HomeMy WebLinkAboutWELLS FARGO PARKING LOT AND ATMS - FDP200016 - - PLANSINDEX OF DRAWINGSCOVER SHEETGENERALGN-1.0INDEX SHEETGN-2.0GENERAL NOTES SHEETARCHITECTURALA-1.0DEMOLITION FLOOR PLANA-1.1 PROPOSED PLANA-2.1 ATM DETAILSA-2.2 ATM DETAILSLANDSCAPINGLS-1 LANDSCAPE PLANLS-2 NOTES AND DETAILSSTRUCTURALS-1.0 ATM KIOSK AND AREA LIGHT FOUNDATIONSELECTRICALE-1.0 GENERAL ELECTRICAL NOTES, SYMBOLS AND LEGENDE-2.0ELECTRICAL SITE PHOTOMETRIC AND NOTES PLANE-3.0LIGHT FIXTURES AND POLES DETAILSE-3.1 METERED PEDESTAL AND CB ENCLOSURE DETAILS550 South Tryon Street, 30th FloorCharlotte, NC 28202ADC235 ALCAZAR AVENUECORAL GABLES, FL 33134OFFICE: (305)442-1188FAX: (305)445-1509WWW. ADCINTERNATIONAL.NETSTATE OF COLORADO AA-C001315JONATHAN N. CHADES, R.A. ARC 00404473ARCHITECTURAL DESIGN COLLABORATIVEOWNER CERTIFICATIONWELLS FARGO - COLLEGE AND MAGNOLIA DRIVE-UP ATM112 W. MAGNOLIA STREETFORT COLLINS, CO 80525PROJECT NUMBER: 19095DESIGN DEVELOPMENT ISSUE SETDATE: 10/11/2019THE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNER'S OF THE REALPROPERTY DESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THECONDITIONS AND RESTRICTIONS SET FORTH ON SAID SITE PLAN.OWNER (SIGNED)DATEOWNER (SIGNED)DATE( STATE OF)( )SS(COUNTY OF)SUBSCRIBED AND SWORN TO BE BEFORE THISDAY OF20.BY WITNESS MY HANDAND OFFICIAL SEAL.NOTARY PUBLICADDRESSMY COMMISSION EXPIRESDIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICESAPPROVED BY THE CURRENT DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOODSERVICES OF THE CITY OF FORT COLLINS, COLORADO, THISOF,20.DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES
F
S
T
G
U
V
W
J
I
H
A
K
L
M
B
C
N
O
D
P
R
E
ABBREVIATIONS GENERAL ACCESSIBILITYSCOPE OF WORK
APPLICABLE CODES
WELLS FARGO BE#:
235 ALCAZAR AVENUE
CORAL GABLE, FL 33134
OFFICE: (305) 442-1188
FAX: (305) 445-1509
WWW. ADCINTERNATIONAL.NET
ADCARCHITECTURAL DESIGN COLLABORATIVE
368643
WELLS FARGO PROJECT #:
120685
JONATHAN N. CHADES, R.A. # ARC 00404473
CORP.# AA-C001315
SD CLIENT REVIEW 05.15.191
DD CLIENT REVIEW 10.11.192
BDR. COMMENTS 01.14.20203
4 C.D.N.S. COMMENTS 04.17.2020
5 FINAL DEVELOPMENT REVIEW 08.25.2020
6 FINAL DEVELOPMENT REVIEW 09.23.2020
7 PERMIT ISSUE 10.27.2020
INDEX
SHEET
ZONING INFORMATION:
ZONING DOWNTOWN DISTRICT
DOWNTOWN SUB-DISTRICT
(CANYON AVENUE)
LOT OCCUPATION:
LOT AREA 18,992 SQUARE FEET
LOT USE PARKING LOT & DRIVE-IN
FACILITY
LOT WIDTH - PRINCIPAL
FRONT (W. MAGNOLIA ST.)190'-0"
LOT WIDTH - PRINCIPAL
FRONT (S COLLEGE AVENUE)100'-0"
TOTAL BUILDING AREA
(2 ATM KIOSKS)
24.00 SQUARE FEET
BUILDING SETBACKS:
MIXED USE FRONTAGE
(ROW INCLUDED)19 FEET MINIMUM
SIDE 0 FEET MINIMUM
REAR 5 FEET MINIMUM
PARKING PROVIDED:
REGULAR PARKING (9'X19')14 SPACES
COMPACT PARKING (9'X17')5 SPACES
ACCESSIBLE PARKING
(12'X19')2 SPACES
TOTAL PARKING 21 SPACES
SITE TABULATIONS
LOCATION MAP
N.T.S.
