Loading...
HomeMy WebLinkAboutFOSSIL CREEK ESTATES PUD FIRST FILING FINAL - 50 92F - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI ': J Final Drainage and Erosion Control Report for FOSSIL CREEK ESTATES P.U.D. FIRST FILING Fort Collins, Colorado Prepared for: FOSSII, CREEK PARTNERS 363 West Drake Road Ft. Collins, Colorado 80526 11�11'T16A s ww YAL Prepared by: SHEAR ENGINEERING CORPORATION Project No: 1318-01-92 Date: March, 1994 4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334 APPENDIX I Stonn Drainage Calculations 1 i 6LOPE 0 5 1TG rS,EAiC i� 1 C>,oss,1 ere tY �lnt)\S CZx (Zw+S,t�� J I_6 aG 1. li rora,cm,- 0.46 I' 0z 4CLS Glu'1 sF 0114 S6z7 sC I (LPA 46 34( 3)o—gGit�� � 19• Igo 5� 4 tof— r.; S�11C? 05 ST 35C LoEy- Zoou sCA,;! 1e.?Qrvwjof L,r� _ �6}oGus� - 1-74=t ,I a. i� Tc�S� Tmy�CrU\UU arc. _ 5,01 tiL 0.rc is1r r,� 1elf\ .Lq:v' d n�n Wit. G CNaJ trrl .e.�L /� -0 erg UF UsC ?JAwP�-,� )AE1)v Y Salmi F4)a AL)_ i' . • is is SHEAR ENGINEERING CORPORATION DEVELOPED'SITE PAGE t 2 PROJECT tPOSSIL CREEK FIRST PROJ.NO. 11318-01-92 DATE? 03/31/94 FILE tFOSSILI BYR NED NOTES 2INCLUDES 1/2 SHIELDS STREET RUNOFF SURFACE CORP. CHARACTERISTICS AREA C C*A (acres) STREETS ASPHALT 3.270 0.950 3.107 CONCRETE 0.000 0.950 0.000 GRAVEL 0.000 0.500 0.000 ROOFS 1.740 0.950 1.653 LAWNS SANDY SOIL PLAT < 2% 0.000 0.100 0.000 AVERAGE 2 - 71 0.000 0.150 0.000 STEEP > 74 0.000 0.200 0.000 LAWNS HEAVY SOIL FLAT < 21 0.000 0.200 0.000 AVERAGE 2 - 7% 8.020 0.250 2.005 STEEP > 7% 0.000 0.350 0.000 TOTAL AREA 13.030 6.765 C2 C10 C100 COMPOSITE C VALUE 0.519 0.519 0.649 USE 0.52 0.52 0.65 No Text I I I� ro%%X I� •�� i 3)31 r II � CZ G\h C1GCi 044 b.Zo i o,_zo O,Z 4- PLAi �Awo , I I 1 Y Svc\ i Tv �,,1 1 e� 1 1 oss�` c�cck vinue �j is I Ppp�e_4- �i II It it i AfCS llizo If O�s,�c - `(,5O it II b i; I,iv ��, 6u�¢u LAwN PAU6�6rVT - Ltiw,� Ao,,slo�e., �i li C.,- = 0163 C,o = 0 ,, Cio o = 0,64, _ •^ I! 0��5\}C — Oi�GT'� s��Gc. W� SCVC�hI �Ul�\nC � �,SO c,c•, '1 �i L ,frN err4iovs La�aN = 10 0 �� ..�,, P,Wb .51o,ve CGog - 0.40 ... I, li i; , ;; Com ostit�- I„ CZ = 6,-3 c,,= 0135 G1QD= (3,44 il covv, os\sr- Zeal,,'. c - d\$Z c - `� I I '�RVGL �Ail� F6zor, Sep. Gxh\brr� A Tv Nw Pes, �0�_,1--- SHEAR ENGINEERING CORPORATION PAGE 4 DEVELOPED FLOW TO •S• PROJECT& FOSSIL CREEK FIRST PILING DATE 03/31/94 PROJ. NO.1318-01-92 BY HBO FILEt FOSSILI AREA (A). 11.83 ACRES SUB BASINIb INCLUDES 1.0 ACRES OFF SITE RUNOFF CORP. (C) 2 YEAR 10 YEAR 200 YEAR C 0.49 0.49 0.62 088 CALCULATIONS ON PAGE 3 TIME OF CONCENTRATION (TC) OVERLAND TRAVEL TIME (Ti) (1.87(1.1-CCf)*(L)"0.5)/(8)•0.33 LENGTH . 200 FEET SLOPE 8.00 1 2 YEAR 10 YEAR 100 YEAR C 0.25 0.25 _ 0.31 Ti (min). 21.32 11.32 10.49 TRAVEL TIME (Tt) .L/(60-V) FLOW TYPE L (ft) 380 S (1) . 1.00 GUTTER V (fps) . 2.00 Tt(min). 3.17 L (ft) . 300 8 (1) . 8.00 GUTTER V (fps) . 5.60 Tt(min). 0.89 L (ft) . 335 8 (t) . 5.00 GUTTER V (fps) . 4.50 Tt(min). 1.24 L (ft) 0 S (t) . 4.40 GUTTER V (fps) . 0.00 Tt(min). 0.00 L (ft) 0 S (1) . 0.00 GUTTER V (fps) . 0.00 Tt(min). 0.00 L (ft) 0 S (1) . 0.00 GUTTER V (fps) . 0.00 Tt(min). 0.00 L (ft) 0 S (1) . 0.00 GUTTER V (fps) . 0.00 Tt(min). 0.00 NOTE ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) . 5.30 TO .Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR TO (min). 16.62 16.62 15.79 USE Tc . 16.5 16.5 16.0 INTENSITY (I) (iph) , 2 YEAR 10 YEAR 100 YEAR I 2.05 3.60 5.80 NOTEt INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q. CIA) (Cfe) 2 YEAR 10 YEAR 100 YEAR Q 11.88 20.87 42.54 CONCLUDE&POR 240 RCP MINIMUM SLOPE . 3.54 n. 0.013 FOR 30• RCP MINIMUM SLOPE . 1.08 ♦ n. 0.012 SHEAR ENGINEERING CORPORATION PAGE 5 DEVELOPED FLOW TO •A• PROJBCTt FOSSIL CREEK FIRST FILING DATE 03/31/94 PROJ. NO.1318-01-92 BY MEO PILEt POSSILI AREA (A). 23.03 ACRES SUS BASINIa 9Ib RUNOFF COBF. (C) 2 YEAR 10 YEAR 100 YEAR C . 0.42 0.42 0.53 ORB CALCULATIONS ON PAGE 3 TIME OF CONCENTRATION (To) OVERLAND TRAVEL TIME (Ti)(1.87(1.1-CCf)*(L)"0.5)/(S)"0.33 LENGTH . 