HomeMy WebLinkAboutRENNAT SUBDIVISION - FDP200006 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH Rennat Property TIS, July 2019
ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Streets ............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pederstrian Facilities ....................................................................................................... 8
Bicycle Facilities ............................................................................................................ 11
Transit Facilities ............................................................................................................ 11
III. PROPOSED DEVELOPMENT ............................................................................... 12
Trip Generation ............................................................................................................. 12
Trip Distribution ............................................................................................................. 12
Background Traffic Projections ..................................................................................... 12
Trip Assignment ............................................................................................................ 18
Signal Warrants ............................................................................................................. 18
Geometry ...................................................................................................................... 23
Operation Analysis ........................................................................................................ 23
Pedestrian Level of Service ........................................................................................... 28
Bicycle Level of Service ................................................................................................ 35
Transit Level of Service ................................................................................................. 35
IV. CONCLUSIONS .................................................................................................... 36
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 9
2. Trip Generation ....................................................................................................... 14
3. Short Range (2024) Background Peak Hour Operation .......................................... 26
4. Long Range (2040) Background Peak Hour Operation ........................................... 29
5. Short Range (2024) Total Peak Hour Operation ..................................................... 31
6. Long Range (2040) Total Peak Hour Operation ...................................................... 33
DELICH Rennat Property TIS, July 2019
ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Averaged/Balanced Recent Peak Hour Traffic .......................................................... 7
5. Site Plan .................................................................................................................. 13
6. Trip Distribution ....................................................................................................... 15
7. Short Range (2024) Background Peak Hour Traffic ................................................ 16
8. Long Range (2040) Background Peak Hour Traffic................................................. 17
9. Short Range (2024) Site Generated Peak Hour Traffic ........................................... 19
10. Long Range (2040) Site Generated Peak Hour Traffic ............................................ 20
11. Short Range (2024) Total Peak Hour Traffic ........................................................... 21
12. Long Range (2040) Total Peak Hour Traffic ............................................................ 22
13. Short Range (2024) Geometry ................................................................................ 24
14. Long Range (2040) Geometry ................................................................................. 25
APPENDICES
A. Base Assumptions Form
B. Peak Hour Traffic Counts
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor
Vehicle LOS Standards (Intersections)
D. Signal Warrant Data
E. Short Range (2024) Background Peak Hour Operation
F. Long Range (2040) Background Peak Hour Operation
G. Short Range (2024) Total Peak Hour Operation
H. Long Range (2040) Total Peak Hour Operation
I. Pedestrian/Bicycle Maps and Level of Service Worksheets
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 1
I. INTRODUCTION
This Transportation Impact Study (TIS) addresses the capacity, geometric, and
control requirements for the proposed Rennat Property. The proposed Rennat Property is
located on the west side of Timberline Road and south of Kechter Road-Willow Springs
Way in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the project
developer (Post Modern Development), project planning consultant (TB Group), the
project engineer (Northern Engineering), and the City of Fort Collins Traffic Operations
Engineer. The Transportation Impact Study Base Assumptions form and related
documents are provided in Appendix A. This study generally conforms to the format set
forth in the Fort Collins TIS Guidelines in the “Larimer County Urban Area Street
Standards” (LCUASS). A scoping discussion was held with the Fort Collins Traffic
Engineering staff. The study involved the following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
- Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key intersections;
- Analyze signal warrants;
- Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the Rennat Property is shown in Figure 1. It is important that a
thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily residential, institutional (school), or open.
There are residential uses to the east and north of the site. Bacon Elementary is to the
east of the site. Kechter Farms (a residential use) to the east of the site and is nearly
built out. The center of Fort Collins lies to the northwest of the proposed Rennat
Property site.
Streets
The primary streets near the Rennat Property site are Timberline Road, Trilby
Road, Fossil Creek Parkway, Zephyr Road, and Kechter Road. Figure 2 shows the
current geometry at the key intersections.
Timberline Road is east of (adjacent to) the proposed Rennat Property site. It is
a north-south street classified as a four-lane arterial street, north of Trilby Road and a
two-lane arterial street, south of Trilby Road on the Fort Collins Master Street Plan.
Currently, Timberline Road has a two-lane cross section (with center lane) in this area.
At the Timberline/Trilby intersection, Timberline Road has northbound and southbound
left-turn lanes, one through lane in each direction, and northbound and southbound
right-turn lanes. The Timberline/Trilby intersection has signal control. At the
Timberline/Fossil Creek intersection, Timberline Road has northbound and southbound
left-turn lanes (two-way continuous left-turn lanes), a northbound through/right-turn lane,
a southbound through lane, and a southbound right-turn lane. At the Timberline/Rosen
intersection, Timberline Road has a northbound left-turn lane (two-way continuous left-
turn lane), one through lane in each direction, and a southbound right-turn lane. At the
Timberline/Zephyr intersection, Timberline Road has a southbound left-turn lane, one
through lane in each direction, and a northbound right-turn lane. The Timberline/Fossil
Creek, Timberline/Rosen, and Timberline/Zephyr intersections have stop sign control on
the minor streets. At the Timberline/Kechter-Willow Springs intersection, Timberline
Road has northbound and southbound left-turn lanes, one through lane in each
direction, and northbound and southbound right-turn lanes. The Timberline/Kechter-
Willow Springs intersection has signal control. The posted speed limit on Timberline
Road is 40 mph in this area.
Trilby Road is south of the proposed Rennat Property site. It is an east-west
street classified as a four-lane arterial, west of Timberline Road and a collector street,
east of Timberline Road on the Fort Collins Master Street Plan. Currently, Trilby Road
has a two-lane cross section. At the Timberline/Trilby intersection, Trilby Road has
Parcel C
Harmony
Timberline
Kechter
Trilby
Fossil
Creek
Rosen
Zephyr
392
Lemay
Ziegler
SCALE: 1"=2000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 3
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 4
Trilby
Rosen
Willow Springs Kechter
Fossil
Creek
Timberline
Zephyr
STOP
STOP STOP
STOP
- Denotes Lane
_ Two-way Continuous
Left-turn Lane
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 5
eastbound and westbound left-turn lanes and a through/right-turn lane in each direction.
The posted speed limit on Trilby Road is 40 mph, west of Timberline Road and 25 mph,
east of Timberline Road.
Fossil Creek Parkway is south of the proposed Rennat Property site. It is an
east-west street classified as a local street on the Fort Collins Master Street Plan.
Currently, Fossil Creek Parkway has a two-lane cross section. At the Timberline/Fossil
Creek intersection, Fossil Creek Parkway has all westbound movements combined into
a single lane. The west leg (eastbound) of Fossil Creek Parkway is wide enough that
right-turning vehicles bypass the through/left-turning vehicles. There is a pedestrian
signal at this intersection.
Zephyr Road is east of the proposed Rennat Property site. It is an east-west
street classified as a two-lane collector street on the Fort Collins Master Street Plan.
Currently, Zephyr Road has a two-lane cross section. Zephyr Road only has an east
leg at the Timberline/Zephyr intersection. At the Timberline/Zephyr intersection, Zephyr
Road has a westbound left-turn lane and a westbound right-turn lane. The posted
speed limit on Zephyr Road is 25 mph.
Kechter Road-Willow Springs Way is north of the proposed Rennat Property site.
Kechter Road is an east-west street classified as a two-lane arterial east of Timberline
Road on the Fort Collins Master Street Plan. Currently, Kechter Road has a two-lane
cross section. At the Timberline/Kechter-Willow Springs intersection, Kechter Road-
Willow Springs Way has eastbound and westbound left-turn lanes, one through lane in
each direction, and a westbound right-turn lane. The posted speed limit on Kechter
Road is 40 mph.
Existing Traffic
Recent peak hour traffic volumes at the Timberline/Trilby, Timberline/Fossil
Creek, Timberline/Rosen, Timberline/Zephyr, and Timberline/Kechter-Willow Springs
intersections are shown in Figure 3. The counts at the Timberline/Trilby and Timberline/
Kechter-Willow Springs intersections were obtained in June 2017. The counts at the
Timberline/Fossil Creek, Timberline/Rosen, and Timberline/Zephyr intersections were
obtained in May 2019. Raw traffic count data is provided in Appendix B. Since the
counts were collected on different days, the volumes at the Timberline/Fossil Creek,
Timberline/Rosen, and Timberline/Zephyr intersections were averaged/balanced and
are shown in Figure 4. Traffic volumes at the Timberline/Trilby and Timberline/Kechter-
Willow Springs intersections were adjusted to reflect the more recent counts at the other
key intersections.
Existing Operation
The Timberline/Trilby, Timberline/Fossil Creek, Timberline/Rosen, Timberline/
Zephyr, and Timberline/Kechter-Willow Springs intersections were evaluated using
techniques provided in the 2016 Highway Capacity Manual, 6
th
Edition. Using the
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 6
Trilby
Rosen
11/63
612/1156
4/14
1003/857
53/30
22/8
Willow Springs Kechter
12/19
790/664
147/128
39/22
16/12
28/28
177/121
5/34
79/225
54/120
424/877
12/28
Fossil
Creek
0/1
16/33
899/756
3/19
44/29
0/1
73/23
53/26
12/6
15/48
622/935
18/44
57/85
466/487
24/32
279/225
59/67
65/80
4/12
55/82
59/45
5/7
362/613
172/371
Zephyr
600/1200
57/89
1025/856
31/31
133/65
23/19
AM/PM
AVERAGED/BALANCED
RECENT PEAK HOUR TRAFFIC Figure 4
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 7
Trilby
Rosen
11/63
618/1083
4/14
981/830
53/30
22/8
Willow Springs Kechter
12/19
970/719
180/140
39/22
16/12
28/28
205/129
5/34
106/243
62/130
567/948
12/28
Fossil
Creek
16/33
888/789
3/19
44/29
0/1
73/23
53/26
0/1
12/6
15/48
607/999
18/44
65/86
554/569
27/35
332/263
65/73
71/87
5/14
62/83
67/47
6/7
458/620
218/376
Zephyr
606/1127
57/89
1003/829
31/31
133/65
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 8
morning and afternoon peak hour traffic shown in Figure 4, the peak hour operation is
shown in Table 1. Calculation forms are provided in Appendix C. A description of level
of service for signalized and unsignalized intersections from the 2016 Highway Capacity
Manual and a table showing the Fort Collins Motor Vehicle LOS Standards
(Intersections) are also provided in Appendix C. Acceptable operation at signalized
intersections during the peak hours is defined as level of service E or better for each
movement and leg, and level of service D or better overall. At arterial/arterial
unsignalized intersections, acceptable operation is considered to be at level of service F
for any approach leg and level of service E overall. At arterial/local unsignalized
intersections, acceptable operation is considered to be at level of service F for any
approach leg and level of service D overall. In such areas, it is expected that there
would be substantial delays to the minor street movements at unsignalized intersections
during the peak hours. This is considered to be normal in urban areas. The key
intersections currently meet the Fort Collins operational criteria with existing control and
geometry in the morning and afternoon peak hours, except for the eastbound left-turn at
the Timberline/Trilby intersection in the afternoon peak hour. Adjustments to the City’s
current signal timing resulted in acceptable operation of the intersection with regard to
delay (EB left-turn: 66.9 seconds = LOS E). This operation is also shown in Table 1.
It is important to note that at the Timberline/Trilby intersection, the eastbound left-
turn volume exceeds the 300+ vehicles per hour “rule of thumb” that would require dual
left-turn lanes. However, the operation of the Timberline/Trilby intersection meets the Fort
Collins operational criteria with a single eastbound left-turn lane.
Over a number of years, Delich Associates has conducted research comparing the
calculated delay (measure of Level of Service (LOS)) and observed delay at stop sign
controlled intersections. This was applied to the minor (stop sign controlled) movements
(left turns and right turns) at both four-leg intersections and three-leg intersections. That
research indicated that an intersection where delay to the minor street movements were
relatively short (LOS A, B, C), the calculated delay reasonably matched the observed
delay. However, when the major street traffic increased substantially (>1500 vph), the
calculated delay to the minor street movements (using the HCM techniques) were longer
than the observed delays. This research was conducted using LOS techniques in the
2000 Highway Capacity Manual. Comparisons have not yet been extended to the 2016
Highway Capacity Manual techniques in a rigorous fashion. However, casual
comparisons indicate that the differences may be similar. This information is provided
to the reviewer in consideration of drawing conclusions based upon the LOS and
calculated delay at the Timberline/Fossil Creek, Timberline/Rosen, and Timberline/
Zephyr intersections.
Pedestrian Facilities
There are sidewalks along the east side of Timberline Road (between Trilby
Road and Zephyr Road), along Zephyr Road, along Fossil Creek Parkway, along Trilby
Road (east of Timberline), and the west side of Timberline Road (near the Timberline/
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 9
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Trilby
(signal)
EB LT E (63.1 secs) F (89.8 secs)
EB T/RT C D
EB APPROACH E (55.7 secs) E (74.2 secs)
WB LT D D
WB T/RT D E (58.4 secs)
WB APPROACH D E (56.9 secs)
NB LT B A
NB T B B
NB RT A A
NB APPROACH B B
SB LT B A
SB T B B
SB RT B A
SB APPROACH B B
OVERALL C C
Timberline/Trilby
(signal with adjusted timing)
EB LT
N/A
E (66.9 secs)
EB T/RT D
EB APPROACH E (58.0 secs)
WB LT D
WB T/RT E (58.4 secs)
WB APPROACH E (56.9 secs)
NB LT B
NB T B
NB RT A
NB APPROACH B
SB LT A
SB T B
SB RT B
SB APPROACH B
OVERALL C
Continued on next page
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 10
Continued from previous page
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Fossil Creek
(stop sign)
EB LT/T F (288.0 secs) F (359.8 secs)
EB RT B C
EB APPROACH F (117.6 secs) F (212.2 secs)
WB LT/T/RT F (50.8 secs) F (51.2 secs)
NB LT A B
SB LT B A
OVERALL A A
Timberline/Rosen
(stop sign)
EB LT/RT F (133.9 secs) F (99.5 secs)
NB LT A B
OVERALL A A
Timberline/Zephyr
(stop sign)
WB LT F (118.8 secs) F (178.2 secs)
WB RT E (47.6 secs) C
WB APPROACH F (58.1 secs) F (54.2 secs)
SB LT B B
OVERALL A A
Timberline/Kechter-Willow Springs
(signal)
EB LT D D
EB T/RT D D
EB APPROACH D D
WB LT D D
WB T D D
WB RT D D
WB APPROACH D D
NB LT A B
NB T B B
NB RT A A
NB APPROACH B B
SB LT B B
SB T A C
SB RT A A
SB APPROACH A C
OVERALL B C
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 11
Rosen intersection). There are also sidewalks along Timberline Road, south of Kechter
Road, extending for approximately 500 feet on the east side and approximately 1,100
feet on the west side of Timberline Road. North of Kechter Road, there are sidewalks
along Timberline Road extending for approximately 550 feet on the east side and
extending to Harmony Road on the west side of Timberline Road. There is a short
segment (≈300 feet) of sidewalk on the north side of Kechter Road. Sidewalks will be
incorporated within and adjacent to this development.
Bicycle Facilities
There are bicycle lanes along Timberline Road, Zephyr Road, Trilby Road (east
of Timberline Road), and Kechter Road within the study area.
Transit Facilities
Currently, this area of Fort Collins is not served by Transfort. The closest route is
Route 16 that runs along Harmony Road.
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 12
III. PROPOSED DEVELOPMENT
The Rennat Property is a residential development, located along the west side of
Timberline Road, between Kechter Road and Fossil Creek Parkway in Fort Collins.
Figure 5 shows a site plan of the Rennat Property. The proposed Rennat Property will
consist of 44 single family detached dwelling units (Parcel A), 67 single family attached
dwelling units (Parcel B), 42 single family detached dwelling units (Parcel C), 48 single
family attached dwelling units (Parcel D), and 14 single family attached dwelling units
(Parcels E).
The short range analysis (Year 2024) includes development of the Rennat
Property site and an appropriate increase in background traffic due to normal growth
and other potential developments in the area. The site plan shows that the Rennat
Property development will have access to/from Zephyr Road. The long range analysis
(Year 2040) includes development of the Rennat Property and an appropriate increase
in background traffic due to normal growth and in general accordance with the Fort
Collins Structure Plan. In the future (beyond the year 2024), it is expected/assumed
that Red Willow Drive will connect to a future signal at the Timberline/Zephyr
intersection from the properties to the south. It is expected/assumed that Red Willow
Drive will also extend south to Trilby Road, by/before 2040.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contain in Trip Generation, 10
th
Edition, ITE was used to estimate the trips that would be
generated by the proposed/expected uses at the Rennat Property site. A trip is defined as
a one-way vehicle movement from origin to destination. Table 2 shows the expected trip
generation on a daily and peak hour basis. The trip generation of the Rennat Property
development resulted in 2030 daily trip ends, 159 morning peak hour trip ends, and 213
afternoon peak hour trip ends.
Trip Distribution
Trip distribution for the Rennat Property was based on existing/future travel
patterns, land uses in the area, consideration of trip attractions/productions in the area,
and engineering judgment. Figure 6 shows the trip distribution for the short range
(2024) and long range (2040) analysis futures. The trip distribution was agreed to by
City of Fort Collins staff.
Background Traffic Projections
Figures 7 and 8 show the short range (2024) and long range (2040) background
traffic projections, respectively. Background traffic projections for the short range
(2024) future horizon were obtained by reviewing the North Front Range Regional
SCALE: 1"=400'
SITE PLAN Figure 5
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 13
Parcel A
Parcel C
Parcel B
Parcel D
E
E
E
E
E
E
E
ZEPHYR ROAD
TIMBERLINE ROAD
ROSEN DRIVE
RED WILLOW DRIVE
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 14
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
Parcel A
210 Single Family Detached 44 D.U. 9.44 416 0.19 8 0.55 25 0.62 27 0.37 16
Parcel B
210 Single Family Attached 67 D.U. 9.44 632 0.19 13 0.55 37 0.62 41 0.37 25
Parcel C
210 Single Family Detached 42 D.U. 9.44 396 0.19 8 0.55 23 0.62 26 0.37 16
Parcel D
210 Single Family Attached 48 D.U. 9.44 454 0.19 9 0.55 26 0.62 30 0.37 18
Parcels E
210 Single Family Attached 14 D.U. 9.44 132 0.19 2 0.55 8 0.62 9 0.37 5
Total 2030 40 119 133 80
Timberline
Kechter
Trilby
Fossil Creek
Rosen
Zephyr
20%
15% 50%
15%
Red Willow
SCALE: 1"=1000'
TRIP DISTRIBUTION Figure 6
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 15
AM/PM
SHORT RANGE (2024) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 16
Trilby
Rosen
11/63
743/1219
4/14
1066/979
53/30
22/8
Willow Springs Kechter
12/19
1129/856
214/167
39/22
16/12
28/28
215/136
5/34
126/290
65/137
631/1141
12/28
Fossil
Creek
16/33
973/938
3/19
53/26
0/1
12/6
44/29
0/1
73/23
15/48
732/1135
18/44
68/89
608/672
31/42
363/308
72/86
75/92
5/15
73/92
76/54
6/7
543/709
258/419
Zephyr
25/100
1060/863
34/46
135/120
10/10
LONG RANGE (2040) BACKGROUND
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 17
Trilby
Rosen
15/85
900/1505
10/30
1225/1120
Willow Springs Kechter
10/20
1390/1050
280/215
40/25
15/10
30/30
255/160
5/35
155/385
80/160
800/1440
15/30
30/25
NOM
65/20
Fossil
Creek
20/50
1150/1100
5/20
55/25
NOM
10/5
15/50
900/1420
25/55
85/115
730/785
35/45
420/375
80/90
100/120
10/20
75/100
80/55
15/20
635/840
310/500
Zephyr
25/95
1165/980
35/45
305/215
15/15
80/60
180/95
10/20
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 18
Transportation Plan and various traffic studies prepared for this area of Fort Collins.
Based upon these sources, it was determined that traffic volumes on Timberline Road,
Kechter Road, and Trilby Road would increase by approximately 1.0% per year plus
other developments in the area. The developments included in the short range (2024)
future are the remainder of Kechter Farms, the remainder of Mail Creek Crossing, and
the Hansen Property. According to City staff, Timberline Road will be improved to a
four-lane arterial in the near future. In addition to this, it is likely that a signal will be
warranted at the Timberline/Zephyr intersection with the development of the Hansen
Property. However, in the short range (2024) future, Red Willow Drive will not extend
north to Zephyr Road.
In the long range (2040) future with a signal at the Timberline/Zephyr
intersection, a significant amount of existing (and future) traffic making a left turn from
Fossil Creek Parkway and Rosen Drive will choose to utilize the signal. The long range
(2040) background traffic volumes shown in Figure 8 reflect this redistribution of traffic.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Figures 9 and 10 show the short range (2024) and long range (2040) site
generated peak hour traffic assignment, respectively. Figures 11 and 12 show the
respective short range (2024) and long range (2040) total (site plus background) peak
hour traffic assignment.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices. The Timberline/
Trilby and Timberline/Kechter-Willow Springs intersections are currently signalized. For
the roads in the vicinity of the Rennat Property development, four hour and/or eight hour
signal warrants are applicable. These warrants require much data and are applied when
the traffic is actually on the area road system. It is acknowledged that peak hour signal
warrants should not be applied, but since the peak hour forecasts are readily available in a
traffic impact study, it is reasonable to use them to estimate whether other signal warrants
may be met. If peak hour signal warrants will not be met at a given intersection, it is
reasonable to conclude that it is not likely that other signal warrants would be met. If peak
hour signal warrants are met, it merely indicates that further evaluation should occur in the
future as the development occurs. However, a judgment can be made that some
intersections will likely meet other signal warrants.
Using the short range (2024) background peak hour traffic (Figure 7), the peak hour
signal warrant will likely be met in the afternoon peak hour at the Timberline/Zephyr
intersection. This was called out in the Hansen Property TIS. Based on the peak hour
signal warrant, it is likely that other volume based signal warrants would be met at the
AM/PM
SHORT RANGE (2024) SITE
GENERATED PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 19
Trilby
Rosen
Willow Springs Kechter
Fossil
Creek
8/27
18/12
24/16
Zephyr
75/51
37/24
20/66
59/40
18/12
6/20
6/20
42/28
14/47 1/4
13/43
1/3
37/24
2/1
5/4
13/43
2/1
25/83
1/3
Timberline
AM/PM
LONG RANGE (2040) SITE
GENERATED PEAK HOUR TRAFFIC Figure 10
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 20
Trilby
Rosen
Willow Springs Kechter
Fossil
Creek
8/27
18/12
24/16
Zephyr
20/66
59/40
18/12
6/20
6/20
42/28
14/47 1/4
13/43
1/3
37/24
77/52
37/24
13/43
25/83
1/3
5/4
Timberline
AM/PM
SHORT RANGE (2024) TOTAL
PEAK HOUR TRAFFIC Figure 11
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 21
Trilby
5/18
1079/1022
Rosen
12/66
780/1243
55/31
27/12
Willow Springs Kechter
12/19
1188/896
232/179
39/22
16/12
28/28
215/136
5/34
132/310
65/137
651/1207
12/28
Fossil
Creek
16/33
987/985
3/19
53/26
0/1
12/6
44/29
0/1
73/23
15/48
774/1163
18/44
68/89
614/692
31/42
371/335
72/86
75/92
5/15
73/92
76/54
6/7
561/721
282/435
210/171
10/10
117/94
74/142
639/1189
75/263
LONG RANGE (2040) TOTAL
PEAK HOUR TRAFFIC Figure 12
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 22
Trilby
Rosen
15/90
940/1530
10/35
1240/1165
Willow Springs Kechter
10/20
1450/1090
300/230
40/25
15/10
30/30
255/160
5/35
160/405
80/160
820/1505
15/30
30/25
NOM
65/20
Fossil
Creek
20/50
1165/1150
5/20
55/25
NOM
10/5
15/50
945/1450
25/55
85/115
735/805
35/45
430/405
80/90
100/120
10/20
75/100
80/55
15/20
655/855
335/515
Zephyr
40/140
1165/980
35/45
385/270
15/15
120/85
180/95
10/20
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 23
Timberline/Zephyr intersection in the short range (2024) future. The distance from Kechter
Road to Trilby Road (each signalized intersections) is one mile. Zephyr Road is
approximately 2300 feet from Kechter Road and approximately 2980 feet from Trilby
Road. While this is not at one-half mile spacing, a future signal at the Timberline/Zephyr
intersection has generally been expected by the City. The only other, somewhat major,
intersection along this section of Timberline Road is at Fossil Creek Parkway. This
intersection is approximately 1250 feet south of Zephyr Road. This separation would not
meet the desired spacing of signalized intersections. Using the short range (2024)
background and total peak hour traffic (Figures 7 & 11), the peak hour signal warrant will
not be met in the afternoon peak hour at the Timberline/Fossil Creek intersection. The
City is not likely to introduce another signal in this segment of Timberline Road. The peak
hour signal warrant analyses are provided in Appendix D.
Geometry
Figure 13 shows a schematic of the minimum short range (2024) intersection
geometry. According to City staff, Timberline Road will be improved to a four-lane
arterial from north of Kechter Road to Trilby Road in the near future. At the Timberline/
Trilby intersection, the eastbound left-turn volume exceeds the 300+ vehicles per hour
“rule of thumb” that would require dual left-turn lanes. However, a single eastbound left-
turn lane was analyzed in this TIS for the short range (2024) future. Similarly at the
Timberline/Kechter-Willow Springs intersection, the westbound left-turn volume exceeds
the 300+ vehicles per hour “rule of thumb” in the afternoon peak hour that would require
dual left-turn lanes. However, a single westbound left-turn lane was analyzed in this TIS
for the short range (2024) future.