PROJECT LOCATION
SITE PLAN NOTES
1. GENERAL NOTES
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
7. THERMAL & MOISTURE PROTECTION
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
”
””
·
·
·
·
o
·
o
o
·
·
·
·
·
·
·
·
·
·
·
·
10. SPECIALTIES6. WOOD, PLASTICS, & COMPOSITES
·
·
·
·
·
o
·
“
”
·
·
·
·
·
·
””
·
8. DOORS & WINDOWS
5. METALS
·
·
·
·
·
9. FINISHES
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
11. DEMOLITION
WELLS FARGO BE#:
235 ALCAZAR AVENUE
CORAL GABLE, FL 33134
OFFICE: (305) 442-1188
FAX: (305) 445-1509
WWW. ADCINTERNATIONAL.NET
ADCARCHITECTURAL DESIGN COLLABORATIVE
368643
WELLS FARGO PROJECT #:
120685
JONATHAN N. CHADES, R.A. # ARC 00404473
CORP.# AA-C001315
SD CLIENT REVIEW 05.15.191
DD CLIENT REVIEW 10.11.192
BDR. COMMENTS 01.14.20203
4 C.D.N.S. COMMENTS 04.17.2020
5 FINAL DEVELOPMENT REVIEW 08.25.2020
6 FINAL DEVELOPMENT REVIEW 09.23.2020
7 PERMIT ISSUE 10.27.2020
GENERAL
NOTES
SHEET
S
S
S
S
SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSFORT
C
O
L
LI
N
S
1
0
0
-
Y
R
F
L
O
O
D
F
RI
N
G
E
FO
R
T
C
O
L
L
I
N
S
1
0
0
-
Y
E
A
R
F
L
O
O
D
W
A
Y
FO
R
T
C
O
L
L
I
N
S
1
0
0
-
Y
E
A
R
F
L
O
O
D
F
R
I
N
G
E FORT COLLINS 100-YEAR FLOODWAYFORT COLLINS 100-YEAR FLOOD FRINGEFORT
C
O
L
LI
N
S
M
O
D
E
R
A
T
E
RI
S
K
F
L
O
O
D
P
L
AI
N
FORT COLLINS 100-YEAR FLOOD FRINGE
FORT COLLINS 100-YEAR FLOODWAY
FORT COLLINS 100-YEAR FLOOD FRINGE
FORT COLLINS MODER
A
T
E
R
I
S
K
F
L
O
O
D
P
L
A
I
N
1
1
11
7
1
7
7
2 2
4
4
4
4
5
7
6
6 6
8
9
9
9
9
10
11
11
3
3
3
3
3
12
13
14
14
15
WELLS FARGO BE#:
235 ALCAZAR AVENUE
CORAL GABLE, FL 33134
OFFICE: (305) 442-1188
FAX: (305) 445-1509
WWW. ADCINTERNATIONAL.NET
ADCARCHITECTURAL DESIGN COLLABORATIVE
368643
WELLS FARGO PROJECT #:
120685
JONATHAN N. CHADES, R.A. # ARC 00404473
CORP.# AA-C001315
SD CLIENT REVIEW 05.15.191
DD CLIENT REVIEW 10.11.192
BDR. COMMENTS 01.14.20203
4 C.D.N.S. COMMENTS 04.17.2020
5 FINAL DEVELOPMENT REVIEW 08.25.2020
6 FINAL DEVELOPMENT REVIEW 09.23.2020
7 PERMIT ISSUE 10.27.2020
DEMOLITION
FLOOR PLAN
RM. NAME
SCALE:
DEMOLITION FLOOR PLAN
3/32" = 1'-0"1
KEY NOTES
GENERAL NOTES
LEGEND
EXISTING LANDSCAPE AREAS TO BE MODIFIED
AND/OR EXTENDED PER NEW SITE LAYOUT
REQUIREMENT. REFER TO CIVIL & LANDSCAPE
DRAWINGS FOR ADDITIONAL INFORMATION.
EXISTING MASONRY WALL OF EXISTING ADJACENT
BUILDING TO REMAIN. GC TO PROTECT DURING
CONSTRUCTION, TYPICAL.
ALL EXISTING TREES AND ROOTS ARE TO BE
PROTECTED DURING DEMOLITION PROCESS.
REFER TO LANDSCAPE DRAWINGS FOR
ADDITIONAL INFORMATION.
EXISTING PUBLIC SIDEWALK TO REMAIN, TYPICAL.
EXISTING CURB AND GUTTER TO REMAIN, TYPICAL.
EXISTING CONCRETE WHEEL STOPS TO BE
REMOVED TYP.
EXISTING GRAVEL COVERED PARKING AREA TO BE
MODIFIED. REFER TO CIVIL DRAWINGS FOR
ADDITIONAL INFORMATION.
EXISTING LIGHT POLE TO BE REMOVED. GC TO
CONTACT LIGHT & POWER COMPANY TO HAVE THIS
STRUCTURE REMOVED PRIOR TO ANY DEMOLITION.
LINE DENOTES EXISTING APPROXIMATE BOUNDARY
LINE. REFER TO CIVIL DRAWINGS POR ADDITIONAL
INFORMATION.
DASHED LINE DENOTES PORTION OF EXISTING
CURB AND GUTTER TO BE REMOVED/MODIFIED.
REFER TO CIVIL DRAWINGS FOR ADDITIONAL
INFORMATION.
EXISTING SIGNAGE TO BE REMOVED AND
RELOCATED.
