 800 East Lincoln Avenue. B 532 0.01 0.01 0.01 0.03 Will be release undetained C 8,292 0.19 0.18 0.31 0.82 Will be release undetained Total 43,255 0.99 1.50 2.03 3.41 Less than historic site release rate of 3.70 cfs. 100-Year (cfs) Notes HISTORIC VS DEVELOPED FLOWRATES On-Site Historic Flowrates On-Site Developed Flowrates (Undetained) Odell Wine Project F. Wegert Area Basin 2-Year (cfs) 10-Year (cfs) February 12, 2020 10-Year (cfs) 100-Year (cfs) On-Site Developed Flowrates (Detained) Basin Area 2-Year (cfs) 10-Year (cfs) 100-Year (cfs) Notes Basin Notes Area 2-Year (cfs) Pond No : A1 100-yr 1.00 9.90 min 2251 ft3 0.54 acres 0.05 ac-ft Max Release Rate = 1.19 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 1612 1.19 357 1255 10 7.720 2501 1.19 714 1787 15 6.520 3169 1.19 1071 2098 20 5.600 3629 1.19 1428 2201 25 4.980 4034 1.19 1785 2249 30 4.520 4393 1.19 2142 2251 35 4.080 4627 1.19 2499 2128 40 3.740 4847 1.19 2856 1991 45 3.460 5045 1.19 3213 1832 50 3.230 5233 1.19 3570 1663 55 3.030 5399 1.19 3927 1472 60 2.860 5560 1.19 4284 1276 65 2.720 5728 1.19 4641 1087 70 2.590 5874 1.19 4998 876 75 2.480 6026 1.19 5355 671 80 2.380 6169 1.19 5712 457 85 2.290 6307 1.19 6069 238 90 2.210 6444 1.19 6426 18 95 2.130 6556 1.19 6783 -227 100 2.060 6674 1.19 7140 -466 105 2.000 6804 1.19 7497 -693 110 1.940 6914 1.19 7854 -940 115 1.890 7042 1.19 8211 -1169 120 1.840 7154 1.19 8568 -1414 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION: MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 100-020 Odell Wine Project Project Number : Project Name : Permeable Pavers A = Tc = Project Location : Design Point Project Number : Project Name : Project Location : Pond No : 800 E. Lincoln Ave. 11,118 ft3 824 E. Lincoln Ave. 2,554 ft3 Total 13,672 ft3 Permeable Pavers 2,261 ft3 East Pond 9,620 ft3 Total 11,881 ft3 2,251 ft3 2,261 ft3 800 E. Lincoln Ave. 8,857 ft3 824 E. Lincoln Ave. (100% of Basin A-2) 763 ft3 Asbuilt Volume 9,620 ft3 30% 3,870 ft2 23.3 in 6.0 in 4.0 in 26.0 in 36.0 in 2,515 ft3 2,251 ft3 Paver & Levelling Course Depth (per FC standard details)3 Design Depth of Subbase Base Depth (per FC standard details)3 Required Volume (100% of Basin A-1) Permeable Pavers (800 E. Lincoln Ave.) Permeable Paver Section (824 E. Lincoln Avenue - Detains 100% of Basin A-1) Assumed Void Ratio per FCSM2 Asbuilt Volume1 Allocation of Detention Resources on 800 E. Lincoln Ave. Required Volumes of 824 E. Lincoln Avenue Required Detention Vol. for 824 E. Lincoln Ave. for Basin A-1 Area of Pavers East Pond Asbuilt Detention Volumes for 800 E. Lincoln Ave. Required Volume1 PERMEABLE PAVER VOLUME & SECTION Design Volume 100-020 Odell Wine Project Fort Collins, Colorado Permeable Pavers Calculated Depth of Required Subbase (minimum) Total Depth of Permeable Paver Section Notes: 1) All volumes from Addendum to Final Drainage Certification Memorandum for 2013 Odell Brew House Expansion by Northern Engineering dated 02/18/2014. 