Loading...
HomeMy WebLinkAboutFOSSIL CREEK ESTATES PUD PRELIMINARY - 50 92D - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTv Preliminary Drainage and Erosion Control Report for FOSSIL CREEK ESTATES P.U.D. Fort Collins, Colorado Prepared for: FOSSIL CREEK PARTNERS 363 West Drake Road Ft. Collins, Colorado 80526 Prepared by: SHEAR ENGINEERING CORPORATION Project No: 1318-01-92 DATE: September, 1993 4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334 C FI() S-3r l.. _ 3 n Off Sl�e 5 . SUv e a — `o I\S %kt- co—t = 13 9 C,rt — 0.4�+ 3.3s !.L U �5�1c m plowrvsLles,, Cu Ali ' 10 11 12 1 - (3 N r tA, 13 ff// 1 1 L n oft' 10-t. C�YcLi = 13.d5_� (,.�,%=.C-----upi,�rr,, �' N01�jNSC�ta�+•� LU rrm 14 1s 2 to �N S22s ae- 1a 17 �Orrr Cr��{cn1C� 1a 19 20 mli1� %lo o li if) 7a� onCA: �eu hlycve 21 Go ej , U,J tv r>\C�C�m-)VZ— 16�1 rehse �aV r�avu�f aU� 22p 23 24 25 26 27 e,ercuLiac" 20 H ISToR lc. N{ 5 Ba.s sw i3ou�dt►,,rS FLOW PATH K ifidiT T N FO FOSS!L CREek SHEAR ENGINEERING CORPORATION PAGE 3 FOSSIL CREEK ESTATES DATE 09/07/93 HISTORIC FLOW FROM SUBBASIN I TO Ai TIME 1237 HOURS PROJ. N0.13t8-01-92 FILE NAME FOSSIL BY MEO AREA (A)= 17.32 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR CCf = 0.25 0.25 0.31 PASTURE WITH HEAVY SOILS AND AVG TO STEEP SLOPES (REF TABLES 3-3 & 3-4) TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (TO LENGTH = 500 FEET 2 YEAR CCf = 0.25 Ti (min)= 18.97 (1.870.1-CCf)*(0^0.5)/(S)^0.33 SLOPE = 6.70 % 10 YEAR 100 YEAR 0.25 0.31 18.97 17.63 TRAVEL TIME (TO=L/(60*V) FLOW TYPE L (ft) = 275 S (%) = 4.20 LAWN L (ft) = 280 S (%) = 2.90 LAWN L (ft) = 200 S (K) = 4.10 GUTTER L (ft) = 175 S (%) = 1.19 GUTTER NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 27.82 27.82 26.48 USE Tc = 28 28 26.5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 1.50 2.70 4.45 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (0= CCfIA) (cfs) 2 YEAR 10 YEAR 100 YEAR 0 = 6.50 11.69 23.89 V (fps) = 1.50 Tt(min)= 3.06 V (fps) = 1.20 Tt(min)= 3.89 V (fps) = 4.05 Tt(min)= 0.82 V (fps) = 2.70 Tt(min)= 1.08 TOTAL TRAVEL TIME (min) = 8.85 CONCLUDE: COMPARE THIS FLOW TO Ai WITH THE DEVELOPED FLOW TO THE SAME POINT SHEAR ENGINEERING CORPORATION PAGE 4 FOSSIL CREEK ESTATES DATE 09/07/93 HISTORIC FLOW FROM SUBBASIN II TO Aii TIME 1233 HOURS PROJ. N0.13t8-01-92 FILE NAME FOSSIL BY MEO AREA (A)= 52.25 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR CCf = 0.25 0.25 0.31 PASTURE WITH HEAVY SOILS AND AVG TO STEEP SLOPES (REF TABLES 3-3 & 3-4) TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (TO (1.87(1.1-CCf)*(L) 0.5)/(S)^0.33 LENGTH = 450 FEET SLOPE = 2.40 Y. 2 YEAR 10 YEAR 100 YEAR CCf = 0.25 0.25 0.31 Ti (min)= 25.26 25.26 23.47 TRAVEL TIME (TO=L/(60*V) FLOW TYPE L (ft) = 500 S (Y.) = 8.40 LAWN L (ft) = 585 S (Y.) = 3.90 LAWN L (ft) = 370 S M = 1.90 LAWN NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 42.32 42.32 40.53 USE Tc = 42 42 41 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 1.18 2.10 3.45 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CCf IA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 15.41 27.43 55.88 V (fps) = 2.00 Tt(min)= 4.17 V (fps) = 1.45 Tt(min)= 6.72 V (fps) = 1.00 Tt(min)= 6.17 TOTAL TRAVEL TIME (min) = 17.06 CONCLUDE:TOTAL FLOW TO CONCENTRATION POINT DOWNSTREAM OF SUBASIN II COMPARE WITH FLOW CAUSED BY DEVELOPMENT OF SITE TO SAME POINT SHEAR ENGINEERING CORPORATION PAGE j DATE 09/07/93 TIME 1245 HOURS FILE NAME FOSSIL BASIN I HISTORIC PROD. NO.1318-01-92 BY MEO FLOW SUMMARY 2 YEAR 10 YEAR 100 YEAR CCF 0.25 0.25 0.31 Tc 28 28 26.5 I 1.50 2.70 4.45 A 17.32 17.32 17.32 Q 6.495 11.691 23.893 NOTES: BASIN II HISTORIC 2 YEAR 10 YEAR 100 YEAR CCF 0.25 0.25 0.31 Tc 42 42 41 I 1.18 2.10 3.45 A 52.25 52.25 52.25 Q 15.41 27.43 55.88 PAf,;IE �oss>`\. Creek l Cs��es PIILPNILU BY �d 60 UA" bJQA)6 mo-QA glow 3 to �7v G�U U\�S SL1�' L.'CC` — �J � �• Cn C,� G 76h,S-7 cC 10 Ode � cnc. Z. 11 12 \ \ 13 t� ,s 1G 17 Cloo 1C4 U .5 v\ 4 s ke v5e 4,.s�a6.c G O zy O,ZS 0,31 zo 21 22 24 21 26 G IT 27 cacc(di.lm' 23 1 { !� NO\� • Y1Nh� uJQ.S, aV c�� 5-�06'm ,c�Gr 3-3 5o. co.