500 FEET SLOPE . 2.00 i 2 YEAR 10 YEAR 100 YEAR C . 0.20 0.20 0.25 Ti (min). 29.94 29.94 28.28 TRAVEL TIME (Tt) .L/(60*V) FLOW TYPE L (ft) . 650 S (1) . 1.20 PASTURE V (fps) . 0.80 Tt(min). 13.54 L (ft) . 400 S (1) 0.80 GUTTER V (fps) . 1.90 Tt(min). 3.51 L (ft) 700 S (1) . 5.00 GUTTER V (fps) . 4.50 Tt(min). 2.59 L (ft) . 45 S (1) 4.44 PIPE V (fps) . 10.00 Tt(min). 0.08 L (ft) 0 S (1) 0.00 GUTTER V (fps) . 0.00 Tt(min). 0.00 L (ft) . 0 S (1) • 0.00 GUTTER V (fps) . 0.00 Tt(min). 0.00 L (ft) 0 S (1) . 0.00 GUTTER V (fps) . 0.00 Tt(min). 0.00 NOTEt ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) . 19.72 To .Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR To (min). 49.66 49.66 47.99 USE To . 49.5 49.5 48 INTENSITY (I) (iph) 2 YEAR 10 YEAR I 1.05 1.89 NOTEt INTENSITIES TAKEN FROM FIGURE RUNOFF (Q. CIA) (cfe) 2 YEAR 10 YEAR Q 10.16 18.28 CONCLUDBtFOR 24• ADS N-12 MINIMUM SLOPE . FOR 30• ADS N-12 MINIMUM SLOPE 100 YEAR 3.12 3-1 100 YEAR 39.08 2.41 1 n. 0.012 0.73 1 n. 0.012 FLOW SUMMARY FOR FOSSIL CREEK FIRST FILING Sun AREA C2 C10 C100 To To To I2 I10 I100 Q2 Q10 Q100 BASIN ac. min. min. min. iph iph iph cfe cfe cfe Ib 11.83 0.49 0.49 0.62 26.50 16.50 16.00 2.05 3.60 5.80 11.88 20.87 42.54 Ia iIb 23.03 0.42 0.42 0.53 49.50 49.50 49.00 1.05 1.89 3.12 10.16 18.28 38.09 APPENDIX II Backup diagrams and exhibits R-M-P Medium Density Planned Residential District — designation for medium density areas planned as a unit (PUD) to provide a variation in use and building placements with a minimum lot area of 6,000 square feet. R-L-M Low Density Multiple Family District— areas containing low density multiple family units or any other use in the R-L District with a minimum lot area of 6,000 square feet for one -family or two-family dwellings and•9,000 square feet for multiple -family dwellings. M-L Low Density Mobile Home District — designation for areas for mobile home parks containing independent mobile homes not exceeding 6 units per acre. M-M Medium Density Mobile Home District — designation for areas of mobile home parks containing independent mobile homes not exceeding 12 units per acre. B-G General Business District — district designation for downtown business areas, including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total floor area of the building. B-P Planned Business District — designates areas planned as unit developments to provide business services while protecting the surrounding residential areas with minumum lot areas the same as R-M. H-B Highway Business District — designates an area of automobile -orientated busi- nesses with a minimum lot area equal to 1/2 of the total floor area of the building. B-L Limited Business District — designates areas for neighborhood convenience centers, including a variety of community uses with minimum lot areas equal to two times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. I-L Limited Industrial District —designates areas of light industrial uses with a minimum area of lot equal to two times the total floor area of the building not to be less than 20.000 square feet. I-P Industrial Park District —designates light industrial park areas containing controlled industrial uses with minimum lot areas equal to two times the total floor area of the building not to be less than 20,000 square feet. I-G General Industrial District —designates areas of major industrial development. T Transition District — designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 118. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: 0.95 Asphalt................................................................................................ Concrete............................................................................................. 0.95 Gravel................................................................................................. 