DEMOLISH EXISTING DRIVE AND APPROACH. NOTE:
AN IRRIGATION MAIN LINE NEEDS TO BE LOCATED
IN THIS AREA AND PROTECTED. PREPARE FOR NEW
CURB AND GUTTER WITH LANDSCAPE WITH SOD,
REF. LS 1 LANDSCAPE PLAN
EXISTING PLANTING BED TO REMAIN AND BE
PROTECTED DURING ALL PHASES OF
CONSTRUCTION
LOCATE VALVE BOXES. TO REMAIN AND BE
PROTECTED THROUGHOUT ALL PHASES OF
CONSTRUCTION
LOCATE IRRIGATION CONTROL BOX, PROTECT
THROUGHOUT ALL PHASES OF CONSTRUCTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
S
S
S
S
SS COLLEGE AVENUEWEST MAGNOLIA STREET COLLEGE AVENUEEXISTING COMMERCIAL BUILDING
2 STORY WITH BASEMENT
FORT
C
O
L
LI
N
S
1
0
0
-
Y
R
F
L
O
O
D
F
RI
N
G
E
FO
R
T
C
O
L
L
I
N
S
1
0
0
-
Y
E
A
R
F
L
O
O
D
W
A
Y
FO
R
T
C
O
L
L
I
N
S
1
0
0
-
Y
E
A
R
F
L
O
O
D
F
R
I
N
G
E FORT COLLINS 100-YEAR FLOODWAYFORT COLLINS 100-YEAR FLOOD FRINGEFORT
C
O
L
LI
N
S
M
O
D
E
R
A
T
E
RI
S
K
F
L
O
O
D
P
L
AI
N
FORT COLLINS 100-YEAR FLOOD FRINGE
FORT COLLINS 100-YEAR FLOODWAY
FORT COLLINS 100-YEAR FLOOD FRINGE
FORT COLLINS MODERA
T
E
R
I
S
K
F
L
O
O
D
P
L
A
I
N
11
1
2 2
4
4
4
4
5
5
55
77
88
8
8
8
8
8
8
9
10
11
12
12
13
13
14
1515
15
16
17 17
17
17
15
12
12
6
9
12
12
12
10
6
18
19
20
3
3
3
3
21
11
22
22
23
PROPOSED
PLAN
SCALE:
PROPOSED PLAN
3/32" = 1'-0"1
KEY NOTES
GENERAL NOTES
LEGEND
WELLS FARGO BE#:
235 ALCAZAR AVENUE
CORAL GABLE, FL 33134
OFFICE: (305) 442-1188
FAX: (305) 445-1509
WWW. ADCINTERNATIONAL.NET
ADCARCHITECTURAL DESIGN COLLABORATIVE
368643
WELLS FARGO PROJECT #:
120685
JONATHAN N. CHADES, R.A. # ARC 00404473
CORP.# AA-C001315
SD CLIENT REVIEW 05.15.191
DD CLIENT REVIEW 10.11.192
BDR. COMMENTS 01.14.20203
4 C.D.N.S. COMMENTS 04.17.2020
5 FINAL DEVELOPMENT REVIEW 08.25.2020
6 FINAL DEVELOPMENT REVIEW 09.23.2020
7 PERMIT ISSUE 10.27.2020
EXISTING LANDSCAPE AREAS TO BE MODIFIED
AND/OR EXTENDED PER NEW SITE LAYOUT
REQUIREMENT. REFER TO CIVIL & LANDSCAPE
DRAWINGS FOR ADDITIONAL INFORMATION.
EXISTING MASONRY WALL OF EXISTING ADJACENT
BUILDING TO REMAIN. GC TO PROTECT DURING
CONSTRUCTION, TYPICAL.
ALL EXISTING TREE LAWNS ARE PARKS MAINTAINED.
PROTECT DURING CONSTRUCTION PROCESS.
EXISTING PUBLIC SIDEWALK TO REMAIN, TYPICAL.
EXISTING CURB AND GUTTER TO REMAIN, TYPICAL.
PROPOSED DRIVE-UP ISLAND ATM WITH ENCLOSURE
AND CANOPY, TYPICAL. PER WELLS FARGO
STANDARDS.
PROPOSED CONCRETE PAD ISLAND ATM WITH
ENCLOSURE AND CANOPY, TYPICAL. PER WELLS
FARGO STANDARDS.
PROPOSED NEW 6" CONCRETE CURB. REFER TO
CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
NEW BANK DIRECTIONAL SIGNAGE PER WELLS
FARGO STANDARDS STANDARDS.
NEW "MINIMUM CLEARANCE" BAR, PER WELLS
FARGO STANDARDS.
ATM TO BE LOCATED OUTSIDE OF FLOODPLAIN
FRINGE AS INDICATED BY DASHED LINE.
NEW LIGHT POLE WITH LIGHT FIXTURES. REFER TO
ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
HATCHED AREA DENOTES NEW BLACK TINTED
CONCRETE SURFACE DRIVEWAY AREA TO MATCH
ASPHALT COLOR. REFER TO CIVIL DRAWINGS FOR
ADDITIONAL INFORMATION.
PROPOSED SIDEWALK CONNECTION WITH EXISTING
PUBLIC SIDEWALK. REFER TO CIVIL DRAWINGS FOR
ADDITIONAL INFORMATION.
NEW D.O.T. APPROVED STOP BAR STRIPING. REFER
TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
NEW D.O.T. APPROVED STRIPING. REFER TO CIVIL
DRAWINGS FOR ADDITIONAL INFORMATION.
NEW STOP SIGN. REFER TO CIVIL DRAWINGS FOR
ADDITIONAL INFORMATION.
LOCATION OF NEW MONUMENT SIGN PER WELLS
FARGO STANDARDS. GC TO VERIFY SIGN TYPE WITH
VENDOR.
PROPOSED LOCATION OF NEW PEDESTAL PER
WELLS FARGO STANDARDS. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
PROPOSED BRICK SCREEN WALL. REFER TO CIVIL
DRAWINGS FOR ADDITIONAL INFORMATION.
APPROXIMATE LOCATION OF PAD MOUNTED
TRANSFORMER. REFER TO ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
LOCATE AND PROTECT ALL VALVE BOXES AND
IRRIGATION CONTROL PRIOR TO PERFORMING ANY
WORK IN THIS AREA.
NEW CURB AND GUTTER IN THIS AREA. MATCH
ADJACENT CURB AND GUTTER SIZES. REF. TO LS 1
FOR LANDSCAPING INFORMATION.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
FLOODPLAIN NOTES
EFFECTIVE IMPERVIOUS SUMMARY
CONDITION EFFECTIVE IMPERVIOUS AREA (SF)PERCENT IMPERVIOUSNESS
EXISTING SITE 7,602 40%
PROPOSED SITE 11,856 62%
DIFFERENCE 4,254 -
3
A2.7
PLAN DETAIL @ D.U. ATM
1/2" = 1'-0"
5
A2.7
PIPE BOLLARD DETAIL @ D.U. ATM
1/2" = 1'-0"
4
A2.7
SECTION @ D.U. ATM FOOTING
1/2" = 1'-0"
6
A2.7
SECTION @ CLEARANCE BAR FOOTING
1/2" = 1'-0"
ALL EXTERIOR CONCRETE:4000 PSI @ 28 DAYS
FOOTINGS:
SLABS:
1. ALLOWABLE BEARING PRESSURE 2000PSF
(PRESUMPTIVE LOAD-BEARING VALUES - TABLE 1806.2)
2. SOILS OR STRUCTURAL FILL BELOW FOUNDATIONS SHALL BE COMPACTED TO A MINIMUM
DENSITY EQUIVALENT OF 95% OF THE MODIFIED PROCTOR (ASTM D-1557) MAXIMUM DRY
DENSITY.
