Loading...
HomeMy WebLinkAboutFOSSIL CREEK ESTATES PUD FIRST FILING FINAL - 50 92F - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCommi y Planning and Environmental Planning Department April 27, 1994 Kay Force Jim Sell Design 117 E. Mountain Avenue Fort Collins, CO 80524 Dear Ms. Force, rvices City Staff has reviewed your submittal for Fossil Creek Estates PUD First Filing Final, and offers the following written comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Utilities Commission. 2. Telephone facilities generally occupy rear lot utility easements, which must be located on terrain which permits trenching operations. 3. The developer is responsible for provision of all trench, street crossings, and ditch crossings for telephone facilities within the project, and the developer pays up front construction costs for facilities within the development. 4. Any relocation of existing telephone facilities required.by these plans will be paid for by the developer. 5. A 15' by 30' easement for three large telephone equipment cabinets would be required in the general vicinity of the north side of the development, possibly in Tract B or Tract A. US West recommends that Tracts be described as utility easements for flexibility in layout of utilities. Planning cautions you about this because any encroachment in a Tract would require a vacation of a utility easement. Planning urges you to work with US West to locate specific utility easements for installation of these utilities. 6. Front lot utility easements adjoining public streets need to be 9' wide rather than 81. Front lot utility easements adjoining private drives need to be 13' wide rather than 81. 7. Planting of street trees in Tract A needs to be coordinated closely with Public Service so that no trees are closer than 4' to any natural gas line. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 8. Water lines and sewer lines are shown on the lot lines and will need to be coordinated with location of Light and Power facilities. 9. Please see attached letter from Terry Farrill regarding water and sewer district's comments. 10. Please see comments on the plat from the City Mapping Division. Also note that the plat will be approved by the Planning and Zoning Board, signed by the Secretary of the Planning and Zoning Board, not the Planning Director. The City Clerk does not sign plats approved by the Board. The plat's location map should include the Fossil Creek Estates Annexation area as well. 11. Use inflow curb and gutter around the medians, to protect the pavement from irrigation water run-off. 12. Engineering has concerns about the perched water table potential. Subdrains must be provided under streets or remove bedrock under streets to 3' below the surface. 13. Subdrains in the city ROW require a hydrologic study. 14. Concrete private drives must be thick enough to support fire vehicle load if fire access is provided by the drive. 15. A traffic striping plan for Shields street is required. 16. Fossil Creek Drive must line up with the street on the east side of Shields. The median causes the intersection to be too wide on the west side of the street. Please have your engineer discuss this with the City Engineering Department. Engineering can also assist in processing the dedication of ROW needed for the north half of the street. 17. Please include with revisions, perhaps as a small sketch on the site plan, a specific design for the shared driveways describing how they will work, what they will look like, etc. 18. The City Forester asks that you not use austrian pines in the medians as they block traffic visibility, shade streets in the winter causing ice problems, and they will eventually outgrow the space. He prefers the use of shade trees in these areas. 19. Parkland fees are $779.00 per dwelling unit, collected at the time of building permit issuance. 20. Natural Resources is requesting a condition of approval that City Council approve the road location and utility easements across the Fromme Prairie. Staff would prefer this project to go to the Planning and Zoning Board only after the ROW and easement dedications have passed on first reading. Please contact Tom Shoemaker about the process for these dedications. 21. Natural Resources would like to discuss the choice of landscaping adjacent to the Prairie. 22. Natural Resources would like to discuss mitigation measures for the wetlands being disturbed on this phase. 23. Natural Resources would like you to delineate on the plans the limits of construction disturbance regarding the boundary of the Fromme Prairie (Lots 37, 38 and the road and utility construction). Please include on the plans, a sketch of the entry feature. 