0.50 Roofs.......................................................................................................... Lawns, Sandy Soil: Flat<2%............................................................................................. Average2 to 7%.................................................................................. Steep>7%.......................................................................................... Lawns-, Heavy Soil: Flat<2%............................................................................................. _.• Average 2 to 7%.................................................................................. Steep>7%......... :................................................................................ MAY 1984 3-4 0.95 0.10 0.15 0.20 0.20 25 0.35 DESIGN CRITERIA PAGE 1 Fossil Creek Estates P.U.D. First Filing Final Drainage and Erosion Control Report A. Location: 1. Fossil Creek Estates P.U.D. First Filing is located in the Northeast one -quarter (1/4) of Section 10, UN, R69W of the 6th P.M., Latimer County, Colorado. 2. More specifically, it is located on the southwest corner of the intersection of South Shields Street and Fossil Creek Drive. It is approximately 1.0 mile south of Harmony Road and 1.0 mile north of Trilby Road. 3. Fossil Creek Estates P.U.D. First Filing is bounded on the East by South Shields Street. Nittman M.R.D. (County M.R.D.) is directly across South Shields Street east of this project. It is bounded on the north, south and west by currently unplatted properties. a. The property to the north is owned by the City of Fort Collins and will be maintained as City open space. This property will not be developed. b. The property to the west is currently being considered for development. c. The property to the south is unplatted and to our knowledge, is not being seriously considered for development at this time. Clarendon Hills is located immediately northeast of this site at the northeast corner of South Shields Street and Fossil Creek Drive. 4. The site is located within the Fossil Creek Basin as defined by the City of Fort Collins Stormwater Basin Map. Fossil Creek flows generally in an easterly direction. Flows west of South Shields Street are conveyed under South Shields Street via a recently constructed 6 x10 reinforced concrete box culvert. This box culvert was constructed as part of the South Shields Street widening project in association with the Clarendon Hills development. The box culvert is located approximately 380 feet north of the project site. The culvert is sized with upstream development in mind as noted in the Fossil Creek Drainage Study prepared by Simons Li Associates, May, 1982. B. Description of Property: 1. The Fossil Creek Estates P.U.D. First Filing property covers approximately 13.03 acres, including the South Shields Street Right -of -Way. A majority of the site is predominantly open pasture land covered with native vegetation. The property generally slopes in a northerly / northeasterly direction. 2. There is approximately 60 feet of relief across the property from the southwest corner of the site to the northeast. 3. Fossil Creek Estates P.U.D. First Filing will consist of the development of 38 single family residences including the necessary infrastructure to service these lots. 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. This can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). Tc=1.87 1.1 —CCI) DI/2 S Ili Where Tc =Time of Concentration, minutes S = Slope of Basin, % C =Rational Method Runoff Coefficient D =Length of Basin, feet C, = Frequency Adjustment Factor Time of concentration calculations should reflect channel and storm sewer velocities as well as overland flow times. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. Table 3-4 RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS Storm Return Period Frequency Factor (years) C, 2 to 10 1.00 11 to25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times C, shall not exceed 1.00 3.2 Analysis Methodology The methods presented in this section will be instituted for use in the determination and/or verification of runoff at specific design points in the drainage system. These methods are (1), the Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods, such as SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where applicable, drainage systems proposed for construction should provide the minimum protection as determined by the methodology so mentioned above. 3.2.1 Rational Method For drainage basins of 200 acres or less, the runoff may be calculated by the Rational Method, which is essentially the following equation: Q = C,CIA Where Q = Flow Quantity, cfs A =Total Area of Basin, acres C, = Storm Frequency Adjustment Factor (See Section 3.1.8) C = Runoff Coefficient (See Section 3.1.6) I = Rainfall Intensity, inches per hour (See Section 3.1.4) 3.2.2 Colorado Urban Hydrograph Procedure For basins larger than 200 acres, the design storm runoff should be analyzed by deriving synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph Procedure be used for such ana!ysis. This procedure is detailed in the Urban Storm Drainage Criteria Manual, Volume 1, Section 4. MAY 1984 3-5 DESIGN CRITERIA DRAINAGE CRITERIA MANUAL RUNOFF 5C 3C F- 20 z w U cc W 10 z w a OJ 5 to w cc 3 0 U 2 cc w I- 3 1 .5 I ►I�� I 1 I ���� INNER ■NNE soon WINNE WAM WA II OR MENEM -►��M ■11 M MEMOS ME C►..N.....mmmo........ FAME NNE NONNI� ........ME ' •0 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING "UNDEVELOPED" LAND SURFACES IN ,THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS 'Jan. 1975. 5 =1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT No Text FORT COLLINS RAINFALL INTENSITY CURVE DATA FIG 3-1 NOVEMBER 1975 INTERPRETED DECEMBER 21, 1992 BY MARK OBERSCHMIDT SHEAR ENGINEERING CORPORATION 2 5 10 25 50 100 TIME YEAR YEAR YEAR YEAR YEAR YEAR 5 .3.29 4.70 5.64 7.02 7.95 8.70 10 2.54 3.65 4.45 5.50 6.35 7.14 15 2.14 3.07 3.75 4.60 5.29 6.06 20 1.85 2.65 3.25 4.00 4.60 5.21 25 1.63 2.34 2.87 3.54 4.08 4.63 30 1.47 2.11 2.60 3.17 3.67 4.20 35 1.32 1.92 2.38 2.88 3.35 3.81 40 1.20 1.76 2.19 2.67 3.08 3.60 45 1.12 1.62 2.02 2.46 2.84 3.28 50 1.04 1.51 1.87 2.27 2.65 3.02 55 0.97 1.40 1.73 2.12 2.46 2.80 60 0.90 1.32 1.62 1.99 2.32 2.60 65 0.88 1.24 1.52 1.84 2.18 2.43 70 0.82 1.18 1.44 1.72 2.05 2.30 75 0.79 1.11 1.38 1.62 1.93 2.17 80 0.74 1.07 1.30 1.53 1.82 2.07 85 0.70 1.00 1.23 1.46 1.73 1.96 90 0.68 0.97 1.20 1.40 1.67 1.87 95 0.64 0.91 1.13 1.32 1.59 1.77 100 0.61 0.88 1.09 1.27 1.51 1.70 105 0.60 0.83 1.04 1.22 1.46 1.63 110 0.57 0.80 1.00 1.18 1.40 1.57 115 0.54 0.78 1.96 1.14 1.33 1.50 120 0.52 0.76 0.91 1.10 1.19 1.44 TABLE 4 CIRCULAR PIPE FLAW CAPACITY Full Flow (cubic feet per second) Mannings "n"= 0.012 Dia. *Conv. % Slope (feet per 100 feet) (in.) Factor 0.02 0.05 0.10 0.20 0.35 0.50 0.75 1.00 1.25 1.50 1.75 2.0 2.5 5.0 10.0 20.0 (c.f.s.) 3 0.957 0.014 0.021 0.030 0.043 0.057 0.068 0.083 0.096 0.107 0.12 0.13 0.14 0.15 0.21 0.30 0.43 4 2.062 0.029 0.046 0.065 0.092 0.122 0.146 .0.179 0.206 0.231 0.25 0.27 0.29 0.33 0.46 0.65 0.92 5 3.738 0.053 0.084 0.118 0.167 0.221 0.264 0.324 0.374 0.418 0.46 0.49. 0.53 0.59 0.84 1.18 1.67 6 6.079 0.086 0.136 0.192 0.272 0.360 0.430 0.526 0.608 0.680 0.74 -0.80 0.86 0.96 1.36 1.92 2.72 8 13.091 0.185 0.293 0.414 0.585 0.774 0.926 1.134 1.309 1.464 1.60' 1M 1.85 2.07 2.93 4.14 5.85 10 _ 23.74 0.34 0.53 0.75 1.06 1.40 1.68 2.06 2.37 2.65 2.91 3.14 3.36 3.75 5.31 7.61 10.61 12 38.60 0.55 0.86 1.22 1.73 2.28 2.73 3.34 3.86 4.32 4.73 5.11 5.46 6.10 8.63 12.21 17.26 15 69.98 0.99 1.56 2.21 3.13 4.14 4.95 6.06 7.00 7.82 8.57 9.26 9.90 11.06 15.65 22.13 31.30 18 113.80 1.61 2.54 3.60 5.09 6.73 8.05 9.86 11.38 12.72 13.94 15.05 16.69 17.99 25.45 35.99 50.89 21 171.65 2.43 3.84 5.43 7.68 10.16 12.14 14.87 17.17 19.19 21.02 22.71 24.28 27.14 38.38 54.28 76.77 