3. IF FOOTING OCCURS IN A DISTURBED, UNSTABLE OR UNSUITABLE SOIL, CONTACT ARCH/ENG
IMMEDIATELY.
1.CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON JOB SITE WITH COMPLETE SET OF
LATEST DRAWINGS. NOTES AND DIMENSIONS SHALL BE CHECKED AND VERIFIED
WITH EQUIPMENT FURNISHED.
2.ANCHORING OF THE EQUIPMENT AND THE EQUIPMENT SURROUND TO THE
FOUNDATION IS THE RESPONSIBILITY OF THE MANUFACTURER. ANCHORS
SHALL BE STAINLESS STEEL.
2.ALL CONCRETE SHALL BE DESIGNED BY APPROVED LABORATORY, AND DESIGN MIX SHALL
BE SUBMITTED TO ARCHITECT/ENGINEER FOR REVIEW, AND OBTAIN APPROVAL PRIOR TO
USE.
1.ALL CONCRETE SHALL BE DESIGNED PER THE ACI 318-11.
1.REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO A.S.T.M. SPECIFICATION
A615 GRADE 60. ALL MESH REINFORCING SHALL CONFORM TO A.S.T.M. SPECIFICATION A1064.
2.UNLESS OTHERWISE SHOWN ON DRAWINGS, MINIMUM COVER FOR REINFORCING SHALL BE AS
FOLLOWS:
3.ALL REINFORCING SHALL BE HELD SECURELY IN POSITION WITH STANDARD ACCESSORIES IN
CONFORMANCE WITH CRSI MANUAL OF STANDARD PRACTICE AND ACI 531 DURING THE
PLACING OF THE CONCRETE. WELDED WIRE MESH REINF. SHALL BE LOCATED AT THE MIDDLE
TO UPPER THIRD OF THE SLAB AND SUPPORTED BY STANDARD ACCESSORIES AT SPACINGS
NOT EXCEEDING 36 INCHES OR IN ACCORDANCE WITH THE MANUF. SPECIFICATIONS.
GENERAL:
CONCRETE:
REINFORCING STEEL:
FOUNDATION NOTES:
1
A2.7
ATM KIOSK ELEVATION
1/2" = 1'-0"
2
A2.7
ATM KIOSK ELEVATION
1/2" = 1'-0"
CENTERED
3"
DETAIL B
SCALE 1 : 8
A
A
SECTION A-A
B
FRONT VIEW APPROACH VIEW
ATM
DETAILS
WELLS FARGO BE#:
235 ALCAZAR AVENUE
CORAL GABLE, FL 33134
OFFICE: (305) 442-1188
FAX: (305) 445-1509
WWW. ADCINTERNATIONAL.NET
ADCARCHITECTURAL DESIGN COLLABORATIVE
368643
WELLS FARGO PROJECT #:
120685
JONATHAN N. CHADES, R.A. # ARC 00404473
CORP.# AA-C001315
SD CLIENT REVIEW 05.15.191
DD CLIENT REVIEW 10.11.192
BDR. COMMENTS 01.14.20203
4 C.D.N.S. COMMENTS 04.17.2020
5 FINAL DEVELOPMENT REVIEW 08.25.2020
6 FINAL DEVELOPMENT REVIEW 09.23.2020
7 PERMIT ISSUE 10.27.2020
1.ALL FINISHES AND COLORS INDICATED ARE WELLS FARGO CORPORATE BRANDED
COLORS AND FINISHES.
GENERAL:
1
A2.2
ATM KIOSK FINISH ELEVATION
NTS
FRONT VIEW RIGHT SIDE VIEW
ATM
DETAILS
WELLS FARGO BE#:
235 ALCAZAR AVENUE
CORAL GABLE, FL 33134
OFFICE: (305) 442-1188
FAX: (305) 445-1509
WWW. ADCINTERNATIONAL.NET
ADCARCHITECTURAL DESIGN COLLABORATIVE
368643
WELLS FARGO PROJECT #:
120685
JONATHAN N. CHADES, R.A. # ARC 00404473
CORP.# AA-C001315
SD CLIENT REVIEW 05.15.191
DD CLIENT REVIEW 10.11.192
BDR. COMMENTS 01.14.20203
4 C.D.N.S. COMMENTS 04.17.2020
5 FINAL DEVELOPMENT REVIEW 08.25.2020
6 FINAL DEVELOPMENT REVIEW 09.23.2020
5'-0"912"512"2'-234"912"10'-4"1'-6"
612"1'-4"
212"
1'-7"814"9"814"
F.F. = 100' - 0"
2
3
5
6
7
℄
PEDESTAL
5'-5"4"
℄
KIOSK FRAME
℄
ATM
1
2'-6"2'-6"1'-10"1'-4"1'-10"6"6"1'-014"834"9"2'-714"1'-1114"
312" TYP.
1'-212"2'-7"2'-5"312"10"10"
3'-912"
1'-234"312"KIOSK ANCHOR LOCATIONS AND SIZE NOT SHOWN. REFER TO
MANUFACTURER DWGS. PRIOR TO CONSTRUCTION, VERIFY
FRAME SIZE AND BLOCKOUTS WITH KIOSK MANUFACTURER.
BLOCKOUT/RACEWAY UNDER ATM
FOR ELECTRICAL SERVICE. VERIFY
DEPTH WITH KIOSK MANUFACTURER.