�,nosiz F��ti11,s�s DEVCLVPGO FLOW rAT4 EX li le iT nt.s. �_ QaSiN i3ouN�4�1� N J SHEAR ENGINEERING CORPORATION PAGE $ FOSSIL CREEK ESTATES DATE 09/07/93 DEVELOPED FLOW FROM SUBBASIN I TO Ai TIME 1248 HOURS PROD. N0.1318-01-92 FILE NAME FOSSIL BY MEO AREA (A)= 16.23 ACRES RUNOFF COEF. (C) 2 YEAR CCf = 0.41 SEE PAGE 6 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH = 200 FEET 2 YEAR CCf = 0.20 Ti (min)= 12.24 10 YEAR 100 YEAR 0.41 0.51 (1.87(1.1-CCf)*(L)A0.5)/(S)AO.33 SLOPE = 7.50 Y. 10 YEAR 100 YEAR 0.20 0.25 12.24 11.56 TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE L (ft) = 410 S (%) = 7.50 GUTTER L (ft) = 300 S (K) = 4.00 GUTTER L (ft) = 185 S (Y.) = 3.50 GUTTER L (ft) = 80 S (%) = 2.00 PIPE L (ft) = 300 S M = 2.00 GRASSED SWALE NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 18.61 18.61 17.93 USE Tc = 19 19 18 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 1.90 3.35 4.85 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (0= CCf IA) (cfs) 2 YEAR 10 YEAR 100 YEAR O = 12.64 22.29 40.14 V (fps) = 4.60 Tt(min)= 1.49 V (fps) = 4.00 Tt(min)= 1.25 V (fps) = 3.80 Tt(min)= 0.81 V (fps) = 3.00 Tt(min)= 0.44 V (fps) = 2.10 Tt(min)= 2.38 TOTAL TRAVEL TIME (min) = 6.37 SHEAR ENGINEERING CORPORATION PAGE q FOSSIL CREEK ESTATES DATE 09/07/93 DEVELOPED FLOW FROM SUBBASIN II TO Aii TIME 1239 HOURS PROD. NO.1318-01-92 FILE NAME FOSSIL BY MEO AREA (A)= 53.34 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR CCf = 0.37 0.37 0.47 SEE PAGE 6 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (TO (1.87(1.1-CCf)*(L)^0.5)/ WO.33 LENGTH = 450 FEET SLOPE = 2.40 Y. 2 YEAR 10 YEAR 100 YEAR CCf = 0.20 0.20 0.25 Ti (min)= 26.74 26.74 25.26 TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE L (ft) = 300 S W L (ft) = = 5.30 GUTTER V (fps) = Tt(min)= 340 S (%) L (ft) = = 1.00 GUTTER 2.00 2.83 200 S (%) L (ft) = = 6.00 GRASSED SWALE V (fps) = 3.80 Tt(min)= 0.88 400 S (Y.) L (ft) = 3.00 LAWN/WETLANDS V (fps) = 1.20 Tt(min)= 5.56 = 370 S (%) NOTE: = 1.90 LAWN/WETLANDS V (fps) = .m 100 Tt(min)= 6.17 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 16.52 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 43.26 43.26 41.78 USE Tc = 43 43 42 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 1.15 2.08 3.40 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CCf IA) (cfs) 2 YEAR 10 YEAR 100 YEAR O = 22.70 41.05 85.24 CONCLUDE:INCREASE IN RUNOFF CAUSED BY DEVELOPMENT OF SITE ONLY UPSTREAM DEVELOPMENT ALSO TO BE CONSIDERED FOR PIPE AND INLET SIZING SHEAR ENGINEERING CORPORATION PAGE IO DATE 09/07/93 PROJ. NO.13Y8-01-92 TIME 1257 HOURS BY NED FILE NAME FOSSIL FLOW SUMMARY BASIN I HISTORIC BASIN I DEVELOPED 2 YEAR 10 YEAR 100 YEAR 2 YEAR CCF 0.25 0.25 0.31 CCF 0.41 Tc 28 28 26.5 Tc 19 I 1.50 2.70 4.45 I 1.90 A 17.32 17.32 17.32 A 16.23 0 6.495 11.691 23.893 O 12.64 BASIN II HISTORIC BASIN II DEVELOPED 2 YEAR 10 YEAR 100 YEAR 2 YEAR CCF 0.25 0.25 0.31 CCF 0.37 Tc 42 42 41 Tc 43 I 1.18 2.10 3.45 I 1.15 A 52.25 52.25 52.25 A 53.34 0 15.41 27.43 55.88 O 22.70 DEVELOPED BASIN SUMMARY SUBBASIN UPSTREAM ONSITE DOWNSTREAM TOTAL ac ac ac ac I 0.47 12.69 3.07 16.23 II 13.69 32.78 6.87 53.34 TOTALS 14.16 45.47 9.94 69.57 HISTORIC BASIN SUMMARY SUBBASIN UPSTREAM ONSITE DOWNSTREAM TOTAL ac ac ac ac I 0.47 13.50 3.35 17.32 II 13.69. 31.69 6.87 52.25 TOTALS 14.16 45.19 10.22 69.57 10 YEAR 100 YEAR 0.41 0.51 19 18 3.35 4.85 16.23 16.23 22.29 40.14 10 YEAR 100 YEAR 0.37 0.47 43 42 2.08 3.40 53.34 53.34 41.05 85.24 PAGE 1 Fossil Creek Estates P.U.D.; Ft. Collins Preliminary Drainage Report L GENERAL LOCATION AND DESCRIPTION: A. Location: 1. Fossil Creek Estates is located in the Northeast one -quarter (1/4) of Section 10, T6N, R69W of the 6th P.M., Larimer County, Colorado. 