2) FCSM = Fort Collins Stormwater Manual. 3) Paver depths based on standard Fort Collins detail D-54. Project Number: Project: Date: Prepared By: Pond Data Rim Elev./Finish Ground 4944.94 100-yr WSEL 4944.11 Pipe Invert Elev. 4942.48 Orifice Plate Outflow Q 1.19 cfs Orifice Coefficient Cd 0.62 Gravity Constant g 32.2 ft/s^2 100-year head H 1.63 ft Orifice Area Ao 0.19 ft^2 Orifice Area Ao 27.00 in^2 Calculated Radius r 2.9 in Calculated Diameter d 5.9 in Orifice Curve Stage (ft) H (ft) Q (cfs) Storage Stage Note 4942.48 0.00 0.00 0.00 Orifice Invert 4942.73 0.25 0.47 0.25 4942.98 0.50 0.66 0.50 4943.23 0.75 0.81 0.75 4943.48 1.00 0.93 1.00 4943.73 1.25 1.04 1.25 4943.98 1.50 1.14 1.50 4944.15 1.67 1.21 1.67 100-yr WSEL 4944.48 2.00 1.32 2.00 4944.73 2.25 1.40 2.25 4944.94 2.46 1.46 2.46 Top of Pavers/Finish Ground ORIFICE RATING CURVE Permeable Paver Outlet 100-yr Orifice 100-020 Odell Wine 2/12/2020 F. Wegert 2/10/2020 2:16 PM P:\100-020\Drainage\Detention\100-020_Orifice.xlsx\Orifice Size X X X X X RD RD X X D G G CTV CTV CTV E E E E T T AC SS SS D ST ST ST ST ST ST ST ST ST D D H Y D W C S VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL CONTROL IRR IRR MH VAULT ELEC VAULT CABLE VAULT ELEC D D D C.O. E VAULT X X X X X X X D G G T AC D ST ST ST ST ST ST ST ST ST D D H Y D W C S VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL CONTROL IRR IRR MH VAULT ELEC VAULT CABLE VAULT ELEC D D D C.O. E VAULT ELEC V.P. ELEC BRKR E GGG C.O. C.O. AC AC M Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Oct 15 2019 15-in HDPE Storm Sewer Circular Diameter (ft) = 1.25 Invert Elev (ft) = 4942.40 Slope (%) = 0.25 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 0.59 Highlighted Depth (ft) = 0.35 Q (cfs) = 0.590 Area (sqft) = 0.28 Velocity (ft/s) = 2.08 Wetted Perim (ft) = 1.40 Crit Depth, Yc (ft) = 0.30 Top Width (ft) = 1.13 EGL (ft) = 0.42 0 1 2 3 Elev (ft) Section 4941.50 4942.00 4942.50 4943.00 4943.50 4944.00 Reach (ft) 15" HDPE Upstream from Pavers Basins OS1 & OS2 - 100-Year Storm Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Jan 8 2020 15-in HDPE Storm Sewer with Flow from Pavers Circular Diameter (ft) = 1.25 Invert Elev (ft) = 4942.40 Slope (%) = 0.25 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 1.77 Highlighted Depth (ft) = 0.63 Q (cfs) = 1.770 Area (sqft) = 0.62 Velocity (ft/s) = 2.85 Wetted Perim (ft) = 1.97 Crit Depth, Yc (ft) = 0.53 Top Width (ft) = 1.25 EGL (ft) = 0.76 0 1 2 3 Elev (ft) Section 4941.50 4942.00 4942.50 4943.00 4943.50 4944.00 Reach (ft) OS1, OS2 and Permeable Paver Release Rate - 100-Year Storm Area Inlet Performance Curve: Permeable Pavers (South) Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 3.1416*Dia.of grate * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: Nyloplast 8" Grate Diameter of Grate (ft): 0.666666667 Open Area