TYPICAL HOOKS AND BENDS SCHEDULE
NOTES:
BAR
#3
#4
#5
#6
#7
#8
#9
DIAMETER
0.375"
0.500"
0.625"
0.750"
0.875"
1.000"
1.128"
STANDARD REINFORCING STIRRUPS AND TIE HOOKS
#10 1.270"
#11 1.410"
#14 1.693"
#18 2.257"
STD. EXTENSION
4.5"
6"
7.5"
9"
10.5"
12"
11.25"
15.25"
17"
20.5"
27"
FBD
2.25"
3"
3.75"
4.5"
5.25"
6"
5.625"
7.625"
8.5"
10.25"
13.5"
STD. HOOK EXT.
1.5"
2"
2.5"
3"
3.5"
4"
4.5"
5"
5.75"
6.75"
9"
STIRRUP EXT. STIRRUP BEND
2.25"
3"
3.75"
9"
1.5"
2"
2.5"
4.5"
STANDARD EXTENSION
90° BEND
FINISHED BEND
DIAMETER "FBD"
180° BEND
FINISHED BEND
DIAMETER "FBD"STANDARDHOOKEXTENSIONSTIRRUP EXTENSION
90° BEND
STIRRUP BEND
DIAMETER
135° BEND
STIRRUP BEND
DIAMETER6xBARDIAMETER3"MINIMUM1. ALL DIMENSIONS PER CRSI MANUAL OF STANDARD PRACTICE AND ACI 318.
2. ALL BARS TO BE BENT COLD.
3. DO NOT BEND OR STRAIGHTEN BARS IN A MANNER THAT WILL DAMAGE THE BARS.
4. DO NOT FIELD BEND BARS PARTIALLY EMBEDDED IN CONCRETE OR MASONRY.
1 SEE KIOSK FOUNDATION SECTION FOR FOUNDATION DETAIL
2 SITE LIGHT FOUNDATION, 24" Ø
3 COMMERCIAL PEDESTAL BASE
4 BLOCKOUT FOR CONDUIT
5 KIOSK BASEPLATE
6 FACE OF CURB
7 4" Ø BOLLARD, TYP. 4
FOUNDATION PLAN KEY NOTES
5'-0"912"512"2'-234"834"912"9'-0"1'-6"
9"1'-7"9"814"
2 6
74"
℄
KIOSK FRAME
℄
ATM
814"2'-714"1'-1114"
F.F. = 100' - 0"
1
6"6"4'-0"2'-6"2'-6"5
312" TYP.2'-7"2'-5"312"312"10"10"
3'-912"
5'-312"
1'-234"
KIOSK ANCHOR LOCATIONS AND SIZE NOT SHOWN. REFER TO
MANUFACTURER DWGS. PRIOR TO CONSTRUCTION, VERIFY
FRAME SIZE AND BLOCKOUTS WITH KIOSK MANUFACTURER.
BLOCKOUT/RACEWAY UNDER ATM
FOR ELECTRICAL SERVICE. VERIFY
DEPTH WITH KIOSK MANUFACTURER.
912"
6"
5'-0"
912"6"2'-6"3'-0"6"KIOSK
4" Ø STEEL BOLLARD
FILLED WITH CONCRETE
#5 @ 18" O.C. MAX, TYP
TOP AND BOT
(3) #5 CONT.
AROUND FDN PERIMETER
#5 @ 18" O.C.3"CLR3'-5"3'-4"2'-0"Ø 9'-0"-MIN.27'-0"3/4" RIGID CONDUIT
(6) #5 AROUND
PERM.
#3 TIES
FINISHED GRADE
1" CHAMFER
HANDHOLE WITH
COVER
#6 STRANDED BARE COPPER
GROUND WIRE, ATTACH TO
GROUNDING LUG ON POLE
AND GROUNDING CLAMP ON
CONDUIT
LIGHT POLE
3"4"4"4"2'-0"3"#3TIESAT7EQ.SPACESMIN.LIGHT POLE ANCHORS AND
BASEPLATES SUPPLIED BY
OTHERS, INSTALLED BY CG.
MINIMUM LAP SPLICE LENGTH (IN INCHES) FOR:
LONGITUDINAL
BAR SIZE
NON-TOP BARS
NO. 3
NO. 4
NO. 5
NO. 6
NO. 7
13
17
22
26
38
2018 IBC TENSION LAP SPLICE LENGTHS,
REF ACI 318-14, SECTION 25.4.2 & 25.5
f'c = 5,000 PSI
TOP BARS
17
23
28
34
49
f'c = 5,000 PSI
GOVERNING CODE : THE DESIGN AND CONSTRUCTION OF THIS PROJECT IS GOVERNED BY THE "INTERNATIONAL BUILDING CODE (IBC)",
2018 EDITION, HEREAFTER REFERRED TO AS THE IBC, AS ADOPTED BY THE CITY OF FORT COLLINS BUILDING DEPARTMENT
UNDERSTOOD TO BE THE AUTHORITY HAVING JURISDICTION (AHJ).
REFERENCE STANDARDS : REFER TO CHAPTER 35 OF THE IBC. WHERE OTHER STANDARDS ARE NOTED IN THE DRAWINGS, USE THE
LATEST EDITION OF THE STANDARD UNLESS A SPECIFIC DATE IS INDICATED. REFERENCE TO A SPECIFIC SECTION IN A CODE DOES
NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH THE ENTIRE STANDARD.
GENERAL REQUIREMENTS
DESIGN CRITERIA
IIRISK CATEGORY
ULTIMATE DESIGN WIND SPEED (3 SECOND GUST), VULT 140 MPH
EXPOSURE CATEGORY B
EARTHQUAKE
DESIGN DATA
SEISMIC DESIGN CATEGORY, SDC B
SITE CLASSIFICATION, SITE CLASS D
IMPORTANCE FACTOR, IE 1.0
MAPPED SPECTRAL
RESPONSE ACCELERATION
0.195 g
0.056 g
SHORT PERIOD, SS
1-SECOND PERIOD, S1
DESIGN SPECTRAL
RESPONSE COEFFICIENT
0.208 g
0.090 g
SHORT PERIOD, SDS
1-SECOND PERIOD, SD1
WIND DESIGN DATA
SNOW LOAD GROUND SNOW LOAD, PG 30 PSF
INSPECTIONS : SPECIAL INSPECTIONS AND TESTING SHALL BE IN ACCORDANCE WITH THE STATEMENT OF SPECIAL INSPECTIONS
PER RBC SECTION 109.7 AND IBC SECTIONS 1704, 1705, AS APPLICABLE.