2. More specifically, it is located on the southwest corner of the intersection of South Shields Street and Fossil Creek Drive. It is approximately 1.0 mile south of Harmony Road and 1.0 mile north of Trilby Road. 3. Fossil Creek Estates P.U.D. is bounded on the East by South Shields Street. Nittman M.R.D. (County M.R.D.) is directly across South Shields Street east of this project. It is bounded on the north, south and west by currently unplatted properties. The property to the north is owned by the City of Fort Collins and will be maintained as City open space. This property will not be developed. The property to the west is currently being considered for development. The property to the south is unplatted and to our knowledge, is not being seriously considered for development at this time. Clarendon Hills is located immediately northeast of this site at the northeast comer of South Shields Street and Fossil Creek Drive. 4. The site is located within the Fossil Creek Basin as defined by the City of Fort Collins Stormwater Basin Map. Fossil Creek flows generally in an easterly direction. Flows west of South Shields Street are conveyed under South Shields Street via a recently constructed 6x10 reinforced concrete box culvert. This box culvert was constructed as part of the South Shields Street widening project in association with the Clarendon Hills development. The box culvert is located approximately 380 feet north of the project site. The culvert is sized with upstream development in mind as noted in the Fossil Creek Drainage Study prepared by Simons Li Associates, May, 1982. B. Description of Property: 1. The Fossil Creek Estates P.U.D. property covers approximately 45.19 acres, including the existing westernmost South Shields Street 30' Right -of -Way. A majority of the site is predominantly open pasture land covered with native vegetation. The property generally slopes in a northerly / northeasterly direction. The southern property line traverses an existing ditch which follows an existing ridge line. The west boundary lies approximately 100 feet west of an existing west ridge line. There is approximately 60 feet of relief across the property from the southwest corner of the site to the northeast. . 2. Fossil Creek Estates P.U.D. will consist of the development of 130 single family residences including the necessary infrastructure to service these lots. 3. The main Fossil Creek channel lies immediately north of Fossil Creek Estates P.U.D. The distance of the Fossil Creek main channel flowline from Fossil Creek Estates P.U.D. ranges from approximately 360' at the creeks intersection with South Shields Street, to approximately 890' at its furthest distance from Fossil Creek Estates P.U.D. APPENDIX II Backup diagrams and exhibits No Text • 3.1.6 Runoff Coef nts The runoff coefficients to be used with the Rational Method referred to in Section 3.2 "Analysis Methodology" can be determined based on either zoning classifications or the 1. types of surfaces on the drainage area. Table 3-2 lists the runoff coefficients for the various types of zoning along with the zoning definitions. Table 3-3 lists coefficients for the different kinds of surfaces. Since the Land Development Guidance System for Fort Collins allows land development to occur which may vary the zoning requirements and produce runoff coeffi- cients different from those specified in Table 3-2, the runoff coefficients should not be based solely on the zoning classifications. The Composite Runoff Coefficient shall be calculated using the following formula: C = (EC,A,)/At ,_i. Where C = Composite Runoff Coefficient C,=Runoff Coefficient for specific area A; A, = Area of surface with runoff coefficient of C, n = Number of different surfaces to be considered A, = Total area over which C is applicable; the sum of all A,'s is equal to A, Table 3-2 RATIONAL METHOD RUNOFF COEFFICIENTS FOR ZONING CLASSIFICATIONS Description of Area or Zoning Coefficient Business: BP, BL........................................................................................ 0.85 Business: BG, HB, C.................................................................................. 0.95 ...................................... Industrial: IL, IP ..:..................... ............................ 