Loading...
HomeMy WebLinkAboutFOSSIL CREEK ESTATES PUD PRELIMINARY - 50 92D - CORRESPONDENCE - APPLICANT COMMUNICATION09/27/1993 00:52 i 3037225843 EWING DEVELOPMENT PAGE 01 ]FOSSIL CREEK ]PART TNIEILROL S FAX TRANSMITTAL, TO: Kirsten whetstone FROM: Carter Ewing FAX #: 0) 221-6378 # OF PAGES (incl. cover): 2 DATE: Sept. 27, 1993 #4RRRR1!?11###",#RR#1R11#4#######iRRiRR#RRO####RRRR#RRRRR (Please call number below if you did not receive full document) Dear Kirsten, This is a weekly "Status Sheet" on my project which I have put together for my Consultants. I thought it may be beneficial for you as well. If not, then you have some extra scrap paper; however, if there is anything which you feel I may have missed or need to focus on more specifically, please let me know. Also, I left you a voice mail message'regarding tonight's Annexation Hearing. Please leave me a message regarding those issues (I will be in meetings most of the afternoon). Thanks for all your help. 363 West Drake • Suite 6 0 Fort Collins, Colorado 90526 • (303) 744-7837 a FAX (303) 722-5843 ok9/27/1993 00:52 3037225843 EWING DEVELOPMENT PAGE 02 1 1=QSSIL CREEK ESTATES STATUS SHEET (9-27-93) (Weekly status of Project from Owner/Developers perspective. Please advise should anything be in need of correction. my phone # is 744-7837. ) TO: COMPANY CONTACT FAX NUMBER CITY KIRSTEN 221-6378 SELL DESIGN KAY 484-2443 SHEAR ENG. BRIAN 282-0311 DELICH TRANS. MATT 669-3071 EMPIRE LABS NEIL 484-0454 BOSS ENVIRO. TED 223-5145 From: Carter B. Ewing 722-5843 �nnw�11111�wa�1a11aw�1111•rsaawe.*.rrM�rtir�ra�1 p�f�a*s**a*+I�xr+►MM�Iwwilwwwll CITY: Conceptual Review completed 8/9/93. Annexation petition submitted 8/6/93. Neighborhood Meeting completed 9/1 /93. Preliminary Design Review Submittal submitted 9/7193. Anticipate Preliminary P&Z Hearing on October 25, 1993. Comments from Neighborhood Meeting received 9/17/93. Annexation Hearing (TONIGHT) 9/27193. Awaiting comments from. Prelim. Review. PLANNING: (JiM SELL DESIGN, INC.) Submitted preliminary review on 9/7/93. Waiting on comments from all consultants, City, and Owner in order to revise submittal. Needs copy of Wetlands Survey submittal as well as Traffic Study. Kay to send Matt Delich latest revised plan. Should have received Soils Report on 9/23/93. ENGINEERING: (SHEAR ENGINEERING) Submitted preliminary design criteria on 9/7/93. Waiting on comments from City and revised Traffic report in order to proceed with design work. Currently working on improvement cost estimate. TRANSPORTATION: (MATT DELICH, P.E.) In lieu of completed report, preliminary submittal included only "old" report for "Wuerker PUD - 15 acres". We included a note stating our intention to submit an updated report within the next couple of weeks. Matt should have received the latest revised plan from Planner. Proposed start date is 9/27/93 (today) for final traffic study. WETLANDS: (TED BOSS ENVIRONMENTAL CONSULTANTS) Wetlands were delineated 8/13/93 and revised 8/16/93. Stewart and Associates surveyed the site on 8/20/93. The final report was submitted to the City on 9/15/93. We need to discuss a mitigation plan for those areas in which we will disturb. FCP awaiting status from Ted Boss. SOILS: (EMPIRE LABS) Revised preliminary report was complete 9/22193. Copies were sent to Sell Design and Shear Engineering. MISC.: 1) Based on the neighbors concerns, Dr. Wuerker and myself will meet with Jim Robbins Sr. to discuss the canal issues, and how to design for them. We have tri6e4 f.•. +•Area aasel.e $auT Fam., ,, t-,. .... S..1 a.. w..a ,, A..*. .3% 1 ...:11 L....-... were sent w oen ussign ana onear tngineermg. MISC.: 1) Based on the. _,ighbors concerns, Dr. Wuerker a,.. myself will meet with Jim Robbins Sr. to discuss the canal issues, and how to design for them. We have tried for two weeks but have been unsuccessful to set up a date. 2) 1 will begin negotiations with the Water District regarding the 12" line this week. 3) Fire Chief will "endorse" our plan as it now stands only for the phase one portion of the project. We will need to figure alternative access for the balance of the property. 4) Solis and groundwater are MAJOR issuesi Need to focus on permanent mitigation for these problems in order to limit liability! Please let me know If 1 have left out anything, or if any new issues arlsel THANK YOU ALL FOR YOUR HELPI Carter.