SPECIAL INSPECTORS: SPECIAL INSPECTORS SHALL BE EMPLOYED BY THE OWNER, E.O.R./ARCHITECT TO PROVIDE SPECIAL
INSPECTIONS FOR THE PROJECT. SPECIAL INSPECTORS SHALL BE QUALIFIED PERSONS WHO ARE REGISTERED WITH AN APPROVED
AGENCY.
INSPECTION SUBMITTALS: SPECIAL INSPECTION REPORTS SHALL BE PROVIDED ON A WEEKLY BASIS. FINAL SPECIAL INSPECTION
REPORTS WILL BE REQUIRED BY EACH SPECIAL INSPECTION FIRM PER IBC 1704.2.4. SUBMIT COPIES OF ALL INSPECTION AND
TESTING REPORTS TO THE ARCHITECT/ENGINEER AND THE AUTHORITY HAVING JURISDICTION FOR REVIEW AS SOON AS THEY ARE
AVAILABLE.
STATEMENT OF SPECIAL INSPECTIONS: SPECIAL INSPECTIONS AND TESTING SHALL BE PROVIDED IN ACCORDANCE WITH IBC
SECTIONS 1704 AND 1705 AND PER THE FOLLOWING SCHEDULE OF SPECIAL INSPECTIONS.
SPECIAL INSPECTIONS AND TESTING
SOILS AND FOUNDATIONS
DESIGN CRITERIA ALLOWABLE SOIL BEARING PRESSURE D+L 1,500 PSF
MINIMUM FOUNDATION DEPTH
SUBSURFACE CONDITIONS MEDIUM-STIFF SANDY LEAN CLAY, NO TO
LOW SWELL POTENTIAL
36 INCHES
GEOTECHNICAL
REPORT
SOILOGIC, INC., NO. 16-1181, GEOTECHNICAL SUBSURFACE EXPLORATION AND PAVEMENT SECTION DESIGN,
DATED 8/11/2016
FOUNDATION DESIGN CRITERIA WAS NOT PROVIDED IN REFERENCED REPORT. FOUNDATION DESIGN HEREIN IS THUS BASED ON
ASSUMED CRITERIA WHICH MUST BE VERIFIED BY A GEOTECHNICAL ENGINEER PRIOR TO FOUNDATION CONSTRUCTION.
CRITERIA DIFFERING FROM THE ASSUMPTIONS MUST BE REPORTED TO THE ENGINEER-OF-RECORD PRIOR TO FOUNDATION
CONSTRUCTION. REDESIGN OF THE FOUNDATION MAY BE WARRANTED.
CAST-IN-PLACE CONCRETE
CONCRETE MIX DESIGN REQUIREMENTS
STRENGTHF'C(PSI)W/CMRATIOAGGREGATE,MAX.(IN.)AIRCONTENT(+/-1.5%)RECOMMEND.SLUMP,(IN)TESTAGEFOUNDATION WALLS EXPOSURECLASSNA40002810.50 6
1.
2.
3.
4.
5.
REFERENCE STANDARDS:
ACI 301-16 "SPECIFICATIONS FOR STRUCTURAL CONCRETE"
ACI 305.1-10 "SPECIFICATIONS FOR HOT WEATHER CONCRETING"
ACI 306.1-10 "SPECIFICATION FOR COLD WEATHER CONCRETING"
ACI 318-14 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE"
ACI 117-10 "SPECIFICATION FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS"
SUBMITTALS
PROVIDE ALL SUBMITTALS REQUIRED BY ACI 301 SECTION 4.1.2. SUBMIT MIX DESIGNS FOR EACH MIX IN THE TABLE BELOW.
SUBSTANTIATING STRENGTH RESULTS FROM PAST TESTS SHALL NOT BE OLDER THAN 12 MONTHS PER ACI 318 SECTION 5.3.
1.
2.
3.
4.
MIX DESIGN REQUIREMENTS NOTES:
FLY ASH: THE USE OF FLY ASH, OTHER POZZOLANS, SILICA FUME OR SLAG SHALL CONFORM TO ACI 318 TABLE 26.4.2.2(b)
AND SECTION 26.4.2.2 MAXIMUM AMOUNT OF FLY ASH SHALL BE 25% OF TOTAL CEMENTITIOUS CONTENT UNLESS
REVIEWED AND APPROVED OTHERWISE BY SER.
AGGREGATES SHALL CONFORM TO ASTM C33.
NON-CHLORIDE ACCELERATOR: NON-CHLORIDE ACCELERATING ADMIXTURE MAY BE USED IN CONCRETE PLACED AT
AMBIENT TEMPERATURES BELOW 50°F AT THE CONTRACTOR'S OPTION.
RECOMMENDED SLUMP APPLY WHEN VIBRATION IS USED TO CONSOLIDATE THE CONCRETE AND MAY BE INCREASED BY 1"
FOR OTHER CONSOLIDATION METHODS. SLUMP MAY BE INCREASED WHEN CHEMICAL ADMIXTURES ARE USED, PROVIDED
THAT THE TREATED CONCRETE HAS THE SAME OR LOWER WATER/CEMENT RATIO AND DOES NOT SHOW SEGREGATION
POTENTIAL OR EXCESSIVE BLEEDING. MEASURED SLUMP TOLERANCE SHALL BE +/-1.5" MAXIMUM.