0.85 Industrial: IG............................................................................................... 0.95 Residential: RE, RLP.................................................................................. 0.45 Residential: RL, ML, RP............................................................................. 0.50 Residential: FILM, RMP.............................................................................. 0.60 Residential: RM, MM.................................................................................. 0.65 Residential: RH.......................................................................................... 0.70 Parks, Cemeteries...................................................................................... 0.25 Playgrounds............................................................................................... 0.35 RailroadYard Areas................................................................................... 0.40 UnimprovedAreas...................................................................................... 0.20 Zoning Definitions R-E Estate Residential District — a low density residential area primarily in outlying areas with a minimum lot area of 9,000 square feet. R-L Low Density Residential District — low density residential areas located throughout the City with a minimum lot area of 6,000 square feet. R-M Medium Density Residential District — both low and medium density residential areas with a minimum tot area of 66,000 square feet for one -family or two-family dwellings and 9,000 square feet for a multiple family dwelling. R-H High Density Residential District— high density residential areas with a minimum lot area of 6,000 square feet for one -family or two-family dwellings, 9,000 square feet for a multiple family dwelling,.and 12,000 square feet for other specified uses. R-P Planned Residential District — designation of areas planned as a unit (PUD) to pro- vide a variation in use and building placements with a minimum lot area of 6,000 square feet. R-L-P Low Density Planned Residential District — areas planned as a unit (PUD) to permit variations in use, density and building placements, with a minumum lot area of 6,000 square feet. MAY 1984 3-3 DESIGN CRITERIA R-M-P Medium Density Planned Residential District — designation for medium density areas planned as a unit (PUD) to provide a variation in use and building placements with a minimum lot area of 6,000 square feet. R-L-M Low Density Multiple Family District— areas containing low density multiple family units or any other use in the R-L District with a minimum lot area of 6,000 square feet for one-farnily or two-family dwellings and•9,000 square feet for multiple -family dwellings. M-L Low Density Mobile Home District — designation for areas for mobile home parks containing independent mobile homes not exceeding 6 units per acre. M-M Medium Density Mobile Home District — designation for areas of mobile home parks containing independent mobile homes not exceeding 12 units per acre. B-G General Business District — district designation for downtown business areas, including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total floor area of the building. B-P Planned Business District — designates areas planned as unit developments to provide business services while protecting the surrounding residential areas with minumum lot areas the same as R-M. H-B Highway Business District — designates an area of automobile -orientated busi- nesses with a minimum lot area equal to 1/2 of the total floor area of the building. B-L Limited Business District — designates areas for neighborhood convenience centers, including a variety of community uses with minimum lot areas equal to two times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. 1-L Limited Industrial District —designates areas of light industrial uses with a minimum area of lot equal to two times the total floor area of the building not to be less than 20,000 square feet. I-P Industrial Park District —designates light industrial park areas containing controlled industrial uses with minimum lot areas equal to two times the total floor area of the building not to be less than 20,000 square feet. I-G General Industrial District — designates areas of major industrial development. T Transition District — designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 118. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt................................................................................................ 0.95 95 Concrete............................................................................................. 0. Gravel................................................................................................. 0.50 Roofs 0.95 .......................................................................................................... Lawns, Sandy Soil: Flat <2% 0.15 Average2 to 7%°.................................................................................. 0.15 Steep >7% 0.20 .......................................................................................... Lawns-, Heavy Soil: Flat<2%.............................................................................................. 0.25 .................................................................................. Average 2 to 7% 0.2 Steep >7%......... :................................................................................ 0.35 MAY 1984 3-4 DESIGN CRITERIA 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. This can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). Tc =1.87 (1.1' iz S Ili Where Tc =Time of Concentration, minutes S = Slope of Basin, % C = Rational Method Runoff Coefficient D = Length of Basin, feet C, = Frequency Adjustment Factor Time of concentration calculations should reflect channel and storm sewer velocities as well as overland flow times. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. Table 3-4 RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS Storm Return Period Frequency Factor (years) Cr 2 to 10 1.00 N 11 to25 1.10 26 to 50 1.20 51 to100 1.25 Note: The product of C times C, shall not exceed 1.00 3.2 Analysis Methodology The methods presented in this section will be instituted for use in the determination and/or verification of runoff at specific design points in the drainage system. These methods are (1), the Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods, such as SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where applicable, drainage systems proposed for construction should provide the minimum protection as determined by the methodology so mentioned above. 3.2.1 Rational Method For drainage basins of 200 acres or less, the runoff may be calculated by the Rational Method, which is essentially the following equation: Q = C,CIA Where Q = Flow Quantity, cis A =Total Area of Basin, acres Ct = Storm Frequency Adjustment Factor (See Section 3.1.8) C = Runoff Coefficient (See Section 3.1.6) I = Rainfall Intensity, inches per hour (See Section 3.1.4) 3.2.2 Colorado Urban Hydrograph Procedure For basins larger than 200 acres, the design storm runoff should be analyzed by deriving synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph Procedure be used for such analysis. This procedure is detailed in the Urban Storm Drainage Criteria Manual, Volume 1, Section 4. MAY 1984 3-5 ' DESIGN CRITERIA DRAINAGE CRITERIA ANUAL RUNOFF. 50 30 I- 20 z w U fr w a 10 z w a O 5 w ¢ 3 O U 2 cr w F- Q t� 1 5 .1 EFAINIMM ..�No NNIN 11 A a / •I ' Il ,' 111111I�IIIIIIIIIIINa&■■■�/I ������■■� �►F�wm/I ■►I ■ N■■� �WMWAWI FAMIWAWMMMNN■■II� ._►._... , IANI.,__M5..■■..- 2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING "UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS 'Jan. 1975. 5 -1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT FORT COLLINS RAINFALL INTENSITY CURVE DATA FIG 3-1 NOVEMBER 1975 INTERPRETED DECEMBER 21, 1992 BY MARK OBERSCHMIDT SHEAR ENGINEERING CORPORATION 2 5 10 25 50 100 TIME YEAR YEAR YEAR YEAR YEAR YEAR *************************************************************** 5 3.29 4.70 5.64 7.02 7.95 8.70 10 2.54 3.65 4.45 5.50 6.35 7.14 15 2.14 3.07 3.75 4.60 5.29 6.06 20 1.85 2.65 3.25 4.00 4.60 5.21 25 1.63 2.34 2.87 3.54 4.08 4.63 30 1.47 2.11 2.60 3.17 3.67 4.20 35 1.32 1.92 2.38 2.88 3.35 3.81 40 1.20 1.76 2.19 2.67 3.08 3.60 45 1.12 1.62 2.02 2.46 2.84 3.28 50 1.04 1.51 1.87 2.27 2.65 3.02 55 0.97 1.40 1.73 2.12 