24 245.08 3.47 5.48 7.75 10.96 14.50 17.33 21.22 24.51 27.40 30.02 32.42 34.66 38.75 54.80 77.50 109.60 27 335.51 4.74 7.50 10.61 15.00 19.85 23.72 29.06 33.55 37.51 41.09 44.38 47.45 53.05 75.0 106.1 160.0 30 444.35 6.28 9.94 14.05 19.87 26.29 31.42 .38.48 44.44 49.68 54.42 58.78 62.84 70.26 99.4 140.5 198.7 36 722.57 10.22 16.16 22.85 32.31 42.75 51.09 62.58 72.26 80.79 88.50 95.59 102.19 114.25 161.6 228.5 323.1 42 1089.9 15.41 24.37 34.47 48.74 64.5 77.1 94.4 109.0 121.9 133.5 144.2 154.1 172.3 243.7 344.7 487.4 48 1556.1 22.01 34.80 49.21 69.59 92.1 110.0 134.8 155.6 174.0 190.6 205.9 220.1 246.0 348.0 492.1 695.9 * Conveyance Factor = (1.486 x R2/3 x A) / n APPENDIX III Stuffer Envelope Drainage and Erosion Control Plan PAGE 2 Fossil Creek Estates P.U.D. First Filing Final Drainage and Erosion Control Report L GENERAL LOCATION AND DESCRIPTION: B. Description of Property: (continued) 4. The main Fossil Creek channel lies immediately north of Fossil Creek Estates P.U.D. The distance of the Fossil Creek main channel flowline from Fossil Creek Estates P.U.D. First Filing ranges from approximately 360' at the creek's intersection with South Shields Street, to approximately 890' at its furthest distance from Fossil Creek Estates P.U.D. First Filing. 5. The Scenic Knolls Ditch , traverses the southern boundary of the project. The ditch line generally defines the southern boundary of Fossil Creek Estates P.U.D. First Filing. Refer to the Final Drainage and Erosion Control Plan in Appendix III of this report. a. All drainage analysis assumes that during larger storm events, the irrigation ditch over flows its bank. H. DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description: Fossil Creek Estates P.U.D. First Filing is within the Fossil Creek Basin. Historic runoff from the site is conveyed to Fossil Creek, west of South Shields Street. Development of the site will not affect the general historic flow pattern. 2. The Fossil Creek Basin Study, which was prepared by Simons Li Associates in May, 1982, considers future development west of South Shields Street. A 6 x10 reinforced concrete box culvert was recently constructed under South Shields Street at Fossil Creek. The culvert was sized based on fully developed flows to South Shields Street from the upstream reaches. 3. Fossil Creek is the only major drainageway within 100' of the property boundary. 4. One irrigation ditch lateral, the Scenic Knolls Ditch, is located along the southern property line of the project as mentioned in Item LBA above. Discussions are continuing concerning lining of the Scenic Knolls Ditch. B. Sub -Basin Description: 1. Historically, runoff from the site is conveyed overland, northerly and northeasterly across the site to Fossil Creek. Runoff continues easterly in Fossil Creek under South Shields Street, through a portion of Clarendon Hills, under Fossil Creek Drive, continuing through the Fossil Creek drainage system to Fossil Creek Reservoir. Refer to the Fossil Creek Major Drainage Basin Study for further detail of the Fossil Creek drainage system. PAGE 3 Fossil Creek Estates P.U.D . First Filing Final Drainage and Erosion Control Report H. DRAINAGE BASINS AND SUB --BASINS: B. Sub -Basin Description (continued): 2. There is some offsite runoff conveyed through and around the site. Offsite developed flows have been included in all drainage calculations. Refer to exhibit 'A' in Appendix I for the offsite contributing areas. 3. The western half of the South Shields R.O.W. will contribute storm water runoff to Fossil Creek Drive. III DRAINAGE DESIGN CRITERIA: A. Regulations: 1. Storm drainage design criteria from the City of Fort Collins Storm Drainage Criteria Manual were used. 2. Erosion control measures and design conform to the requirements of the City of Fort Collins Erosion Control Reference Manual. B. Development Criteria Reference and Constraints: 1. Development of this area was considered in the Fossil Creek Drainage Study, prepared ;by Simons Li Associates, May, 1982. The recent South Shields Street widening project adjacent to Clarendon Hills considered the Fossil Creek study in the design and installation of the drainage structures under South Shields Street. 