Figure 14 shows a schematic of the long range (2040) geometry. The geometry at
the key intersections in the long range future was determined based upon achieving
acceptable operation, meeting the geometric criteria in LCUASS, and the City of Fort
Collins Master Street Plan.
Operation Analysis
Operation analyses were performed at the Timberline/Trilby, Timberline/Site
Access, Timberline/Fossil Creek, Timberline/Rosen, and Timberline/Zephyr
intersections. As mentioned earlier, Timberline Road will be improved to a four-lane
arterial in the near future. The operations analyses were conducted for the short range
future, reflecting a year 2024 condition, and long range future, reflecting a year 2040
condition. In light of the potential differences in calculated delay versus observed delay
mentioned earlier, conclusions with regard to delay at stop sign controlled intersections
should be tempered. The long range (2040) analysis is provided for informational
purposes and to identify potential operational and/or geometric issues.
Using the short range (2024) background traffic volumes shown in Figure 7, the
Timberline/Trilby, Timberline/Fossil Creek, Timberline/Rosen, and Timberline/Zephyr
intersections operate as indicated in Table 3. Calculation forms for these analyses are
SHORT RANGE (2024) GEOEMTRY Figure 13
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 24
Trilby
Rosen
Willow Springs Kechter
Fossil
Creek
Zephyr
- Denotes Lane
_ Two-way Continuous
Left-turn Lane
STOP
STOP STOP
Timberline
LONG RANGE (2040) GEOEMTRY Figure 14
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Page 25
Trilby
Willow Springs Kechter
Fossil
Creek
Zephyr
- Denotes Lane
_ Two-way Continuous
Left-turn Lane
STOP
STOP
Rosen
STOP
Timberline
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 26
TABLE 3
Short Range (2024) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Trilby
(signal)
EB LT E (70.4 secs) E (66.8 secs)
EB T/RT C D
EB APPROACH E (60.7 secs) E (57.1 secs)
WB LT D D
WB T/RT D E (58.4 secs)
WB APPROACH D E (56.8 secs)
NB LT B B
NB T C B
NB RT A A
NB APPROACH B B
SB LT B B
SB T C C
SB RT B B
SB APPROACH C B
OVERALL C C
Timberline/Fossil Creek
(stop sign)
EB LT/T F (119.5 secs) F (294.4 secs)
EB RT B B
EB APPROACH F (52.6 secs) F (172.7 secs)
WB LT/T/RT D E (37.6 secs)
NB LT A B
SB LT B B
OVERALL A A
Timberline/Rosen
(stop sign)
EB LT/RT F (63.2 secs) F (82.9 secs)
NB LT A B
OVERALL A A
Continued on next page
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 27
Continued from previous page
TABLE 3
Short Range (2024) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Zephyr
(signal)
EB LT D D
EB T/RT D D
EB APPROACH D D
WB LT D D
WB T/RT D D
WB APPROACH D D
NB LT A A
NB T B A
NB T/RT B A
NB APPROACH B A
SB LT A A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL B A
Timberline/Kechter-Willow Springs
(signal)
EB LT D D
EB T/RT D C
EB APPROACH D C
WB LT D D
WB T D C
WB RT D C
WB APPROACH D D
NB LT A B
NB T A A
NB RT A A
NB APPROACH A A
SB LT A A
SB T A B
SB RT A B
SB APPROACH A B
OVERALL A B
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 28
provided in Appendix E. At the key stop sign controlled intersections, the calculated delay
for the minor street left turns is commensurate with level of service F. Since it is likely that
a signal will be installed at the Timberline/Zephyr intersection with the approved Hansen
Property, the operation analysis was conducted for this condition.
Using the long range (2040) background traffic volumes shown in Figure 8, the key
intersections operate as indicated in Table 4. Calculation forms for these analyses are
provided in Appendix F. The key intersections will meet the Fort Collins operational
criteria, overall.
Using the short range (2024) total traffic volumes shown in Figure 11, the key
intersections operate as indicated in Table 5. Calculation forms for these analyses are
provided in Appendix G. The Timberline/Trilby, Timberline/Site Access, Timberline/
Rosen, and Timberline/Zephyr intersections will meet the Fort Collins operational
criteria. At the Timberline/Fossil Creek intersection during both peak hours, the calculated
delay for the eastbound left-turn/through movement and eastbound leg was
commensurate with level of service F. The calculated delay for the westbound leg during
the morning and afternoon peak hours was commensurate with level of service E and F,
respectively. As mentioned earlier, the Timberline/Site Access intersection is expected to
be restricted to right-in/right-out movements. However, there is currently a two-way
continuous left-turn lane on Timberline Road in this area. So, northbound left-turn
entrances at the Site Access could occur.
Using the long range (2040) total traffic volumes shown in Figure 12, the key
intersections operate as indicated in Table 6. Calculation forms for these analyses are
provided in Appendix H. The key intersections will meet the Fort Collins operational
criteria, overall.
Pedestrian Level of Service
Appendix I shows a map of the area that is within 1320 feet of the Rennat
Property development. The Union Pacific railroad tracks create a barrier that has no
pedestrian crossings or underpasses. Therefore, the pedestrian influence area stops at
the railroad tracks. There will be four pedestrian destinations within 1320 feet of the
Rennat Property development. These are: 1) the residential/commercial neighborhood
to the north of the site, 2) Bacon Elementary School, 3) the residential area to the east
of the site, and 4) the residential area to the south of the site. Appendix I also contains
a map that shows the existing/planned pedestrian facilities within the influence area.
This site is in an area type termed “other.” The minimum level of service for “other” is C.
In this pedestrian analysis, it is assumed that all of the sidewalks related to the Hansen
Property are built, since it is an approved development.
• Directness – The distance ratio to all pedestrian destinations is less than 1.2
(LOS A)
• Continuity – The continuity to pedestrian destinations 1 and 4 will be acceptable
at LOS B, since there will be direct connection of the sidewalk system to the
north and to the south. The continuity to pedestrian destinations 2 and 3 is at
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 29
TABLE 4
Long Range (2040) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Trilby
(signal)
EB LT E (70.6 secs) E (61.9 secs)
EB T/RT D D
EB APPROACH E (65.4 secs) E (57.2 secs)
WB LT E (68.1 secs) E (63.7 secs)
WB T/RT E (59.3 secs) E (58.6 secs)
WB APPROACH E (63.7 secs) E (60.3 secs)
NB LT B C
NB T B C
NB RT A A
NB APPROACH B C
SB LT B B
SB T B C
SB RT B B
SB APPROACH B C
OVERALL C C
Timberline/Fossil Creek
(stop sign)
EB LT/T F (148.6 secs) F (911.6 secs)
EB RT B C
EB APPROACH F (56.7 secs) F (522.3 secs)
WB LT/T/RT E (38.8 secs) F (75.3 secs)
NB LT B B
SB LT B B
OVERALL A A
Timberline/Rosen
(RT-in/RT-out/LT-in)
EB RT B C
NB LT B C
OVERALL A A
Continued on next page
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 30
Continued from previous page
TABLE 4
Long Range (2040) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Zephyr
(signal)
EB LT D D
EB T/RT C D
EB APPROACH D D
WB LT C D
WB T/RT C D
WB APPROACH C D
NB LT B A
NB T C B
NB T/RT C B
NB APPROACH C B
SB LT B A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL B B
Timberline/Kechter-Willow Springs
(signal)
EB LT D C
EB T/RT D C
EB APPROACH D C
WB LT D E (55.0 secs)
WB T D C
WB RT D C
WB APPROACH D D
NB LT A B
NB T A A
NB RT A A
NB APPROACH A A
SB LT A B
SB T A C
SB RT A C
SB APPROACH A C
OVERALL A C
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 31
TABLE 5
Short Range (2024) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Trilby
(signal)
EB LT E (75.6 secs) E (73.5 secs)
EB T/RT C D
EB APPROACH E (64.8 secs) E (62.0 secs)
WB LT D D
WB T/RT D E (58.4 secs)
WB APPROACH D E (56.8 secs)
NB LT B B
NB T C B
NB RT A A
NB APPROACH B B
SB LT B B
SB T C C
SB RT B B
SB APPROACH C C
OVERALL C C
Timberline/Fossil Creek
(stop sign)
EB LT/T F (143.5 secs) F (359.8 secs)
EB RT B B
EB APPROACH F (61.8 secs) F (209.8 secs)
WB LT/T/RT D E (43.0 secs)
NB LT A B
SB LT B B
OVERALL A A
Timberline/Rosen
(stop sign)
EB LT/RT F (76.5 secs) F (94.4 secs)
NB LT A B
OVERALL A A
Continued on next page
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 32
Continued from previous page
TABLE 5
Short Range (2024) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Zephyr
(signal)
EB LT D D
EB T/RT C D
EB APPROACH D D
WB LT C D
WB T/RT C D
WB APPROACH C D
NB LT A A
NB T B B
NB T/RT B B
NB APPROACH B A
SB LT B A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL B A
Timberline/Kechter-Willow Springs
(signal)
EB LT D C
EB T/RT D C
EB APPROACH D C
WB LT D D
WB T D C
WB RT D C
WB APPROACH D D
NB LT A B
NB T A A
NB RT A A
NB APPROACH A A
SB LT A A
SB T A B
SB RT A B
SB APPROACH A B
OVERALL A B
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 33
TABLE 6
Long Range (2040) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Trilby
(signal)
EB LT E (74.5 secs) E (65.9 secs)
EB T/RT D D
EB APPROACH E (68.5 secs) E (60.1 secs)
WB LT E (68.1 secs) E (63.7 secs)
WB T/RT E (59.3 secs) E (58.6 secs)
WB APPROACH E (63.7 secs) E (60.3 secs)
NB LT B C
NB T B C
NB RT A A
NB APPROACH B C
SB LT B B
SB T B C
SB RT B B
SB APPROACH B C
OVERALL C C
Timberline/Fossil Creek
(stop sign)
EB LT/T F (175.7 secs) F (1100.0 secs)
EB RT B C
EB APPROACH F (65.7 secs) F (629.0 secs)
WB LT/T/RT E (42.6 secs) F (93.1 secs)
NB LT B C
SB LT B B
OVERALL A B
Timberline/Rosen
(RT-in/RT-out/LT-in)
EB RT B C
NB LT B C
OVERALL A A
Continued on next page
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 34
Continued from previous page
TABLE 6
Long Range (2040) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/Zephyr
(signal)
EB LT E (65.7 secs) D
EB T/RT C C
EB APPROACH E (60.6 secs) D
WB LT C D
WB T/RT C D
WB APPROACH C D
NB LT B B
NB T C B
NB T/RT C B
NB APPROACH C B
SB LT B B
SB T A A
SB RT A A
SB APPROACH A A
OVERALL C B
Timberline/Kechter-Willow Springs
(signal)
EB LT D C
EB T/RT D C
EB APPROACH D C
WB LT D E (61.3 secs)
WB T D C
WB RT D C
WB APPROACH D E (55.1 secs)
NB LT A B
NB T A A
NB RT A A
NB APPROACH A A
SB LT A B
SB T A C
SB RT A C
SB APPROACH A C
OVERALL A C
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 35
LOS B as well, since there will be direct connection of the sidewalk system with
the anticipated signal at the Timberline/Zephyr intersection and a sidewalk
between the Rennat Property and the pedestrian signal at the Timberline/Fossil
Creek intersection.
• Street Crossings – The street crossings to pedestrian destinations 1 and 4 will
be acceptable at LOS B, since the street crossings are all at local residential
streets. The street crossings to pedestrian destinations 2 and 3 is also at LOS B,
since there is an anticipated signal at the Timberline/Zephyr intersection and a
sidewalk between the Rennat Property and the pedestrian signal at the
Timberline/Fossil Creek intersection. .
• Visual Interest and Amenity – The visual interest and amenity to pedestrian
destinations 1, 2, 3, and 4 is acceptable at LOS B, since most of the sidewalks
have some landscaped parkways and a residential neighborhood character.
• Security – The security to pedestrian destinations 1, 2, 3, and 4 is acceptable at
LOS A, since most of the sidewalks are adjacent to residential land uses and the
area has a residential neighborhood character.
Acceptable pedestrian level of service will be achieved for all pedestrian
destinations within 1320 feet of the Rennat Property. The Pedestrian LOS Worksheet is
provided in Appendix I. The future signal at the Timberline/Zephyr intersection will
provide safe crossing of Timberline Road for students attending Bacon Elementary
School.
Bicycle Level of Service
Appendix I shows a map of the area that is within 1320 feet of the Rennat
Property development. There will be one bicycle destination near the Rennat Property
development. This is: 1) Bacon Elementary School to the northeast of the site. The
Bicycle LOS Worksheet is provided in Appendix I. The minimum level of service for this
site is C. This site is connected to Timberline Road. Therefore, it is concluded that
level of service B can be achieved.
Transit Level of Service
Expansion of Transfort service to this area will likely be made by the City of Fort
Collins, when appropriate.
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 36
IV. CONCLUSIONS
This study assessed the impacts of the Rennat Property on the street system in the
vicinity of the proposed development in the short range (2024) and long range (2040)
futures. As a result of this analysis, the following is concluded:
- The development of the Rennat Property is feasible from a traffic engineering
standpoint. At full development, the Rennat Property will generate approximately
2030 daily trip ends, 159 morning peak hour trip ends, and 213 afternoon peak
hour trip ends.
- Currently, the key intersections are currently operating acceptably with existing
control and geometry in the morning and afternoon peak hours, except for the
eastbound left-turn at the Timberline/Trilby intersection in the afternoon peak
hour. Adjustments to the City’s current signal timing resulted in acceptable
operation of the intersection with regard to delay.
- The Timberline/Trilby intersection is currently signalized. The Timberline/Zephyr
intersection is likely to meet signal warrants in the short range (2024) future and
was called out in the Hansen Property TIS.
- In the short range (2024) future, given development of the Rennat Property
development and an increase in background traffic, the Timberline/Trilby,
Timberline/Site Access, Timberline/Rosen, and Timberline/Zephyr intersections
will meet the Fort Collins operational criteria. At the Timberline/Fossil Creek
intersection during both peak hours, the calculated delay for the eastbound left-
turn/through movement and eastbound leg was commensurate with level of service
F. At the Timberline/Trilby intersection, the eastbound left-turn volume exceeds the
300+ vehicles per hour “rule of thumb” that would require dual left-turn lanes.
However, a single eastbound left-turn lane was analyzed in this TIS for the short
range (2024) future. The calculated delay for the eastbound leg during the morning
and afternoon peak hours was commensurate with level of service E. Similarly at
the Timberline/Kechter-Willow Springs intersection, the westbound left-turn
volume exceeds the 300+ vehicles per hour “rule of thumb” in the afternoon peak
hour that would require dual left-turn lanes. However, a single westbound left-turn
lane was analyzed in this TIS for the short range (2024) future. The calculated
delay for the westbound leg during the morning and afternoon peak hours was
commensurate with level of service D.
- In the long range (2040) future, given development of the Rennat Property
development and an increase in background traffic, the key intersections will meet
the Fort Collins operational criteria, overall, with the recommended geometry and
control.
- The short range (2024) geometry is shown in Figure 13. According to City staff,
Timberline Road will be improved to a four-lane arterial in the near future. At the
Timberline/Trilby intersection, the eastbound left-turn volume exceeds the 300+
DELICH Rennat Property TIS, July 2019
ASSOCIATES Page 37
vehicles per hour “rule of thumb” that would require dual left-turn lanes. In addition
to this at the Timberline/Kechter-Willow Springs intersection, the westbound left-
turn volume exceeds the 300+ vehicles per hour “rule of thumb” in the afternoon
peak hour. However, single eastbound and westbound left-turn lanes were
analyzed at these intersections in this TIS for the short range (2024) future.
- The long range (2040) geometry is shown in Figure 14.
- Acceptable level of service is achieved for bicycle and transit modes based upon
the measures in the multi-modal transportation guidelines and future improvements
to the street system in the area. Acceptable pedestrian level of service can be
achieved for all pedestrian destinations. The pedestrian signal at the future
Timberline/Zephyr intersection will provide safe crossing of Timberline Road for
students attending Bacon Elementary School.
APPENDIX A
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 6/22/2017 Observer: City of Fort Collins
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Timberline/Trilby
S = straight
L = left turn
Time Northbound: Timberline Southbound: Timberline Total Eastbound: Trilby Westbound: Trilby Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 15 113 4 132 2 100 45 147 279 64 10 16 90 16 11 1 28 118 397
7:45 16 136 4 156 0 105 55 160 316 89 17 21 127 21 15 1 37 164 480
8:00 8 106 5 119 2 83 33 118 237 61 10 10 81 10 15 1 26 107 344
8:15 18 111 11 140 1 74 39 114 254 65 22 18 105 12 14 1 27 132 386
7:30-8:30 57 466 24 547 5 362 172 539 1086 279 59 65 403 59 55 4 118 521 1607
PHF 0.79 0.86 0.55 0.88 0.63 0.86 0.78 0.84 0.78 0.67 0.77 0.79 0.7 0.92 1 0.8 0.84
4:30 15 107 6 128 1 149 84 234 362 40 16 22 78 9 18 5 32 110 472
4:45 21 117 4 142 0 157 92 249 391 61 19 14 94 13 18 3 34 128 519
5:00 24 127 13 164 3 173 88 264 428 52 16 22 90 12 21 3 36 126 554
5:15 25 136 9 170 3 134 107 244 414 72 16 22 110 11 25 1 37 147 561
4:30-5:30 85 487 32 604 7 613 371 991 1595 225 67 80 372 45 82 12 139 511 2106
PHF 0.85 0.9 0.62 0.89 0.58 0.89 0.87 0.94 0.78 0.88 0.91 0.85 0.87 0.82 0.6 0.94 0.94
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 5/9/2019 Observer: Vickie
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Timberline/Westchase
S = straight
L = left turn
Time Northbound: Timberline Southbound: Timberline Total Eastbound: Driveway Westbound: Westchase Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 0 227 0 227 4 200 0 204 431 0 0 0 0 2 0 4 6 6 437
7:45 0 214 4 218 3 179 0 182 400 0 0 0 0 3 0 2 5 5 405
8:00 0 211 1 212 1 131 0 132 344 0 0 0 0 4 0 7 11 11 355
8:15 0 210 2 212 5 143 0 148 360 0 0 0 0 2 0 3 5 5 365
7:30-8:30 0 862 7 869 13 653 0 666 1535 0 0 0 0 11 0 16 27 27 1562
PHF n/a 0.95 0.44 0.96 0.65 0.82 n/a 0.82 n/a n/a n/a n/a 0.69 n/a 0.57 0.61 0.89
4:30 0 188 3 191 9 215 0 224 415 0 0 0 0 1 0 1 2 2 417
4:45 0 228 3 231 7 239 0 246 477 0 0 0 0 0 0 5 5 5 482
5:00 0 203 1 204 3 277 0 280 484 0 0 0 0 2 0 3 5 5 489
5:15 0 214 4 218 11 263 0 274 492 0 0 0 0 2 0 2 4 4 496
4:30-5:30 0 833 11 844 30 994 0 1024 1868 0 0 0 0 5 0 11 16 16 1884
PHF n/a 0.91 0.69 0.91 0.68 0.9 n/a 0.91 n/a n/a n/a n/a 0.63 n/a 0.55 0.8 0.95
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 5/7/2019 Observer: Vickie
Day: Tuesday Jurisdiction: Fort Collins
R = right turn Intersection: Timberline/Fossil Creek
S = straight
L = left turn
Time Northbound: Timberline Southbound: Timberline Total Eastbound: Fossil Creek Westbound: Fossil Creek Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 4 256 0 260 1 156 7 164 424 13 0 33 46 6 0 21 27 73 497
7:45 4 220 1 225 5 197 3 205 430 7 0 16 23 3 0 12 15 38 468
8:00 5 186 1 192 2 139 4 145 337 11 0 10 21 2 0 8 10 31 368
8:15 3 237 1 241 7 130 4 141 382 13 0 14 27 1 0 12 13 40 422
7:30-8:30 16 899 3 918 15 622 18 655 1573 44 0 73 117 12 0 53 65 182 1755
PHF 0.8 0.88 0.75 0.88 0.54 0.79 0.64 0.8 0.85 n/a 0.55 0.64 0.5 n/a 0.63 0.6 0.88
4:30 5 167 3 175 9 221 6 236 411 6 0 4 10 1 0 7 8 18 429
4:45 10 213 6 229 13 252 6 271 500 5 0 4 9 2 0 2 4 13 513
5:00 7 177 5 189 17 234 19 270 459 11 0 6 17 0 1 6 7 24 483
5:15 11 199 5 215 9 228 13 250 465 7 1 9 17 3 0 11 14 31 496
4:30-5:30 33 756 19 808 48 935 44 1027 1835 29 1 23 53 6 1 26 33 86 1921
PHF 0.75 0.89 0.79 0.88 0.71 0.93 0.58 0.95 0.66 0.25 0.64 0.78 0.5 0.25 0.59 0.59 0.94
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 5/8/2019 Observer: Vickie
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: Timberline/Rosen
S = straight
L = left turn
Time Northbound: Timberline Southbound: Timberline Total Eastbound: Rosen Westbound: Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 1 310 311 194 2 196 507 17 7 24 0 24 531
7:45 0 285 285 141 2 143 428 10 1 11 0 11 439
8:00 1 200 201 146 5 151 352 15 3 18 0 18 370
8:15 2 208 210 131 2 133 343 11 11 22 0 22 365
7:30-8:30 4 1003 0 1007 0 612 11 623 1630 53 0 22 75 0 0 0 0 75 1705
PHF 0.5 0.81 n/a 0.81 n/a 0.79 0.55 0.79 0.78 n/a 0.5 0.78 n/a n/a n/a n/a 0.8
4:30 3 223 226 293 16 309 535 7 2 9 0 9 544
4:45 4 192 196 265 12 277 473 6 3 9 0 9 482
5:00 3 199 202 322 20 342 544 8 2 10 0 10 554
5:15 4 243 247 276 15 291 538 9 1 10 0 10 548
4:30-5:30 14 857 0 871 0 1156 63 1219 2090 30 0 8 38 0 0 0 0 38 2128
PHF 0.88 0.88 n/a 0.88 n/a 0.9 0.79 0.89 0.83 n/a 0.67 0.95 n/a n/a n/a n/a 0.96
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 5/8/2019 Observer: Vickie
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: Timberline/Zephyr
S = straight
L = left turn
Time Northbound: Timberline Southbound: Timberline Total Eastbound: Driveway Westbound: Zephyr Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 0 321 6 327 13 191 0 204 531 0 0 0 0 5 0 30 35 35 566
7:45 0 287 8 295 28 141 0 169 464 0 0 0 0 2 0 32 34 34 498
8:00 0 213 2 215 12 145 0 157 372 0 0 0 0 6 0 54 60 60 432
8:15 0 204 15 219 4 123 0 127 346 0 0 0 0 10 0 17 27 27 373
7:30-8:30 0 1025 31 1056 57 600 0 657 1713 0 0 0 0 23 0 133 156 156 1869
PHF n/a 0.8 0.52 0.81 0.51 0.79 n/a 0.81 n/a n/a n/a n/a 0.58 n/a 0.62 0.65 0.83
4:30 0 222 8 230 13 305 0 318 548 0 0 0 0 4 0 13 17 17 565
4:45 0 194 4 198 20 274 0 294 492 0 0 0 0 3 0 12 15 15 507
5:00 0 198 9 207 28 339 0 367 574 0 0 0 0 3 0 26 29 29 603
5:15 0 242 10 252 28 282 0 310 562 0 0 0 0 9 0 14 23 23 585
4:30-5:30 0 856 31 887 89 1200 0 1289 2176 0 0 0 0 19 0 65 84 84 2260
PHF n/a 0.88 0.78 0.88 0.79 0.88 n/a 0.88 n/a n/a n/a n/a 0.53 n/a 0.63 0.72 0.94
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 6/22/2017 Observer: City of Fort Collins
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Timberline/Kechter-Willow Springs
S = straight
L = left turn
Time Northbound: Timberline Southbound: Timberline Total Eastbound: Willow Springs Westbound: Kechter Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 3 193 24 220 18 122 3 143 363 9 3 11 23 16 1 33 50 73 436
7:45 3 246 42 291 13 109 3 125 416 18 6 9 33 27 3 60 90 123 539
8:00 3 178 41 222 8 103 4 115 337 4 4 3 11 13 0 31 44 55 392
8:15 3 173 40 216 15 90 2 107 323 8 3 5 16 23 1 53 77 93 416
7:30-8:30 12 790 147 949 54 424 12 490 1439 39 16 28 83 79 5 177 261 344 1783
PHF 1 0.8 0.88 0.82 0.75 0.87 0.75 0.86 0.54 0.67 0.64 0.63 0.73 0.42 0.74 0.73 0.83
4:30 3 147 20 170 30 208 8 246 416 7 3 4 14 44 9 33 86 100 516
4:45 5 161 29 195 22 223 5 250 445 6 3 11 20 52 7 31 90 110 555
5:00 6 177 42 225 33 237 10 280 505 6 4 8 18 57 7 24 88 106 611
5:15 5 179 37 221 35 209 5 249 470 3 2 5 10 72 11 33 116 126 596
4:30-5:30 19 664 128 811 120 877 28 1025 1836 22 12 28 62 225 34 121 380 442 2278
PHF 0.79 0.93 0.76 0.9 0.86 0.93 0.7 0.92 0.79 0.75 0.64 0.78 0.78 0.77 0.92 0.82 0.93
APPENDIX C
HCM 6th Signalized Intersection Summary Recent AM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 332 65 71 67 62 5 65 554 27 6 458 218
Future Volume (veh/h) 332 65 71 67 62 5 65 554 27 6 458 218
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 391 76 40 79 73 2 76 652 0 7 539 90
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 427 325 171 182 165 5 448 1089 923 377 1028 872
Arrive On Green 0.16 0.28 0.28 0.09 0.09 0.09 0.05 0.58 0.00 0.02 0.55 0.55
Sat Flow, veh/h 1781 1154 607 1276 1812 50 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 391 0 116 79 0 75 76 652 0 7 539 90
Grp Sat Flow(s),veh/h/ln 1781 0 1761 1276 0 1861 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 18.0 0.0 5.6 6.6 0.0 4.2 1.9 24.6 0.0 0.2 20.0 3.0
Cycle Q Clear(g_c), s 18.0 0.0 5.6 6.6 0.0 4.2 1.9 24.6 0.0 0.2 20.0 3.0
Prop In Lane 1.00 0.34 1.00 0.03 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 427 0 496 182 0 169 448 1089 923 377 1028 872
V/C Ratio(X) 0.92 0.00 0.23 0.44 0.00 0.44 0.17 0.60 0.00 0.02 0.52 0.10
Avail Cap(c_a), veh/h 427 0 688 321 0 372 488 1089 923 475 1028 872
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 38.8 0.0 30.4 48.4 0.0 47.4 10.8 14.7 0.0 12.4 15.7 11.8