2.46 2.80 60 0.90 1.32 1.62 1.99 2.32 2.60 65 0.88 1.24 1.52 1.84 2.18 2.43 70 0.82 1.18 1.44 1.72 2.05 2.30 75 0.79 1.11 1.38 1.62 1.93 2.17 80 0.74 1.07 1.30 1.53 1.82 2.07 85 0.70 1.00 1.23 1.46 1.73 1.96 90 0.68 0.97 1.20 1.40 1.67 1.87 95 0.64 0.91 1.13 1.32 1.59 1.77 100 0.61 0.88 1.09 1.27 1.51 1.70 105 0.60 0.83 1.04 1.22 1.46 1.63 110 0.57 0.80 1.00 1.18 1.40 1.57 115 0.54 0.78 1.96 1.14 1.33 1.50 120 0.52 0.76 0.91 1.10 1.19 1.44 6 APPENDIX III Stuffer Envelope Drainage Plan; Historic Conditions Preliminary Drainage and Erosion Control Plan PAGE 2 Fossil Creek Estates P.U.D.; Ft. Collins Preliminary Drainage Report L GENERAL LOCATION AND DESCRIPTION: B. Description of Property: (continued) 4. Existing irrigation ditches traverse the southern boundary of the project. The ditch line generally defines the southern boundary of Fossil Creek Estates P.U.D. The Trilby lateral traverses a portion of the western section of the project. The Scenic Knolls ditch traverses the central and eastern southern boundary of the project. Refer to the Preliminary Drainage and Erosion Control Plan in the appendix of this report. U. DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description: 1. Fossil Creek Estates P.U.D. is within the Fossil Creek Basin. Historic runoff from the site is conveyed to Fossil Creek, west of South Shields Street. Development of the site will not affect the general historic flow pattern. 2. The Fossil Creek Basin Study, which was prepared by Simons Li Associates in May, 1982, considers future development west of South Shields Street. A 6 x10 reinforced concrete box culvert was recently constructed under South Shields Street at Fossil Creek. The culvert was sized based on fully developed flows to South Shields Street from the upstream reaches. 3. Fossil Creek is the only major drainageway within 100' of the property boundary. B. Sub -Basin Description: 1. There are two sub -basins defined within the Fossil Creek Estates P.U.D. project area. These sub -basins are well defined by an existing ridge which nearly parallels South Shields Street. Refer to the the existing conditions plan located in the appendix of this report. 2. Historically, runoff from the site is conveyed overland, northerly and northeasterly across the site to Fossil Creek. Runoff continues easterly in Fossil Creek under South Shields Street, through a portion of Clarendon Hills, under Fossil Creek Drive, continuing through the Fossil Creek drainage system to Fossil Creek Reservoir. Refer to the Fossil Creek Major Drainage Basin Study for further detail of the Fossil Creek drainage system. 3. There is minimal contributing offsite runoff conveyed through the site because of the southernmost ridge defining the south Fossil Creek Basin boundary, and a ridge near the west boundary of the development. PAGE 3 Fossil Creek Estates P.U.D.; Ft. Collins Preliminary Drainage Report III DRAINAGE DESIGN CRITERIA: A. Regulations: 1. Storm drainage design criteria from the City of Fort Collins Storm Drainage Criteria Manual were used. 2. Erosion control measures and design will conform to the requirements of the City of Fort Collins Erosion Control Reference Manual. B. Development Criteria Reference and Constraints: Development of this area was considered in the Fossil Creek Drainage Study, prepared by Simons I i Associates, May, 1982. The recent South Shields Street widening project adjacent to Clarendon Hills considered the Fossil Creek study in the design and installation of the drainage structures under South Shields Street. 2. 'Detention is not being considered with the development of Fossil Creek Estates P.U.D. because of its proximity and relationship to the Fossil Creek Drainageway. 