Loading...
HomeMy WebLinkAboutSupporting Documentation - 07/15/20253201 East Mulberry, Unit Q – P.O. Box 1518 • Fort Collins, Colorado 80522 Phone (970) 498-0604 •Fax (970) 498-0701 •www.boxeldersanitation.org July 15, 2025 City of Fort Collins Planning & Development Services Brandy Bethurem Harras 281 N College Ave Fort Collins, CO 80524 RE: Case Number: PDP230015 Title: Prospect Ridge Multifamily – Lot 1 Engineering/Survey: Kimley-Horn & Associates – Andy Reese Applicant: Pacific North Enterprises, LLC - Bryan Byler Parcel Number(s): Boxelder Sanitation District (BSD) has reviewed the proposed project identified as: Project to develop 228 multifamily residential units at the NE corner of the Prospect Rd and I- 25 interchange. 228 Multifamily dwelling units across six 4-story buildings. Includes 314 parking stalls, pool and an amenity/clubhouse building at the NE corner of the site. The property is within the General Commercial District (C-G) zone district. The District hereby advises as follows:  There is no objection to this proposal.  Responses required to comments below.  The District will respond at the hearing date of ______________. Comments: 1) Standalone easement will be required for all sewers that are not located in the public R.O.W. The easements are necessary to address access and maintenance issues that are not included on the plat. Standard easement width for Boxelder is 30-feet. . Perpetual easement agreement has been provided to applicant. 2) Show curb distances and distances of sewer easements for proposed sanitary sewer on utility plan. 3) Applicant shall provide drawings and specifications describing how pool drains and mechanical systems connect to the sewer. It will be necessary to incorporate a sampling manhole for future sampling of pool discharge. The District will not own the manhole and it does not need to be in a defined District easement. A possible alternative will be to provide a design that utilizes an air gap for sampling. Regardless of the sampling method, future access will be required for sampling as needed. If the Applicant has any proposed substitutes or modifications, the District will review them. 4) Provide information on kitchen and bathroom facilities for any communal facilities or restaurants. 5) Sanitary sewer service lines shall be perpendicular to sanitary sewer mains. 6) Sanitary sewer service lines shall not terminate in manholes. We look forward to reviewing future submittals on this project. Please feel free to contact me if you have any questions. Sincerely, Daniel Richardson, PE District Engineer