of Grate (ft2): 0.21 Rim Elevation (ft): 4944.930 Reduction Factor: 50% Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 4944.93 0.00 0.00 0.00 0.20 4945.13 0.28 0.25 0.25 0.40 4945.33 0.79 0.36 0.36 0.60 4945.53 1.46 0.44 0.44 0.80 4945.73 2.25 0.50 0.50 <-2-Year 1.00 4945.93 3.14 0.56 0.56 1.20 4946.13 4.13 0.62 0.62 1.40 4946.33 5.20 0.67 0.67 1.60 4946.53 6.36 0.71 0.71 1.80 4946.73 7.59 0.76 0.76 2.35 4947.28 11.32 0.86 0.86 <-10-Year 10-Year Design Flow = 0.86 cfs 2-Year Design Flow = 0.50 cfs Q = 3 . 0 P H 1 . 5 Q = 0 . 67 A ( 2 gH ) 0 . 5 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 Discharge (cfs) Stage (ft) Stage - Discharge Curves Weir Flow Area Inlet Performance Curve: Permeable Pavers (North) Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 3.1416*Dia.of grate * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: Nyloplast 8" Grate Diameter of Grate (ft): 0.666666667 Open Area of Grate (ft2): 0.21 Rim Elevation (ft): 4945.940 Reduction Factor: 50% Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 4945.94 0.00 0.00 0.00 0.20 4946.14 0.28 0.25 0.25 0.40 4946.34 0.79 0.36 0.36 0.60 4946.54 1.46 0.44 0.44 0.80 4946.74 2.25 0.50 0.50 <-2-Year 1.00 4946.94 3.14 0.56 0.56 1.20 4947.14 4.13 0.62 0.62 1.40 4947.34 5.20 0.67 0.67 1.60 4947.54 6.36 0.71 0.71 1.80 4947.74 7.59 0.76 0.76 2.35 4948.29 11.32 0.86 0.86 <-10-Year 10-Year Design Flow = 0.86 cfs 2-Year Design Flow = 0.50 cfs Q = 3 . 0 P H 1 . 5 Q = 0 . 67 A ( 2 gH ) 0 . 5 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 Discharge (cfs) Stage (ft) Stage - Discharge Curves Weir Flow Area Inlet Performance Curve: North Inlet (OS-1 & OS-2) Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 3.1416*Dia.of grate * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: Nyloplast 15" Dome Diameter of Grate (ft): 1.25 Open Area of Grate (ft2): 0.74 Rim Elevation (ft): 4945.750 Reduction Factor: 50% Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 4945.75 0.00 0.00 0.00 0.12 4945.87 0.24 0.69 0.24 <-10-Year 0.20 4945.95 0.53 0.88 0.53 0.22 4945.97 0.59 0.92 0.59 <-100-Year 0.40 4946.15 1.49 1.25 1.25 0.60 4946.35 2.74 1.53 1.53 0.80 4946.55 4.21 1.77 1.77 1.00 4946.75 5.89 1.98 1.98 1.20 4946.95 7.74 2.17 2.17 1.40 4947.15 9.76 2.34 2.34 1.60 4947.35 11.92 2.50 2.50 100-Year Design Flow = 0.58 cfs 10-Year Design Flow = 0.22 cfs Q = 3 . 0 P H 1 . 5 Q = 0 . 67 A ( 2 gH ) 0 . 5 0.00 2.00 4.00 6.00 8.00 10.00 12.00 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Discharge (cfs) Stage (ft) Stage - Discharge Curves Weir Flow Orifice Flow Final Drainage Certification Memorandum Date: February 3, 2014 Project: 2013 Odell Brew House Expansion Project No. 100-009 Fort Collins, Colorado Attn: Mr. Glen Schlueter City of Fort Collins – Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Glen: This memorandum serves to supplement the Commercial, Multi-Family and Subdivision