2. Detention is not being considered with the development of Fossil Creek Estates P.U.D. First Filing because of its proximity and relationship to the Fossil Creek Drainageway in accordance with the City of Fort Collins Master Plan and the Fossil Creek Master Drainageway Planning Study. 3. South Shields Street bounds Fossil Creek Estates P.U.D. First Filing to the east. Development of Fossil Creek Estates P.U.D. First Filing will require the widening of South Shields Street to City of Fort Collins Arterial standards. The existing South Shields Street grade will dictate the ultimate grading constraints to the South Shields Street new Right -of -Way (20' west of the current 30' Right -of -Way; total 50' R.O.W.) and the easternmost lots located adjacent to the South Shields Street Right -of -Way. a. Easement acquisition from the City of Fort Collins will be required in order to extend sanitary sewer service from the project to the existing sewer trunk main adjacent to Fossil Creek . The sewer trunk main is owned by the South Fort Collins Sanitation District. b. Slope easement acquisition from the City of Fort Collins will also be required due to the existing topography along the north side of Fossil Creek Drive at the intersection with South Shields Street. PAGE 4 Fossil Creek Estates P.U.D. First Filing Final Drainage and Erosion Control Report B. Development Criteria Reference and Constraints: (continued) 5. Wetland area identification and documentation is also a design constraint in the layout of the street and drainage system and the lot layout. Separate wetland studies have been prepared in association with the planning of the project. 6. Groundwater considerations and underground conveyance to the Fossil Creek channel remains a major design issue. A groundwater interceptor and conveyance system has been designed with this project. C. Hydrological Criteria: 1. The Rainfall -Intensity -Duration curves for the Fort Collins area were used in conjunction with the "Rational Method" for determining peak flows at various concentration points. 2. The site is situated within the Fossil Creek Drainage Study area. The majority of the improvements recommended by the study have been, installed up to South Shields Street. The design and installation of these improvements considered development within the basin and therefore, no detention is proposed at this time. 3. The 2 and 100 year storms have been used in analyzing the effects of development and providing recommendations for a storm drainage system which will adequately convey peak flows to the major drainage system. D. Hydraulic Criteria: 1. Street capacity references provided in the City of Fort Collins Storm Drainage Criteria Manual and street capacity exhibits which were prepared by this office and based on the Mannings equation, were used. 2. Storm sewer and drainage channel capacities were based on the Mannings Equation. The Mannings coefficients are as suggested by the City of Fort Collins Storm Drainage Criteria Manual. IV DRAINAGE FACLLIW DESIGN: A. General Concept: 1. Proposed drainage improvements will 'convey 100% of storm runoff to the main Fossil Creek channel, north of Fossil Creek Estates P.U.D. First Filing and west of South Shields Street, maintaining discharge points at, or near, historic discharge locations. Runoff will continue to be conveyed to the 6' x 10' concrete box culvert at Fossil Creek, approximately 380 feet north of Fossil Creek Estates P.U.D. First Filing. PAGE 5. Fossil Creek Estates P.U.D. First Filing Final Drainage and Erosion Control Report IV DRAINAGE FACILITY DESIGN: A. General Concept: (continued) 2. There is some offsite contributing runoff to the site (refer to exhibit'A' included in Appendix I). This offsite contributing area, which includes one half (1/2) of the South Shields Street R.O.W. and portions of the property to the south and west, was utilized in calculations for developed peak flows. 