Incr Delay (d2), s/veh 24.3 0.0 0.2 1.6 0.0 1.8 0.2 2.4 0.0 0.0 1.9 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.4 0.0 2.3 2.1 0.0 2.0 0.7 10.2 0.0 0.1 8.5 1.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 63.1 0.0 30.6 50.1 0.0 49.2 11.0 17.2 0.0 12.4 17.6 12.1
LnGrp LOS E A C D A D BBABBB
Approach Vol, veh/h 507 154 728 636
Approach Delay, s/veh 55.7 49.6 16.5 16.7
Approach LOS E D B B
Timer - Assigned Phs 1 2 45678
Phs Duration (G+Y+Rc), s 8.5 65.5 36.0 5.0 69.0 21.0 15.0
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 7.0 45.0 42.0 7.0 45.0 17.0 21.0
Max Q Clear Time (g_c+I1), s 3.9 22.0 7.6 2.2 26.6 20.0 8.6
Green Ext Time (p_c), s 0.0 3.6 0.6 0.0 4.0 0.0 0.4
Intersection Summary
HCM 6th Ctrl Delay 28.9
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Recent AM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent am.syn
Phase Number 1245678
Movement NBL SBTL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None None
Maximum Split (s) 11 51 48 11 51 21 27
Maximum Split (%) 10.0% 46.4% 43.6% 10.0% 46.4% 19.1% 24.5%
Minimum Split (s) 9.5 28 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1 1.5
Minimum Initial (s) 5555555
Vehicle Extension (s) 3333333
Minimum Gap (s) 3333333
Time Before Reduce (s) 0000000
Time To Reduce (s) 0000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 89 100 41 89 100 41 62
End Time (s) 100 41 89 100 41 62 89
Yield/Force Off (s) 96 35 83 96 35 58 83
Yield/Force Off 170(s) 96 20 70 96 21 58 71
Local Start Time (s) 54 65 6 54 65 6 27
Local Yield (s) 61 0 48 61 0 23 48
Local Yield 170(s) 61 95 35 61 96 23 36
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 35 (32%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Recent AM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent am.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 391 160 79 79 76 652 32 7 539 256
v/c Ratio 0.69 0.24 0.53 0.35 0.21 0.67 0.04 0.02 0.64 0.30
Control Delay 34.2 15.6 57.3 45.4 13.1 24.8 0.1 13.0 27.9 4.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 34.2 15.6 57.3 45.4 13.1 24.8 0.1 13.0 27.9 4.9
Queue Length 50th (ft) 196 43 53 50 26 346 0 2 270 0
Queue Length 95th (ft) 291 89 92 87 42 482 0 m6 355 53
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275 250
Base Capacity (vph) 566 714 244 370 366 974 880 330 856 865
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.69 0.22 0.32 0.21 0.21 0.67 0.04 0.02 0.63 0.30
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Recent PM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 263 73 87 47 83 14 86 569 35 7 620 376
Future Volume (veh/h) 263 73 87 47 83 14 86 569 35 7 620 376
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 280 78 52 50 88 9 91 605 0 7 660 205
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 291 224 149 161 134 14 419 1236 1048 497 1178 999
Arrive On Green 0.11 0.21 0.21 0.08 0.08 0.08 0.05 0.66 0.00 0.02 0.63 0.63
Sat Flow, veh/h 1781 1047 698 1260 1669 171 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 280 0 130 50 0 97 91 605 0 7 660 205
Grp Sat Flow(s),veh/h/ln 1781 0 1745 1260 0 1840 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 13.0 0.0 7.6 4.6 0.0 6.1 2.0 19.5 0.0 0.2 24.2 6.6
Cycle Q Clear(g_c), s 13.0 0.0 7.6 4.6 0.0 6.1 2.0 19.5 0.0 0.2 24.2 6.6
Prop In Lane 1.00 0.40 1.00 0.09 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 291 0 373 161 0 148 419 1236 1048 497 1178 999
V/C Ratio(X) 0.96 0.00 0.35 0.31 0.00 0.66 0.22 0.49 0.00 0.01 0.56 0.21
Avail Cap(c_a), veh/h 291 0 611 333 0 399 453 1236 1048 585 1178 999
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 47.3 0.0 40.1 52.8 0.0 53.6 9.2 10.2 0.0 8.5 12.7 9.4
Incr Delay (d2), s/veh 42.5 0.0 0.6 1.1 0.0 4.9 0.3 1.4 0.0 0.0 1.9 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.4 0.0 3.3 1.5 0.0 3.0 0.7 7.6 0.0 0.1 9.8 2.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 89.8 0.0 40.6 53.9 0.0 58.4 9.5 11.6 0.0 8.6 14.6 9.9
LnGrp LOS F A D D AEABAABA
Approach Vol, veh/h 410 147 696 872
Approach Delay, s/veh 74.2 56.9 11.3 13.5
Approach LOS EEBB
Timer - Assigned Phs 1 2 45678
Phs Duration (G+Y+Rc), s 8.8 80.6 30.6 5.0 84.3 16.0 14.6
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 7.0 56.0 41.0 7.0 56.0 12.0 25.0
Max Q Clear Time (g_c+I1), s 4.0 26.2 9.6 2.2 21.5 15.0 8.1
Green Ext Time (p_c), s 0.0 5.4 0.7 0.0 4.2 0.0 0.5
Intersection Summary
HCM 6th Ctrl Delay 27.5
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Recent PM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm.syn
Phase Number 1245678
Movement NBL SBTL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None None
Maximum Split (s) 11 62 47 11 62 16 31
Maximum Split (%) 9.2% 51.7% 39.2% 9.2% 51.7% 13.3% 25.8%
Minimum Split (s) 9.5 28 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1 1.5
Minimum Initial (s) 5555555
Vehicle Extension (s) 3333333
Minimum Gap (s) 3333333
Time Before Reduce (s) 0000000
Time To Reduce (s) 0000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 88 99 41 88 99 41 57
End Time (s) 99 41 88 99 41 57 88
Yield/Force Off (s) 95 35 82 95 35 53 82
Yield/Force Off 170(s) 95 20 69 95 21 53 70
Local Start Time (s) 53 64 6 53 64 6 22
Local Yield (s) 60 0 47 60 0 18 47
Local Yield 170(s) 60 105 34 60 106 18 35
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 35 (29%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Recent PM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 280 171 50 103 91 605 37 7 660 400
v/c Ratio 0.65 0.31 0.39 0.52 0.26 0.54 0.04 0.02 0.68 0.40
Control Delay 42.0 23.1 57.9 55.8 10.6 17.3 0.1 12.3 29.1 6.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 42.0 23.1 57.9 55.8 10.6 17.3 0.1 12.3 29.1 6.7
Queue Length 50th (ft) 162 62 37 71 29 286 0 2 371 20
Queue Length 95th (ft) #298 133 76 125 43 408 0 m4 m467 m94
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275 250
Base Capacity (vph) 431 634 261 400 358 1120 992 454 970 1007
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.65 0.27 0.19 0.26 0.25 0.54 0.04 0.02 0.68 0.40
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Recent PM
16: Timberline & Trilby Adjusted Timing
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm adjusted.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 263 73 87 47 83 14 86 569 35 7 620 376
Future Volume (veh/h) 263 73 87 47 83 14 86 569 35 7 620 376
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 280 78 52 50 88 9 91 605 0 7 660 205
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 321 241 161 161 134 14 403 1205 1021 477 1147 972
Arrive On Green 0.13 0.23 0.23 0.08 0.08 0.08 0.05 0.64 0.00 0.02 0.61 0.61
Sat Flow, veh/h 1781 1047 698 1260 1669 171 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 280 0 130 50 0 97 91 605 0 7 660 205
Grp Sat Flow(s),veh/h/ln 1781 0 1745 1260 0 1840 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 15.0 0.0 7.4 4.6 0.0 6.1 2.1 20.4 0.0 0.2 25.3 6.9
Cycle Q Clear(g_c), s 15.0 0.0 7.4 4.6 0.0 6.1 2.1 20.4 0.0 0.2 25.3 6.9
Prop In Lane 1.00 0.40 1.00 0.09 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 321 0 402 161 0 148 403 1205 1021 477 1147 972
V/C Ratio(X) 0.87 0.00 0.32 0.31 0.00 0.66 0.23 0.50 0.00 0.01 0.58 0.21
Avail Cap(c_a), veh/h 321 0 640 333 0 399 436 1205 1021 565 1147 972
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 44.5 0.0 38.4 52.8 0.0 53.6 10.2 11.2 0.0 9.4 13.9 10.3
Incr Delay (d2), s/veh 22.3 0.0 0.5 1.1 0.0 4.9 0.3 1.5 0.0 0.0 2.1 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.9 0.0 3.2 1.5 0.0 3.0 0.7 8.1 0.0 0.1 10.4 2.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 66.9 0.0 38.9 53.9 0.0 58.4 10.5 12.7 0.0 9.4 16.0 10.8
LnGrp LOS E A D D AEBBAABB
Approach Vol, veh/h 410 147 696 872
Approach Delay, s/veh 58.0 56.9 12.4 14.7
Approach LOS EEBB
Timer - Assigned Phs 1 2 45678
Phs Duration (G+Y+Rc), s 8.8 78.6 32.6 5.0 82.3 18.0 14.6
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 7.0 54.0 43.0 7.0 54.0 14.0 25.0
Max Q Clear Time (g_c+I1), s 4.1 27.3 9.4 2.2 22.4 17.0 8.1
Green Ext Time (p_c), s 0.0 5.3 0.7 0.0 4.1 0.0 0.5
Intersection Summary
HCM 6th Ctrl Delay 25.2
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Recent PM
16: Timberline & Trilby Adjusted Timing
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm adjusted.syn
Phase Number 1245678
Movement NBL SBTL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None None
Maximum Split (s) 11 60 49 11 60 18 31
Maximum Split (%) 9.2% 50.0% 40.8% 9.2% 50.0% 15.0% 25.8%
Minimum Split (s) 9.5 28 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1 1.5
Minimum Initial (s) 5555555
Vehicle Extension (s) 3333333
Minimum Gap (s) 3333333
Time Before Reduce (s) 0000000
Time To Reduce (s) 0000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 90 101 41 90 101 41 59
End Time (s) 101 41 90 101 41 59 90
Yield/Force Off (s) 97 35 84 97 35 55 84
Yield/Force Off 170(s) 97 20 71 97 21 55 72
Local Start Time (s) 55 66 6 55 66 6 24
Local Yield (s) 62 0 49 62 0 20 49
Local Yield 170(s) 62 105 36 62 106 20 37
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 35 (29%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Recent PM
16: Timberline & Trilby Adjusted Timing
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm adjusted.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 280 171 50 103 91 605 37 7 660 400
v/c Ratio 0.64 0.31 0.39 0.52 0.26 0.54 0.04 0.02 0.69 0.40
Control Delay 40.8 22.5 57.9 55.8 11.0 17.7 0.1 12.7 28.9 7.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 40.8 22.5 57.9 55.8 11.0 17.7 0.1 12.7 28.9 7.0
Queue Length 50th (ft) 162 62 37 71 29 286 0 2 357 18
Queue Length 95th (ft) 265 129 76 125 45 425 0 m4 m470 m99
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275 250
Base Capacity (vph) 437 662 261 400 354 1114 986 450 960 994
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.64 0.26 0.19 0.26 0.26 0.54 0.04 0.02 0.69 0.40
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Recent AM
10: Timberline & Fossil Creek
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent am.syn
Intersection
Int Delay, s/veh 10
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 44 0 73 12 0 53 16 888 3 15 607 18
Future Vol, veh/h 44 0 73 12 0 53 16 888 3 15 607 18
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - 200
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 22222222222
Mvmt Flow 50 0 83 14 0 60 18 1009 3 17 690 20
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1801 1772 690 1823 1791 1011 710 0 0 1012 0 0
Stage 1 724 724 - 1047 1047 -------
Stage 2 1077 1048 - 776 744 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 62 83 445 60 81 291 889 - - 685 - -
Stage 1 417 430 - 276 305 -------
Stage 2 265 305 - 390 421 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 47 79 445 47 77 291 889 - - 685 - -
Mov Cap-2 Maneuver ~ 47 79 - 47 77 -------
Stage 1 409 419 - 270 299 -------
Stage 2 206 299 - 309 410 -------
Approach EB WB NB SB
HCM Control Delay, s 117.6 50.8 0.2 0.2
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 889 - - 47 445 149 685 - -
HCM Lane V/C Ratio 0.02 - - 1.064 0.186 0.496 0.025 - -
HCM Control Delay (s) 9.1 - - 288 14.9 50.8 10.4 - -
HCM Lane LOS A - - F B F B - -
HCM 95th %tile Q(veh) 0.1 - - 4.5 0.7 2.4 0.1 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC Recent PM
10: Timberline & Fossil Creek
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm.syn
Intersection
Int Delay, s/veh 6.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 29 1 23 6 1 26 33 789 19 48 999 44
Future Vol, veh/h 29 1 23 6 1 26 33 789 19 48 999 44
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - 200
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 2 22222222222
Mvmt Flow 31 1 24 6 1 28 35 839 20 51 1063 47
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2099 2094 1063 2120 2131 849 1110 0 0 859 0 0
Stage 1 1165 1165 - 919 919 -------
Stage 2 934 929 - 1201 1212 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 38 52 271 37 50 361 629 - - 782 - -
Stage 1 237 268 - 325 350 -------
Stage 2 319 346 - 226 255 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 31 46 271 30 44 361 629 - - 782 - -
Mov Cap-2 Maneuver 31 46 - 30 44 -------
Stage 1 224 251 - 307 330 -------
Stage 2 277 327 - 191 238 -------
Approach EB WB NB SB
HCM Control Delay, s 212.2 51.2 0.4 0.4
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 629 - - 31 271 112 782 - -
HCM Lane V/C Ratio 0.056 - - 1.03 0.09 0.313 0.065 - -
HCM Control Delay (s) 11.1 - -$ 359.8 19.6 51.2 9.9 - -
HCM Lane LOS B - - F C F A - -
HCM 95th %tile Q(veh) 0.2 - - 3.5 0.3 1.2 0.2 - -
HCM 6th TWSC Recent AM
8: Timberline & Rosen
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent am.syn
Intersection
Int Delay, s/veh 5.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 53 22 4 981 618 11
Future Vol, veh/h 53 22 4 981 618 11
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 62 26 5 1154 727 13
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1891 727 740 0 - 0
Stage 1 727 -----
Stage 2 1164 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 77 424 867 - - -
Stage 1 478 -----
Stage 2 297 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 77 424 867 - - -
Mov Cap-2 Maneuver 77 -----
Stage 1 475 -----
Stage 2 297 -----
Approach EB NB SB
HCM Control Delay, s 133.9 0 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 867 - 101 - -
HCM Lane V/C Ratio 0.005 - 0.874 - -
HCM Control Delay (s) 9.2 - 133.9 - -
HCM Lane LOS A - F - -
HCM 95th %tile Q(veh) 0 - 5 - -
HCM 6th TWSC Recent PM
8: Timberline & Rosen
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm.syn
Intersection
Int Delay, s/veh 1.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 30 8 14 830 1083 63
Future Vol, veh/h 30 8 14 830 1083 63
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 96 96 96 96 96 96
Heavy Vehicles, % 2 22222
Mvmt Flow 31 8 15 865 1128 66
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2023 1128 1194 0 - 0
Stage 1 1128 -----
Stage 2 895 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 64 249 585 - - -
Stage 1 309 -----
Stage 2 399 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 62 249 585 - - -
Mov Cap-2 Maneuver 62 -----
Stage 1 301 -----
Stage 2 399 -----
Approach EB NB SB
HCM Control Delay, s 99.5 0.2 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 585 - 74 - -
HCM Lane V/C Ratio 0.025 - 0.535 - -
HCM Control Delay (s) 11.3 - 99.5 - -
HCM Lane LOS B - F - -
HCM 95th %tile Q(veh) 0.1 - 2.3 - -
HCM 6th TWSC Recent AM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent am.syn
Intersection
Int Delay, s/veh 5.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 23 133 1003 31 57 606
Future Vol, veh/h 23 133 1003 31 57 606
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 75 0 - 125 150 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 27 156 1180 36 67 713
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2027 1180 0 0 1216 0
Stage 1 1180 -----
Stage 2 847 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 63 232 - - 573 -
Stage 1 292 -----
Stage 2 420 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 56 232 - - 573 -
Mov Cap-2 Maneuver 56 -----
Stage 1 292 -----
Stage 2 371 -----
Approach WB NB SB
HCM Control Delay, s 58.1 0 1
HCM LOS F
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 56 232 573 -
HCM Lane V/C Ratio - - 0.483 0.674 0.117 -
HCM Control Delay (s) - - 118.8 47.6 12.1 -
HCM Lane LOS - - F E B -
HCM 95th %tile Q(veh) - - 1.9 4.3 0.4 -
HCM 6th TWSC Recent PM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm.syn
Intersection
Int Delay, s/veh 2.6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 19 65 829 31 89 1127
Future Vol, veh/h 19 65 829 31 89 1127
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 75 0 - 125 150 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 94 94 94 94 94 94
Heavy Vehicles, % 2 22222
Mvmt Flow 20 69 882 33 95 1199
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2271 882 0 0 915 0
Stage 1 882 -----
Stage 2 1389 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 44 345 - - 745 -
Stage 1 405 -----
Stage 2 231 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 38 345 - - 745 -
Mov Cap-2 Maneuver 38 -----
Stage 1 405 -----
Stage 2 201 -----
Approach WB NB SB
HCM Control Delay, s 54.2 0 0.8
HCM LOS F
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 38 345 745 -
HCM Lane V/C Ratio - - 0.532 0.2 0.127 -
HCM Control Delay (s) - - 178.2 18 10.5 -
HCM Lane LOS - - F C B -
HCM 95th %tile Q(veh) - - 1.9 0.7 0.4 -
HCM 6th Signalized Intersection Summary Recent AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 39 16 28 106 5 205 12 970 180 62 567 12
Future Volume (veh/h) 39 16 28 106 5 205 12 970 180 62 567 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 46 19 0 125 6 65 14 1141 167 73 667 0
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 230 237 0 230 237 201 567 1336 1132 266 1383 1172
Arrive On Green 0.13 0.13 0.00 0.13 0.13 0.13 0.02 0.71 0.71 0.05 0.74 0.00
Sat Flow, veh/h 1329 1870 0 1393 1870 1585 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 46 19 0 125 6 65 14 1141 167 73 667 0
Grp Sat Flow(s),veh/h/ln 1329 1870 0 1393 1870 1585 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 3.5 1.0 0.0 9.6 0.3 4.1 0.2 49.1 3.7 1.0 15.9 0.0
Cycle Q Clear(g_c), s 3.8 1.0 0.0 10.5 0.3 4.1 0.2 49.1 3.7 1.0 15.9 0.0
Prop In Lane 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 230 237 0 230 237 201 567 1336 1132 266 1383 1172
V/C Ratio(X) 0.20 0.08 0.00 0.54 0.03 0.32 0.02 0.85 0.15 0.27 0.48 0.00
Avail Cap(c_a), veh/h 370 434 0 376 434 367 652 1336 1132 356 1383 1172
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 43.7 42.4 0.0 47.0 42.1 43.7 4.6 11.5 5.0 17.0 5.8 0.0
Incr Delay (d2), s/veh 0.4 0.1 0.0 2.0 0.0 0.9 0.0 7.1 0.3 0.5 1.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 0.5 0.0 3.4 0.1 1.6 0.1 18.5 1.1 1.0 5.3 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 44.1 42.5 0.0 49.0 42.1 44.6 4.6 18.6 5.3 17.6 7.0 0.0
LnGrp LOS D D A D D D ABABAA
Approach Vol, veh/h 65 196 1322 740
Approach Delay, s/veh 43.7 47.4 16.8 8.1
Approach LOS D D B A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.7 85.8 18.5 8.5 83.1 18.5
Change Period (Y+Rc), s 4.0 5.5 5.5 4.0 5.5 5.5
Max Green Setting (Gmax), s 7.0 63.5 24.5 10.0 60.5 24.5
Max Q Clear Time (g_c+I1), s 2.2 17.9 5.8 3.0 51.1 12.5
Green Ext Time (p_c), s 0.0 4.9 0.2 0.1 6.0 0.4
Intersection Summary
HCM 6th Ctrl Delay 17.3
HCM 6th LOS B
Timing Report, Sorted By Phase Recent AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 11 69 30 14 66 30
Maximum Split (%) 10.0% 62.7% 27.3% 12.7% 60.0% 27.3%
Minimum Split (s) 9.5 22.5 24.5 9.5 24.5 22.5
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 111111
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 30.5 41.5 0.5 30.5 44.5 0.5
End Time (s) 41.5 0.5 30.5 44.5 0.5 30.5
Yield/Force Off (s) 37.5 105 25 40.5 105 25
Yield/Force Off 170(s) 37.5 95 13 40.5 93 15
Local Start Time (s) 35.5 46.5 5.5 35.5 49.5 5.5
Local Yield (s) 42.5 0 30 45.5 0 30
Local Yield 170(s) 42.5 100 18 45.5 98 20
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 100
Offset: 105 (95%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Recent AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent am.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 46 52 125 6 241 14 1141 212 73 667 14
v/c Ratio 0.22 0.18 0.62 0.02 0.62 0.03 0.89 0.19 0.35 0.49 0.01
Control Delay 41.1 20.1 55.7 36.2 19.5 4.1 25.8 4.4 10.9 9.5 0.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 41.1 20.1 55.7 36.2 19.5 4.1 25.8 4.4 10.9 9.5 0.0
Queue Length 50th (ft) 29 12 84 4 41 2 402 17 10 141 0
Queue Length 95th (ft) 56 40 128 14 98 m5 #1026 63 33 341 0
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225 200
Base Capacity (vph) 325 416 312 431 502 576 1277 1124 254 1361 1174
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.14 0.13 0.40 0.01 0.48 0.02 0.89 0.19 0.29 0.49 0.01
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Recent PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 22 12 28 243 34 129 19 719 140 130 948 28
Future Volume (veh/h) 22 12 28 243 34 129 19 719 140 130 948 28
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 24 13 5 261 37 27 20 773 103 140 1019 4
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222222222
Cap, veh/h 335 285 109 357 414 351 228 1154 978 375 1200 1017
Arrive On Green 0.22 0.22 0.21 0.22 0.22 0.22 0.03 0.62 0.62 0.05 0.64 0.64
Sat Flow, veh/h 1338 1286 495 1395 1870 1585 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 24 0 18 261 37 27 20 773 103 140 1019 4
Grp Sat Flow(s),veh/h/ln 1338 0 1781 1395 1870 1585 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 1.7 0.0 1.0 21.7 1.9 1.6 0.5 32.4 3.2 3.2 51.4 0.1
Cycle Q Clear(g_c), s 3.6 0.0 1.0 22.7 1.9 1.6 0.5 32.4 3.2 3.2 51.4 0.1
Prop In Lane 1.00 0.28 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 335 0 394 357 414 351 228 1154 978 375 1200 1017
V/C Ratio(X) 0.07 0.00 0.05 0.73 0.09 0.08 0.09 0.67 0.11 0.37 0.85 0.00
Avail Cap(c_a), veh/h 485 0 594 514 623 528 326 1154 978 532 1200 1017
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 38.6 0.0 36.9 45.7 37.1 37.0 17.8 15.0 9.4 12.7 16.9 7.7
Incr Delay (d2), s/veh 0.1 0.0 0.0 3.0 0.1 0.1 0.2 3.1 0.2 0.6 7.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.0 0.4 7.6 0.9 0.6 0.2 13.4 1.1 1.2 21.8 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 38.7 0.0 36.9 48.7 37.2 37.1 17.9 18.1 9.6 13.3 24.5 7.7
LnGrp LOS D A DDDDBBABCA
Approach Vol, veh/h 42 325 896 1163
Approach Delay, s/veh 37.9 46.5 17.1 23.1
Approach LOS D D B C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.4 82.0 31.5 9.4 79.1 31.5
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 9.0 56.0 39.0 16.0 49.0 39.0
Max Q Clear Time (g_c+I1), s 2.5 53.4 5.6 5.2 34.4 24.7
Green Ext Time (p_c), s 0.0 1.7 0.1 0.2 4.8 0.9
Intersection Summary
HCM 6th Ctrl Delay 24.3
HCM 6th LOS C
Timing Report, Sorted By Phase Recent PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 13 62 45 20 55 45
Maximum Split (%) 10.8% 51.7% 37.5% 16.7% 45.8% 37.5%
Minimum Split (s) 9.5 23 25 9.5 25 23
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 35.5 48.5 110.5 35.5 55.5 110.5
End Time (s) 48.5 110.5 35.5 55.5 110.5 35.5
Yield/Force Off (s) 44.5 104.5 29.5 51.5 104.5 29.5
Yield/Force Off 170(s) 44.5 94.5 17.5 51.5 92.5 19.5
Local Start Time (s) 51 64 6 51 71 6
Local Yield (s) 60 0 45 67 0 45
Local Yield 170(s) 60 110 33 67 108 35
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 104.5 (87%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Recent PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates recent pm.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 24 43 261 37 139 20 773 151 140 1019 30
v/c Ratio 0.07 0.10 0.78 0.08 0.28 0.11 0.75 0.16 0.41 0.86 0.03
Control Delay 31.5 14.7 57.3 31.8 6.4 8.6 28.0 6.0 11.3 30.0 0.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 31.5 14.7 57.3 31.8 6.4 8.6 28.0 6.0 11.3 30.0 0.4
Queue Length 50th (ft) 14 8 190 22 0 5 509 11 33 526 0
Queue Length 95th (ft) 33 33 259 45 45 m11 #859 m45 73 #1150 3
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225 200
Base Capacity (vph) 455 575 452 621 620 234 1030 920 419 1181 1027
Starvation Cap Reductn 00000000000
Spillback Cap Reductn 00000000000
Storage Cap Reductn 00000000000
Reduced v/c Ratio 0.05 0.07 0.58 0.06 0.22 0.09 0.75 0.16 0.33 0.86 0.03
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Overall
Any
Approach Leg
Any
Movement
Signalized D1
E E2
Unsignalized E3 F4
Arterial/Arterial
Collector/Collector
Unsignalized D3 F4
Arterial/Collector
Arterial/Local
Collector/Local
Local/Local
Roundabout E3,5 E5,4 E5
1 In mixed use district including downtown as defined by structure plan, overall LOS E is acceptable
2 Applicable with at least 5% of total entering volume
3 Use weighed average to identify overall delay
4 Mitigation may be required
5 Apply unsignalized delay value thresholds to determine LOS
APPENDIX D
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
EB AM 225 VPH
AM 1881 VPH
*100
*150
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2517 VPH
EB PM 200 VPH
MINOR STREET APPROACH - VPH
MAJOR STREET - TOTAL OF BOTH APPROACH -
VEHICLES PER HOUR (VPH)
*Note: 150 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 100 vph applies as the lower
threshold volume for a minor-street approach with one lane.