Certification Checklist, as published on the City of Fort Collins’ website. Specifically, it is intended to document the modifications and current condition of the East Pond. Due to the transplanting of several mature trees from the adjacent Link-N-Greens construction site, as well as the presence of buried electrical lines and irrigation facilities, the East Pond fell short of the required detention storage volume when initially surveyed for certification purposes. An alternative design was subsequently developed, and vetted in the field with Wes Lamarque of Fort Collins Stormwater. While the pond was deficient in total volume, it met the requirements for site generated runoff from Odell Brewing Co. The shortage was purely due to the off-site volume burden from Fort Collins Monument and Stone (FCM&S). It is anticipated that FCM&S will construct their own detention pond, thereby relieving the 2,554 cu.ft. of storage volume currently imposed on the Odell East Pond. However, until said pond is built and certified, Odell will make an effort to provide the interim volume, or increased water quality measures as an offset. It is with those intentions in mind that the East Pond was modified after the aforementioned trees were transplanted. The pond bottom was over-excavated two feet. 4-in. of topsoil was then placed above 8-in. of sand, resulting in a nominal pond bottom approximately one foot lower than the original design (4939.0 instead of 4940.0). This puts the pond bottom slightly below the existing gravity outfall. While this is good from a low-impact development (LID) perspective, there is a strong objective to minimize the potential depth and frequency of standing water. For these reasons, a fourth dry well was added in addition to the sand bottom. 2013 Odell Brew House Expansion | Final Site Drainage Certification | 02.03.14 D:\Projects\100-009\Drainage\DrngCert\Odell_FinalDrngCertMemo_2014-02-03.docx Page 2 of 2 The permeable paver system was constructed pursuant to the approved plans and specifications. This provides roughly 2,261 cu.ft. of LID detention storage in the sub-surface aggregate void space. When combined with the 9,620 cu.ft. of open air detention volume, the East Pond provides approximately 11,881 cu.ft. of total storage. At this time it is kindly requested that the Temporary Certificate of Occupancy be switched to a permanent Certificate of Occupancy given the substantial completion of the drainage improvements. The attached Record Drawings and Checklist, as well as this memo, serve to document the constructed condition. The slight shortage in detention volume in the East Pond is not expected have adverse impacts to public health or safety. The additional trees and LID/water quality benefits employed are viewed as positive offsets to the storage volume that will ultimately reside on the FCM&S property. The Overall Site Drainage