3. Ground water will be intercepted in a subdrain system constructed with the storm and sanitary sewer system. The groundwater will be conveyed in a subdrain to the proposed storm sewer at the intersection of Fossil Creek Drive and South Shields Street where it will be conveyed via the storm sewer to Fossil Creek. (Refer to sheets 4 and 6 of 19 of the Utility Plans). 4. Appendix II contains all tables, charts and figures referenced in the calculations for storm sewer design, and developed runoff peak flow quantities. B. Specific Details: 1. The street system will convey the runoff to concentration points in the street system. 2. Runoff will be conveyed from the street system, to the main channel of Fossil Creek via a combination storm sewer and open channels. The outlet to Fossil Creek will be located at the northwest corner of the intersection of Fossil Creek Drive and South Shields Street. This storm sewer will also convey groundwater intercepted by the subdrain to Fossil Creek. 3. A ten (10) foot type R inlet is to be constructed at Sta. 53+15.36 (South Shields Street stationing) in a continuous grade condition on the south side of the median island near the intersection of Fossil Creek Drive and South Shields Street (refer to sheet 6 of 19 of the Utility Plans). a. This inlet will intercept a majority of the storm water runoff from the south side of Fossil Creek Drive and the ofsite contributing area south of Fossil Creek Drive. b. The majority of the storm water that is not intercepted by this inlet will be intercepted by the 10' type 'R' inlet on the north side of Fossil Creek Drive (see item 4). c. Refer to the grading plan (sheet 16 of 19 of the Utility Plans), the plan and profile for Fossil Creek Drive (sheet 12 of 19 of the Utility Plans), and the Storm sewer profile (sheet 6 of 19 of the Utility Plans). PAGE 6 Fossil Creek Estates P.U.D. First Filing Final Drainage and Erosion Control Report B. Specific Details: (continued) 4. A ten foot (10) type 'R' inlet is to be constructed in a continuous grade condition at Sta. 52+75.03 (South Shields Street stationing) on the north side of Fossil Creek Drive (refer to sheet 6 of 19 of the Utility Plans). a. This inlet will intercept a portion of the storm water runoff from the site. b. It will also intercept some of the storm water runoff from the western half of South Shields Street and the off site contributing area to the south. c. Refer to the grading plan (sheet 16 of 19 of the Utility Plans) , the storm sewer profile (sheet 6 of 19 of the Utility Plans)., and the plan and profile for Fossil Creek Drive (sheet 12 of 19 of the Utility Plans). 5.. Forty five (45� lineal feet of 24" RCP Class III will connect the two inlets in Fossil Creek Drive. a. The slope of the pipe is 4.44%. b. The peak 100 year flow to the inlet is 42.54 cfs. Refer to page 4 in the drainage calculations. c. The pipe has a capacity of 47.62 cfs based on Mannings equation using a Mannings 'n' value of 0.013 as suggested by the City of Fort Collins Storm Drainage Criteria Manual. 