June 27, 2025
Mason Smith
St Peter Evangelical Lutheran Church
4610 HOGAN DR
Fort Collins, CO 80525
RE: Fairway Estates Fifth Filing, BDR250013, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Fairway Estates Fifth Filing. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Seth Goldstein via email at sgoldstein@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Seth Goldstein sgoldstein@fcgov.com
Topic: General
Comment Number: 1
INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Comment Number: 2
SUBMITTAL:
As part of your submittal, a response to the comments provided in this letter and
a response to plan markups is required. The final letter is provided to you in
Microsoft Word format. Please use this letter to insert responses to each
comment for your submittal, using a different font color. Please use the markups
to insert responses to each comment on plans. Please do not flatten markup responses.
Provide a detailed response for any comment asking a question or requiring an
action. Any comment requesting a response or requiring action by you with a
response of noted, acknowledged etc. will be considered not addressed. You
will need to provide references to specific project plans, pages, reports, or
explanations of why comments have not been addressed [when applicable].
2
Comment Number: 3
SUBMITTAL:
Correct file naming is required as part of a complete submittal. Please follow
the Electronic Submittal Requirements and File Naming Standards found here:
https://www.fcgov.com/developmentreview/files/electronic-submittal-requiremen
ts-and-file-naming-standards_v1_8-1-19.pdf?1703783275
File names should have the corresponding number, followed by the file type
prefix, project information, and round number.
For example: 1_SITE PLAN_Project Name_FDP_Rd1.
A list of numbers and prefixes for each file can be found at the link above.
Comment Number: 4
SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be
removed from the PDF’s.AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the PDF file.
The default setting is "1" ("on") in AutoCAD. To change the setting and remove
this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and
newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-AutoCAD.html
Comment Number: 5
SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are preparing to resubmit your
plans, please notify me with an expected submittal date with as much advanced notice as possible
Comment Number: 6
INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project.
Comment Number: 7
INFORMATION:
ANY project that requires four or more rounds of review would be subject to an additional fee of $3,000.00.
Comment Number: 8
NOTICE:
A Development Review sign will be posted on the property. This sign will be
posted through the final decision and appeal process. A request for the removal
of signs will be made by your Development Review Coordinator at the appropriate time.
Comment Number: 9
FOR APPROVAL:
The Director will make a decision to either approve, approve with conditions, or
deny the application. This decision will be based on whether the proposal
meets the requirements outlined in Step 8 of the Common Development Review
Procedures (Section 6.3.8).
We will send a written decision to the applicant, any individuals who provided
comments during the review period, and nearby property owners. The decision
will also be posted on the City’s website at fcgov.com/developmentreview/proposals
3
Comment Number: 10
FOR APPROVAL:
Once the decision has been finalized by the Director, there is a two-week
appeal period from the date of the signed decision. The project is not able to be
recorded until it is confirmed there are no appeals.
Comment Number: 11
FOR APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information when we
are closer to this step.
King Surveyors has updated the plat per notes and markups of the city and that has been resubmitted.
Department: Planning Services
Contact: Kayla Redd kredd@fcgov.com 970-224-6086
Topic: General
Comment Number: 1
06/24/2025: FOR APPROVAL - SITE PLAN
A site plan is required for this project. Please show property lines, outlines of
the existing structures, critical dimensions, a land use table, a signature block,
and standard site plan notes. List the standards involved in site plan note #6
regarding modifications of standards.
Please include the language, "Structures demonstrate existing conditions for
illustrative purposes. Not intended to require exact location as shown."
King Surveyors is working on Site Plan. A property binder will be required for them to be able to complete,
that has been ordered and is in process. King has updated the plat per notes and markups of the city and that has been
resubmitted.
Comment Number: 2
06/24/2025: FOR APPROVAL
Please work with Planning Staff regarding the language for the Modification of Standard requests.