Certification for the 2013 Odell Brew House is based upon field survey information and site observation(s) conducted by Northern Engineering, as well as information and testimony supplied by the General Contractor. Please feel free to contact me if you have any questions. Sincerely, Nicholas W. Haws, PE, LEED AP cc: Ben Basalay – RB+B Architects Brian Cass – GH Phipps Construction Companies enc. 02.03.14 Addendum to Final Drainage Certification Memorandum Date: February 18, 2014 Project: 2013 Odell Brew House Expansion Project No. 100-009 Fort Collins, Colorado Attn: Mr. Wes Lamarque City of Fort Collins – Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: This addendum letter is provided pursuant to your request to further document the interim volume shortage in the East Pond. According to the 04.22.13 Drainage Addendum Letter for the Odell Brewing Co. expansion applications (PDP120032 and MA130002), the required storage volume is 13,672 cu.ft. (11,118 cu.ft from Odell + 2,554 cu.ft. from Fort Collins Monument & Stone). The volume currently provided (per the 02.03.14 Odell Record Drawings) is 11,881 cu.ft. (2,261 cu.ft. under the pavers + 9,620 cu.ft. in the open pond). This results in an interim volume shortage of 1,791 cu.ft. (13,672 – 11,881). According to recent soils reports (Terracon Proj. No. 20125035), infiltration rates of the native soils range from 0.1 – 1 in/hr for upper lean clay and clayey sand soils to 2 – 6 in/hr for lower sands and gravels. I chose to conservatively use 0.25 in/hr for infiltration at the installed dry wells. There are four (4) dry wells, each 2 ft. diameter by 6 ft. deep. The total flow rate of all four dry wells combined using an infiltration rate of 0.25 in/hr is 0.26 cfs. The estimated time to drain 1,791 cu.ft. of volume at 0.26 cfs is 1.9 hrs. Since the volume in question can theoretically be drained in less than 2 hours, I feel the constructed pond remains adequate as-is. Please feel free to contact me if you have any questions. Sincerely, Nicholas W. Haws, PE, LEED AP 02.18.14 CTV CTV CTV CTV CTV CTV CTV T X D ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST D MH VAULT CABLE D D D C.O. V.P. C.O. C.O. AC AC M X X X X X X X X X X ST ST ST ST ST UD UD UD UD 0.54 ac. A-1 0.17 ac. OS-1 0.03 ac. OS-2 0.19 ac. 0.25 ac. C A-2 EAST POND (EXISTING) CONCRETE WALK OUTDOOR PATIO EXISTING CONCRETE APRON EXISTING BUILDING (824 E. LINCOLN AVE.) ODELL BREWING EXISTING OUTDOOR PATIO EXISTING PARKING LOT PERMEABLE PAVERS PERMEABLE PAVERS EXISTING SIDEWALK EXISTING 327.12 LF OF 15" HDPE STORM SEWER S = 0.25% 0.01 ac. B 0.02 ac. OS-3 0.03 ac. OS-5 0.01 ac. OS-4 EXISTING RETAINING WALL EX. OVERHEAD STRUCTURE EXISTING DOWNSPOUT (TYP.) EXISTING BOLLARD (TYP.) EXISTING VALLEY PAN EXISTING STORM MH RIM=4947.83 (RECORD) INV IN=4943.22 (N) INV OUT=4943.23 (S) EXISTING STORM MH RIM=4946.55 INV IN=4941.75 (W) EXISTING OUTLET