SHORT RANGE (2024) BACKGROUND PEAK HOUR WARRANT
AT TIMBERLINE/ZEPHYR
MUTCD, 2003 EDITION, PAGE 4C-7
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
EB AM 225 VPH
AM 1881 VPH
*100
*150
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2517 VPH
EB PM 200 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
EB AM 225 VPH
AM 1881 VPH
*100
*150
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2517 VPH
EB PM 200 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
WB AM 65 VPH
AM 1757 VPH
*100
*150
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2217 VPH
WB PM 33 VPH
MINOR STREET APPROACH - VPH
MAJOR STREET - TOTAL OF BOTH APPROACH -
VEHICLES PER HOUR (VPH)
*Note: 150 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 100 vph applies as the lower
threshold volume for a minor-street approach with one lane.
SHORT RANGE (2024) BACKGROUND PEAK HOUR WARRANT
AT TIMBERLINE/FOSSIL CREEK
MUTCD, 2003 EDITION, PAGE 4C-7
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
WB AM 65 VPH
AM 1757 VPH
*100
*150
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2217 VPH
WB PM 33 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
WB AM 65 VPH
AM 1757 VPH
*100
*150
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2217 VPH
WB PM 33 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
WB AM 65 VPH
AM 1813 VPH
*100
*150
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2292 VPH
WB PM 33 VPH
2 OR MORE LANES & 1 LANE
MINOR STREET APPROACH - VPH
MAJOR STREET - TOTAL OF BOTH APPROACH -
VEHICLES PER HOUR (VPH)
*Note: 150 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 100 vph applies as the lower
threshold volume for a minor-street approach with one lane.
SHORT RANGE (2024) TOTAL PEAK HOUR WARRANT
AT TIMBERLINE/FOSSIL CREEK
MUTCD, 2003 EDITION, PAGE 4C-7
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
WB AM 65 VPH
AM 1813 VPH
*100
*150
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2292 VPH
WB PM 33 VPH
2 OR MORE LANES & 1 LANE
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
WB AM 65 VPH
AM 1813 VPH
*100
*150
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2292 VPH
WB PM 33 VPH
2 OR MORE LANES & 1 LANE
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
APPENDIX E
HCM 6th Signalized Intersection Summary Short Bkgrd AM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 363 72 75 76 73 5 68 608 31 6 543 258
Future Volume (veh/h) 363 72 75 76 73 5 68 608 31 6 543 258
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 427 85 47 89 86 2 80 715 0 7 639 115
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 446 339 188 191 182 4 360 1055 894 314 994 842
Arrive On Green 0.17 0.30 0.30 0.10 0.10 0.10 0.05 0.56 0.00 0.02 0.53 0.53
Sat Flow, veh/h 1781 1132 626 1258 1820 42 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 427 0 132 89 0 88 80 715 0 7 639 115
Grp Sat Flow(s),veh/h/ln 1781 0 1758 1258 0 1863 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 19.0 0.0 6.3 7.5 0.0 4.9 2.1 29.7 0.0 0.2 26.8 4.0
Cycle Q Clear(g_c), s 19.0 0.0 6.3 7.5 0.0 4.9 2.1 29.7 0.0 0.2 26.8 4.0
Prop In Lane 1.00 0.36 1.00 0.02 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 446 0 527 191 0 186 360 1055 894 314 994 842
V/C Ratio(X) 0.96 0.00 0.25 0.47 0.00 0.47 0.22 0.68 0.00 0.02 0.64 0.14
Avail Cap(c_a), veh/h 446 0 687 306 0 356 383 1055 894 395 994 842
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 38.3 0.0 29.1 47.9 0.0 46.8 13.4 16.9 0.0 14.3 18.4 13.0
Incr Delay (d2), s/veh 32.1 0.0 0.2 1.8 0.0 1.9 0.3 3.5 0.0 0.0 3.2 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.2 0.0 2.6 2.4 0.0 2.3 0.8 12.6 0.0 0.1 11.5 1.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 70.4 0.0 29.4 49.7 0.0 48.6 13.8 20.4 0.0 14.4 21.6 13.4
LnGrp LOS E A C D A D B C A B C B
Approach Vol, veh/h 559 177 795 761
Approach Delay, s/veh 60.7 49.2 19.8 20.2
Approach LOS E D B C
Timer - Assigned Phs 1 2 45678
Phs Duration (G+Y+Rc), s 8.6 63.4 38.0 5.0 67.0 22.0 16.0
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 6.0 46.0 42.0 6.0 46.0 18.0 20.0
Max Q Clear Time (g_c+I1), s 4.1 28.8 8.3 2.2 31.7 21.0 9.5
Green Ext Time (p_c), s 0.0 4.1 0.7 0.0 4.0 0.0 0.5
Intersection Summary
HCM 6th Ctrl Delay 32.2
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Bkgrd AM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Phase Number 1245678
Movement NBL SBTL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None None
Maximum Split (s) 10 52 48 10 52 22 26
Maximum Split (%) 9.1% 47.3% 43.6% 9.1% 47.3% 20.0% 23.6%
Minimum Split (s) 9.5 28 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1 1.5
Minimum Initial (s) 5555555
Vehicle Extension (s) 3333333
Minimum Gap (s) 3333333
Time Before Reduce (s) 0000000
Time To Reduce (s) 0000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 54 64 6 54 64 6 28
End Time (s) 64 6 54 64 6 28 54
Yield/Force Off (s) 60 0 48 60 0 24 48
Yield/Force Off 170(s) 60 95 35 60 96 24 36
Local Start Time (s) 54 64 6 54 64 6 28
Local Yield (s) 60 0 48 60 0 24 48
Local Yield 170(s) 60 95 35 60 96 24 36
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Short Bkgrd AM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 427 173 89 92 80 715 36 7 639 304
v/c Ratio 0.76 0.26 0.57 0.38 0.28 0.73 0.04 0.03 0.75 0.34
Control Delay 38.1 17.0 57.7 45.3 14.2 27.4 0.1 13.8 31.7 6.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 38.1 17.0 57.7 45.3 14.2 27.4 0.1 13.8 31.7 6.5
Queue Length 50th (ft) 240 55 60 58 25 360 0 2 197 0
Queue Length 95th (ft) 311 95 100 96 47 #621 0 m9 428 77
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275
Base Capacity (vph) 559 712 230 354 284 973 878 268 862 893
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.76 0.24 0.39 0.26 0.28 0.73 0.04 0.03 0.74 0.34
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Bkgrd PM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 308 86 92 54 92 15 89 672 42 7 709 419
Future Volume (veh/h) 308 86 92 54 92 15 89 672 42 7 709 419
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 328 91 61 57 98 11 95 715 1 7 754 249
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 364 273 183 167 143 16 314 1147 972 365 1088 922
Arrive On Green 0.15 0.26 0.26 0.09 0.09 0.09 0.05 0.61 0.61 0.02 0.58 0.58
Sat Flow, veh/h 1781 1044 700 1235 1652 185 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 328 0 152 57 0 109 95 715 1 7 754 249
Grp Sat Flow(s),veh/h/ln 1781 0 1744 1235 0 1837 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 18.0 0.0 8.5 5.3 0.0 6.9 2.4 28.7 0.0 0.2 33.9 9.4
Cycle Q Clear(g_c), s 18.0 0.0 8.5 5.3 0.0 6.9 2.4 28.7 0.0 0.2 33.9 9.4
Prop In Lane 1.00 0.40 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 364 0 456 167 0 159 314 1147 972 365 1088 922
V/C Ratio(X) 0.90 0.00 0.33 0.34 0.00 0.69 0.30 0.62 0.00 0.02 0.69 0.27
Avail Cap(c_a), veh/h 364 0 611 276 0 321 332 1147 972 439 1088 922
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 42.4 0.0 35.8 52.5 0.0 53.2 14.4 14.5 9.0 12.3 17.6 12.4
Incr Delay (d2), s/veh 24.4 0.0 0.4 1.2 0.0 5.1 0.5 2.6 0.0 0.0 3.6 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 11.1 0.0 3.6 1.7 0.0 3.4 0.9 11.9 0.0 0.1 14.5 3.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 66.8 0.0 36.3 53.7 0.0 58.4 14.9 17.1 9.0 12.3 21.2 13.2
LnGrp LOS E A D D AEBBABCB
Approach Vol, veh/h 480 166 811 1010
Approach Delay, s/veh 57.1 56.8 16.8 19.2
Approach LOS EEBB
Timer - Assigned Phs 1 2 45678
Phs Duration (G+Y+Rc), s 8.8 74.8 36.4 5.0 78.6 21.0 15.4
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 6.0 57.0 41.0 6.0 57.0 17.0 20.0
Max Q Clear Time (g_c+I1), s 4.4 35.9 10.5 2.2 30.7 20.0 8.9
Green Ext Time (p_c), s 0.0 6.0 0.8 0.0 5.0 0.0 0.5
Intersection Summary
HCM 6th Ctrl Delay 28.3
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Bkgrd PM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Phase Number 1245678
Movement NBL SBTL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None None
Maximum Split (s) 10 63 47 10 63 21 26
Maximum Split (%) 8.3% 52.5% 39.2% 8.3% 52.5% 17.5% 21.7%
Minimum Split (s) 9.5 28 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1 1.5
Minimum Initial (s) 5555555
Vehicle Extension (s) 3333333
Minimum Gap (s) 3333333
Time Before Reduce (s) 0000000
Time To Reduce (s) 0000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 88 98 41 88 98 41 62
End Time (s) 98 41 88 98 41 62 88
Yield/Force Off (s) 94 35 82 94 35 58 82
Yield/Force Off 170(s) 94 20 69 94 21 58 70
Local Start Time (s) 53 63 6 53 63 6 27
Local Yield (s) 59 0 47 59 0 23 47
Local Yield 170(s) 59 105 34 59 106 23 35
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 35 (29%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Short Bkgrd PM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 328 189 57 114 95 715 45 7 754 446
v/c Ratio 0.74 0.33 0.43 0.55 0.35 0.65 0.05 0.02 0.80 0.45
Control Delay 44.9 24.4 58.6 56.8 13.1 21.3 0.1 4.6 24.7 5.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 44.9 24.4 58.6 56.8 13.1 21.3 0.1 4.6 24.7 5.7
Queue Length 50th (ft) 204 79 42 80 29 347 0 2 568 82
Queue Length 95th (ft) #305 142 83 135 52 594 0 m2 #537 3
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275
Base Capacity (vph) 442 633 208 324 270 1095 972 342 944 988
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.74 0.30 0.27 0.35 0.35 0.65 0.05 0.02 0.80 0.45
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Short Bkgrd AM
10: Timberline & Fossil Creek
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Intersection
Int Delay, s/veh 4.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 44 0 73 12 0 53 16 973 3 15 732 18
Future Vol, veh/h 44 0 73 12 0 53 16 973 3 15 732 18
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 22222222222
Mvmt Flow 50 0 83 14 0 60 18 1106 3 17 832 20
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1465 2021 426 1594 2030 555 852 0 0 1109 0 0
Stage 1 876 876 - 1144 1144 -------
Stage 2 589 1145 - 450 886 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 89 57 577 72 57 475 783 - - 625 - -
Stage 1 310 365 - 213 273 -------
Stage 2 461 272 - 558 361 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 75 54 577 59 54 475 783 - - 625 - -
Mov Cap-2 Maneuver 75 54 - 59 54 -------
Stage 1 303 355 - 208 267 -------
Stage 2 393 266 - 465 351 -------
Approach EB WB NB SB
HCM Control Delay, s 52.6 31.9 0.2 0.2
HCM LOS F D
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 783 - - 75 577 206 625 - -
HCM Lane V/C Ratio 0.023 - - 0.667 0.144 0.359 0.027 - -
HCM Control Delay (s) 9.7 - - 119.5 12.3 31.9 10.9 - -
HCM Lane LOS A - - F B D B - -
HCM 95th %tile Q(veh) 0.1 - - 3 0.5 1.5 0.1 - -
HCM 6th TWSC Short Bkgrd PM
10: Timberline & Fossil Creek
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 29 1 23 6 1 26 33 938 19 48 1135 44
Future Vol, veh/h 29 1 23 6 1 26 33 938 19 48 1135 44
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 2 22222222222
Mvmt Flow 31 1 24 6 1 28 35 998 20 51 1207 47
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1903 2421 627 1784 2434 509 1254 0 0 1018 0 0
Stage 1 1333 1333 - 1078 1078 -------
Stage 2 570 1088 - 706 1356 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 42 32 426 52 31 509 551 - - 677 - -
Stage 1 162 221 - 233 293 -------
Stage 2 474 290 - 393 216 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 35 28 426 43 27 509 551 - - 677 - -
Mov Cap-2 Maneuver 35 28 - 43 27 -------
Stage 1 152 204 - 218 274 -------
Stage 2 418 271 - 341 200 -------
Approach EB WB NB SB
HCM Control Delay, s 172.7 37.6 0.4 0.4
HCM LOS F E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 551 - - 35 426 145 677 - -
HCM Lane V/C Ratio 0.064 - - 0.912 0.057 0.242 0.075 - -
HCM Control Delay (s) 12 - - 294.4 14 37.6 10.8 - -
HCM Lane LOS B - - F B E B - -
HCM 95th %tile Q(veh) 0.2 - - 3.3 0.2 0.9 0.2 - -
HCM 6th TWSC Short Bkgrd AM
8: Timberline & Rosen
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Intersection
Int Delay, s/veh 2.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 53 22 4 1066 743 11
Future Vol, veh/h 53 22 4 1066 743 11
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 62 26 5 1254 874 13
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1511 437 887 0 - 0
Stage 1 874 -----
Stage 2 637 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 111 567 759 - - -
Stage 1 369 -----
Stage 2 489 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 110 567 759 - - -
Mov Cap-2 Maneuver 110 -----
Stage 1 366 -----
Stage 2 489 -----
Approach EB NB SB
HCM Control Delay, s 63.2 0 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 759 - 144 - -
HCM Lane V/C Ratio 0.006 - 0.613 - -
HCM Control Delay (s) 9.8 - 63.2 - -
HCM Lane LOS A - F - -
HCM 95th %tile Q(veh) 0 - 3.2 - -
HCM 6th TWSC Short Bkgrd PM
8: Timberline & Rosen
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Intersection
Int Delay, s/veh 1.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 30 8 14 979 1219 63
Future Vol, veh/h 30 8 14 979 1219 63
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 96 96 96 96 96 96
Heavy Vehicles, % 2 22222
Mvmt Flow 31 8 15 1020 1270 66
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1810 635 1336 0 - 0
Stage 1 1270 -----
Stage 2 540 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 70 421 512 - - -
Stage 1 228 -----
Stage 2 548 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 68 421 512 - - -
Mov Cap-2 Maneuver 68 -----
Stage 1 221 -----
Stage 2 548 -----
Approach EB NB SB
HCM Control Delay, s 82.9 0.2 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 512 - 83 - -
HCM Lane V/C Ratio 0.028 - 0.477 - -
HCM Control Delay (s) 12.2 - 82.9 - -
HCM Lane LOS B - F - -
HCM 95th %tile Q(veh) 0.1 - 2 - -
HCM 6th Signalized Intersection Summary Short Bkgrd AM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 135 10 80 36 5 179 25 1060 34 74 638 50
Future Volume (veh/h) 135 10 80 36 5 179 25 1060 34 74 638 50
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 159 12 8 42 6 78 29 1247 38 87 751 30
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 260 202 135 321 22 287 570 2245 68 345 2321 1035
Arrive On Green 0.19 0.19 0.18 0.19 0.19 0.18 0.04 0.64 0.63 0.10 1.00 1.00
Sat Flow, veh/h 1314 1047 698 1392 114 1488 1781 3521 107 1781 3554 1585
Grp Volume(v), veh/h 159 0 20 42 0 84 29 629 656 87 751 30
Grp Sat Flow(s),veh/h/ln 1314 0 1745 1392 0 1603 1781 1777 1851 1781 1777 1585
Q Serve(g_s), s 12.9 0.0 1.0 2.8 0.0 5.0 0.6 21.8 21.9 1.7 0.0 0.0
Cycle Q Clear(g_c), s 17.9 0.0 1.0 3.8 0.0 5.0 0.6 21.8 21.9 1.7 0.0 0.0
Prop In Lane 1.00 0.40 1.00 0.93 1.00 0.06 1.00 1.00
Lane Grp Cap(c), veh/h 260 0 336 321 0 309 570 1133 1180 345 2321 1035
V/C Ratio(X) 0.61 0.00 0.06 0.13 0.00 0.27 0.05 0.56 0.56 0.25 0.32 0.03
Avail Cap(c_a), veh/h 365 0 476 432 0 437 620 1133 1180 400 2321 1035
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.94 0.94 0.94
Uniform Delay (d), s/veh 45.4 0.0 36.4 37.8 0.0 38.2 6.0 11.2 11.2 7.8 0.0 0.0
Incr Delay (d2), s/veh 2.3 0.0 0.1 0.2 0.0 0.5 0.0 2.0 1.9 0.4 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.4 0.0 0.4 1.0 0.0 2.0 0.2 8.1 8.5 0.5 0.1 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 47.8 0.0 36.5 38.0 0.0 38.7 6.0 13.1 13.1 8.1 0.3 0.0
LnGrp LOS D A D D A D ABBAAA
Approach Vol, veh/h 179 126 1314 868
Approach Delay, s/veh 46.5 38.5 13.0 1.1
Approach LOS D D B A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.9 76.8 26.2 8.6 75.1 26.2
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 59.0 29.0 8.0 57.0 29.0
Max Q Clear Time (g_c+I1), s 2.6 2.0 19.9 3.7 23.9 7.0
Green Ext Time (p_c), s 0.0 5.8 0.4 0.1 10.2 0.5
Intersection Summary
HCM 6th Ctrl Delay 12.5
HCM 6th LOS B
Timing Report, Sorted By Phase Short Bkgrd AM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 65 35 12 63 35
Maximum Split (%) 9.1% 59.1% 31.8% 10.9% 57.3% 31.8%
Minimum Split (s) 9.5 27 28 9.5 27 28
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 14 15 14 15
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 41 51 6 41 53 6
End Time (s) 51 6 41 53 6 41
Yield/Force Off (s) 47 0 35 49 0 35
Yield/Force Off 170(s) 47 96 20 49 96 20
Local Start Time (s) 41 51 6 41 53 6
Local Yield (s) 47 0 35 49 0 35
Local Yield 170(s) 47 96 20 49 96 20
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 6: Timberline & Zephyr
Queues Short Bkgrd AM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 159 106 42 217 29 1287 87 751 59
v/c Ratio 0.89 0.25 0.15 0.47 0.06 0.60 0.29 0.33 0.06
Control Delay 85.0 9.8 33.6 15.7 8.6 21.2 9.8 8.9 1.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 85.0 9.8 33.6 15.7 8.6 21.2 9.8 8.9 1.2
Queue Length 50th (ft) 108 7 24 41 8 322 14 121 1
Queue Length 95th (ft) #182 43 49 93 m14 483 31 143 6
Internal Link Dist (ft) 337 353 400 2203
Turn Bay Length (ft) 75 75 150 150 200
Base Capacity (vph) 225 508 343 539 505 2148 308 2255 1033
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.71 0.21 0.12 0.40 0.06 0.60 0.28 0.33 0.06
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Bkgrd PM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 120 10 70 26 15 96 100 863 46 142 1186 180
Future Volume (veh/h) 120 10 70 26 15 96 100 863 46 142 1186 180
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 128 11 8 28 16 11 106 918 47 151 1262 126
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 223 132 96 229 135 93 424 2445 125 501 2529 1128
Arrive On Green 0.13 0.13 0.12 0.13 0.13 0.12 0.05 0.71 0.70 0.10 1.00 1.00
Sat Flow, veh/h 1383 1007 732 1393 1033 710 1781 3439 176 1781 3554 1585
Grp Volume(v), veh/h 128 0 19 28 0 27 106 474 491 151 1262 126
Grp Sat Flow(s),veh/h/ln 1383 0 1739 1393 0 1743 1781 1777 1839 1781 1777 1585
Q Serve(g_s), s 10.8 0.0 1.2 2.2 0.0 1.6 1.8 12.6 12.7 2.8 0.0 0.0
Cycle Q Clear(g_c), s 12.4 0.0 1.2 3.3 0.0 1.6 1.8 12.6 12.7 2.8 0.0 0.0
Prop In Lane 1.00 0.42 1.00 0.41 1.00 0.10 1.00 1.00
Lane Grp Cap(c), veh/h 223 0 228 229 0 229 424 1263 1307 501 2529 1128
V/C Ratio(X) 0.58 0.00 0.08 0.12 0.00 0.12 0.25 0.38 0.38 0.30 0.50 0.11
Avail Cap(c_a), veh/h 364 0 406 372 0 407 500 1263 1307 605 2529 1128
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.73 0.73 0.73
Uniform Delay (d), s/veh 51.5 0.0 46.0 47.2 0.0 46.2 3.7 6.8 6.9 4.4 0.0 0.0
Incr Delay (d2), s/veh 2.3 0.0 0.2 0.2 0.0 0.2 0.3 0.9 0.8 0.2 0.5 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.9 0.0 0.5 0.8 0.0 0.7 0.6 4.4 4.5 0.8 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 53.8 0.0 46.1 47.5 0.0 46.4 4.0 7.7 7.7 4.7 0.5 0.1
LnGrp LOS D A D D A D AAAAAA
Approach Vol, veh/h 147 55 1071 1539
Approach Delay, s/veh 52.8 47.0 7.3 0.9
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.9 90.4 20.7 9.0 90.3 20.7
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 10.0 67.0 27.0 12.0 65.0 27.0
Max Q Clear Time (g_c+I1), s 3.8 2.0 14.4 4.8 14.7 5.3
Green Ext Time (p_c), s 0.1 13.3 0.3 0.2 7.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 7.0
HCM 6th LOS A
Timing Report, Sorted By Phase Short Bkgrd PM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 14 73 33 16 71 33
Maximum Split (%) 11.7% 60.8% 27.5% 13.3% 59.2% 27.5%
Minimum Split (s) 9.5 27 28 9.5 27 28
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 14 15 14 15
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 39 53 6 39 55 6
End Time (s) 53 6 39 55 6 39
Yield/Force Off (s) 49 0 33 51 0 33
Yield/Force Off 170(s) 49 106 18 51 106 18
Local Start Time (s) 39 53 6 39 55 6
Local Yield (s) 49 0 33 51 0 33
Local Yield 170(s) 49 106 18 51 106 18
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 6: Timberline & Zephyr
Queues Short Bkgrd PM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 128 85 28 118 106 967 151 1262 191
v/c Ratio 0.72 0.27 0.14 0.35 0.31 0.42 0.33 0.54 0.17
Control Delay 68.8 13.6 42.0 13.2 5.6 10.1 7.0 12.8 4.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 68.8 13.6 42.0 13.2 5.6 10.1 7.0 12.8 4.2
Queue Length 50th (ft) 95 7 19 11 18 160 19 160 1
Queue Length 95th (ft) 154 49 44 59 m16 236 m66 350 47
Internal Link Dist (ft) 337 353 400 2203
Turn Bay Length (ft) 75 75 150 150 200
Base Capacity (vph) 263 434 305 456 376 2307 503 2348 1110
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.49 0.20 0.09 0.26 0.28 0.42 0.30 0.54 0.17
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Bkgrd AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 39 16 28 126 5 215 12 1129 214 65 631 12
Future Volume (veh/h) 39 16 28 126 5 215 12 1129 214 65 631 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 46 19 1 148 6 104 14 1328 158 76 742 13
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 247 254 13 253 270 229 570 2475 1104 402 2579 45
Arrive On Green 0.14 0.14 0.14 0.14 0.14 0.14 0.05 1.00 1.00 0.05 0.72 0.72
Sat Flow, veh/h 1283 1761 93 1392 1870 1585 1781 3554 1585 1781 3573 63
Grp Volume(v), veh/h 46 0 20 148 6 104 14 1328 158 76 369 386