F1/S1/W0/C1
REINFORCING BAR
MATERIALS
REINFORCING BARS ASTM A615 GRADE 60 DEFORMED BARS
BAR SUPPORTS CRS I MSP-09, CHAPTER 3 "BAR SUPPORTS"
TIE WIRE 16 GAGE OR HEAVIER, BLACK ANNEALED
CONCRETE COVER
FOR REINFORCEMENT:
CONFORM TO THE FOLLOWING
COVER REQUIREMENTS UNLESS
NOTED OTHERWISE IN THE
DRAWINGS:
CONCRETE CAST AGAINST EARTH 3"
CONCRETE EXPOSED TO EARTH OR WEATHER 2"
TIES IN COLUMNS AND BEAMS 1-1/2"
SPLICES: CONFORM TO ACI 301 SECTION 3.3.2.7, "SPLICES". REFER TO "TYPICAL LAP SPLICE AND DEVELOPMENT LENGTH
SCHEDULE" FOR TYPICAL REINFORCEMENT SPLICES.
SCHEDULE OF SPECIAL INSPECTIONS
FOOTING SOIL BEARING SURFACES X
COMPACTED FILL MATERIAL; PHYSICAL PROPERTIES
EXCAVATION DEPTH AND BEARING LAYER
DESCRIPTION OF SPECIAL INSPECTION PERIODIC CONTINUOUS
X
X
CONCRETE
CONSTRUCTION
SIZE & PLACEMENT OF ALL REINFORCING STEEL X
PLACEMENT CLEARANCES AROUND REINFORCING STEEL AT
EMBEDDED CONDUIT X
SHAPE, LOCATION & DIMENSIONS OF MEMBERS FORMED X
USE OF THE REQUIRED DESIGN CONCRETE MIX X
MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND
TECHNIQUES X
VERIFICATION OF IN-SITU CONCRETE STRENGTH PRIOR TO REMOVAL
OF SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS X
PLACING & SIZE OF CAST-IN-PLACE ANCHOR BOLTS AND
EMBEDDED FABRICATIONS PRIOR TO THE POUR X
PLACING OF CONCRETE AROUND CAST-IN-PLACE BOLTS AND EMBEDS X
SAMPLING OF FRESH CONCRETE X
DETERMINATIONS OF SLUMP, AIR CONTENT, AND TEMPERATURE X
INSTALLATION OF POST-INSTALLED ADHESIVE ANCHOR BOLTS X
SOILS
KIOSK REFERENCE DOCUMENTS
FOR ALL ABOVE GROUND KIOSK ELEMENTS INCLUDING ANCHORS AND FRAME, AND BLOCKOUT INFORMATION, REFERENCE KIOSK
CONSTRUCTION DOCUMENTS AS FOLLOWS:COMPANION, 645 WEST 200 NORTH, NORTH SALT LAKE, UT 84054, 877-736-3445,
www.companionsystems.com . KIOSK NO. 3897, 10/17/2019.
ALL KIOSK ANCHORAGE IS DESIGNED AND SUPPLIED BY KIOSK MANUFACTURER.
4 WEST KIOSK - FOUNDATION PLAN
1/2" = 1'-0"N1 EAST KIOSK - FOUNDATION PLAN
1/2" = 1'-0"N5 KIOSK FOUNDATION SECTION
1/2" = 1' - 0"2 AREA LIGHT DETAIL
1/2" = 1'-0"
3 CONC. REBAR TENSION LAP SPLICE SCHEDULE
NO SCALE6TYPICAL HOOKS AND BENDS SCHEDULE
NO SCALE
WELLS FARGO BE#:
ADCARCHITECTURAL DESIGN COLLABORATIVE
368643
WELLS FARGO PROJECT #:
120685
ATM KIOSK AND AREA
LIGHT FOUNDATIONS
9/23/2020
GENERAL NOTES - ELECTRICALELECTRICAL SPECIFICATIONSINSTALLATION DIMENSIONSCLEARING THE AREA FOR PROPER ILLUMINATIONATM ILLUMINATION REQUIREMENTSADClperez@pgengineeringdesign.com21 SW 102 CT. MIAMI, FL 33174Office 786.747-5018 | Cell 786. 863.7091 ARCHITECTURAL DESIGN COLLABORATIVEP&G ENGINEERINGDESIGN GROUP CORP.SD CLIENT REVIEW05.15.20191DD CLIENT REVIEW10.11.20192BDR. COMMENTS01.14.202034C.D.N.S. COMMENTS04.17.20205FINAL DEVELOPMENT REVIEW08.25.20206FINAL DEVELOPMENT REVIEW09.23.20207PERMIT ISSUE10.27.2020GENERAL ELECTRICALNOTES, SYMBOLS,E-1.0AND LEGEND
SS(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)(OHP)
(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(GAS)(OHP)(OHP)(OHP)EXISTING COMMERCIAL BUILDING2 STORY WITH BASEMENTSASASASBSBSBSB101010101522134568345689111134568345689771412130.30.50.60.80.91.11.31.62.02.42.73.13.43.73.94.04.03.93.73.43.12.72.42.01.71.41.21.01.01.01.11.11.11.11.11.00.90.50.20.20.20.20.20.30.30.40.50.60.70.80.80.80.90.90.90.90.70.40.20.30.30.40.40.50.50.50.50.60.70.60.60.60.60.70.70.80.91.01.01.11.11.11.11.11.11.11.11.21.21.31.21.21.21.11.00.80.50.60.50.50.50.40.40.30.40.40.40.40.40.50.50.60.60.60.50.50.31.51.51.51.51.51.71.71.81.92.02.02.02.22.32.52.62.83.03.23.33.43.43.43.53.52.01.81.82.02.12.22.22.42.52.73.03.33.74.04.34.54.64.74.74.74.62.42.32.32.42.42.61.61.82.12.42.62.93.23.64.14.65.15.55.86.16.16.05.82.72.52.52.62.62.81.51.82.12.42.83.23.74.24.95.66.26.87.27.57.77.47.12.82.62.52.62.83.03.21.51.82.12.42.93.44.14.95.76.67.48.08.58.99.08.78.37.06.25.54.74.03.42.92.72.62.72.93.13.23.12.82.51.51.82.12.53.03.74.55.49.610.010.29.79.37.86.85.95.04.23.53.02.72.62.72.93.03.02.82.52.31.41.82.12.53.13.94.95.910.911.110.610.18.47.36.25.14.23.53.02.72.52.62.72.72.72.52.42.11.51.82.22.63.34.15.26.37.58.79.811.711.711.510.88.97.76.45.24.23.42.92.52.42.42.42.42.42.42.21.91.61.92.32.73.44.35.46.67.89.010.111.912.011.611.09.07.86.55.24.13.32.72.42.22.22.22.22.22.22.01.61.61.92.32.93.54.45.46.67.99.110.212.010.99.07.76.45.14.03.22.62.22.12.02.02.02.02.01.91.51.72.02.42.93.54.35.36.57.89.010.011.911.910.78.77.56.24.93.83.02.42.12.01.91.91.91.91.91.81.52.93.44.15.16.211.511.511.010.29.33.62.82.32.01.81.91.91.91.91.81.71.51.61.92.32.73.13.84.75.76.87.98.99.710.310.610.710.510.19.58.67.66.45.34.23.32.62.21.91.71.81.91.91.91.81.61.51.51.72.02.42.83.44.25.16.17.18.08.79.29.69.79.59.18.57.76.75.74.73.73.02.31.91.71.61.61.71.91.91.91.71.51.31.51.82.12.53.03.74.55.36.16.97.58.08.38.48.37.97.36.65.84.94.03.22.62.11.71.61.51.51.61.71.81.71.61.41.11.31.51.82.22.63.13.74.45.05.76.26.66.97.06.86.56.15.54.84.13.42.72.21.81.51.41.31.41.41.51.51.51.51.20.10.20.20.30.30.30.30.30.30.30.30.40.30.30.30.30.20.20.20.20.20.20.20.20.20.20.20.20.20.20.10.10.10.10.10.10.10.10.10.00.00.20.20.30.40.40.50.50.50.50.50.50.50.40.40.40.40.30.30.30.30.30.30.30.30.30.30.30.30.20.20.20.20.20.20.20.10.10.10.10.10.00.20.30.50.60.60.70.70.70.70.70.70.60.60.50.50.50.50.50.40.40.40.40.40.40.40.30.30.40.30.30.30.30.30.30.20.20.20.10.10.10.00.20.50.70.80.90.91.01.01.01.00.90.80.80.80.80.80.70.70.70.70.60.60.60.50.50.50.50.50.50.40.40.40.40.40.30.30.30.20.20.10.10.30.10.30.20.20.40.20.50.20.50.20.50.20.60.30.60.30.50.30.50.30.60.20.50.20.40.20.30.20.20.20.20.30.10.30.10.30.10.30.10.20.00.20.10.40.20.00.10.10.30.10.011WORK NOTES ····LUMINAIRE SCHEDULEELECTRICAL RISER LEGENDSTATISTICSAVAILABLE FAULT CURRENT LABELING” ADClperez@pgengineeringdesign.com21 SW 102 CT. MIAMI, FL 33174Office 786.747-5018 | Cell 786. 863.7091 ARCHITECTURAL DESIGN COLLABORATIVEP&G ENGINEERINGDESIGN GROUP CORP.SD CLIENT REVIEW05.15.20191DD CLIENT REVIEW10.11.20192BDR. COMMENTS01.14.202034C.D.N.S. COMMENTS04.17.20205FINAL DEVELOPMENT REVIEW08.25.20206FINAL DEVELOPMENT REVIEW09.23.20207PERMIT ISSUE10.27.2020ELECTRICAL SITE,PHOTOMETRIC AND E-2.0NOTES PLANScale:NORTH1/8"=1'-0"1E-2.0ELECTRICAL SITE AND PHOTOMETRIC PLAN11
POLE HT= 27'FIXTURE TYPE SC LuminaireADClperez@pgengineeringdesign.com21 SW 102 CT. MIAMI, FL 33174Office 786.747-5018 | Cell 786. 863.7091 ARCHITECTURAL DESIGN COLLABORATIVEP&G ENGINEERINGDESIGN GROUP CORP.SD CLIENT REVIEW05.15.20191DD CLIENT REVIEW10.11.20192BDR. COMMENTS01.14.202034C.D.N.S. COMMENTS04.17.20205FINAL DEVELOPMENT REVIEW08.25.20206FINAL DEVELOPMENT REVIEW09.23.20207PERMIT ISSUE10.27.2020LIGHT FIXTURES &POLES DETAILSE-3.0SCALELIGHT POLE DETAIL1N.T.S.SCALEPOLE DETAIL2N.T.S.SCALELIGHTING FIXTURE DETAIL3N.T.S.1
NOTES:ADClperez@pgengineeringdesign.com21 SW 102 CT. MIAMI, FL 33174Office 786.747-5018 | Cell 786. 863.7091 ARCHITECTURAL DESIGN COLLABORATIVEP&G ENGINEERINGDESIGN GROUP CORP.SD CLIENT REVIEW05.15.20191DD CLIENT REVIEW10.11.20192BDR. COMMENTS01.14.202034C.D.N.S. COMMENTS04.17.20205FINAL DEVELOPMENT REVIEW08.25.20206FINAL DEVELOPMENT REVIEW09.23.20207PERMIT ISSUE10.27.2020METERED PEDESTALAND CB ENCLOSUREE-3.1DETAILSSCALEPANEL SCHEDULE ENCLOSURE BUILT-IN PEDESTAL (PART OF ASSEMBLY)1N.T.S.SCALE“A” STYLE 16" METERED COMMERCIAL PEDESTAL2N.T.S.