STRUCTURE EXISTING STORM MH RIM=4946.20 INV IN=4942.08 (N) INV IN=4942.12 (NE) INV OUT=4942.01 (S) EXISTING 22.74 LF 15" HDPE @ 0.92% EXISTING STORM MH RIM=4946.15 INV IN=4942.40 (N) INV OUT=4942.33 (SW) EXISTING 30.6 LF 18" HDPE @ 0.85% a-1 b os-1 os-2 a2 c os-4 PROPOSED RETAINING WALL PROPOSED BRIDGE PROPOSED CLEANOUT (TYP.) PROPOSED BOULDER WALL (RE: LANDSCAPE ARCHITECT) PROPOSED VALLEY PAN PROPOSED SWALE PROPOSED INLET CTV CTV CTV CTV CTV CTV CTV T X D ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST D MH VAULT CABLE D D D C.O. V.P. C.O. C.O. AC AC M X X X X X X X X X X ST ST ST ST ST W W W W W EAST POND (EXISTING) EXISTING CONCRETE APRON EXISTING BUILDING (824 E. LINCOLN AVE.) ODELL BREWING EXISTING OUTDOOR PATIO EXISTING PARKING LOT EXISTING SIDEWALK EXISTING 327.12 LF OF 15" HDPE STORM SEWER S = 0.25% 0.42 ac. HB 0.57 ac. HA 0.03 ac. HOS4 0.17 ac. HOS1 0.03 ac. HOS2 0.03 ac. HOS3 EXISTING RETAINING WALL EX. OVERHEAD STRUCTURE EXISTING DOWNSPOUT (TYP.) EXISTING BOLLARD (TYP.) EXISTING VALLEY PAN EXISTING STORM MH RIM=4947.83 (RECORD) INV IN=4943.22 (N) INV OUT=4943.23 (S) EXISTING STORM MH RIM=4946.55 INV IN=4941.75 (W) EXISTING OUTLET STRUCTURE EXISTING STORM MH RIM=4946.20 INV IN=4942.08 (N) INV IN=4942.12 (NE) INV OUT=4942.01 (S) EXISTING 22.74 LF 15" HDPE @ 0.92% EXISTING STORM MH RIM=4946.15 INV IN=4942.40 (N) INV OUT=4942.33 (SW) EXISTING 30.6 LF 18" HDPE @ 0.85% hb hos3 hos1 hos2 ha Sheet ODELL WINE PROJECT These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 12 ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 NORTH CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R C603 DRAINAGE EXHIBIT 13 LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPERTY BOUNDARY DESIGN POINT A FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 B2 1.45 ac PROPOSED AREA DRAIN INLET PROPOSED UNDERDRAIN UD HISTORIC BASIN BOUNDARIES DEVELOPED BASIN BOUNDARIES DEVELOPED DRAINAGE SUMMARY Design Point Basin ID Total Area (acres) C2 C100 2-Yr Tc (min) 100-Yr Tc (min) Q2 (cfs) Q100 (cfs) a-1 A-1 0.536 0.75 0.94 9.91 9.91 0.91 4.86 a-2 A-2 0.255 0.57 0.71 11.64 11.64 0.30 1.37 b B 0.012 0.20 0.25 5.69 5.69 0.01 0.03 c C 0.190 0.43 0.54 10.13 10.13 0.18 0.82 os-1 OS-1 0.174 0.27 0.34 8.02 8.02 0.11 0.50 os-2 OS-2 0.035 0.20 0.25 6.23 6.23 0.02 0.08 os-3 OS-3 0.017 0.20 0.25 5.00 5.00 0.01 0.04 os-4 OS-4 0.011 0.67 0.83 5.00 5.00 0.02 0.09 os-5 OS-5 0.030 0.43 0.54 5.00 5.00 0.04 0.16 HISTORIC DRAINAGE SUMMARY Design Point Basin ID Total Area (acres) C2 C100 2-Yr Tc (min) 100-Yr Tc (min) Q2 (cfs) Q100 (cfs) ha HA 0.573 0.67 0.84 11.16 11.16 0.82 4.14 a1 HB 0.420 0.61 0.77 5.18 5.18 0.73 3.20 hos1 HOS1 0.174 0.20 0.25 8.48 8.48 0.08 0.36 a3 HOS2 0.035 0.20 0.25 6.23 6.23 0.02 0.08 hos3 HOS3 0.028 0.35 0.44 7.05 7.05 0.02 0.11 a5 HOS4 0.030 0.42 0.52 5.00 5.00 0.04 0.15 DETENTION POND SUMMARY Pond ID Volume (cu. ft.) WSEL Release Rate (cfs) Permeable