Grp Sat Flow(s),veh/h/ln 1283 0 1854 1392 1870 1585 1781 1777 1585 1781 1777 1859
Q Serve(g_s), s 3.5 0.0 1.0 11.3 0.3 6.6 0.2 0.0 0.0 1.2 8.0 8.0
Cycle Q Clear(g_c), s 3.8 0.0 1.0 12.3 0.3 6.6 0.2 0.0 0.0 1.2 8.0 8.0
Prop In Lane 1.00 0.05 1.00 1.00 1.00 1.00 1.00 0.03
Lane Grp Cap(c), veh/h 247 0 268 253 270 229 570 2475 1104 402 1282 1342
V/C Ratio(X) 0.19 0.00 0.07 0.58 0.02 0.45 0.02 0.54 0.14 0.19 0.29 0.29
Avail Cap(c_a), veh/h 359 0 430 375 434 367 655 2475 1104 491 1282 1342
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 0.73 0.73 0.73 1.00 1.00 1.00
Uniform Delay (d), s/veh 42.0 0.0 40.7 46.0 40.4 43.1 4.3 0.0 0.0 3.3 5.4 5.4
Incr Delay (d2), s/veh 0.4 0.0 0.1 2.1 0.0 1.4 0.0 0.6 0.2 0.2 0.6 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 0.0 0.5 4.0 0.1 2.6 0.1 0.2 0.1 0.3 2.6 2.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 42.4 0.0 40.8 48.2 40.4 44.5 4.3 0.6 0.2 3.5 5.9 5.9
LnGrp LOS D A DDDDAAAAAA
Approach Vol, veh/h 66 258 1500 831
Approach Delay, s/veh 41.9 46.5 0.6 5.7
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.7 83.9 20.4 8.5 81.1 20.4
Change Period (Y+Rc), s 4.0 5.5 5.5 4.0 5.5 5.5
Max Green Setting (Gmax), s 7.0 63.5 24.5 10.0 60.5 24.5
Max Q Clear Time (g_c+I1), s 2.2 10.0 5.8 3.2 2.0 14.3
Green Ext Time (p_c), s 0.0 5.0 0.2 0.1 14.6 0.5
Intersection Summary
HCM 6th Ctrl Delay 7.7
HCM 6th LOS A
Timing Report, Sorted By Phase Short Bkgrd AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 11 69 30 14 66 30
Maximum Split (%) 10.0% 62.7% 27.3% 12.7% 60.0% 27.3%
Minimum Split (s) 9.5 22.5 24.5 9.5 24.5 22.5
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 111111
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 30.5 41.5 0.5 30.5 44.5 0.5
End Time (s) 41.5 0.5 30.5 44.5 0.5 30.5
Yield/Force Off (s) 37.5 105 25 40.5 105 25
Yield/Force Off 170(s) 37.5 95 13 40.5 93 15
Local Start Time (s) 35.5 46.5 5.5 35.5 49.5 5.5
Local Yield (s) 42.5 0 30 45.5 0 30
Local Yield 170(s) 42.5 100 18 45.5 98 20
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 105 (95%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Short Bkgrd AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb am.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 46 52 148 6 253 14 1328 252 76 756
v/c Ratio 0.20 0.17 0.66 0.02 0.65 0.03 0.56 0.22 0.24 0.30
Control Delay 39.1 19.1 56.2 34.6 24.3 8.3 17.6 6.8 5.9 7.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 39.1 19.1 56.2 34.6 24.3 8.3 17.6 6.8 5.9 7.3
Queue Length 50th (ft) 28 11 99 4 64 3 262 30 11 74
Queue Length 95th (ft) 55 39 146 14 124 m9 418 89 27 161
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225
Base Capacity (vph) 325 416 312 431 484 573 2375 1141 359 2524
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.14 0.13 0.47 0.01 0.52 0.02 0.56 0.22 0.21 0.30
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Bkgrd PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 22 12 28 290 34 136 19 856 167 137 1141 28
Future Volume (veh/h) 22 12 28 290 34 136 19 856 167 137 1141 28
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 24 13 6 312 37 33 20 920 89 147 1227 29
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222222222
Cap, veh/h 383 312 144 407 481 408 286 2051 915 484 2149 51
Arrive On Green 0.26 0.26 0.25 0.26 0.26 0.26 0.06 1.00 1.00 0.06 0.61 0.61
Sat Flow, veh/h 1331 1211 559 1393 1870 1585 1781 3554 1585 1781 3548 84
Grp Volume(v), veh/h 24 0 19 312 37 33 20 920 89 147 614 642
Grp Sat Flow(s),veh/h/ln 1331 0 1770 1393 1870 1585 1781 1777 1585 1781 1777 1855
Q Serve(g_s), s 1.7 0.0 1.0 26.0 1.8 1.9 0.5 0.0 0.0 3.8 25.0 25.0
Cycle Q Clear(g_c), s 3.5 0.0 1.0 27.0 1.8 1.9 0.5 0.0 0.0 3.8 25.0 25.0
Prop In Lane 1.00 0.32 1.00 1.00 1.00 1.00 1.00 0.05
Lane Grp Cap(c), veh/h 383 0 456 407 481 408 286 2051 915 484 1076 1124
V/C Ratio(X) 0.06 0.00 0.04 0.77 0.08 0.08 0.07 0.45 0.10 0.30 0.57 0.57
Avail Cap(c_a), veh/h 495 0 605 525 639 542 339 2051 915 546 1076 1124
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 0.89 0.89 0.89 1.00 1.00 1.00
Uniform Delay (d), s/veh 35.1 0.0 33.6 43.6 33.8 33.8 11.1 0.0 0.0 8.0 14.3 14.3
Incr Delay (d2), s/veh 0.1 0.0 0.0 5.0 0.1 0.1 0.1 0.6 0.2 0.3 2.2 2.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.0 0.4 9.3 0.8 0.7 0.2 0.2 0.0 1.4 9.9 10.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 35.1 0.0 33.6 48.6 33.8 33.9 11.2 0.6 0.2 8.3 16.5 16.4
LnGrp LOS D A CDCCBAAABB
Approach Vol, veh/h 43 382 1029 1403
Approach Delay, s/veh 34.5 45.9 0.8 15.6
Approach LOS C D A B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.4 77.7 35.9 9.9 74.3 35.9
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 58.0 40.0 10.0 54.0 40.0
Max Q Clear Time (g_c+I1), s 2.5 27.0 5.5 5.8 2.0 29.0
Green Ext Time (p_c), s 0.0 9.6 0.1 0.1 7.9 0.9
Intersection Summary
HCM 6th Ctrl Delay 14.6
HCM 6th LOS B
Timing Report, Sorted By Phase Short Bkgrd PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 64 46 14 60 46
Maximum Split (%) 8.3% 53.3% 38.3% 11.7% 50.0% 38.3%
Minimum Split (s) 9.5 23 25 9.5 25 23
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 36.5 46.5 110.5 36.5 50.5 110.5
End Time (s) 46.5 110.5 36.5 50.5 110.5 36.5
Yield/Force Off (s) 42.5 104.5 30.5 46.5 104.5 30.5
Yield/Force Off 170(s) 42.5 94.5 18.5 46.5 92.5 20.5
Local Start Time (s) 52 62 6 52 66 6
Local Yield (s) 58 0 46 62 0 46
Local Yield 170(s) 58 110 34 62 108 36
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 104.5 (87%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Short Bkgrd PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates sb pm.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 24 43 312 37 146 20 920 180 147 1257
v/c Ratio 0.06 0.09 0.83 0.07 0.27 0.08 0.49 0.19 0.38 0.59
Control Delay 29.1 13.6 58.6 29.3 5.8 7.9 14.4 2.5 11.9 18.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 29.1 13.6 58.6 29.3 5.8 7.9 14.4 2.5 11.9 18.1
Queue Length 50th (ft) 14 7 225 21 0 3 151 2 40 271
Queue Length 95th (ft) 32 33 313 44 45 m13 253 29 79 475
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225
Base Capacity (vph) 466 589 463 636 636 268 1880 925 399 2134
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.05 0.07 0.67 0.06 0.23 0.07 0.49 0.19 0.37 0.59
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
APPENDIX F
HCM 6th Signalized Intersection Summary Long Bkgrd AM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 420 80 100 80 75 10 85 730 35 15 635 310
Future Volume (veh/h) 420 80 100 80 75 10 85 730 35 15 635 310
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 442 84 63 84 79 6 89 768 0 16 668 169
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 490 145 109 120 123 9 399 1174 995 363 1132 960
Arrive On Green 0.14 0.15 0.15 0.07 0.07 0.07 0.05 0.63 0.00 0.03 0.61 0.61
Sat Flow, veh/h 3456 992 744 1781 1717 130 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 442 0 147 84 0 85 89 768 0 16 668 169
Grp Sat Flow(s),veh/h/ln 1728 0 1736 1781 0 1847 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 15.1 0.0 9.5 5.5 0.0 5.4 2.1 31.1 0.0 0.4 26.3 5.7
Cycle Q Clear(g_c), s 15.1 0.0 9.5 5.5 0.0 5.4 2.1 31.1 0.0 0.4 26.3 5.7
Prop In Lane 1.00 0.43 1.00 0.07 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 490 0 254 120 0 132 399 1174 995 363 1132 960
V/C Ratio(X) 0.90 0.00 0.58 0.70 0.00 0.64 0.22 0.65 0.00 0.04 0.59 0.18
Avail Cap(c_a), veh/h 490 0 420 134 0 323 417 1174 995 422 1132 960
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.7 0.0 47.8 54.8 0.0 54.2 10.8 14.1 0.0 11.7 14.5 10.5
Incr Delay (d2), s/veh 19.9 0.0 2.1 13.3 0.0 5.1 0.3 2.8 0.0 0.0 2.3 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.8 0.0 4.2 2.9 0.0 2.6 0.8 12.7 0.0 0.1 10.9 2.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 70.6 0.0 49.9 68.1 0.0 59.3 11.0 17.0 0.0 11.7 16.8 10.9
LnGrp LOS E A D EAEBBABBB
Approach Vol, veh/h 589 169 857 853
Approach Delay, s/veh 65.4 63.7 16.3 15.5
Approach LOS EEBB
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.7 77.6 11.1 22.5 6.1 80.3 20.0 13.6
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 6.0 58.0 8.0 28.0 6.0 58.0 16.0 20.0
Max Q Clear Time (g_c+I1), s 4.1 28.3 7.5 11.5 2.4 33.1 17.1 7.4
Green Ext Time (p_c), s 0.0 5.3 0.0 0.6 0.0 5.5 0.0 0.2
Intersection Summary
HCM 6th Ctrl Delay 31.0
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Bkgrd AM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode None C-Min None None None C-Min None None
Maximum Split (s) 10 64 12 34 10 64 20 26
Maximum Split (%) 8.3% 53.3% 10.0% 28.3% 8.3% 53.3% 16.7% 21.7%
Minimum Split (s) 9.5 28 9.5 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1 1.5 1 1.5 1 1.5
Minimum Initial (s) 55555555
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 52 62 6 18 52 62 6 26
End Time (s) 62 6 18 52 62 6 26 52
Yield/Force Off (s) 58 0 14 46 58 0 22 46
Yield/Force Off 170(s) 58 105 14 33 58 106 22 34
Local Start Time (s) 52 62 6 18 52 62 6 26
Local Yield (s) 58 0 14 46 58 0 22 46
Local Yield 170(s) 58 105 14 33 58 106 22 34
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Long Bkgrd AM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 442 189 84 90 89 768 37 16 668 326
v/c Ratio 0.80 0.55 0.58 0.48 0.24 0.69 0.04 0.05 0.67 0.33
Control Delay 60.9 39.1 69.1 56.2 10.0 22.4 0.1 17.0 40.9 14.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 60.9 39.1 69.1 56.2 10.0 22.4 0.1 17.0 40.9 14.1
Queue Length 50th (ft) 164 98 62 63 26 382 0 10 532 133
Queue Length 95th (ft) #270 172 #135 114 46 636 0 m19 559 143
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275
Base Capacity (vph) 550 449 149 324 366 1113 1000 325 994 992
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.80 0.42 0.56 0.28 0.24 0.69 0.04 0.05 0.67 0.33
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Bkgrd PM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 375 90 120 55 100 20 115 785 45 20 840 500
Future Volume (veh/h) 375 90 120 55 100 20 115 785 45 20 840 500
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 395 95 82 58 105 15 121 826 0 21 884 335
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 474 166 143 89 147 21 249 1138 965 310 1100 932
Arrive On Green 0.14 0.18 0.18 0.05 0.09 0.09 0.05 0.61 0.00 0.03 0.59 0.59
Sat Flow, veh/h 3456 927 800 1781 1601 229 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 395 0 177 58 0 120 121 826 0 21 884 335
Grp Sat Flow(s),veh/h/ln 1728 0 1726 1781 0 1829 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 13.4 0.0 11.3 3.8 0.0 7.7 3.1 37.2 0.0 0.5 44.3 13.3
Cycle Q Clear(g_c), s 13.4 0.0 11.3 3.8 0.0 7.7 3.1 37.2 0.0 0.5 44.3 13.3
Prop In Lane 1.00 0.46 1.00 0.13 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 474 0 309 89 0 168 249 1138 965 310 1100 932
V/C Ratio(X) 0.83 0.00 0.57 0.65 0.00 0.72 0.49 0.73 0.00 0.07 0.80 0.36
Avail Cap(c_a), veh/h 490 0 417 134 0 320 264 1138 965 362 1100 932
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.4 0.0 45.1 56.0 0.0 53.0 19.8 16.5 0.0 14.1 19.3 12.9
Incr Delay (d2), s/veh 11.4 0.0 1.7 7.7 0.0 5.6 1.5 4.1 0.0 0.1 6.3 1.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.4 0.0 4.9 1.9 0.0 3.7 1.6 15.6 0.0 0.2 19.3 4.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.9 0.0 46.8 63.7 0.0 58.6 21.2 20.5 0.0 14.2 25.6 14.0
LnGrp LOS E A D E A E C C A B C B
Approach Vol, veh/h 572 178 947 1240
Approach Delay, s/veh 57.2 60.3 20.6 22.3
Approach LOS E E C C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.0 75.5 9.0 26.5 6.5 78.0 19.5 16.0
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 6.0 58.0 8.0 28.0 6.0 58.0 16.0 20.0
Max Q Clear Time (g_c+I1), s 5.1 46.3 5.8 13.3 2.5 39.2 15.4 9.7
Green Ext Time (p_c), s 0.0 5.7 0.0 0.7 0.0 5.6 0.1 0.3
Intersection Summary
HCM 6th Ctrl Delay 30.8
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Bkgrd PM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode None C-Min None None None C-Min None None
Maximum Split (s) 10 64 12 34 10 64 20 26
Maximum Split (%) 8.3% 53.3% 10.0% 28.3% 8.3% 53.3% 16.7% 21.7%
Minimum Split (s) 9.5 28 9.5 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1 1.5 1 1.5 1 1.5
Minimum Initial (s) 55555555
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 52 62 6 18 52 62 6 26
End Time (s) 62 6 18 52 62 6 26 52
Yield/Force Off (s) 58 0 14 46 58 0 22 46
Yield/Force Off 170(s) 58 105 14 33 58 106 22 34
Local Start Time (s) 52 62 6 18 52 62 6 26
Local Yield (s) 58 0 14 46 58 0 22 46
Local Yield 170(s) 58 105 14 33 58 106 22 34
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Long Bkgrd PM
16: Timberline & Trilby
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 395 221 58 126 121 826 47 21 884 526
v/c Ratio 0.83 0.57 0.46 0.57 0.58 0.74 0.05 0.08 0.90 0.52
Control Delay 65.5 39.1 65.7 56.8 29.7 24.9 0.1 13.7 38.6 12.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 65.5 39.1 65.7 56.8 29.7 24.9 0.1 13.7 38.6 12.8
Queue Length 50th (ft) 155 121 44 88 35 394 0 7 411 108
Queue Length 95th (ft) #227 196 89 146 #117 #827 0 m14 #917 219
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275
Base Capacity (vph) 486 450 132 323 207 1115 1002 280 985 1019
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.81 0.49 0.44 0.39 0.58 0.74 0.05 0.07 0.90 0.52
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Long Bkgrd AM
10: Timberline & Fossil Creek
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Intersection
Int Delay, s/veh 3.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 30 1 65 10 1 55 20 1150 5 15 900 25
Future Vol, veh/h 30 1 65 10 1 55 20 1150 5 15 900 25
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 32 1 68 11 1 58 21 1211 5 16 947 26
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1640 2250 487 1762 2261 608 973 0 0 1216 0 0
Stage 1 992 992 - 1256 1256 -------
Stage 2 648 1258 - 506 1005 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 66 41 526 54 40 439 704 - - 569 - -
Stage 1 264 322 - 181 241 -------
Stage 2 425 241 - 517 317 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 54 39 526 44 38 439 704 - - 569 - -
Mov Cap-2 Maneuver 54 39 - 44 38 -------
Stage 1 256 313 - 176 234 -------
Stage 2 356 234 - 436 308 -------
Approach EB WB NB SB
HCM Control Delay, s 56.7 38.8 0.2 0.2
HCM LOS F E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 704 - - 53 526 174 569 - -
HCM Lane V/C Ratio 0.03 - - 0.616 0.13 0.399 0.028 - -
HCM Control Delay (s) 10.3 - - 148.6 12.9 38.8 11.5 - -
HCM Lane LOS B - - F B E B - -
HCM 95th %tile Q(veh) 0.1 - - 2.5 0.4 1.8 0.1 - -
HCM 6th TWSC Long Bkgrd PM
10: Timberline & Fossil Creek
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Intersection
Int Delay, s/veh 10
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 1 20 5 1 25 50 1100 20 50 1420 55
Future Vol, veh/h 25 1 20 5 1 25 50 1100 20 50 1420 55
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 26 1 21 5 1 26 53 1158 21 53 1495 58
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2316 2915 777 2129 2934 590 1553 0 0 1179 0 0
Stage 1 1630 1630 - 1275 1275 -------
Stage 2 686 1285 - 854 1659 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver ~ 20 15 340 28 15 451 422 - - 588 - -
Stage 1 106 158 - 177 236 -------
Stage 2 404 233 - 320 153 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 15 12 340 21 12 451 422 - - 588 - -
Mov Cap-2 Maneuver ~ 15 12 - 21 12 -------
Stage 1 93 144 - 155 206 -------
Stage 2 331 204 - 271 139 -------
Approach EB WB NB SB
HCM Control Delay, s$ 522.3 75.3 0.6 0.4
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 422 - - 15 340 82 588 - -
HCM Lane V/C Ratio 0.125 - - 1.825 0.062 0.398 0.09 - -
HCM Control Delay (s) 14.7 - -$ 911.6 16.3 75.3 11.7 - -
HCM Lane LOS B - - F C F B - -
HCM 95th %tile Q(veh) 0.4 - - 4.1 0.2 1.6 0.3 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC Long Bkgrd AM
8: Timberline & Rosen
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Intersection
Int Delay, s/veh 0.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 40 10 1225 900 15
Future Vol, veh/h 0 40 10 1225 900 15
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 42 11 1289 947 16
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 474 963 0 - 0
Stage 1 - -----
Stage 2 - -----
Critical Hdwy - 6.94 4.14 - - -
Critical Hdwy Stg 1 - -----
Critical Hdwy Stg 2 - -----
Follow-up Hdwy - 3.32 2.22 - - -
Pot Cap-1 Maneuver 0 537 711 - - -
Stage 1 0 -----
Stage 2 0 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 537 711 - - -
Mov Cap-2 Maneuver - -----
Stage 1 - -----
Stage 2 - -----
Approach EB NB SB
HCM Control Delay, s 12.3 0.1 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 711 - 537 - -
HCM Lane V/C Ratio 0.015 - 0.078 - -
HCM Control Delay (s) 10.1 - 12.3 - -
HCM Lane LOS B - B - -
HCM 95th %tile Q(veh) 0 - 0.3 - -
HCM 6th TWSC Long Bkgrd PM
8: Timberline & Rosen
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Intersection
Int Delay, s/veh 0.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 20 30 1120 1505 85
Future Vol, veh/h 0 20 30 1120 1505 85
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 21 32 1179 1584 89
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 792 1673 0 - 0
Stage 1 - -----
Stage 2 - -----
Critical Hdwy - 6.94 4.14 - - -
Critical Hdwy Stg 1 - -----
Critical Hdwy Stg 2 - -----
Follow-up Hdwy - 3.32 2.22 - - -
Pot Cap-1 Maneuver 0 332 380 - - -
Stage 1 0 -----
Stage 2 0 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 332 380 - - -
Mov Cap-2 Maneuver - -----
Stage 1 - -----
Stage 2 - -----
Approach EB NB SB
HCM Control Delay, s 16.6 0.4 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 380 - 332 - -
HCM Lane V/C Ratio 0.083 - 0.063 - -
HCM Control Delay (s) 15.3 - 16.6 - -
HCM Lane LOS C - C - -
HCM 95th %tile Q(veh) 0.3 - 0.2 - -
HCM 6th Signalized Intersection Summary Long Bkgrd AM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 305 15 80 35 10 180 25 1165 35 90 800 55
Future Volume (veh/h) 305 15 80 35 10 180 25 1165 35 90 800 55
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 321 16 26 37 11 94 26 1226 35 95 842 26
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 410 205 333 472 54 460 452 1850 53 265 1919 856
Arrive On Green 0.32 0.32 0.31 0.32 0.32 0.31 0.03 0.52 0.52 0.10 1.00 1.00
Sat Flow, veh/h 1289 641 1042 1365 169 1442 1781 3528 101 1781 3554 1585
Grp Volume(v), veh/h 321 0 42 37 0 105 26 617 644 95 842 26
Grp Sat Flow(s),veh/h/ln 1289 0 1683 1365 0 1611 1781 1777 1852 1781 1777 1585
Q Serve(g_s), s 29.0 0.0 2.1 2.3 0.0 5.7 0.8 30.4 30.4 2.9 0.0 0.0
Cycle Q Clear(g_c), s 34.7 0.0 2.1 4.4 0.0 5.7 0.8 30.4 30.4 2.9 0.0 0.0
Prop In Lane 1.00 0.62 1.00 0.90 1.00 0.05 1.00 1.00
Lane Grp Cap(c), veh/h 410 0 537 472 0 514 452 931 971 265 1919 856
V/C Ratio(X) 0.78 0.00 0.08 0.08 0.00 0.20 0.06 0.66 0.66 0.36 0.44 0.03
Avail Cap(c_a), veh/h 449 0 589 514 0 564 498 931 971 283 1919 856
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.92 0.92 0.92
Uniform Delay (d), s/veh 42.4 0.0 28.7 30.1 0.0 30.1 12.0 20.8 20.8 15.5 0.0 0.0
Incr Delay (d2), s/veh 8.1 0.0 0.1 0.1 0.0 0.2 0.1 3.7 3.6 0.8 0.7 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 10.1 0.0 0.9 0.8 0.0 2.3 0.3 12.8 13.3 1.1 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 50.5 0.0 28.8 30.1 0.0 30.3 12.0 24.5 24.4 16.3 0.7 0.1
LnGrp LOS D A C C A C B C C B A A
Approach Vol, veh/h 363 142 1287 963
Approach Delay, s/veh 48.0 30.3 24.2 2.2
Approach LOS D C C A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.9 69.8 43.3 8.8 67.9 43.3
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 57.0 41.0 6.0 57.0 41.0
Max Q Clear Time (g_c+I1), s 2.8 2.0 36.7 4.9 32.4 7.7
Green Ext Time (p_c), s 0.0 6.8 0.6 0.0 9.0 0.7
Intersection Summary
HCM 6th Ctrl Delay 20.0
HCM 6th LOS B
Timing Report, Sorted By Phase Long Bkgrd AM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 63 47 10 63 47
Maximum Split (%) 8.3% 52.5% 39.2% 8.3% 52.5% 39.2%
Minimum Split (s) 9.5 27 28 9.5 27 28
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 14 15 14 15
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 53 63 6 53 63 6
End Time (s) 63 6 53 63 6 53
Yield/Force Off (s) 59 0 47 59 0 47
Yield/Force Off 170(s) 59 106 32 59 106 32
Local Start Time (s) 53 63 6 53 63 6
Local Yield (s) 59 0 47 59 0 47
Local Yield 170(s) 59 106 32 59 106 32
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 6: Timberline & Zephyr
Queues Long Bkgrd AM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 321 100 37 200 26 1263 95 842 58
v/c Ratio 0.92 0.17 0.09 0.32 0.07 0.73 0.45 0.45 0.07
Control Delay 69.9 8.2 26.4 10.9 12.4 28.6 23.3 17.5 2.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 69.9 8.2 26.4 10.9 12.4 28.6 23.3 17.5 2.3
Queue Length 50th (ft) 223 8 18 32 7 333 26 266 4
Queue Length 95th (ft) #408 46 44 90 m15 537 m74 196 m10
Internal Link Dist (ft) 337 353 400 2203
Turn Bay Length (ft) 75 75 150 150 200
Base Capacity (vph) 369 635 460 658 360 1763 209 1895 877