3. South Shields Street bounds Fossil Creek Estates to the east. Development of Fossil Creek Estates will require the widening of South Shields Street to City of Fort Collins Arterial standards. The existing South Shields Street grade will dictate the ultimate grading restraints to the South Shields Street new Right -of -Way (20' west of the current 30' Right -of -Way) and the easternmost lots located adjacent to the South Shields Street Right -of -Way. 4. The property to the north of Fossil Creek Estates P.U.D. will be the major design constraint in the design of the Fossil Creek Estates P.U.D. drainage infrastructure. Coordination of the two sites will allow for an effective method of conveying runoff to the box culvert at Fossil Creek. a. The property directly to the north is currently owned by the City of Fort Collins. The property for was purchased primarily for utilization as open space. b. There are no conceptual design plans for the property to the north of Fossil Creek Estates P.U.D. as we understand it. Further detail of the situation with the property to the north is required prior to final drainage and utility design, if available. c. Easement acquisition from the City of Fort Collins will be required in order to extend sanitary sewer service from the project to the existing sewer trunk main adjacent to Fossil Creek . The sewer trunk main is owned by the South Fort Collins Sanitation District. S. Wetland area identification and documentation will also be a design constraint in the layout of the street and drainage system and the lot layout. PAGE 4 Fossil Creek Estates P.U.D.; Ft. Collins Preliminary Drainage Report III DRAINAGE DESIGN CRITERIA: B. Development Criteria Reference and Constraints: (continued) 6. Groundwater considerations and underground conveyance to the wetlands and the Fossil Creek channel, are a major issue and design constraint. C. Hydrological Criteria: 1. The Rainfall -Intensity -Duration curves for the Fort Collins area were used in conjunction with the "Rational Method" for determining peak flows at various concentration points. 2. The site is situated within the Fossil Creek Drainage Study area. The majority of the improvements recommended by the study have been installed up to South Shields Street. The design and installation of these improvements considered development within the basin and therefore, no detention is proposed at this time. 3. The 2 and 100 year storms have been used in analyzing the effects of development and providing recommendations for a storm drainage system which will adequately convey peak flows to the major drainage system. D. Hydraulic Criteria: Street capacity references provided in the City of Fort Collins Storm Drainage Criteria Manual and street capacity exhibits which were prepared by this office and based on the Mannings equation, were used. 2. Storm sewer and drainage channel capacities were based on the Mannings Equation. The Mannings coefficients are as suggested by the City of Fort Collins Storm Drainage Criteria Manual. 3. Storm inlet capacities were based on the Allowable inlet Capacity charts and Figures provided in the City of Fort Collins Storm Drainage Criteria Manual. IV DRAINAGE FACILITY DESIGN: A. General Concept: 1. Proposed drainage improvements will convey 100% of storm runoff to the main Fossil Creek channel, north of Fossil Creek Estates P.U.D. and west of South Shields Street, maintaining peak discharge points at, or near, historic peak discharge locations. Runoff will continue to be conveyed to the 6' x 10' concrete box culvert at Fossil Creek, approximately 380 feet north of Fossil Creek Estates P.U.D. 2. There is minimal offsite contributing runoff to the site due to the site's proximity to the southern ridge line which defines the Fossil Creek Major Basin. PAGE S Fossil Creek Estates P.U.D.; Ft. Collins Preliminary Drainage Report IV DRAINAGE FACILITY DESIGN: A. General Concept: (continued) 3. The appendix contains all tables, charts and figures referenced in the calculations for storm sewer design, street capacities and historic and developed runoff peak flow quantities. B. Specific Details: 1. The street system will convey the runoff which contributes to the street system, to peak concentration points in the street system. Proposed street grades allow adequate street conveyance capacities. 