Pavers 2,515 4946.39 1.19 Orifice Flow Assumes permeable pavers are 100% clogged. Orifice Flow Assumes permeable pavers are 100% clogged. G G G G ST VAULT ELEC EXISTING DRAINAGE EASEMENT PROPOSED DRAINAGE EASEMENT PERMEABLE PAVERS (SOLID AREA) P:\100-020\DWG\DRNG\100-020_DRAINAGE EASEMENT.DWG 824 E. LINCOLN AVENUE FORT COLLINS COLORADO Fort Collins: 301 N. Howes St., Ste. 100, 80521 Greeley: 820 8th Street, 80631 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DESCRIPTION DRAINAGE EASEMENTS DRAWN BY F. WEGERT DATE FEBRUARY 12, 2020 PROJECT 100-020 DR-C2 SCALE DRAWING 1"=50' ELEC V.P. ELEC BRKR E GGG C.O. C.O. AC AC M G G G G E E E E E E X T T T X T T T T ST SS SS SS VAULT ELEC E E E E E E PROPOSED CONCRETE PROPOSED GRAVEL EXISTING CONCRETE EXISTING ROOF P:\100-020\DWG\DRNG\100-020_LID.DWG 824 E. LINCOLN AVENUE FORT COLLINS COLORADO Fort Collins: 301 N. Howes St., Ste. 100, 80521 Greeley: 820 8th Street, 80631 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DESCRIPTION NEW IMPERVIOUS AREA AND LID TREATMENT DRAWN BY F. WEGERT DATE FEBRUARY 12, 2020 PROJECT 100-020 DR-C1 SCALE DRAWING 1"=50' PAVERS LID TREATMENT OF IMPERVIOUS AREAS PROPOSED CONCRETE NEW IMPERVIOUS AREA NOT TREATED BY LID 2,881 ft2 662 ft2 1,405 ft2 4,092 ft2 2,986 ft2 TOTAL TREATED 9,040 ft 2 NEW IMPERVIOUS AREA TREATED 5,497 ft 2 1,718 ft2 NEW IMPERVIOUS AREA NOT TREATED 1,718 ft 2 AREA REQUIRING LID (2015): AREA REQUIRING LID (2020): TOTAL AREA REQUIRING LID: TOTAL IMPERVIOUS AREAS RECEIVING LID TREATEMENT: RUN ON AREA / TREATMENT AREA: 1,573 FT2 7,215 FT2 8,788 FT2 9,040 FT2 3.0 C = Design Storm Page 1 of 1 100-020_Pond_FAA.xls FEBRUARY 12, 2020 PROJECT 100-020 DR-A1 SCALE DRAWING 1"=50' LANDSCAPE 10,184 0% 0 LANDSCAPE 14,177 0% 0 9,645 8,645 2,711 9,589 11,726 9,589 100-Yr (min) a-1 A-1 143 47.72 46.11 1.13% 7.4 7.4 3.4 N/A N/A N/A 126 46.11 45.71 0.32% 0.85 2.48 11.49 9.91 11.49 9.91 11.49 5.86 a-2 A-2 125 47.50 45.91 1.27% 10.2 10.2 7.5 N/A N/A N/A 170 45.91 45.35 0.33% 0.86 3.29 11.64 11.64 11.64 11.64 11.64 10.79 b B 25 46.30 45.39 3.64% 5.5 5.5 5.2 N/A N/A N/A 35 45.39 44.31 3.09% 2.63 0.22 10.33 5.69 10.33 5.69 10.33 5.39 c C 35 47.50 47.00 1.43% 6.6 6.6 5.5 N/A N/A N/A 225 47.00 45.88 0.50% 1.06 3.54 11.44 10.13 11.44 10.13 11.44 9.07 os-1 OS-1 69 56.00 47.50 12.32% 5.6 5.6 5.1 N/A N/A N/A 100 47.50 47.29 0.21% 0.69 2.42 10.94 8.02 10.94 8.02 10.94 7.57 os-2 OS-2 69 56.00 47.50 12.32% 6.1 6.1 5.7 N/A N/A N/A 23 47.50 47.00 2.17% 2.21 0.17 10.51 6.23 10.51 6.23 10.51 5.89 os-3 OS-3 20 46.54 45.39 5.75% 4.2 4.2 4.0 N/A N/A N/A 35 45.39 44.31 3.09% 2.63 0.22 10.31 5.00 10.31 5.00 10.31 5.00 os-4 OS-4 25 46.45 45.58 3.48% 2.7 2.7 1.6 N/A N/A N/A N/A N/A N/A 10.14 5.00 10.14 5.00 10.14 5.00 os-5 OS-5 10 45.77 45.58 1.90% 3.2 3.2 2.7 N/A N/A N/A N/A N/A N/A 10.06 5.00 10.06 5.00 10.06 5.00 a-1 A-B 125 47.50 45.91 1.27% 8.0 8.0 4.7 N/A N/A N/A 317 45.91 39.00 2.18% 2.21 