Department: Historic Preservation
Contact: Jim Bertolini jbertolini@fcgov.com 970-416-4250
Topic: General
Comment Number: 1
06/05/2025: NO HISTORIC REVIEW REQUIRED:
This proposal does not require historic review because there are no designated
historic resources on the site and the nature of the project does not impact any
historic resources that may lie on the development site or within 200 feet of the site.
Department: Engineering Development Review
Contact: Tim Dinger tdinger@fcgov.com
Topic: General
Comment Number: 1
4
06/04/2025: FOR APPROVAL:
Utility easements are required to be dedicated adjacent to the ROW of public
streets, per LCUASS. Redlines have been provided on the plat. A 9-ft width UE
is required adjacent to Hogan Drive, and a 15-ft width UE is required adjacent
to Harmony Road.
Comment Number: 2
06/04/2025: INFORMATION:
Per the plat, approximately 22 feet of additional ROW was dedicated to CDOT
through a deed recorded at Book 1430, Page 306. Therefore, no additional
ROW is required to be dedicated.
Department: Traffic Operation
Contact: Steve Gilchrist sgilchrist@fcgov.com 970-224-6175
Topic: General
Comment Number: 1
06/04/2025: INFORMATION: TIS waived in Conceptual Review. Traffic
Operations has no other comments at this time.
Department: Stormwater Engineering
Contact: Basil Hamdan bhamdan@fcgov.com 970-222-1801
Topic: Erosion Control
Comment Number: 2
06/24/2025: INFORMATION:
Sine no improvements are proposed, there are no Erosion Control
requirements for this site.
Contact: Derek Lutz dlutz@fcgov.com 970-221-6339
Topic: General
Comment Number: 1
06/20/2025: INFORMATION:
Water Utilities will not require further documentation of the drainage path
between the church and the parsonage. I just wanted to point out that the church
could be liable if stormwater runoff from the church were to cause damage to
the parsonage once the separate lot is created. This should not be a concern if
the existing grade prevents church runoff from reaching the parsonage.
Department: Water-Wastewater Engineering
Contact: Derek Lutz dlutz@fcgov.com 970-221-6339
Topic: General
Comment Number: 1
06/20/2025: NO COMMENTS
Department: Light And Power
Contact: Daniel Paluzzi dpaluzzi@fcgov.com
Topic: General
Comment Number: 1
5
06/18/2025: INFORMATION:
It is the understanding of Light and Power that this minor subdivision will not
cause a change to the electric capacity needs or the location of our facilities. If
this an incorrect understanding or if plans change, please contact me directly at
dpaluzzi@fcgov.com or (970)221-6799. Thank you.
There will be no change to the electrical capacity.
Department: Environmental Planning
Contact: Kristie Raymond kraymond@fcgov.com
Topic: General
Comment Number: 1
06/02/2025: No comments.
Department: Park Planning
Contact: Missy Nelson mnelson@fcgov.com
Topic: General
Comment Number: 1
06/24/2025: No comments from Parks O&M or Park Planning & Development.
Thank you.
Department: PFA
Contact: Marcus Glasgow marcus.glasgow@poudre-fire.org 970-416-2869
Topic: General
Comment Number: 1
06/12/2025: PFA has no comments on the lot subdivision.
Department: Internal Services
Contact: Russell Hovland rhovland@fcgov.com 970-416-2341
Topic: Building Insp Plan Review
Comment Number: 1
06/16/2025: It's not clear what is happening with this re-plat/change. Any new
property lines must be 5ft from existing residential structures and 10ft from PL
for existing commercial structures to maintain fire separation distance. Contact
Russ in Building Services to verify new PL locations to create violations for
existing buildings.
New plat should have details outlining this and all requirements of setback are met.
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970-221-6588
Topic: Plat
Comment Number: 1
06/24/2025: FOR APPROVAL:
Please make changes as marked in the Technical Services (TS) markup PDF.
If changes are not made or you disagree with comments, please provide written
response of why corrections were not made. Please provide any responses on
6
redlined sheets and/or in response letter. If you have any specific questions
about the markups, please contact John Von Nieda at 970-221-6565 or
jvonnieda@fcgov.com
This should be addressed in the updated plat.