Loading...
HomeMy WebLinkAboutErosion Control EscrowProject:Disturbed Acres:0.69 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price L.F. 575 $3.00 $1,725.00 EA. 9 $300.00 $2,700.00 EA. 1 $1,000.00 $1,000.00 EA. 1 $1,600.00 $1,600.00 EA. 2 $75.00 $150.00 Sub-Total: $7,175.00 1.5 x Sub-Total: $10,762.50 Amount of security: $10,762.50 Minimum escrow amount: $3,000.00 Erosion Control Escrow:$10,762.50 “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Inlet Protection (IP) Concrete Washout (CW) Final Escrow Amount Example Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Sediment Control Log (SCL) Vehicle Tracking Control (VTC) Curb Sock (CS) Miniumum Escrow Amount Oak 140 10/20/2020 5:01 PM V:\3258c 140 East Oak Street\Reports\Calculations\Spreadsheets\Escrow