HomeMy WebLinkAbout1605 PETERSON PLACE CARRIAGE HOUSE - FDP200023 - - DRAINAGE REPORT
4025 AUTOMATION WAY, STE B2 | FORT COLLINS, CO 80525 | 970-698-6046 | www.CivilWorxEng.com
December 1, 2020
Dan Mogen
Development Review Division
City of Fort Collins Utilities
281 N. College Ave.
Fort Collins, Colorado 80524
Re: 1605 Peterson Place, Carriage House – Drainage Narrative
Dan,
I am writing this letter to discuss the drainage impacts associated with the addition of a
‘carriage house’ to the existing duplex located at 1605 Peterson Pl. (the property). The
intent of this letter is to satisfy the City of Fort Collins requirements on drainage analysis
associated with the proposed improvements to the property.
The owner of the property is proposing a 912 square foot carriage home located at the
NW corner of the lot, the drainage from this building will be conveyed eastward to the
extent practical. The existing drainage patterns of the site can be summarized by 2 basins,
an eastern and a western existing basin. The western basin is a small 0.01 sliver of the
property area which abuts and drains to the Peterson St. alley to the west. Most of the
property generally drains to the east where flows would enter the curb and gutter at
Peterson Pl. The east basin is 0.25 acres in size with slopes varying between 0 and 4%.
For a summary of basin areas and surface coverages see Table 1 below.
Surface Type Area
(Sq.Ft.)
Percent
Imperv. (%) I * A
Existing Drainage
Total Area 11,175 23.4% 2617.6
Asphalt, Concrete 676 100% 675.7
Rooftop 1,044 90% 939.4
Gravel 1,744 40% 697.6
Pavers 396 40% 158.6
Lawn/ Landscaping 7,315 2% 146.3
Proposed Condition Drainage
Total Area 11,175 31.6% 3534.4
Asphalt, Concrete 676 100% 675.7
Rooftop 1,956 90% 1760.2
Gravel 1,977 40% 790.8
Pavers 464 40% 185.6
Lawn/ Landscaping 6,194 2% 123.9
Table 1) Proposed and Existing Basin characteristics and area cover
4025 AUTOMATION WAY, STE B2 | FORT COLLINS, CO 80525 | 970-698-6046 | www.Civilworxeng.com
Based on initial design scoping meetings with the client, it was requested that this lot
improvement would not impact the tenant side of her existing home. To respect this
design constraint, the limits of this construction and grading for the proposed project will
not address any of the existing drainage on the tenant side of her property. See the
construction plans for the proposed limits of construction, but this is to say that we
cannot address any existing drainage issues outside of the construction limits.
With the added impervious area, the increase to the anticipated stormwater flows for the
2-year and 100-year design storm were calculated. A summary of the existing and
proposed runoff rates can be found below in Table 2 (calculations are available in
attachments). This additional runoff generated by the proposed condition will be
conveyed eastward via a proposed grass swale as shown on the plans. This swale was
positioned as close to the northern property line as possible while maintaining positive
drainage away from the existing duplex as well as the property to the north. A Tc of 5
minutes will be assumed based on the December 2018 COFC Stormwater Criteria manual.
Existing drainage conditions will be improved by employing this new swale as there were
some very flat areas at the west and north side of the existing home, which should be
graded to drain to the proposed swale. In an effort to slow down the runoff as it runs
through the swale, I will encourage the client to plant a few rows of taller decorate grasses
(buffalo grass, or equivalent) positioned perpendicular to the swale flowline just before
the swale reaches the outfall near the sidewalk at Peterson Pl.
Basin
Proposed Existing
Total Flow 2-
year (cfs)
Total Flow
100-year (cfs)
Total Flow 2-
year (cfs)
Total Flow
100-year (cfs)
East
Basin 0.33 1.78 0.29 1.26
West
Basin 0.02 0.09 0.01 0.04
Table 2) Flow comparison for existing drainage versus proposed conditions
4025 AUTOMATION WAY, STE B2 | FORT COLLINS, CO 80525 | 970-698-6046 | www.Civilworxeng.com
The addition of the carriage house to this lot is being designed with as little impact to the
existing stormwater patterns as reasonably achievable. With the minimal additions to
the gravel driveway and maximizing landscaped or lawn area, the resulting runoff
increases are modest. Care has been taken not to increase flows to the Peterson St. alley
and the Carriage House will have its gutters sloped to convey stormwater to the east,
where the downspouts will be outlet towards the proposed swale. With the overall
distance that stormwater flows must travel through the swale and the addition of grass
buffers to reduce velocities and drop out any sediments within the storm flows. This
project’s impact on the greater storm sewer in the area should be quite small, and with
the efforts taken to help slow the stormwater velocities and reduce sediment transport;
the existing downstream infrastructure should handle these flows without issue.
Sincerely,
Scott Nesbitt, PE
Project Engineer
CivilWorx, LLC
4025 AUTOMATION WAY, STE B2 | FORT COLLINS, CO 80525 | 970-698-6046 | www.Civilworxeng.com
ATTACHMENTS
Runoff Coefficients and % Impervious1605 Peterson Place
Fort Collins, CO
Roof (1)Asphalt Walks(1)Gravel(1)Lawns(1)
%I = 90% %I = 100% %I = 90% %I =40% %I=2%
acres sf sf sf sf sf sf
C2 C100 CF
EX-E EX-E
0.25 10751 1044 676 0 2028.8 7002 23.9% C/D 0.409 0.511
EX-W EX-W
0.01 419.3 0 0 0 111.2 308 12.1% C/D 0.316 0.395
0.00 0 - - -
0.3 11170 1044 676 0 2140 7310 23%0.406 0.507
PR-E PR-E
0.24 10468 1956 676 0 2126 5710 32.5% C/D 0.477 0.596 0.745
PR-W PR-W
0.02 702 0 0 0 291 411 17.8% C/D 0.354 0.442 0.553
0.00 0 - - -
Total 0.3 11170 1956 676 0 2417 6121 32%0.469 0.596
Notes:
(1) Recommended % Imperviousness Values from USDCM Vol 1 - Ch 5 - Table RO-3. Increased Lawns from 0% to 2% Impervious.
(2) Runoff C is based on %I, UDFCD Eq RO-7 and correction factors in Table RO-4.
(3) Impervious area assumed to be 2500 s.f. of roof and 500 s.f. of driveway per single family and twin home lot.
Proposed Basins
Existing Basins
Onsite Total
Basin
Areas
Composite
Imperviousness
(%I)
Total TotalDesign Pt.NRCS Soil
Type
Composite Runoff Coefficients (2)
D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2020\C20025 - Peterson Place Carriage House\06_Design\Reports\Drainage\1605 Peterson Pl - Hydrol_Std-updated.xlsm
Calculations by: STN
Date: 10/19/2020
Time of Concentration1605 Peterson Place
Fort Collins, CO
Area Length Slope ti
(2)Length Slope Velocity (3)tt
(4)Check tc?Total
Length tc
(5)
acres ft % min ft % fps min min Urban? ft min min
EX-E EX-E 0.2 Roof 0.73 ----Yes 0 5 5
EX-W EX-W 0.0 Lawn 0.09 ----Yes 0 5 5
0.0 - - - - - - - -
PR-E PR-E 0.2 Roof 0.73 ----Yes 0 5 5
PR-W PR-W 0.0 Lawn 0.09 ----Yes 0 5 5
0.0 - - - - - - - -
Notes:
(1) C5 based initial ground type and Table RO-5 (4)tt=L/(V*60 sec/min)
(2)ti = [1.8(1.1-C5)L1/2]/S1/3, S= slope in %, L=length of overland flow (400' max)(5)tc check (for urban or developed areas only) = total length/180 + 10
(3)V=CvS0.5, S=watercourse slope in ft/ft, UDFCD Equation RO-4 (6)min tc = 5 min
Proposed Basins
Existing Basins
Initial
Ground
Type
C5
(1)Cv
ti+tt Final tc
(6)
tc Check for Urbanized
Basin
Initial Overland Flow Time (ti)Travel/Channelized Time of Flow (tt)
Design Pt.
D:\CivilWorx Dropbox\CivilWorx Dropbox\CivilWorx\Projects\2020\C20025 - Peterson Place Carriage House\06_Design\Reports\Drainage\1605 Peterson Pl - Hydrol_Std-updated
Calculations by: STN
Date: 10/19/2020
Rational Method Peak Runoff
1605 Peterson Place
Fort Collins, CO
Final
tc
(6)I2 I100 Q2 Q100
acre min in/hr in/hr cfs cfs
EX-E EX-E 0.2 5 0.409 0.511 2.85 9.95 0.29 1.26
EX-W EX-W 0.0 5 0.316 0.395 2.85 9.95 0.01 0.04
0.0 - - - - - - -
0.30 1.29
PR-E PR-E 0.2 5 0.475 0.742 2.85 9.95 0.33 1.78
PR-W PR-W 0.0 5 0.354 0.553 2.85 9.95 0.02 0.09
0.0 - - - - - - -
0.34 1.86
Totals
Totals
Peak Discharge
Proposed Basins
Existing Basins
Design Pt.AreaBasin
C100
Rainfall IntensityRunoff Coefficients
C2
Calculations by: STN
Date: 10/19/2020