6. One hundred and twenty (120') lineal feet of 30" ADS N-12 will convey the storm water and the runoff from the sub drain to Fossil Creek from the northern inlet. a. The slope of the pipe is 1.0%. b. The peak 100 year flow to the inlet is 38..08 cfs. Refer to page 4 in the drainage calculations. c. The pipe has a capacity of 44.44 cfs based on Mannings equation using a Mannings 'n' value of 0.012 as suggested by the Advanced Drainage Systems Technical Note No. 2.109 (88) dated June 1,1988. d. Refer to table 4 attached in Appendix H. 3. Runoff which is conveyed directly to South Shields Street, will ultimately be conveyed to Fossil Creek with an inlet on the west side of South Shields Street. at the South Shields Street design low point. This is depicted on the South Shields Street Widening Project plans which were prepared by Intermill Land Surveying in conjunction with Clarendon Hills (Sta. 48+16.46). Interim drainage conveyance will be provided with the development of Fossil Creek Estates P.U.D. First Filing. PAGE 7 Fossil Creek Estates P.U.D. First Filing Final Drainage and Erosion Control Report V. EROSION CONTROL: A. General Concept Permanent and temporary erosion control measures will be provided with construction. a. The temporary measures will include; L silt fence along downstream property lines. I hay bale barriers in swales. iii. Gravel filters at storm sewer inlets. These measures will effectively reduce the amount of soil erosion potential created during the construction of the project. b. The permanent treasures will include rip rap aprons at all storm sewer outfalls, particularly at Fossil Creek. These will effectively reduce the amount of soil erosion potential and bank erosion created by storm water runoff from the site. c. Erosion control device maintenance, both onsite and offsite, will retrain the responsibility of the developer until the subdivision is completely developed. 2. An erosion control security deposit will be required for each phase of construction according to current City of Fort Collins policy as presented in the City of Fort Collins Development Manual. a. The security deposit will be the higher of the following determinations. * The cost to reseed the actual affected property during overlot grading activity (Project Phasing). Currently, security deposit estimates are based on $ 650.00 per acre to reseed sites between 1 and 10 acres and $ 500.00 per acre to reseed sites greater than 10 acres. L The estimated security deposit for the entire 13.03 acres would be $0,772.50 (13.03 X 500.00 X 1.5). Reseeding cost estimates have been provided by the City's Storm Water Utility and are based on recent experience. * The cost to provide the actual erosion control device improvements noted on the Drainage and Erosion Control Plan. Refer to sheet 17 of 19 of the Utility Plans. PAGE 8 Fossil Creek Estates P.U.D. First Filing Final Drainage and Erosion Control Report VI. CONCLUSIONS: A. Compliance with Standards 1. All drainage analysis has been performed in accordance with the requirements of the City of Fort Collins Storm Drainage Criteria Manual. 2. Erosion control considerations conform to the City of Fort Collins Erosion Control Reference Manual and generally accepted practices. 3. Proposed drainage improvements generally conform with the recommendations of the Fossil Creek Drainage Study. B. Drainage Concept: 1. The proposed drainage design for Fossil Creek Estates P.U.D. First Filing is effective for the control of storm runoff with little or no downstream effects. 2. The proposed development of the site was considered in the Fossil Creek Drainage Study. 3. There are major irrigation facilities that will be affected by the development of Fossil Creek Estates P.U.D. First Filing. An irrigation ditch noted along the south boundary (the Scenic Knolls Ditch) is considered as a major design factor with the design of Fossil Creek Estates P.U.D. First Filing. Easements and possible ditch improvements are being discussed with users of the ditch. This however, has no immediate affect on drainage, erosion control or wetlands considerations. VII REFERENCES: 1. City of Fort Collins Storm Drainage Criteria Manual 2. City of Fort Collins Erosion Control Reference Manual 3. Fossil Creek Master Drainage Study, Simons Li Associates, 1982 4. South Shields Street Widening Project plans; Intermill Land Surveying; Approved by the City of Fort Collins, December, 1991. 5. Clarendon Hills Drainage reports