August 16, 1993
Carter Ewing
c/o Jim Sell Design
117 E. Mountain Ave.
Fort Collins, CO 80524
Dear Mr. Ewing:
ices
For your information, attached is a copy of the Staff's comments concerning
Fossil Creek Estates, presented before the Conceptual Review Team on August 9,
1993.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Kirsten Whetstone
Project Planner
KW/gjt
Attachments
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Transportation Department
Stormwater Department
Project Planner
File
381 Worth CU11e1--e :AVrnuc I'.1�. Rk)\ 1�1) • Fort Collin,,. CO 10;22-0;,aO • (30,1) 21_o-711)
4aCONCEPTUAL REVIEW STAFF COMMENTS
Citv of Fort Collins
MEETING DATE: August 9, 1993
ITEM: Fossil Creek Estates
APPLICANT: Carter Ewing
c/o Jim Sell Design
117 E. Mountain Ave.
Fort Collins, CO 80524
LAND USE DATA: This is a proposal for approximately 135 single family lots on
45 acres located 1 mile south of Harmony Road and East of South Shields Street
at Fossil Creek (south of The Ridge subdivision). The proposed density is 3
DU/acre.
COMMENTS:
1. Light and Power will bring power in from the south and east to serve this
property. There is power at the corner of Shields and Trilby. Light and
Power will require about 3 months lead time to get power to the site.
Normal L & P development charges will apply.
2. Please contact Fort Collins -Loveland Water District and South Fort Collins
Sanitation District for information on water and sewer service. The phone
number is 226-3104.
3. There is a proposed future City bike/pedestrian trail planned along the
Burns Tributary, to the north. Pedestrian connections should be provided
from this site to the Open Space area to the north.
4. Parkland fees are $779.00 per dwelling unit and are collected at the time
of building permit issuance.
5. Poudre Fire Authority has concerns about fire access and water supply.
You should remind the Water District that the City requires 1,000 gpm for
fire flows. Access issues are more difficult to address. The standard
access requirement, for length of cul-de-sac, from a point of two
accesses, is 660'. Your cul-de-sac is longer that this. There are
several factors which Fire will look at in reviewing your plans,
including, the use of residential fire sprinkler systems, the width and
grade of streets, boulevard treatments at the entry may be considered. It
is possible that some combination of remedies may be required.
6. Street connections to the west and south will be needed.
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
7. Additional discussions will need to occur with Transportation,
Engineering, Fire, and Planning concerning these street connections,
location of a collector street in this area, etc.
8. The property is located in the Fossil Creek Basin which has development
fees of $2274.00 per acre, subject to the coefficient of runoff for the
project.
9. No on -site detention is required in the Basin, but you will likely need
off -site drainage easements to convey developed flows off the site to
Fossil Creek.
10. The adjacent Ditch companies will be required to sign the Utility plans.
You will have to negotiate with these ditch owners for easements,
restrictions, access, etc.
11. There is high ground water in the area. You may need to outlet a sub
drain system to your surface drainage, as it is unlikely that the sewer
district will accept these flows. These would require easements.
12. A standard submittal consists of a drainage and grading plan, a drainage
report, and an erosion control plan.
12. Natural Resources will compare the site plan with the field conditions.
13. The developer has an obligation to improve Shields Street to arterial
standards for the length of this property frontage. The timing of
construction will be decided by the Engineering department.
14. Utility Plans will be required as part of the submittal. Final street
design plans need to include centerline and flowline profiles on both
sides of Shields. Flowline profiles will be required north and south of
the property.
15. A soils report and pavement design will be required. There is likely to
be bedrock in the area, and sub drains under streets may be required.
Street grades and cuts may pose some problem with street construction (8%
is the maximum grade allowed).
16. There may be off -site improvements to Shields Street required as part of
the project. The traffic study will provide more information about needed
improvements. The -traffic study should be submitted with the preliminary
plans. Please contact Rick Ensdorff at Transportation for guidance on the
traffic study.
17. The cul-de-sacs should be designed to City standards. They should be
defined bulbs, not of open "eye brow" design.
18. Street medians require a written variance to the City street standards.
This variance needs to be written by a licensed engineer.
19. A development agreement will be required when this project is finalized,
to spell out obligations and agreements between the City and the
developer.
20. Street oversizing fees are $584 per dwelling unit and are collected at the
time of building permit issuance.
21. The traffic study should address improvements to Shields along the open
space area. There is a big question about whether development to the west
will be allowed to occur, as it is currently out of the UGA (Urban Growth
Area).
22. The entrance design will be looked at carefully by Transportation and
Engineering. Plan C seems to be a better plan for this entry.
23. Any street which eventually connects through to Taft Hill is likely to
carry an increased traffic load. This needs careful thought.
24. Access to the south should be provided (for future connections from the
south). ,
25. The proposed zoning will likely be rlp, low density planned residential.
26. Staff will have concerns about grading of the hills, and incorporating the
existing topography into the design. There will be wetland and ridge line
issues with the Natural Resources Department. Your submittal should
address fencing guidelines for the area along Shields Street and for the
common property line with the open space area.
27. Staff will pay particular attention to the landscape treatment along
Shields.
28. I have reviewed you anticipated time schedule for this project, and it
appears that the annexation hearing dates will work. The resolution could
be held at the September 7, 1993 City Council meeting. Let me know if
Thursday, August 26th works for you for a neighborhood meeting (from 7 to
8:30 pm).