2.39 12.46 10.35 12.46 10.35 12.46 7.04 a-1 Pavers 125 47.50 45.91 1.27% 9.4 9.4 6.4 N/A N/A N/A 126 46.11 45.71 0.32% 0.85 2.48 11.39 11.39 11.39 11.39 11.39 8.93 a-1 A-OS1 69 56.00 47.50 12.32% 3.6 3.6 2.7 N/A N/A N/A 327 43.22 42.40 0.25% 0.75 7.26 12.20 10.87 12.20 10.87 12.20 9.92 c C-OS2 69 56.00 47.50 12.32% 4.8 4.8 4.1 N/A N/A N/A 225 47.50 44.31 1.42% 1.79 2.10 11.63 6.85 11.63 6.85 11.63 6.19 Velocity (Gutter Flow), V = 20·S½ Rational Equation: Q = CiA (Equation 6-1) Intensity, i (per Table 3.4-1 of the Fort Collins Stormwater Manual) Velocity (Swale Flow), V = 15·S½ Odell Wine F. Wegert February 12, 2020 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Overland Flow, Time of Concentration: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V (Equation 6-4 per MHFD) Tc = Ti + Tt (Equation 6-2 per MHFD) Combined Basins Channelized Flow Swale Flow Design Point Basin Overland Flow Time of Concentration (Equation 6-4 per MHFD) (Equation 3.3-2 per Fort Collins } 𝑇𝑖 = 1.87 1.1 − 𝐶 ∗ 𝐶𝑓 𝐿 𝑆 ൗ 1 3 Notes: 1) Add 4900 to all elevations. Page 1 of 1 Streets, Parking Lots, Roofs, Alleys, and Drives: Lawns and Landscaping: Combined Basins 2) Composite Runoff Coefficient adjusted per Table 3.2-3 of the Fort Collins Stormwater Manual (FCSM). Lawns, Clayey Soil, Flat Slope < 2% USDA SOIL TYPE: C Lawns, Sandy Soil, Flat Slope < 2% Composite Runoff Coefficient2 1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM. Page 1 of 1 100-Yr (min) ha HA 147 48.00 45.91 1.42% 8.6 8.6 5.2 N/A N/A N/A 248 45.91 43.00 1.18% 1.63 2.54 12.19 11.16 12.19 11.16 12.19 7.77 a1 HB 15 47.50 47.00 3.33% 2.4 2.4 1.6 N/A N/A N/A 257 47.00 44.38 1.02% 1.51 2.83 11.51 5.18 11.51 5.18 11.51 5.00 hos1 HOS1 69 56.00 47.50 12.32% 6.1 6.1 5.7 N/A N/A N/A 100 47.50 47.29 0.21% 0.69 2.42 10.94 8.48 10.94 8.48 10.94 8.14 a3 HOS2 69 56.00 47.50 12.32% 6.1 6.1 5.7 N/A N/A N/A 23 47.50 47.00 2.17% 2.21 0.17 10.51 6.23 10.51 6.23 10.51 5.89 hos3 HOS3 40 46.45 45.60 2.13% 6.9 6.9 6.1 N/A N/A N/A 30 45.60 44.38 4.07% 3.02 0.17 10.39 7.05 10.39 7.05 10.39 6.24 a5 HOS4 25 45.84 43.00 11.36% 2.8 2.8 2.4 N/A N/A N/A N/A N/A N/A 10.14 5.00 10.14 5.00 10.14 5.00 Channelized Flow Swale Flow Design Point Basin Overland Flow Time of Concentration Velocity (Gutter Flow), V = 20·S½ Rational Equation: Q = CiA (Equation 6-1) Intensity, i (per Table 3.4-1 of the Fort Collins Stormwater Manual) Velocity (Swale Flow), V = 15·S½ Odell Wine F. Wegert February 12, 2020 HISTORIC TIME OF CONCENTRATION COMPUTATIONS Overland Flow, Time of Concentration: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V (Equation 6-4 per MHFD) Tc = Ti + Tt (Equation 6-2 per MHFD) (Equation 6-4 per MHFD) (Equation 3.3-2 per Fort Collins } 𝑇𝑖 = 1.87 1.1 − 𝐶 ∗ 𝐶𝑓 𝐿 𝑆 ൗ 1 3 Notes: 1) Add 4900 to all elevations. Page 1 of 1 Calculations By: Date: Character of Surface Streets, Parking Lots, Roofs, Alleys, and Drives: Page 1 of 1