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.87 0.16 0.08 0.30 0.07 0.72 0.45 0.44 0.07
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Bkgrd PM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 215 15 60 25 20 95 95 980 45 145 1505 200
Future Volume (veh/h) 215 15 60 25 20 95 95 980 45 145 1505 200
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 226 16 11 26 21 18 100 1032 45 153 1584 144
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 318 214 147 329 193 165 278 2184 95 405 2260 1008
Arrive On Green 0.21 0.21 0.20 0.21 0.21 0.20 0.05 0.63 0.62 0.07 0.85 0.85
Sat Flow, veh/h 1368 1033 710 1383 930 797 1781 3469 151 1781 3554 1585
Grp Volume(v), veh/h 226 0 27 26 0 39 100 529 548 153 1584 144
Grp Sat Flow(s),veh/h/ln 1368 0 1743 1383 0 1727 1781 1777 1843 1781 1777 1585
Q Serve(g_s), s 19.3 0.0 1.5 1.9 0.0 2.2 2.3 18.8 18.8 3.6 20.2 1.9
Cycle Q Clear(g_c), s 21.5 0.0 1.5 3.4 0.0 2.2 2.3 18.8 18.8 3.6 20.2 1.9
Prop In Lane 1.00 0.41 1.00 0.46 1.00 0.08 1.00 1.00
Lane Grp Cap(c), veh/h 318 0 361 329 0 358 278 1119 1161 405 2260 1008
V/C Ratio(X) 0.71 0.00 0.07 0.08 0.00 0.11 0.36 0.47 0.47 0.38 0.70 0.14
Avail Cap(c_a), veh/h 377 0 436 389 0 432 295 1119 1161 412 2260 1008
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.47 0.47 0.47
Uniform Delay (d), s/veh 47.3 0.0 38.5 39.7 0.0 38.8 9.0 11.7 11.7 8.4 4.9 3.5
Incr Delay (d2), s/veh 5.0 0.0 0.1 0.1 0.0 0.1 0.8 1.4 1.4 0.3 0.9 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.0 0.0 0.7 0.6 0.0 1.0 0.8 7.2 7.5 1.2 3.9 0.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.3 0.0 38.6 39.8 0.0 38.9 9.8 13.1 13.1 8.7 5.8 3.7
LnGrp LOS D A D D A D ABBAAA
Approach Vol, veh/h 253 65 1177 1881
Approach Delay, s/veh 50.8 39.3 12.8 5.9
Approach LOS D D B A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.8 81.3 29.9 9.6 80.6 29.9
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 69.0 29.0 6.0 69.0 29.0
Max Q Clear Time (g_c+I1), s 4.3 22.2 23.5 5.6 20.8 5.4
Green Ext Time (p_c), s 0.0 18.6 0.4 0.0 8.2 0.2
Intersection Summary
HCM 6th Ctrl Delay 12.3
HCM 6th LOS B
Timing Report, Sorted By Phase Long Bkgrd PM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 75 35 10 75 35
Maximum Split (%) 8.3% 62.5% 29.2% 8.3% 62.5% 29.2%
Minimum Split (s) 9.5 27 28 9.5 27 28
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 14 15 14 15
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 41 51 6 41 51 6
End Time (s) 51 6 41 51 6 41
Yield/Force Off (s) 47 0 35 47 0 35
Yield/Force Off 170(s) 47 106 20 47 106 20
Local Start Time (s) 41 51 6 41 51 6
Local Yield (s) 47 0 35 47 0 35
Local Yield 170(s) 47 106 20 47 106 20
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 6: Timberline & Zephyr
Queues Long Bkgrd PM
6: Timberline & Zephyr
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 226 79 26 121 100 1079 153 1584 211
v/c Ratio 0.86 0.19 0.09 0.27 0.49 0.51 0.44 0.74 0.21
Control Delay 73.6 13.1 35.9 11.6 17.2 19.8 11.6 22.8 7.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 73.6 13.1 35.9 11.6 17.2 19.8 11.6 22.8 7.5
Queue Length 50th (ft) 164 10 16 13 23 251 43 393 23
Queue Length 95th (ft) #286 49 40 61 m46 472 m72 540 m60
Internal Link Dist (ft) 337 353 400 2203
Turn Bay Length (ft) 75 75 150 150 200
Base Capacity (vph) 295 457 328 483 205 2130 351 2152 1027
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.77 0.17 0.08 0.25 0.49 0.51 0.44 0.74 0.21
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Bkgrd AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 40 15 30 155 5 255 10 1390 280 80 800 15
Future Volume (veh/h) 40 15 30 155 5 255 10 1390 280 80 800 15
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 42 16 4 163 5 159 11 1463 202 84 842 15
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 244 221 55 260 286 243 504 2456 1096 351 2563 46
Arrive On Green 0.15 0.15 0.14 0.15 0.15 0.15 0.04 1.00 1.00 0.05 0.72 0.72
Sat Flow, veh/h 1222 1444 361 1392 1870 1585 1781 3554 1585 1781 3572 64
Grp Volume(v), veh/h 42 0 20 163 5 159 11 1463 202 84 419 438
Grp Sat Flow(s),veh/h/ln 1222 0 1805 1392 1870 1585 1781 1777 1585 1781 1777 1859
Q Serve(g_s), s 3.6 0.0 1.1 13.6 0.3 11.3 0.2 0.0 0.0 1.5 10.5 10.5
Cycle Q Clear(g_c), s 3.9 0.0 1.1 14.8 0.3 11.3 0.2 0.0 0.0 1.5 10.5 10.5
Prop In Lane 1.00 0.20 1.00 1.00 1.00 1.00 1.00 0.03
Lane Grp Cap(c), veh/h 244 0 276 260 286 243 504 2456 1096 351 1275 1334
V/C Ratio(X) 0.17 0.00 0.07 0.63 0.02 0.66 0.02 0.60 0.18 0.24 0.33 0.33
Avail Cap(c_a), veh/h 312 0 376 337 390 330 570 2456 1096 370 1275 1334
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 0.55 0.55 0.55 1.00 1.00 1.00
Uniform Delay (d), s/veh 44.8 0.0 43.6 49.8 43.2 47.8 5.1 0.0 0.0 3.8 6.3 6.3
Incr Delay (d2), s/veh 0.3 0.0 0.1 2.5 0.0 3.0 0.0 0.6 0.2 0.3 0.7 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 0.0 0.5 4.8 0.1 4.6 0.1 0.2 0.1 0.5 3.6 3.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 45.1 0.0 43.7 52.3 43.2 50.8 5.1 0.6 0.2 4.1 7.0 6.9
LnGrp LOS D A DDDDAAAAAA
Approach Vol, veh/h 62 327 1676 941
Approach Delay, s/veh 44.7 51.5 0.6 6.7
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.5 91.1 23.4 8.7 87.9 23.4
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 74.0 24.0 6.0 74.0 24.0
Max Q Clear Time (g_c+I1), s 2.2 12.5 5.9 3.5 2.0 16.8
Green Ext Time (p_c), s 0.0 5.9 0.2 0.0 18.3 0.6
Intersection Summary
HCM 6th Ctrl Delay 8.9
HCM 6th LOS A
Timing Report, Sorted By Phase Long Bkgrd AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 80 30 10 80 30
Maximum Split (%) 8.3% 66.7% 25.0% 8.3% 66.7% 25.0%
Minimum Split (s) 9.5 23 25 9.5 25 23
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 36.5 46.5 6.5 36.5 46.5 6.5
End Time (s) 46.5 6.5 36.5 46.5 6.5 36.5
Yield/Force Off (s) 42.5 0.5 30.5 42.5 0.5 30.5
Yield/Force Off 170(s) 42.5 110.5 18.5 42.5 108.5 20.5
Local Start Time (s) 36 46 6 36 46 6
Local Yield (s) 42 0 30 42 0 30
Local Yield 170(s) 42 110 18 42 108 20
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 0.5 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Long Bkgrd AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb am.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 42 48 163 5 268 11 1463 295 84 858
v/c Ratio 0.18 0.16 0.73 0.02 0.73 0.02 0.61 0.25 0.31 0.33
Control Delay 42.8 20.3 65.4 38.8 36.5 7.8 23.2 7.5 7.2 6.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 42.8 20.3 65.4 38.8 36.5 7.8 23.2 7.5 7.2 6.9
Queue Length 50th (ft) 28 11 120 3 106 3 541 73 14 101
Queue Length 95th (ft) 59 43 190 14 195 m5 474 m74 31 201
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225
Base Capacity (vph) 292 374 281 388 428 509 2406 1164 269 2590
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.14 0.13 0.58 0.01 0.63 0.02 0.61 0.25 0.31 0.33
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Bkgrd PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 25 10 30 385 35 160 20 1050 215 160 1440 30
Future Volume (veh/h) 25 10 30 385 35 160 20 1050 215 160 1440 30
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 26 11 10 405 37 61 21 1105 111 168 1516 31
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 442 278 253 477 577 489 187 1834 818 417 1973 40
Arrive On Green 0.31 0.31 0.30 0.31 0.31 0.31 0.06 1.00 1.00 0.07 0.55 0.55
Sat Flow, veh/h 1297 902 820 1391 1870 1585 1781 3554 1585 1781 3561 73
Grp Volume(v), veh/h 26 0 21 405 37 61 21 1105 111 168 755 792
Grp Sat Flow(s),veh/h/ln 1297 0 1723 1391 1870 1585 1781 1777 1585 1781 1777 1857
Q Serve(g_s), s 1.7 0.0 1.0 34.5 1.7 3.3 0.6 0.0 0.0 5.0 39.6 39.8
Cycle Q Clear(g_c), s 3.4 0.0 1.0 35.5 1.7 3.3 0.6 0.0 0.0 5.0 39.6 39.8
Prop In Lane 1.00 0.48 1.00 1.00 1.00 1.00 1.00 0.04
Lane Grp Cap(c), veh/h 442 0 531 477 577 489 187 1834 818 417 984 1029
V/C Ratio(X) 0.06 0.00 0.04 0.85 0.06 0.12 0.11 0.60 0.14 0.40 0.77 0.77
Avail Cap(c_a), veh/h 442 0 531 477 577 489 238 1834 818 445 984 1029
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 0.80 0.80 0.80 1.00 1.00 1.00
Uniform Delay (d), s/veh 30.5 0.0 29.2 41.5 29.3 29.9 17.5 0.0 0.0 10.6 20.8 20.8
Incr Delay (d2), s/veh 0.1 0.0 0.0 13.5 0.0 0.1 0.2 1.2 0.3 0.6 5.7 5.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.0 0.4 13.2 0.8 1.3 0.3 0.3 0.1 1.9 16.7 17.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 30.5 0.0 29.3 55.0 29.3 30.0 17.7 1.2 0.3 11.3 26.5 26.3
LnGrp LOS C A C E C C BAABCC
Approach Vol, veh/h 47 503 1237 1715
Approach Delay, s/veh 30.0 50.1 1.4 24.9
Approach LOS C D A C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.5 71.5 42.0 11.1 66.9 42.0
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 62.0 36.0 9.0 59.0 36.0
Max Q Clear Time (g_c+I1), s 2.6 41.8 5.4 7.0 2.0 37.5
Green Ext Time (p_c), s 0.0 10.8 0.1 0.1 10.5 0.0
Intersection Summary
HCM 6th Ctrl Delay 20.3
HCM 6th LOS C
Timing Report, Sorted By Phase Long Bkgrd PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 68 42 13 65 42
Maximum Split (%) 8.3% 56.7% 35.0% 10.8% 54.2% 35.0%
Minimum Split (s) 9.5 23 25 9.5 25 23
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 48.5 58.5 6.5 48.5 61.5 6.5
End Time (s) 58.5 6.5 48.5 61.5 6.5 48.5
Yield/Force Off (s) 54.5 0.5 42.5 57.5 0.5 42.5
Yield/Force Off 170(s) 54.5 110.5 30.5 57.5 108.5 32.5
Local Start Time (s) 48 58 6 48 61 6
Local Yield (s) 54 0 42 57 0 42
Local Yield 170(s) 54 110 30 57 108 32
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0.5 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Long Bkgrd PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/10/2019 Synchro 10 Light Report
Delich Associates lb pm.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 26 43 405 37 168 21 1105 226 168 1548
v/c Ratio 0.06 0.08 0.90 0.06 0.27 0.13 0.65 0.26 0.60 0.80
Control Delay 28.6 13.2 62.8 28.3 7.3 6.8 14.7 1.7 19.9 26.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 28.6 13.2 62.8 28.3 7.3 6.8 14.7 1.7 19.9 26.0
Queue Length 50th (ft) 13 5 277 18 8 5 206 6 60 492
Queue Length 95th (ft) 37 33 #512 46 60 m7 248 m11 82 618
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225
Base Capacity (vph) 453 570 450 618 627 167 1777 899 282 1947
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.06 0.08 0.90 0.06 0.27 0.13 0.62 0.25 0.60 0.80
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
APPENDIX G
HCM 6th Signalized Intersection Summary Short Total AM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 371 72 75 76 73 5 68 614 31 6 561 282
Future Volume (veh/h) 371 72 75 76 73 5 68 614 31 6 561 282
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 436 85 47 89 86 2 80 722 0 7 660 131
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 446 339 188 191 182 4 345 1055 894 309 994 842
Arrive On Green 0.17 0.30 0.30 0.10 0.10 0.10 0.05 0.56 0.00 0.02 0.53 0.53
Sat Flow, veh/h 1781 1132 626 1258 1820 42 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 436 0 132 89 0 88 80 722 0 7 660 131
Grp Sat Flow(s),veh/h/ln 1781 0 1758 1258 0 1863 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 19.0 0.0 6.3 7.5 0.0 4.9 2.1 30.2 0.0 0.2 28.1 4.6
Cycle Q Clear(g_c), s 19.0 0.0 6.3 7.5 0.0 4.9 2.1 30.2 0.0 0.2 28.1 4.6
Prop In Lane 1.00 0.36 1.00 0.02 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 446 0 527 191 0 186 345 1055 894 309 994 842
V/C Ratio(X) 0.98 0.00 0.25 0.47 0.00 0.47 0.23 0.68 0.00 0.02 0.66 0.16
Avail Cap(c_a), veh/h 446 0 687 306 0 356 368 1055 894 391 994 842
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 38.6 0.0 29.1 47.9 0.0 46.8 13.9 17.0 0.0 14.5 18.7 13.2
Incr Delay (d2), s/veh 36.9 0.0 0.2 1.8 0.0 1.9 0.3 3.6 0.0 0.0 3.5 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.0 0.0 2.6 2.4 0.0 2.3 0.8 12.8 0.0 0.1 12.2 1.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 75.6 0.0 29.4 49.7 0.0 48.6 14.2 20.6 0.0 14.5 22.2 13.6
LnGrp LOS E A C D A D B C A B C B
Approach Vol, veh/h 568 177 802 798
Approach Delay, s/veh 64.8 49.2 20.0 20.7
Approach LOS E D B C
Timer - Assigned Phs 1 2 45678
Phs Duration (G+Y+Rc), s 8.6 63.4 38.0 5.0 67.0 22.0 16.0
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 6.0 46.0 42.0 6.0 46.0 18.0 20.0
Max Q Clear Time (g_c+I1), s 4.1 30.1 8.3 2.2 32.2 21.0 9.5
Green Ext Time (p_c), s 0.0 4.2 0.7 0.0 4.0 0.0 0.5
Intersection Summary
HCM 6th Ctrl Delay 33.3
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Total AM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st am.syn
Phase Number 1245678
Movement NBL SBTL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None None
Maximum Split (s) 10 52 48 10 52 22 26
Maximum Split (%) 9.1% 47.3% 43.6% 9.1% 47.3% 20.0% 23.6%
Minimum Split (s) 9.5 28 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1 1.5
Minimum Initial (s) 5555555
Vehicle Extension (s) 3333333
Minimum Gap (s) 3333333
Time Before Reduce (s) 0000000
Time To Reduce (s) 0000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 54 64 6 54 64 6 28
End Time (s) 64 6 54 64 6 28 54
Yield/Force Off (s) 60 0 48 60 0 24 48
Yield/Force Off 170(s) 60 95 35 60 96 24 36
Local Start Time (s) 54 64 6 54 64 6 28
Local Yield (s) 60 0 48 60 0 24 48
Local Yield 170(s) 60 95 35 60 96 24 36
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Short Total AM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st am.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 436 173 89 92 80 722 36 7 660 332
v/c Ratio 0.78 0.26 0.57 0.38 0.30 0.74 0.04 0.03 0.77 0.37
Control Delay 39.6 17.1 57.7 45.3 14.4 27.4 0.1 14.3 41.9 10.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 39.6 17.1 57.7 45.3 14.4 27.4 0.1 14.3 41.9 10.2
Queue Length 50th (ft) 252 56 60 58 24 355 0 3 391 46
Queue Length 95th (ft) 320 95 100 96 47 #631 0 m7 446 83
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275
Base Capacity (vph) 556 711 230 354 270 976 881 265 864 903
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.78 0.24 0.39 0.26 0.30 0.74 0.04 0.03 0.76 0.37
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Total PM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 335 86 92 54 92 15 89 692 42 7 721 435
Future Volume (veh/h) 335 86 92 54 92 15 89 692 42 7 721 435
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 356 91 62 57 98 11 95 736 0 7 767 261
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 379 280 191 167 143 16 298 1131 959 342 1073 909
Arrive On Green 0.16 0.27 0.27 0.09 0.09 0.09 0.05 0.60 0.00 0.02 0.57 0.57
Sat Flow, veh/h 1781 1037 706 1234 1652 185 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 356 0 153 57 0 109 95 736 0 7 767 261
Grp Sat Flow(s),veh/h/ln 1781 0 1743 1234 0 1837 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 19.0 0.0 8.4 5.3 0.0 6.9 2.4 30.8 0.0 0.2 35.6 10.1
Cycle Q Clear(g_c), s 19.0 0.0 8.4 5.3 0.0 6.9 2.4 30.8 0.0 0.2 35.6 10.1
Prop In Lane 1.00 0.41 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 379 0 470 167 0 159 298 1131 959 342 1073 909
V/C Ratio(X) 0.94 0.00 0.33 0.34 0.00 0.69 0.32 0.65 0.00 0.02 0.71 0.29
Avail Cap(c_a), veh/h 379 0 625 276 0 321 316 1131 959 415 1073 909
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 42.5 0.0 35.1 52.5 0.0 53.2 15.4 15.5 0.0 13.2 18.5 13.1
Incr Delay (d2), s/veh 31.0 0.0 0.4 1.2 0.0 5.1 0.6 2.9 0.0 0.0 4.1 0.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.5 0.0 3.6 1.7 0.0 3.4 0.9 12.9 0.0 0.1 15.3 3.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 73.5 0.0 35.5 53.7 0.0 58.4 16.0 18.4 0.0 13.2 22.6 13.9
LnGrp LOS E A D D AEBBABCB
Approach Vol, veh/h 509 166 831 1035
Approach Delay, s/veh 62.0 56.8 18.1 20.3
Approach LOS E E B C
Timer - Assigned Phs 1 2 45678
Phs Duration (G+Y+Rc), s 8.8 73.8 37.4 5.0 77.6 22.0 15.4
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 6.0 56.0 42.0 6.0 56.0 18.0 20.0
Max Q Clear Time (g_c+I1), s 4.4 37.6 10.4 2.2 32.8 21.0 8.9
Green Ext Time (p_c), s 0.0 5.9 0.8 0.0 5.1 0.0 0.5
Intersection Summary
HCM 6th Ctrl Delay 30.3
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Total PM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Phase Number 1245678
Movement NBL SBTL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None None
Maximum Split (s) 10 62 48 10 62 22 26
Maximum Split (%) 8.3% 51.7% 40.0% 8.3% 51.7% 18.3% 21.7%
Minimum Split (s) 9.5 28 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1 1.5
Minimum Initial (s) 5555555
Vehicle Extension (s) 3333333
Minimum Gap (s) 3333333
Time Before Reduce (s) 0000000
Time To Reduce (s) 0000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 89 99 41 89 99 41 63
End Time (s) 99 41 89 99 41 63 89
Yield/Force Off (s) 95 35 83 95 35 59 83
Yield/Force Off 170(s) 95 20 70 95 21 59 71
Local Start Time (s) 54 64 6 54 64 6 28
Local Yield (s) 60 0 48 60 0 24 48
Local Yield 170(s) 60 105 35 60 106 24 36
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 35 (29%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Short Total PM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 356 189 57 114 95 736 45 7 767 463
v/c Ratio 0.79 0.33 0.43 0.55 0.37 0.68 0.05 0.02 0.82 0.47
Control Delay 47.6 24.1 58.6 56.8 13.9 22.5 0.1 5.9 24.3 4.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 47.6 24.1 58.6 56.8 13.9 22.5 0.1 5.9 24.3 4.7
Queue Length 50th (ft) 234 82 42 80 27 343 0 1 559 98
Queue Length 95th (ft) #347 140 83 135 53 634 0 m3 #750 47
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275
Base Capacity (vph) 452 647 208 324 254 1085 964 319 935 983
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.79 0.29 0.27 0.35 0.37 0.68 0.05 0.02 0.82 0.47
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Short Total AM
10: Timberline & Fossil Creek
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 44 0 73 12 0 53 16 987 3 15 774 18
Future Vol, veh/h 44 0 73 12 0 53 16 987 3 15 774 18
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 22222222222
Mvmt Flow 50 0 83 14 0 60 18 1122 3 17 880 20
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1521 2085 450 1634 2094 563 900 0 0 1125 0 0
Stage 1 924 924 - 1160 1160 -------
Stage 2 597 1161 - 474 934 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 81 52 556 67 52 470 751 - - 617 - -
Stage 1 290 346 - 208 268 -------
Stage 2 456 268 - 540 343 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 68 49 556 55 49 470 751 - - 617 - -
Mov Cap-2 Maneuver 68 49 - 55 49 -------
Stage 1 283 336 - 203 262 -------
Stage 2 388 262 - 447 333 -------
Approach EB WB NB SB
HCM Control Delay, s 61.8 34.1 0.2 0.2
HCM LOS F D
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 751 - - 68 556 196 617 - -
HCM Lane V/C Ratio 0.024 - - 0.735 0.149 0.377 0.028 - -
HCM Control Delay (s) 9.9 - - 143.5 12.6 34.1 11 - -
HCM Lane LOS A - - F B D B - -
HCM 95th %tile Q(veh) 0.1 - - 3.3 0.5 1.6 0.1 - -
HCM 6th TWSC Short Total PM
10: Timberline & Fossil Creek
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 5.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 29 1 23 6 1 26 33 985 19 48 1163 44
Future Vol, veh/h 29 1 23 6 1 26 33 985 19 48 1163 44
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 2 22222222222
Mvmt Flow 31 1 24 6 1 28 35 1048 20 51 1237 47
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1958 2501 642 1849 2514 534 1284 0 0 1068 0 0
Stage 1 1363 1363 - 1128 1128 -------
Stage 2 595 1138 - 721 1386 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 38 28 417 46 28 491 536 - - 648 - -
Stage 1 156 214 - 218 278 -------
Stage 2 458 275 - 385 209 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 31 24 417 37 24 491 536 - - 648 - -
Mov Cap-2 Maneuver 31 24 - 37 24 -------
Stage 1 146 197 - 204 260 -------
Stage 2 402 257 - 332 192 -------
Approach EB WB NB SB
HCM Control Delay, s 209.8 43 0.4 0.4
HCM LOS F E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 536 - - 31 417 129 648 - -
HCM Lane V/C Ratio 0.065 - - 1.03 0.059 0.272 0.079 - -
HCM Control Delay (s) 12.2 - -$ 359.8 14.2 43 11 - -
HCM Lane LOS B - - F B E B - -
HCM 95th %tile Q(veh) 0.2 - - 3.5 0.2 1 0.3 - -
HCM 6th TWSC Short Total AM
8: Timberline & Rosen
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 3.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 55 27 5 1079 780 12
Future Vol, veh/h 55 27 5 1079 780 12
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 65 32 6 1269 918 14
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1565 459 932 0 - 0
Stage 1 918 -----
Stage 2 647 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 102 549 730 - - -
Stage 1 349 -----
Stage 2 483 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 101 549 730 - - -
Mov Cap-2 Maneuver 101 -----
Stage 1 346 -----
Stage 2 483 -----
Approach EB NB SB
HCM Control Delay, s 76.5 0 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 730 - 138 - -
HCM Lane V/C Ratio 0.008 - 0.699 - -
HCM Control Delay (s) 10 - 76.5 - -
HCM Lane LOS A - F - -
HCM 95th %tile Q(veh) 0 - 4 - -
HCM 6th TWSC Short Total PM
8: Timberline & Rosen
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 1.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 31 12 18 1022 1243 66