24. A written solar orientation variance is required, unless you could find two more solar lots. The overall preliminary plan did meet the requirements, but because that plan is now restricted by Council's Zoning action, it would be best to justify this variance for this filing based on terrain and natural resource values. The fact that you are only two lots short says a lot as well. 25. Please contact Basil Hamdan at the City Stormwater Utility for Stormwater comments. Have you obtained a 404 permit? 26. Please include an attorney certification or a notary public signature block on the site plan. 27. Please explain note #8. Staff is not sure why you need this. 28. Note #3 should say direct lot access to be from local street or private drives. No access to Shields Street or Fossil Creek Drive is permitted, except for Lots 37 and 38. 29. It would be a good idea -to show building envelops for Lots 37, 38, 321 33, 34 and to keep the houses as close to the front of the lots as possible. 30. Please include a wall detail with your revisions. 31. Additional shrubbery and evergreen trees are needed as foundation plantings to soften the visual appearance of the and for additional buffering for Lots 11, 7, and 6. These lots are relatively close to what will be a busy arterial street in the future. 32. Please include a note on the plans, perhaps in conjunction with the zoning, that the zoning is conditional with a PUD and with a density. A PUD is required of all developments and that a minimum density of 1.5 DU/acre is allowed as a condition of zoning. You may want to refer to the specific ordinance number, which the City Clerk could provide. This concludes staff comments at this time. In order to stay on schedule for the May 23, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due May 6th by 8:30 am (Final Staff Review is that day) (3 sets of plans and written documentation responding to the above concerns), PMT's (one PMT of each plan sheet), colored renderings, and 8 prints are due May 16th. Final mylars and other documents are due as soon as possible following the hearing. Please be aware that the development agreement and utility plans must be signed prior to the Planning and Zoning Board Hearing, for all rUD1s. If not, a condition will be placed on the project giving you 30 days to finalise the plans and agreement, after which time, you must submit a request for an extension, to the Planning and Zoning Board. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. Sincerely, 4dw. k/'A� Kirsten Whetstone, AICP Project Planner cc Kerrie Ashbeck, Engineering Department Shear Engineering Gotil INS -to t NS-tot o w d CR DIS_' M E M O SOUTH FORT COLLINS Sanitation --District TO: Kirsten Whetstone FROM: Mr. Terry Farrill, Systems Engineer DATE: April 20, 1994 SUBJECT: FOSSIL CREEK ESTATES P.U.D. The Fort Collins_Loveland Water Distri-ct and the.South Fort Collins Sanitation District have reviewed the above mentioned project and submit the following comments. 1. General Note #2 is to be corrected to read..."All sanitary sewer construction shall conform to the most current South Fort Collins Sanitation District standards and specifications." 2. General Note #3 is to be corrected to read..."All water distribution system construction shall conform to the most current Fort Collins -Loveland Water District standards and specifications." 3. Air release valves are to be sized and located at the high points. 4. The existing 4 inch water line located in Shields Street is to be lowered to maintain a minimuw_of 5 feet of bury. 5. Please be advised that this property is not within the service area of the South Fort Collins Sanitation District and, therefore, the sanitary sewer service is contingent upon the land being included into the District boundary which must be approved by the Board of Directors. Final approval of the construction drawings is contingent upon the successful inclusion of the property. Please do not hesitate to contact me at 226-3104, if you have any xc: Michael D. DiTullio, District Manager 4700 South College Avenue Fort Collins, Colorado 80525n Telephone 226.3104-669.4321 FAX (303) 226.0186 PROJECT— -_ - - - City of Fort Coll COMMENT SHEET DATE: 5 April 1994 DEPARTMENT: PROJECT• - �oSsl� C2EC�K EST. Put). F�2sT /iUNf PLANNER: Steve Olt Please respond to this project by Friday, April 15, 1994. ❑ No Problems ❑ Problems or concerns (see below) 3� Naw cc�05 TId E4�T C_i�c a(= TMer /V.c,'/� 5cC-IL11 (U � eTE 2rn phi er ? (/aw WAS 77ft /�O2rN Lima of ,—hic- NLTI ( 0C�Tf/LHin/tT0 lT -0 ThFc rCou(es c- , A 3��-" Usto A D I F F Fier "7-- L e TT C- (L TN ,4 Ttft C'-'2V� I Lt% 1�o CA.7 I L� MA �rJ7A 1 A J T2Ac-rs jf- i H` Lis,— Cc,I Qf4AT Does 2 PLC MT,4,J e Date: Signature: Lcs..+,- C-«5 ) CHECK IF YOU WISH TO RECEIVE ❑ SITE Vna `)°" COPIES OF REVISIONS: ❑ LANDSCAPE. ❑ UTILITY COMMUNITY PLANNING. ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS. COLOR -ADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT