June 11, 2025
Patrick Mcmeekin
MULBERRY DEVELOPMENT LLC
4801 GOODMAN ST
Timnath, CO 80547
RE: Bloom Filing Eight, BDR250010, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Bloom Filing Eight. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or
via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras bbethuremharras@fcgov.com 970-416-2744
Topic: General
Comment Number: 1
05/22/2025: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Response: Noted Thank you!
Comment Number: 2
05/22/2025: SUBMITTAL:
As part of your submittal, a response to the comments provided in this letter and
a response to plan markups is required. The final letter is provided to you in
Microsoft Word format. Please use this letter to insert responses to each
comment for your submittal, using a different font color. Please use the markups
to insert responses to each comment on plans. Please do not flatten markup
2
responses.
Provide a detailed response for any comment asking a question or requiring an
action. Any comment requesting a response or requiring action by you with a
response of noted, acknowledged etc. will be considered not addressed. You
will need to provide references to specific project plans, pages, reports, or
explanations of why comments have not been addressed [when applicable].
Response: Noted Thank you!
Comment Number: 3
05/22/2025: SUBMITTAL:
Correct file naming is required as part of a complete submittal. Please follow
the Electronic Submittal Requirements and File Naming Standards found here:
https://www.fcgov.com/developmentreview/files/electronic-submittal-requiremen
ts-and-file-naming-standards_v1_8-1-19.pdf?1703783275
File names should have the corresponding number, followed by the file type
prefix, project information, and round number.
For example: 1_SITE PLAN_Project Name_FDP_Rd1.
A list of numbers and prefixes for each file can be found at the link above.
Response: Named as noted.
Comment Number: 4
05/22/2025: SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the
PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting and remove
this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and
newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-Aut oCAD.html
Response: PDF provided as flattened.
Comment Number: 5
05/22/2025: SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are preparing to resubmit your
plans, please notify me with an expected submittal date with as much advanced notice as possible.
Response: Noted Thank you!
Comment Number: 6
05/22/2025: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project.
Response: Noted Thank you!
3
Comment Number: 7
05/22/2025: INFORMATION:
ANY project that requires four or more rounds of review would be subject to an
additional fee of $3,000.00.
Response: Noted Thank you!
Comment Number: 8
05/22/2025: NOTICE:
A Development Review sign will be posted on the property. This sign will be
posted through the final decision and appeal process. A request for the removal
of signs will be made by your Development Review Coordinator at the
appropriate time.
Response: Noted Thank you!
Comment Number: 9
05/22/2025: FOR RECORDING – PLAT :
Could you please update the City signature blocks on the Plat ? Instead of using
"this _______ day of ______A.D., 20____," could you opt for "on this day,
____________" for the date? This alternative format facilitates smoother date
input with digital signatures.
Please add "or Designee" to the end of each title under the signature line for
City signatures.
Additionally, kindly ensure there is sufficient space between the signature line
and the title line to accommodate the digital signature.
Response: Updated as requested.
Comment Number: 10
05/22/2025: FOR APPROVAL:
The Director shall issue a written decision to approve, approve with conditions,
or deny the development application based on compliance with the standards
referenced in Step 8 of the Common Development Review Procedures
(Section 6.3.8).
The written decision shall be mailed to the applicant, to any person who
provided comments during the comment period and to the abutting property
owners and shall also be posted on the City's website at
fcgov.com/developmentreview/proposals
Response: Noted Thank you!
Comment Number: 11
05/22/2025: FOR APPROVAL:
Once the decision has been finalized by the Director, there is a two-week
appeal period from the date of the signed decision. The project is not able to be
recorded until it is confirmed there are no appeals.
Response: Noted Thank you!
Comment Number: 12
05/22/2025: FOR APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information when we
4
are closer to this step.
Response: Noted Thank you!
Department: Planning Services
Contact: Kai Kleer kkleer@fcgov.com 970-416-4284
Topic: General
Comment Number: 1
06/11/2025: INFORMATION:
No comments
Response: Noted Thank you!
Department: Engineering Development Review
Contact: Sophie Buckingham sbuckingham@fcgov.com
Topic: General
Comment Number: 1
06/09/2025: FOR APPROVAL:
The plat lists two owner entities: Mulberry Development, LLC and Hartford
Construction, LLC. According to the Larimer County Assessor, the entire plat
area is owned by just one entity, Mulberry Development, LLC. Will Hartford
Construction, LLC own one of the parcels at the time the plat is signed? If not,
please update the ownership listed on the plat to match the Larimer County Assessor.
Response: Both signatures left due to title commitment language.
Department: Traffic Operation
Contact: Steve Gilchrist sgilchrist@fcgov.com 970-224-6175
Topic: General
Comment Number: 1
05/29/2025: INFORMATION:
Based on the narrative provided this project is just a replat to correct lot line
discrepancies. This would not trigger any requirements for a TIS. TIS waived.
Traffic Operations has no other comments.
Response: Noted Thank you!
Department: Stormwater Engineering
Contact: Andrew Crecca acrecca@fcgov.com
Topic: Erosion Control
Comment Number: 1
06/05/2025: INFORMATION:
No Comment
Response: Noted Thank you!
5
Contact: Wes Lamarque wlamarque@fcgov.com 970-416-2418
Topic: General
Comment Number: 1
05/29/2025: INFORMATION:
No comments.
Response: Noted Thank you!
Department: Water-Wastewater Engineering
Contact: Wes Lamarque wlamarque@fcgov.com 970-416-2418
Topic: General
Comment Number: 1
05/29/2025: INFORMATION:
No comments.
Response: Noted Thank you!
Department: Environmental Planning
Contact: Clint Anders canders@fcgov.com
Topic: General
Comment Number: 1
06/09/2025: INFORMATION:
Environmental Planning has no comments on the lot line adjustment.
Response: Noted Thank you!
Department: Forestry
Contact: Malesa Plumley mplumley@fcgov.com
Topic: General
Comment Number: 1
06/09/2025: INFORMATION:
Forestry has no comments.
Response: Noted Thank you!
Department: Park Planning
Contact: Missy Nelson mnelson@fcgov.com
Topic: General
Comment Number: 1
06/09/2025: INFORMATION:
No comments from Parks O&M or Park Planning and Development.
Response: Noted Thank you!
6
Department: PFA
Contact: Marcus Glasgow marcus.glasgow@poudre-fire.org 970-416-2869
Topic: General
Comment Number: 1
05/29/2025: INFORMATION:
PFA has no comments on the lot line adjustment.
Response: Noted Thank you!
Department: Building Services
Contact: Russell Hovland rhovland@fcgov.com 970-416-2341
Topic: Building Insp Plan Review
Comment Number: 1
06/06/2025: INFORMATION:
If these new property lines locations will affect existing buildings, contact
Building Services to go over fire separation distance requirements.
Response: Building Services will be contacted as necessary.
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970-221-6588
Topic: Plat
Comment Number: 1
06/10/2025: FOR FINAL APPROVAL:
Please make changes as marked in the Technical Services (TS) markup PDF.
If changes are not made or you disagree with comments, please provide written
response of why corrections were not made. Please provide any responses on
redlined sheets and/or in response letter. If you have any specific questions
about the markups, please contact John Von Nieda at 970-221-6565 or jvonnieda@fcgov.com
Response: Responses provided on PDF
Department: Outside Agencies
Contact: Cheryl Smith, Larimer County Assessor, smithcl@co.larimer.co.us
Topic: General
Comment Number: 1
05/23/2025: INFORMATION / QUESTION:
There are no Tax Liens or issues at this time.
Currently we are showing Mulberry Development LLC as the owner for both
parcels. The Plat is showing a signature block for Hartford Construction LLC -
is that correct?
Response: Both signatures left due to title commitment language.