Future Vol, veh/h 31 12 18 1022 1243 66
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 96 96 96 96 96 96
Heavy Vehicles, % 2 22222
Mvmt Flow 32 13 19 1065 1295 69
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1866 648 1364 0 - 0
Stage 1 1295 -----
Stage 2 571 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 64 413 500 - - -
Stage 1 221 -----
Stage 2 529 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 62 413 500 - - -
Mov Cap-2 Maneuver 62 -----
Stage 1 213 -----
Stage 2 529 -----
Approach EB NB SB
HCM Control Delay, s 94.4 0.2 0
HCM LOS F
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 500 - 81 - -
HCM Lane V/C Ratio 0.038 - 0.553 - -
HCM Control Delay (s) 12.5 - 94.4 - -
HCM Lane LOS B - F - -
HCM 95th %tile Q(veh) 0.1 - 2.4 - -
HCM 6th Signalized Intersection Summary Short Total AM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 210 10 117 36 5 179 38 1062 34 74 639 75
Future Volume (veh/h) 210 10 117 36 5 179 38 1062 34 74 639 75
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 247 12 26 42 6 93 45 1249 38 87 752 40
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 342 138 299 402 25 395 531 1999 61 298 2047 913
Arrive On Green 0.26 0.26 0.25 0.26 0.26 0.25 0.04 0.57 0.56 0.10 1.00 1.00
Sat Flow, veh/h 1296 526 1139 1370 97 1503 1781 3521 107 1781 3554 1585
Grp Volume(v), veh/h 247 0 38 42 0 99 45 630 657 87 752 40
Grp Sat Flow(s),veh/h/ln 1296 0 1665 1370 0 1600 1781 1777 1851 1781 1777 1585
Q Serve(g_s), s 20.4 0.0 1.9 2.6 0.0 5.4 1.1 26.1 26.2 2.1 0.0 0.0
Cycle Q Clear(g_c), s 25.8 0.0 1.9 4.5 0.0 5.4 1.1 26.1 26.2 2.1 0.0 0.0
Prop In Lane 1.00 0.68 1.00 0.94 1.00 0.06 1.00 1.00
Lane Grp Cap(c), veh/h 342 0 438 402 0 420 531 1009 1051 298 2047 913
V/C Ratio(X) 0.72 0.00 0.09 0.10 0.00 0.24 0.08 0.62 0.63 0.29 0.37 0.04
Avail Cap(c_a), veh/h 355 0 454 415 0 436 568 1009 1051 353 2047 913
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.94 0.94 0.94
Uniform Delay (d), s/veh 42.0 0.0 30.9 32.3 0.0 32.3 8.5 15.9 16.0 11.6 0.0 0.0
Incr Delay (d2), s/veh 6.7 0.0 0.1 0.1 0.0 0.3 0.1 2.9 2.8 0.5 0.5 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.1 0.0 0.8 0.9 0.0 2.1 0.4 10.5 10.9 0.8 0.1 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 48.8 0.0 30.9 32.4 0.0 32.5 8.6 18.8 18.8 12.1 0.5 0.1
LnGrp LOS D A C C A C ABBBAA
Approach Vol, veh/h 285 141 1332 879
Approach Delay, s/veh 46.4 32.5 18.5 1.6
Approach LOS D C B A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.7 68.4 33.9 8.6 67.4 33.9
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 59.0 29.0 8.0 57.0 29.0
Max Q Clear Time (g_c+I1), s 3.1 2.0 27.8 4.1 28.2 7.4
Green Ext Time (p_c), s 0.0 5.9 0.1 0.1 9.8 0.6
Intersection Summary
HCM 6th Ctrl Delay 16.6
HCM 6th LOS B
Timing Report, Sorted By Phase Short Total AM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates st am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 65 35 12 63 35
Maximum Split (%) 9.1% 59.1% 31.8% 10.9% 57.3% 31.8%
Minimum Split (s) 9.5 27 28 9.5 27 28
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 14 15 14 15
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 41 51 6 41 53 6
End Time (s) 51 6 41 53 6 41
Yield/Force Off (s) 47 0 35 49 0 35
Yield/Force Off 170(s) 47 96 20 49 96 20
Local Start Time (s) 41 51 6 41 53 6
Local Yield (s) 47 0 35 49 0 35
Local Yield 170(s) 47 96 20 49 96 20
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 6: Timberline & Zephyr
Queues Short Total AM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates st am.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 247 150 42 217 45 1289 87 752 88
v/c Ratio 0.83 0.26 0.12 0.37 0.11 0.71 0.36 0.40 0.10
Control Delay 60.3 7.5 29.5 12.8 11.1 28.6 16.5 14.4 1.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 60.3 7.5 29.5 12.8 11.1 28.6 16.5 14.4 1.9
Queue Length 50th (ft) 156 6 21 36 14 428 22 201 2
Queue Length 95th (ft) #300 47 49 93 m21 482 46 141 10
Internal Link Dist (ft) 337 353 400 2203
Turn Bay Length (ft) 75 75 150 150 200
Base Capacity (vph) 297 588 356 588 415 1920 250 1980 924
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.83 0.26 0.12 0.37 0.11 0.67 0.35 0.38 0.10
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Total PM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 171 10 94 26 15 96 143 864 46 142 1189 263
Future Volume (veh/h) 171 10 94 26 15 96 143 864 46 142 1189 263
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 182 11 15 28 16 15 152 919 46 151 1265 174
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 276 123 168 280 152 143 400 2296 115 472 2373 1058
Arrive On Green 0.17 0.17 0.16 0.17 0.17 0.16 0.05 0.67 0.66 0.11 1.00 1.00
Sat Flow, veh/h 1378 717 978 1385 888 833 1781 3444 172 1781 3554 1585
Grp Volume(v), veh/h 182 0 26 28 0 31 152 474 491 151 1265 174
Grp Sat Flow(s),veh/h/ln 1378 0 1694 1385 0 1721 1781 1777 1839 1781 1777 1585
Q Serve(g_s), s 15.4 0.0 1.6 2.1 0.0 1.8 3.1 14.6 14.6 3.2 0.0 0.0
Cycle Q Clear(g_c), s 17.2 0.0 1.6 3.6 0.0 1.8 3.1 14.6 14.6 3.2 0.0 0.0
Prop In Lane 1.00 0.58 1.00 0.48 1.00 0.09 1.00 1.00
Lane Grp Cap(c), veh/h 276 0 291 280 0 295 400 1185 1226 472 2373 1058
V/C Ratio(X) 0.66 0.00 0.09 0.10 0.00 0.10 0.38 0.40 0.40 0.32 0.53 0.16
Avail Cap(c_a), veh/h 361 0 395 365 0 401 471 1185 1226 570 2373 1058
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.68 0.68 0.68
Uniform Delay (d), s/veh 49.2 0.0 42.1 43.3 0.0 42.1 5.2 9.1 9.1 6.0 0.0 0.0
Incr Delay (d2), s/veh 2.8 0.0 0.1 0.2 0.0 0.2 0.6 1.0 1.0 0.3 0.6 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.5 0.0 0.7 0.7 0.0 0.8 1.1 5.4 5.6 1.0 0.2 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.0 0.0 42.2 43.5 0.0 42.3 5.8 10.1 10.1 6.2 0.6 0.2
LnGrp LOS D A D D A D ABBAAA
Approach Vol, veh/h 208 59 1117 1590
Approach Delay, s/veh 50.8 42.9 9.5 1.1
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.3 85.1 25.6 9.4 85.0 25.6
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 10.0 67.0 27.0 12.0 65.0 27.0
Max Q Clear Time (g_c+I1), s 5.1 2.0 19.2 5.2 16.6 5.6
Green Ext Time (p_c), s 0.1 13.7 0.4 0.2 7.0 0.2
Intersection Summary
HCM 6th Ctrl Delay 8.6
HCM 6th LOS A
Timing Report, Sorted By Phase Short Total PM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 14 73 33 16 71 33
Maximum Split (%) 11.7% 60.8% 27.5% 13.3% 59.2% 27.5%
Minimum Split (s) 9.5 27 28 9.5 27 28
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 14 15 14 15
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 39 53 6 39 55 6
End Time (s) 53 6 39 55 6 39
Yield/Force Off (s) 49 0 33 51 0 33
Yield/Force Off 170(s) 49 106 18 51 106 18
Local Start Time (s) 39 53 6 39 55 6
Local Yield (s) 49 0 33 51 0 33
Local Yield 170(s) 49 106 18 51 106 18
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 6: Timberline & Zephyr
Queues Short Total PM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 182 111 28 118 152 968 151 1265 280
v/c Ratio 0.80 0.28 0.12 0.30 0.47 0.45 0.35 0.58 0.26
Control Delay 70.1 10.8 38.5 11.6 9.0 12.8 8.2 15.2 4.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 70.1 10.8 38.5 11.6 9.0 12.8 8.2 15.2 4.1
Queue Length 50th (ft) 134 7 18 10 30 249 24 200 1
Queue Length 95th (ft) 211 53 43 58 m32 273 m58 311 45
Internal Link Dist (ft) 337 353 400 2203
Turn Bay Length (ft) 75 75 150 150 200
Base Capacity (vph) 275 455 282 459 343 2169 476 2183 1076
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.66 0.24 0.10 0.26 0.44 0.45 0.32 0.58 0.26
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Total AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 39 16 28 132 5 215 12 1188 232 65 651 12
Future Volume (veh/h) 39 16 28 132 5 215 12 1188 232 65 651 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 46 19 1 155 6 109 14 1398 177 76 766 13
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 253 263 14 260 279 237 553 2457 1096 380 2563 43
Arrive On Green 0.15 0.15 0.14 0.15 0.15 0.15 0.05 1.00 1.00 0.05 0.72 0.72
Sat Flow, veh/h 1277 1761 93 1392 1870 1585 1781 3554 1585 1781 3576 61
Grp Volume(v), veh/h 46 0 20 155 6 109 14 1398 177 76 381 398
Grp Sat Flow(s),veh/h/ln 1277 0 1854 1392 1870 1585 1781 1777 1585 1781 1777 1859
Q Serve(g_s), s 3.5 0.0 1.0 11.9 0.3 6.9 0.2 0.0 0.0 1.2 8.5 8.5
Cycle Q Clear(g_c), s 3.8 0.0 1.0 12.9 0.3 6.9 0.2 0.0 0.0 1.2 8.5 8.5
Prop In Lane 1.00 0.05 1.00 1.00 1.00 1.00 1.00 0.03
Lane Grp Cap(c), veh/h 253 0 277 260 279 237 553 2457 1096 380 1273 1333
V/C Ratio(X) 0.18 0.00 0.07 0.60 0.02 0.46 0.03 0.57 0.16 0.20 0.30 0.30
Avail Cap(c_a), veh/h 358 0 430 375 434 367 638 2457 1096 469 1273 1333
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 0.61 0.61 0.61 1.00 1.00 1.00
Uniform Delay (d), s/veh 41.6 0.0 40.3 45.8 39.9 42.7 4.5 0.0 0.0 3.4 5.6 5.6
Incr Delay (d2), s/veh 0.3 0.0 0.1 2.2 0.0 1.4 0.0 0.6 0.2 0.3 0.6 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 0.0 0.5 4.2 0.1 0.1 0.1 0.2 0.1 0.3 2.8 2.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 41.9 0.0 40.4 47.9 40.0 44.1 4.5 0.6 0.2 3.6 6.2 6.2
LnGrp LOS D A DDDDAAAAAA
Approach Vol, veh/h 66 270 1589 855
Approach Delay, s/veh 41.4 46.2 0.6 6.0
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.7 83.3 20.9 8.5 80.6 20.9
Change Period (Y+Rc), s 4.0 5.5 5.5 4.0 5.5 5.5
Max Green Setting (Gmax), s 7.0 63.5 24.5 10.0 60.5 24.5
Max Q Clear Time (g_c+I1), s 2.2 10.5 5.8 3.2 2.0 14.9
Green Ext Time (p_c), s 0.0 5.2 0.2 0.1 16.1 0.5
Intersection Summary
HCM 6th Ctrl Delay 7.6
HCM 6th LOS A
Timing Report, Sorted By Phase Short Total AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 11 69 30 14 66 30
Maximum Split (%) 10.0% 62.7% 27.3% 12.7% 60.0% 27.3%
Minimum Split (s) 9.5 22.5 24.5 9.5 24.5 22.5
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 111111
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 30.5 41.5 0.5 30.5 44.5 0.5
End Time (s) 41.5 0.5 30.5 44.5 0.5 30.5
Yield/Force Off (s) 37.5 105 25 40.5 105 25
Yield/Force Off 170(s) 37.5 95 13 40.5 93 15
Local Start Time (s) 35.5 46.5 5.5 35.5 49.5 5.5
Local Yield (s) 42.5 0 30 45.5 0 30
Local Yield 170(s) 42.5 100 18 45.5 98 20
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 105 (95%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Short Total AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st am.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 46 52 155 6 253 14 1398 273 76 780
v/c Ratio 0.19 0.17 0.68 0.02 0.65 0.03 0.59 0.24 0.26 0.31
Control Delay 38.7 19.0 56.8 34.6 25.0 8.2 22.9 8.4 6.3 7.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 38.7 19.0 56.8 34.6 25.0 8.2 22.9 8.4 6.3 7.5
Queue Length 50th (ft) 28 11 104 4 67 4 485 78 11 79
Queue Length 95th (ft) 55 39 152 14 129 m7 449 m86 27 166
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225
Base Capacity (vph) 325 416 312 431 479 557 2362 1139 338 2510
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.14 0.13 0.50 0.01 0.53 0.03 0.59 0.24 0.22 0.31
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Total PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 22 12 28 310 34 136 19 896 179 137 1207 28
Future Volume (veh/h) 22 12 28 310 34 136 19 896 179 137 1207 28
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 24 13 7 333 37 34 20 963 94 147 1298 29
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222222222
Cap, veh/h 403 312 168 428 509 432 258 1993 889 463 2099 47
Arrive On Green 0.27 0.27 0.26 0.27 0.27 0.27 0.06 1.00 1.00 0.06 0.59 0.59
Sat Flow, veh/h 1329 1144 616 1392 1870 1585 1781 3554 1585 1781 3554 79
Grp Volume(v), veh/h 24 0 20 333 37 34 20 963 94 147 649 678
Grp Sat Flow(s),veh/h/ln 1329 0 1760 1392 1870 1585 1781 1777 1585 1781 1777 1856
Q Serve(g_s), s 1.6 0.0 1.0 27.8 1.8 1.9 0.5 0.0 0.0 3.9 28.2 28.3
Cycle Q Clear(g_c), s 3.4 0.0 1.0 28.8 1.8 1.9 0.5 0.0 0.0 3.9 28.2 28.3
Prop In Lane 1.00 0.35 1.00 1.00 1.00 1.00 1.00 0.04
Lane Grp Cap(c), veh/h 403 0 479 428 509 432 258 1993 889 463 1050 1096
V/C Ratio(X) 0.06 0.00 0.04 0.78 0.07 0.08 0.08 0.48 0.11 0.32 0.62 0.62
Avail Cap(c_a), veh/h 495 0 601 524 639 542 311 1993 889 523 1050 1096
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 0.86 0.86 0.86 1.00 1.00 1.00
Uniform Delay (d), s/veh 33.7 0.0 32.3 42.7 32.4 32.5 12.5 0.0 0.0 8.7 15.8 15.8
Incr Delay (d2), s/veh 0.1 0.0 0.0 6.0 0.1 0.1 0.1 0.7 0.2 0.4 2.7 2.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.0 0.4 10.0 0.8 0.7 0.2 0.2 0.1 1.5 11.3 11.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 33.7 0.0 32.3 48.7 32.5 32.5 12.6 0.7 0.2 9.1 18.6 18.5
LnGrp LOS C A CDCCBAAABB
Approach Vol, veh/h 44 404 1077 1474
Approach Delay, s/veh 33.1 45.9 0.9 17.6
Approach LOS C D A B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.4 75.9 37.7 10.0 72.3 37.7
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 58.0 40.0 10.0 54.0 40.0
Max Q Clear Time (g_c+I1), s 2.5 30.3 5.4 5.9 2.0 30.8
Green Ext Time (p_c), s 0.0 10.1 0.1 0.1 8.5 0.9
Intersection Summary
HCM 6th Ctrl Delay 15.6
HCM 6th LOS B
Timing Report, Sorted By Phase Short Total PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 64 46 14 60 46
Maximum Split (%) 8.3% 53.3% 38.3% 11.7% 50.0% 38.3%
Minimum Split (s) 9.5 23 25 9.5 25 23
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 36.5 46.5 110.5 36.5 50.5 110.5
End Time (s) 46.5 110.5 36.5 50.5 110.5 36.5
Yield/Force Off (s) 42.5 104.5 30.5 46.5 104.5 30.5
Yield/Force Off 170(s) 42.5 94.5 18.5 46.5 92.5 20.5
Local Start Time (s) 52 62 6 52 66 6
Local Yield (s) 58 0 46 62 0 46
Local Yield 170(s) 58 110 34 62 108 36
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 104.5 (87%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Short Total PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 24 43 333 37 146 20 963 192 147 1328
v/c Ratio 0.06 0.09 0.85 0.07 0.26 0.08 0.52 0.21 0.41 0.63
Control Delay 28.4 13.3 59.7 28.6 5.6 11.3 18.0 5.1 12.9 19.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 28.4 13.3 59.7 28.6 5.6 11.3 18.0 5.1 12.9 19.7
Queue Length 50th (ft) 13 7 240 21 0 3 162 2 42 308
Queue Length 95th (ft) 32 33 338 44 45 m17 370 62 79 516
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225
Base Capacity (vph) 466 589 463 636 636 241 1840 913 373 2096
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.05 0.07 0.72 0.06 0.23 0.08 0.52 0.21 0.39 0.63
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
APPENDIX H
HCM 6th Signalized Intersection Summary Long Total AM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 430 80 100 80 75 10 85 735 35 15 655 335
Future Volume (veh/h) 430 80 100 80 75 10 85 735 35 15 655 335
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 453 84 63 84 79 6 89 774 0 16 689 187
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 490 145 109 120 123 9 383 1174 995 360 1132 960
Arrive On Green 0.14 0.15 0.15 0.07 0.07 0.07 0.05 0.63 0.00 0.03 0.61 0.61
Sat Flow, veh/h 3456 992 744 1781 1717 130 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 453 0 147 84 0 85 89 774 0 16 689 187
Grp Sat Flow(s),veh/h/ln 1728 0 1736 1781 0 1847 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 15.5 0.0 9.5 5.5 0.0 5.4 2.1 31.5 0.0 0.4 27.6 6.3
Cycle Q Clear(g_c), s 15.5 0.0 9.5 5.5 0.0 5.4 2.1 31.5 0.0 0.4 27.6 6.3
Prop In Lane 1.00 0.43 1.00 0.07 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 490 0 254 120 0 132 383 1174 995 360 1132 960
V/C Ratio(X) 0.93 0.00 0.58 0.70 0.00 0.64 0.23 0.66 0.00 0.04 0.61 0.19
Avail Cap(c_a), veh/h 490 0 420 134 0 323 401 1174 995 418 1132 960
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.9 0.0 47.8 54.8 0.0 54.2 11.2 14.2 0.0 11.8 14.8 10.6
Incr Delay (d2), s/veh 23.6 0.0 2.1 13.3 0.0 5.1 0.3 2.9 0.0 0.1 2.4 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 8.2 0.0 4.2 2.9 0.0 2.6 0.8 12.9 0.0 0.1 11.5 2.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 74.5 0.0 49.9 68.1 0.0 59.3 11.5 17.1 0.0 11.8 17.2 11.0
LnGrp LOS E A D EAEBBABBB
Approach Vol, veh/h 600 169 863 892
Approach Delay, s/veh 68.5 63.7 16.5 15.8
Approach LOS EEBB
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.7 77.6 11.1 22.5 6.1 80.3 20.0 13.6
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 6.0 58.0 8.0 28.0 6.0 58.0 16.0 20.0
Max Q Clear Time (g_c+I1), s 4.1 29.6 7.5 11.5 2.4 33.5 17.5 7.4
Green Ext Time (p_c), s 0.0 5.6 0.0 0.6 0.0 5.6 0.0 0.2
Intersection Summary
HCM 6th Ctrl Delay 31.8
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Total AM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode None C-Min None None None C-Min None None
Maximum Split (s) 10 64 12 34 10 64 20 26
Maximum Split (%) 8.3% 53.3% 10.0% 28.3% 8.3% 53.3% 16.7% 21.7%
Minimum Split (s) 9.5 28 9.5 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1 1.5 1 1.5 1 1.5
Minimum Initial (s) 55555555
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 52 62 6 18 52 62 6 26
End Time (s) 62 6 18 52 62 6 26 52
Yield/Force Off (s) 58 0 14 46 58 0 22 46
Yield/Force Off 170(s) 58 105 14 33 58 106 22 34
Local Start Time (s) 52 62 6 18 52 62 6 26
Local Yield (s) 58 0 14 46 58 0 22 46
Local Yield 170(s) 58 105 14 33 58 106 22 34
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Long Total AM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 453 189 84 90 89 774 37 16 689 353
v/c Ratio 0.81 0.54 0.58 0.48 0.26 0.70 0.04 0.05 0.70 0.35
Control Delay 60.7 38.5 70.0 56.2 10.3 22.8 0.1 17.1 45.6 17.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 60.7 38.5 70.0 56.2 10.3 22.8 0.1 17.1 45.6 17.4
Queue Length 50th (ft) 168 96 62 63 27 396 0 10 548 143
Queue Length 95th (ft) #280 172 #135 114 46 646 0 m17 577 153
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275
Base Capacity (vph) 561 449 147 324 345 1106 995 316 988 996
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.81 0.42 0.57 0.28 0.26 0.70 0.04 0.05 0.70 0.35
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Total PM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 405 90 120 55 100 20 115 805 45 20 855 515
Future Volume (veh/h) 405 90 120 55 100 20 115 805 45 20 855 515
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 426 95 82 58 105 15 121 847 0 21 900 346
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 490 170 147 89 147 21 237 1130 958 292 1091 924
Arrive On Green 0.14 0.18 0.18 0.05 0.09 0.09 0.05 0.60 0.00 0.03 0.58 0.58
Sat Flow, veh/h 3456 927 800 1781 1601 229 1781 1870 1585 1781 1870 1585
Grp Volume(v), veh/h 426 0 177 58 0 120 121 847 0 21 900 346
Grp Sat Flow(s),veh/h/ln 1728 0 1726 1781 0 1829 1781 1870 1585 1781 1870 1585
Q Serve(g_s), s 14.5 0.0 11.2 3.8 0.0 7.7 3.1 39.3 0.0 0.6 46.4 14.0
Cycle Q Clear(g_c), s 14.5 0.0 11.2 3.8 0.0 7.7 3.1 39.3 0.0 0.6 46.4 14.0
Prop In Lane 1.00 0.46 1.00 0.13 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 490 0 316 89 0 168 237 1130 958 292 1091 924
V/C Ratio(X) 0.87 0.00 0.56 0.65 0.00 0.72 0.51 0.75 0.00 0.07 0.83 0.37
Avail Cap(c_a), veh/h 490 0 417 134 0 320 252 1130 958 344 1091 924
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.4 0.0 44.6 56.0 0.0 53.0 21.2 17.2 0.0 15.0 20.1 13.3
Incr Delay (d2), s/veh 15.5 0.0 1.6 7.7 0.0 5.6 1.7 4.6 0.0 0.1 7.1 1.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.2 0.0 4.9 1.9 0.0 3.7 1.8 16.7 0.0 0.2 20.5 5.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 65.9 0.0 46.2 63.7 0.0 58.6 22.9 21.8 0.0 15.1 27.2 14.5
LnGrp LOS E A D E A E C C A B C B
Approach Vol, veh/h 603 178 968 1267
Approach Delay, s/veh 60.1 60.3 21.9 23.6
Approach LOS E E C C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.0 75.0 9.0 27.0 6.5 77.5 20.0 16.0
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 6.0 58.0 8.0 28.0 6.0 58.0 16.0 20.0
Max Q Clear Time (g_c+I1), s 5.1 48.4 5.8 13.2 2.6 41.3 16.5 9.7
Green Ext Time (p_c), s 0.0 5.1 0.0 0.7 0.0 5.5 0.0 0.3
Intersection Summary
HCM 6th Ctrl Delay 32.5
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Total PM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode None C-Min None None None C-Min None None
Maximum Split (s) 10 64 12 34 10 64 20 26
Maximum Split (%) 8.3% 53.3% 10.0% 28.3% 8.3% 53.3% 16.7% 21.7%
Minimum Split (s) 9.5 28 9.5 26 9.5 27 10.5 26
Yellow Time (s) 3 4.5 3 4.5 3 4.5 3 4.5
All-Red Time (s) 1 1.5 1 1.5 1 1.5 1 1.5
Minimum Initial (s) 55555555
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 15 13 14 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 52 62 6 18 52 62 6 26
End Time (s) 62 6 18 52 62 6 26 52
Yield/Force Off (s) 58 0 14 46 58 0 22 46
Yield/Force Off 170(s) 58 105 14 33 58 106 22 34
Local Start Time (s) 52 62 6 18 52 62 6 26
Local Yield (s) 58 0 14 46 58 0 22 46
Local Yield 170(s) 58 105 14 33 58 106 22 34
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 16: Timberline & Trilby
Queues Long Total PM
16: Timberline & Trilby
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 426 221 58 126 121 847 47 21 900 542
v/c Ratio 0.88 0.57 0.46 0.57 0.59 0.76 0.05 0.08 0.92 0.53
