Loading...
HomeMy WebLinkAboutELM RIDGE RANCH PUD PRELIMINARY AND FINAL - 49 92 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCommw_.ity Planning and Environmenta ervices Planning Department City of Fort Collins October 16, 1992 Daniel M. McGuire 1727 Ridgecrest Road Fort Collins, CO. 80524 Dear Dan, Staff has reviewed your submittal of the Elm ridge Ranch P.U.D., Preliminary and Final, and would like to offer the following comments: 1. The township shown on the Plat, Site and Landscape Plan is incorrect. The correct township designation is T 8 N, not T 7 N. This should be changed in the legal description on both the Site Plan and the Plat, and in the title on the Plat. 2. New buildings added to this site in the future will have to comply with all building and fire code requirements at time of construction. Water supply and emergency access may be a problem for any new buildings. 3. The note under the Planning Objectives on the Site .and Landscape Plan referencing the preservation of existing trees should be more specific. What is meant by "existing vegetation, such as elm trees and tall grasses, will be preserved in their natural state where possible"? 4. This property is in the RP, Planned Residential Zoning District, not the RLP district. The Proposed Zoning note under Site Data on the Site and Landscape Plan should be omitted. The zoning on this property will remain the same and the P.U.D. will simply superimpose and legalize this use on the property, if approved by the Planning and Zoning Board. This will become an approved P.U.D., not a home occupation. 5. The proposed Northeast Area Transportation Plan, not yet adopted by the City, shows an extensive bicycle system planned throughout this area. It is being recommended that this property owner show an access easement along the southern edge of the property, adjacent to the Larimer & Weld Canal, for a future bikeway. This easement could occur in the canal right- of-way if physically possible and the Canal Company approves it. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 6. Water and sanitary sewer services will be provided by other utility companies, not the City of Fort Collins. 7. As per City ordinance, no future building permits on this property can be issued until the existing overhead electric line (owned by the Poudre Valley REA) is undergrounded. This only applies to the lower voltage line, of the two existing, along the west side of the property. 8. The City cannot require dedication of street right-of-way for the proposed Redwood Street extension at this time since the proposed use is not generating development impacts sufficient to ask for dedication. 9. The existing gravel access drive into this property is contained within. both dedicated street right-of-way (Ridgecrest Drive) and an access & utility easement in Pheasant Ridge Estates. The Plat and the Site and Landscape Plan should show this status. Please refer to the Pheasant Ridge Estates plat for the information that should be included. 10. Parkland fees of $625/dwelling unit for any new residential unit will apply and be collected at the time of issuance of building permits. 11. A copy of the comments from the City Stormwater Utility is attached to this letter. 12. The Site Plan should identify the existing land use south of the Larimer & Weld Canal. The property to the east is Pheasant Ridge Estates and the zoning is RP. The property to the north (Juday/Rempfer) is in the County, with a county zoning designation. These changes should be made to the Site Plan. 13. The buildings on the Site and Landscape Plan should be labeled as "existing" or "new". How much of the compacted gravel road base is in place and how much is new? 14. No off -site street improvements to Spaulding Lane are being required with this request. 15. A letter identifying the anticipated vehicular use of this site should be submitted for review by the City Transportation Division. This will fulfill the traffic study requirement. This completes the .review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on the agenda for the November 16, 1992 Planning and Zoning Board hearing: u Plan revisions are due October 28, 1992 by 12:00 noon. Please contact me for the number of revisions required for each document. PMT's, renderings, and 8 copies of final revisions (for the Planning and Zoning Board packets) are due November 9, 1992. Final documents (including the signed development agreement, applicable mylars and utility plans) are due November 12, 1992 by 12:00 noon. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. 1 cerely, S e e Olt Project Planner xc: Kerrie Ashbeck Sherry Albertson -Clark Advance Planning Stormwater Utility Transportation Natural Resources Parks & Recreation Stewart and Associates file/Project Planner