2. Runoff will be conveyed from the street system, to the main channel of Fossil Creek via a combination storm sewer and open channels. a. All runoff will be directed to the designated wetland areas as much as reasonably possible on the project site. b. A utility and drainage easement will be required adjacent to the west Right -of - Way of South Shields Street, to be secured from the owners of the property to the north, to facilitate drainage conveyance from the easternmost sub -basin to Fossil Creek. The drainage design and easement will be defined based on the future conditions for full arterial widening of South Shields Street adjacent to the property to the north. 3. Runoff which is conveyed directly to South Shields Street, will ultimately be conveyed to Fossil Creek with an inlet on the west side of South Shields Street. This is depicted on the South Shields Street Widening Project plans which were prepared by Intermill Land Surveying in conjunction with Clarendon Hills (Sta. 48 + 16.46). Interim drainage conveyance will be provided with the development of Fossil Creek Estates P.U.D. V. EROSION CONTROL: A. General Concept Erosion control measures will be provided with construction. These measures will include; silt fence along downstream property lines, hay bale barriers in swales, and inlet filters at storm sewer inlets. These measures will effectively reduce the amount of soil erosion potential created during the construction of the project. a. Erosion Control device maintenance, both ofsite and offsite, will remain the responsibility of the developer until the subdivision is completely developed. This includes completion of housing and yard surfacing, which until completed, contributes to erosion potential. PAGE 6 Fossil Creek Estates P.U.D.; Ft. Collins Preliminary Drainage Report V. EROSION CONTROL: A. General Concept (continued) 2. An Erosion control security deposit will be required for each phase of construction according to current City of Fort Collins policy as presented in the City of Fort Collins Development Manual. a. The security deposit is based on the cost to reseed the actual affected property during overlot grading activity (Project Phasing). Currently, security deposit estimates are based on $ 650.00 per acre to reseed sites between 1 and 10 acres and $ 500.00 per acre to reseed sites greater than 10 acres. i. The estimated security deposit for the entire 45.19 acres would be $22,593.00. b. Construction phasing has not been established at the time of preliminary submittal. Phasing is being discussed. VI. CONCLUSIONS: A. Compliance with Standards 1. All drainage analysis has been performed according to the requirements of the City of Fort Collins Storm Drainage Criteria Manual. 2. Erosion control considerations conform to the City of Fort Collins Erosion Control Reference Manual. 3. Proposed drainage improvements generally conform with the recommendations of the Fossil Creek Drainage Study. B. Drainage Concept: 1. The proposed drainage design for Fossil Creek Estates P.U.D. is effective for the control of storm runoff with little or no downstream effects. 2. The proposed development of the site was considered in the Fossil Creek Drainage Study. The property to the north of Fossil Creek Estates P.U.D. is owned by the City of Fort Collins and will remain undisturbed open space. 3. There are no major irrigation facilities that will be affected by the development of Fossil Creek Estates P.U.D. The small irrigation ditch noted along the south boundary (the Trilby lateral) will be considered as a major design factor with the design of Fossil Creek Estates P.U.D. Easements and possible ditch improvements are being discussed with users of the ditch. This however, has no immediate affect on drainage, erosion control and / or wetlands considerations. PAGE 7 Fossil Creek Estates P.U.D.; Ft. Collins Preliminary Drainage Report 0 1. City of Fort Collins Storm Drainage Criteria Manual 2. City of Fort Collins Erosion Control Reference Manual 3. Fossil Creek Master Drainage Study, Simons Li Associates, 1982 4. South Shields Street Widening Project plans; Intermill Land Surveying; Approved by the City of Fort Collins, December, 1991. 5. Clarendon Hills Drainage reports APPENDIX I Storm Drainage Calculations