Control Delay 70.3 38.8 65.7 56.8 30.7 25.9 0.1 14.2 42.4 14.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 70.3 38.8 65.7 56.8 30.7 25.9 0.1 14.2 42.4 14.0
Queue Length 50th (ft) 169 121 44 88 36 413 0 7 487 146
Queue Length 95th (ft) #255 196 89 146 #120 #860 0 m14 #941 226
Internal Link Dist (ft) 909 738 1193 874
Turn Bay Length (ft) 250 170 350 350 275
Base Capacity (vph) 486 450 132 323 206 1111 999 261 981 1019
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.88 0.49 0.44 0.39 0.59 0.76 0.05 0.08 0.92 0.53
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Long Total AM
10: Timberline & Fossil Creek
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 30 1 65 10 1 55 20 1165 5 15 945 25
Future Vol, veh/h 30 1 65 10 1 55 20 1165 5 15 945 25
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 32 1 68 11 1 58 21 1226 5 16 995 26
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1696 2313 511 1801 2324 616 1021 0 0 1231 0 0
Stage 1 1040 1040 - 1271 1271 -------
Stage 2 656 1273 - 530 1053 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 60 37 508 50 37 433 675 - - 562 - -
Stage 1 246 306 - 178 237 -------
Stage 2 421 237 - 500 301 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 49 35 508 40 35 433 675 - - 562 - -
Mov Cap-2 Maneuver 49 35 - 40 35 -------
Stage 1 238 297 - 172 230 -------
Stage 2 352 230 - 419 293 -------
Approach EB WB NB SB
HCM Control Delay, s 65.7 42.6 0.2 0.2
HCM LOS F E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 675 - - 48 508 163 562 - -
HCM Lane V/C Ratio 0.031 - - 0.68 0.135 0.426 0.028 - -
HCM Control Delay (s) 10.5 - - 175.7 13.2 42.6 11.6 - -
HCM Lane LOS B - - F B E B - -
HCM 95th %tile Q(veh) 0.1 - - 2.7 0.5 1.9 0.1 - -
HCM 6th TWSC Long Total PM
10: Timberline & Fossil Creek
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Intersection
Int Delay, s/veh 11.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 1 20 5 1 25 50 1150 20 50 1450 55
Future Vol, veh/h 25 1 20 5 1 25 50 1150 20 50 1450 55
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 75 - - - 150 - - 150 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 26 1 21 5 1 26 53 1211 21 53 1526 58
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2373 2999 792 2198 3018 616 1584 0 0 1232 0 0
Stage 1 1661 1661 - 1328 1328 -------
Stage 2 712 1338 - 870 1690 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver ~ 18 13 332 25 13 433 411 - - 561 - -
Stage 1 101 153 - 164 223 -------
Stage 2 389 220 - 313 148 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 13 10 332 18 10 433 411 - - 561 - -
Mov Cap-2 Maneuver ~ 13 10 - 18 10 -------
Stage 1 88 139 - 143 194 -------
Stage 2 317 192 - 263 134 -------
Approach EB WB NB SB
HCM Control Delay, s $ 629 93.1 0.6 0.4
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 411 - - 13 332 71 561 - -
HCM Lane V/C Ratio 0.128 - - 2.105 0.063 0.46 0.094 - -
HCM Control Delay (s) 15 - - $ 1100 16.6 93.1 12.1 - -
HCM Lane LOS C - - F C F B - -
HCM 95th %tile Q(veh) 0.4 - - 4.2 0.2 1.8 0.3 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC Long Total AM
8: Timberline & Rosen
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Intersection
Int Delay, s/veh 0.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 45 10 1240 940 15
Future Vol, veh/h 0 45 10 1240 940 15
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 47 11 1305 989 16
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 495 1005 0 - 0
Stage 1 - -----
Stage 2 - -----
Critical Hdwy - 6.94 4.14 - - -
Critical Hdwy Stg 1 - -----
Critical Hdwy Stg 2 - -----
Follow-up Hdwy - 3.32 2.22 - - -
Pot Cap-1 Maneuver 0 520 685 - - -
Stage 1 0 -----
Stage 2 0 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 520 685 - - -
Mov Cap-2 Maneuver - -----
Stage 1 - -----
Stage 2 - -----
Approach EB NB SB
HCM Control Delay, s 12.6 0.1 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 685 - 520 - -
HCM Lane V/C Ratio 0.015 - 0.091 - -
HCM Control Delay (s) 10.3 - 12.6 - -
HCM Lane LOS B - B - -
HCM 95th %tile Q(veh) 0 - 0.3 - -
HCM 6th TWSC Long Total PM
8: Timberline & Rosen
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Intersection
Int Delay, s/veh 0.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 25 35 1165 1530 90
Future Vol, veh/h 0 25 35 1165 1530 90
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 150 - - 150
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 26 37 1226 1611 95
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 806 1706 0 - 0
Stage 1 - -----
Stage 2 - -----
Critical Hdwy - 6.94 4.14 - - -
Critical Hdwy Stg 1 - -----
Critical Hdwy Stg 2 - -----
Follow-up Hdwy - 3.32 2.22 - - -
Pot Cap-1 Maneuver 0 325 369 - - -
Stage 1 0 -----
Stage 2 0 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 325 369 - - -
Mov Cap-2 Maneuver - -----
Stage 1 - -----
Stage 2 - -----
Approach EB NB SB
HCM Control Delay, s 17.1 0.5 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 369 - 325 - -
HCM Lane V/C Ratio 0.1 - 0.081 - -
HCM Control Delay (s) 15.8 - 17.1 - -
HCM Lane LOS C - C - -
HCM 95th %tile Q(veh) 0.3 - 0.3 - -
HCM 6th Signalized Intersection Summary Long Total AM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 385 15 120 35 10 180 40 1165 35 90 800 80
Future Volume (veh/h) 385 15 120 35 10 180 40 1165 35 90 800 80
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 405 16 45 37 11 102 42 1226 35 95 842 37
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 444 152 426 496 55 508 442 1738 50 245 1784 796
Arrive On Green 0.35 0.35 0.34 0.35 0.35 0.34 0.04 0.49 0.48 0.10 1.00 1.00
Sat Flow, veh/h 1280 433 1218 1341 157 1452 1781 3528 101 1781 3554 1585
Grp Volume(v), veh/h 405 0 61 37 0 113 42 617 644 95 842 37
Grp Sat Flow(s),veh/h/ln 1280 0 1651 1341 0 1609 1781 1777 1852 1781 1777 1585
Q Serve(g_s), s 36.0 0.0 3.0 2.3 0.0 6.0 1.4 32.4 32.5 3.1 0.0 0.0
Cycle Q Clear(g_c), s 42.0 0.0 3.0 5.3 0.0 6.0 1.4 32.4 32.5 3.1 0.0 0.0
Prop In Lane 1.00 0.74 1.00 0.90 1.00 0.05 1.00 1.00
Lane Grp Cap(c), veh/h 444 0 578 496 0 563 442 875 912 245 1784 796
V/C Ratio(X) 0.91 0.00 0.11 0.07 0.00 0.20 0.10 0.71 0.71 0.39 0.47 0.05
Avail Cap(c_a), veh/h 444 0 578 496 0 563 475 875 912 262 1784 796
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.92 0.92 0.92
Uniform Delay (d), s/veh 42.9 0.0 26.6 28.1 0.0 27.6 13.4 23.7 23.7 17.8 0.0 0.0
Incr Delay (d2), s/veh 22.8 0.0 0.1 0.1 0.0 0.2 0.1 4.8 4.6 0.9 0.8 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 14.9 0.0 1.2 0.8 0.0 2.3 0.5 14.0 14.6 1.2 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 65.7 0.0 26.7 28.2 0.0 27.8 13.5 28.4 28.3 18.8 0.8 0.1
LnGrp LOS E A C C A C B C C B A A
Approach Vol, veh/h 466 150 1303 974
Approach Delay, s/veh 60.6 27.9 27.9 2.5
Approach LOS E C C A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.8 65.2 47.0 8.9 64.1 47.0
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 57.0 41.0 6.0 57.0 41.0
Max Q Clear Time (g_c+I1), s 3.4 2.0 44.0 5.1 34.5 8.0
Green Ext Time (p_c), s 0.0 6.8 0.0 0.0 8.7 0.8
Intersection Summary
HCM 6th Ctrl Delay 24.6
HCM 6th LOS C
Timing Report, Sorted By Phase Long Total AM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 63 47 10 63 47
Maximum Split (%) 8.3% 52.5% 39.2% 8.3% 52.5% 39.2%
Minimum Split (s) 9.5 27 28 9.5 27 28
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 14 15 14 15
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 53 63 6 53 63 6
End Time (s) 63 6 53 63 6 53
Yield/Force Off (s) 59 0 47 59 0 47
Yield/Force Off 170(s) 59 106 32 59 106 32
Local Start Time (s) 53 63 6 53 63 6
Local Yield (s) 59 0 47 59 0 47
Local Yield 170(s) 59 106 32 59 106 32
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 6: Timberline & Zephyr
Queues Long Total AM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 405 142 37 200 42 1263 95 842 84
v/c Ratio 0.96 0.20 0.08 0.28 0.14 0.81 0.57 0.52 0.11
Control Delay 72.0 6.8 25.7 10.4 13.3 34.8 35.4 22.4 2.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 72.0 6.8 25.7 10.4 13.3 34.8 35.4 22.4 2.6
Queue Length 50th (ft) 307 8 18 32 12 344 25 268 6
Queue Length 95th (ft) #546 52 45 90 m22 538 m86 196 m13
Internal Link Dist (ft) 337 353 400 2203
Turn Bay Length (ft) 75 75 150 150 200
Base Capacity (vph) 422 711 475 710 305 1705 167 1710 808
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.96 0.20 0.08 0.28 0.14 0.74 0.57 0.49 0.10
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Total PM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 270 15 85 25 20 95 140 980 45 145 1510 280
Future Volume (veh/h) 270 15 85 25 20 95 140 980 45 145 1510 280
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 284 16 20 26 21 22 147 1032 44 153 1589 192
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 371 187 234 378 207 217 253 2033 87 379 2086 930
Arrive On Green 0.25 0.25 0.24 0.25 0.25 0.24 0.06 0.59 0.58 0.08 0.78 0.78
Sat Flow, veh/h 1364 756 945 1372 836 876 1781 3473 148 1781 3554 1585
Grp Volume(v), veh/h 284 0 36 26 0 43 147 528 548 153 1589 192
Grp Sat Flow(s),veh/h/ln 1364 0 1700 1372 0 1713 1781 1777 1844 1781 1777 1585
Q Serve(g_s), s 24.4 0.0 2.0 1.8 0.0 2.3 3.9 21.0 21.1 4.1 29.0 3.8
Cycle Q Clear(g_c), s 26.7 0.0 2.0 3.7 0.0 2.3 3.9 21.0 21.1 4.1 29.0 3.8
Prop In Lane 1.00 0.56 1.00 0.51 1.00 0.08 1.00 1.00
Lane Grp Cap(c), veh/h 371 0 421 378 0 424 253 1040 1080 379 2086 930
V/C Ratio(X) 0.76 0.00 0.09 0.07 0.00 0.10 0.58 0.51 0.51 0.40 0.76 0.21
Avail Cap(c_a), veh/h 374 0 425 381 0 428 256 1040 1080 379 2086 930
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.39 0.39 0.39
Uniform Delay (d), s/veh 45.1 0.0 34.9 36.1 0.0 35.0 16.1 14.7 14.7 10.7 8.6 5.8
Incr Delay (d2), s/veh 9.0 0.0 0.1 0.1 0.0 0.1 3.2 1.8 1.7 0.3 1.1 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 9.1 0.0 0.8 0.6 0.0 1.0 1.8 8.4 8.7 1.4 6.1 1.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 54.2 0.0 35.0 36.2 0.0 35.1 19.3 16.4 16.4 11.0 9.7 6.0
LnGrp LOS D A C D A D BBBBAA
Approach Vol, veh/h 320 69 1223 1934
Approach Delay, s/veh 52.0 35.5 16.8 9.4
Approach LOS D D B A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.8 75.4 34.7 10.0 75.3 34.7
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 69.0 29.0 6.0 69.0 29.0
Max Q Clear Time (g_c+I1), s 5.9 31.0 28.7 6.1 23.1 5.7
Green Ext Time (p_c), s 0.0 17.6 0.0 0.0 8.2 0.2
Intersection Summary
HCM 6th Ctrl Delay 16.3
HCM 6th LOS B
Timing Report, Sorted By Phase Long Total PM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 75 35 10 75 35
Maximum Split (%) 8.3% 62.5% 29.2% 8.3% 62.5% 29.2%
Minimum Split (s) 9.5 27 28 9.5 27 28
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 14 15 14 15
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 41 51 6 41 51 6
End Time (s) 51 6 41 51 6 41
Yield/Force Off (s) 47 0 35 47 0 35
Yield/Force Off 170(s) 47 106 20 47 106 20
Local Start Time (s) 41 51 6 41 51 6
Local Yield (s) 47 0 35 47 0 35
Local Yield 170(s) 47 106 20 47 106 20
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 6: Timberline & Zephyr
Queues Long Total PM
6: Timberline & Zephyr
Rennat Property 07/15/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBR
Lane Group Flow (vph) 284 105 26 121 147 1079 153 1589 295
v/c Ratio 0.92 0.22 0.08 0.25 0.79 0.54 0.48 0.79 0.29
Control Delay 78.1 11.0 35.1 11.3 42.9 20.2 12.6 25.9 7.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 78.1 11.0 35.1 11.3 42.9 20.2 12.6 25.9 7.2
Queue Length 50th (ft) 215 9 15 12 58 279 37 335 19
Queue Length 95th (ft) #389 54 40 61 m#96 m472 m69 m543 m77
Internal Link Dist (ft) 337 353 400 2203
Turn Bay Length (ft) 75 75 150 150 200
Base Capacity (vph) 313 488 327 497 186 2055 322 2064 1018
Starvation Cap Reductn 000000000
Spillback Cap Reductn 000000000
Storage Cap Reductn 000000000
Reduced v/c Ratio 0.91 0.22 0.08 0.24 0.79 0.53 0.48 0.77 0.29
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Total AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 40 15 30 160 5 255 10 1450 300 80 820 15
Future Volume (veh/h) 40 15 30 160 5 255 10 1450 300 80 820 15
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 42 16 4 168 5 164 11 1526 220 84 863 15
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 248 226 57 265 293 248 491 2444 1090 334 2552 44
Arrive On Green 0.16 0.16 0.15 0.16 0.16 0.16 0.04 1.00 1.00 0.05 0.71 0.71
Sat Flow, veh/h 1216 1444 361 1392 1870 1585 1781 3554 1585 1781 3574 62
Grp Volume(v), veh/h 42 0 20 168 5 164 11 1526 220 84 429 449
Grp Sat Flow(s),veh/h/ln 1216 0 1805 1392 1870 1585 1781 1777 1585 1781 1777 1859
Q Serve(g_s), s 3.6 0.0 1.1 14.0 0.3 11.7 0.2 0.0 0.0 1.5 10.9 10.9
Cycle Q Clear(g_c), s 3.9 0.0 1.1 15.2 0.3 11.7 0.2 0.0 0.0 1.5 10.9 10.9
Prop In Lane 1.00 0.20 1.00 1.00 1.00 1.00 1.00 0.03
Lane Grp Cap(c), veh/h 248 0 283 265 293 248 491 2444 1090 334 1269 1328
V/C Ratio(X) 0.17 0.00 0.07 0.63 0.02 0.66 0.02 0.62 0.20 0.25 0.34 0.34
Avail Cap(c_a), veh/h 311 0 376 337 390 330 558 2444 1090 354 1269 1328
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 0.41 0.41 0.41 1.00 1.00 1.00
Uniform Delay (d), s/veh 44.5 0.0 43.3 49.6 42.8 47.6 5.3 0.0 0.0 3.9 6.5 6.5
Incr Delay (d2), s/veh 0.3 0.0 0.1 2.5 0.0 3.0 0.0 0.5 0.2 0.4 0.7 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.1 0.0 0.5 5.0 0.1 4.7 0.1 0.2 0.1 0.5 3.8 3.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 44.8 0.0 43.4 52.2 42.8 50.6 5.3 0.5 0.2 4.3 7.2 7.2
LnGrp LOS D A DDDDAAAAAA
Approach Vol, veh/h 62 337 1757 962
Approach Delay, s/veh 44.3 51.3 0.5 6.9
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.5 90.7 23.8 8.7 87.5 23.8
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 74.0 24.0 6.0 74.0 24.0
Max Q Clear Time (g_c+I1), s 2.2 12.9 5.9 3.5 2.0 17.2
Green Ext Time (p_c), s 0.0 6.1 0.2 0.0 20.0 0.6
Intersection Summary
HCM 6th Ctrl Delay 8.8
HCM 6th LOS A
Timing Report, Sorted By Phase Long Total AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 80 30 10 80 30
Maximum Split (%) 8.3% 66.7% 25.0% 8.3% 66.7% 25.0%
Minimum Split (s) 9.5 23 25 9.5 25 23
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 36.5 46.5 6.5 36.5 46.5 6.5
End Time (s) 46.5 6.5 36.5 46.5 6.5 36.5
Yield/Force Off (s) 42.5 0.5 30.5 42.5 0.5 30.5
Yield/Force Off 170(s) 42.5 110.5 18.5 42.5 108.5 20.5
Local Start Time (s) 36 46 6 36 46 6
Local Yield (s) 42 0 30 42 0 30
Local Yield 170(s) 42 110 18 42 108 20
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 0.5 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Long Total AM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt am.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 42 48 168 5 268 11 1526 316 84 879
v/c Ratio 0.18 0.15 0.73 0.02 0.73 0.02 0.64 0.27 0.34 0.34
Control Delay 42.3 20.1 65.1 38.4 37.1 7.6 20.8 6.8 7.9 7.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 42.3 20.1 65.1 38.4 37.1 7.6 20.8 6.8 7.9 7.1
Queue Length 50th (ft) 28 10 124 3 110 3 562 76 14 107
Queue Length 95th (ft) 59 43 196 14 200 m5 m498 m70 31 207
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225
Base Capacity (vph) 292 374 281 388 424 497 2398 1164 251 2575
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.14 0.13 0.60 0.01 0.63 0.02 0.64 0.27 0.33 0.34
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Total PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 25 10 30 405 35 160 20 1090 230 160 1505 30
Future Volume (veh/h) 25 10 30 405 35 160 20 1090 230 160 1505 30
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 26 11 10 426 37 67 21 1147 122 168 1584 31
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 440 278 253 477 577 489 174 1834 818 405 1975 39
Arrive On Green 0.31 0.31 0.30 0.31 0.31 0.31 0.06 1.00 1.00 0.07 0.55 0.55
Sat Flow, veh/h 1290 902 820 1391 1870 1585 1781 3554 1585 1781 3565 70
Grp Volume(v), veh/h 26 0 21 426 37 67 21 1147 122 168 788 827
Grp Sat Flow(s),veh/h/ln 1290 0 1723 1391 1870 1585 1781 1777 1585 1781 1777 1858
Q Serve(g_s), s 1.7 0.0 1.0 36.0 1.7 3.7 0.6 0.0 0.0 5.0 42.7 42.9
Cycle Q Clear(g_c), s 3.4 0.0 1.0 37.0 1.7 3.7 0.6 0.0 0.0 5.0 42.7 42.9
Prop In Lane 1.00 0.48 1.00 1.00 1.00 1.00 1.00 0.04
Lane Grp Cap(c), veh/h 440 0 531 477 577 489 174 1834 818 405 984 1029
V/C Ratio(X) 0.06 0.00 0.04 0.89 0.06 0.14 0.12 0.63 0.15 0.41 0.80 0.80
Avail Cap(c_a), veh/h 440 0 531 477 577 489 225 1834 818 434 984 1029
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 0.75 0.75 0.75 1.00 1.00 1.00
Uniform Delay (d), s/veh 30.5 0.0 29.2 42.4 29.3 30.0 18.5 0.0 0.0 10.6 21.5 21.5
Incr Delay (d2), s/veh 0.1 0.0 0.0 18.9 0.0 0.1 0.2 1.2 0.3 0.7 6.8 6.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.0 0.4 14.8 0.8 1.4 0.3 0.3 0.1 1.9 18.2 19.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 30.5 0.0 29.3 61.3 29.3 30.1 18.8 1.2 0.3 11.3 28.3 28.1
LnGrp LOS C A C E C C BAABCC
Approach Vol, veh/h 47 530 1290 1783
Approach Delay, s/veh 30.0 55.1 1.4 26.6
Approach LOS C E A C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.5 71.5 42.0 11.1 66.9 42.0
Change Period (Y+Rc), s 4.0 6.0 6.0 4.0 6.0 6.0
Max Green Setting (Gmax), s 6.0 62.0 36.0 9.0 59.0 36.0
Max Q Clear Time (g_c+I1), s 2.6 44.9 5.4 7.0 2.0 39.0
Green Ext Time (p_c), s 0.0 10.2 0.1 0.1 11.2 0.0
Intersection Summary
HCM 6th Ctrl Delay 21.9
HCM 6th LOS C
Timing Report, Sorted By Phase Long Total PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 10 68 42 13 65 42
Maximum Split (%) 8.3% 56.7% 35.0% 10.8% 54.2% 35.0%
Minimum Split (s) 9.5 23 25 9.5 25 23
Yellow Time (s) 3 4.5 4.5 3 4.5 4.5
All-Red Time (s) 1 1.5 1.5 1 1.5 1.5
Minimum Initial (s) 555555
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 10 12 12 10
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 48.5 58.5 6.5 48.5 61.5 6.5
End Time (s) 58.5 6.5 48.5 61.5 6.5 48.5
Yield/Force Off (s) 54.5 0.5 42.5 57.5 0.5 42.5
Yield/Force Off 170(s) 54.5 110.5 30.5 57.5 108.5 32.5
Local Start Time (s) 48 58 6 48 61 6
Local Yield (s) 54 0 42 57 0 42
Local Yield 170(s) 54 110 30 57 108 32
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0.5 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: Timberline & Willow Springs/Kechter
Queues Long Total PM
3: Timberline & Willow Springs/Kechter
Rennat Property 07/12/2019 Synchro 10 Light Report
Delich Associates lt pm.syn
Lane Group EBL EBT WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 26 43 426 37 168 21 1147 242 168 1616
v/c Ratio 0.06 0.07 0.92 0.06 0.26 0.13 0.69 0.28 0.65 0.85
Control Delay 29.1 13.4 65.5 28.8 8.0 6.5 16.4 1.8 24.5 28.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 29.1 13.4 65.5 28.8 8.0 6.5 16.4 1.8 24.5 28.7
Queue Length 50th (ft) 14 6 318 19 12 4 240 7 54 481
Queue Length 95th (ft) 37 33 #551 46 64 m6 m268 m13 98 668
Internal Link Dist (ft) 790 807 2203 1632
Turn Bay Length (ft) 75 200 165 170 200 225
Base Capacity (vph) 465 586 463 636 636 167 1769 899 262 1912
Starvation Cap Reductn 0000000000
Spillback Cap Reductn 0000000000
Storage Cap Reductn 0000000000
Reduced v/c Ratio 0.06 0.07 0.92 0.06 0.26 0.13 0.65 0.27 0.64 0.85
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
APPENDIX I
Timberline
Kechter
Trilby
Fossil Creek
Rosen
Westchase
Zephyr
Lemay
Bacon
Elementary
School
SCALE: 1"=1000'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Pedestrian LOS Worksheet
Project Location Classification: Other/School Walking Area
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Residential/commercial
neighborhood to the
north of the site
Residential
Minimum C C C C C
1 Actual A B B B A
Proposed A B B B A
Bacon Elementary
School Institutional
Minimum B B B C B
2 Actual A B B B A
Proposed A B B B A
Residential
neighborhood to the
east of the site
Residential
Minimum C C C C C
3 Actual A B B B A
Proposed A B B B A
Residential
neighborhood to the
south of the site
Residential
Minimum C C C C C
4 Actual A B B B A
Proposed A B B B A
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
Timberline
Kechter
Trilby
Fossil Creek
Rosen
Westchase
Zephyr
Lemay
Bacon
Elementary
School
SCALE: 1"=1000'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Rennat Property TIS, July 2019
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C B B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Bacon Elementary
1 School Institutional C B B
2
3
4
5
6
7
8
300
400
500
600
WB AM 65 VPH
AM 1813 VPH
*100
*150
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2292 VPH
WB PM 33 VPH
2 OR MORE LANES & 1 LANE
300
400
500
600
WB AM 65 VPH
AM 1757 VPH
*100
*150
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2217 VPH
WB PM 33 VPH
300
400
500
600
EB AM 225 VPH
AM 1881 VPH
*100
*150
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
PM 2517 VPH
EB PM 200 VPH
35/25
90/145
800/1510
80/280
AM/PM
Rounded to Nearest
5 Vehicles
45/25
Timberline
Zephyr
38/143
1062/864
34/46
179/96
5/15
36/26
Timberline
35/25
90/145
800/1505
55/200
AM/PM
Rounded to Nearest
5 Vehicles
40/20
Timberline
80/70
179/96
5/15
36/26
74/142
638/1186
50/180
Timberline
23/19
Timberline
Timberline