Subject: AT&T WCF - 2602 S Timberline Road, BDR250014, Round Number 1
Thank you for your comments regarding the proposed telecommunications facility at 2602 S Timberline
Rd. In response to said comments, the drawings have been revised to reflect the requested corrections. All
changes to the drawings have been listed here.
Drawing Correction items:
Development Review Coordinator
Comment Number: 9
The formatting of the date fill in on the Signature Block of the title sheet has been modified to only
include: “on this day,_____.”
Planning Services
Comment Number: 1
• 4.3.5(H)(4)(b) WCFs
o On sheet Z-3, a cornice has been added into the elevation views of the proposed antenna
shrouds to mimic the existing building façade parapet.
o The materials of the existing building the shrouds are intended to match are called out on
sheet Z-3. The Alpha, Beta, and Delta sectors will mimic the existing building CMU
façade. The Gamma sector will mimic the existing red brick façade.
• 4.3.5(H)(4)(d) Collocated or attached WCFs
o The colors of the materials of the existing building the shrouds intended to match are
called out on sheet Z-3. The Alpha, Beta, and Delta sectors will mimic the existing
building CMU façade with a cornice on top to mimic the existing building parapet. The
Gamma sector will mimic the existing red brick façade with a cornice on top to mimic the
existing building parapet.
o The proposed antenna shrouds are shown as 12’ taller than the roof height.
• 4.3.5(H)(4)(e) Landscaping
o The proposed ground equipment is located in the building’s loading dock area behind
existing screen walls on the property. We will also be adding our own CMU screen wall
to hide the proposed ground equipment from view. The area surrounding the proposed
DESIGN REVIEW
RESPONSE LETTER
July 23, 2025
Page 2 of 2
4570 Ivy Street, Suite B-100, Denver, CO 80216 o) 303.566.9914
www.tepgroup.net
CMU wall is all concrete sidewalk and asphalt parking.
• 4.3.5(H)(4)(i) Color
o The colors of the materials of the existing building the shrouds intended to match are
called out on sheet Z-3. The Alpha, Beta, and Delta sectors will mimic the existing
building CMU façade with a cornice on top to mimic the existing building parapet. The
Gamma sector will mimic the existing red brick façade with a cornice on top to mimic the
existing building parapet.
• 4.3.5(H)(4)(j) Lighting
o There will not be any lighting proposed
• 4.3.5(H)(4)(r) Compatibility Required
o The intent of the antenna shrouds is to blend with the existing building architecture by
mimicking the CMU and red brick facades respective to each shroud’.
• Photosims
o The photosims have been adjusted to show more detail in matching the existing building
façade and materials. The Alpha, Beta, and Delta sectors will mimic the existing building
CMU façade with a cornice on top to mimic the existing building parapet. The Gamma
sector will mimic the existing red brick façade with a cornice on top to mimic the existing
building parapet.
Comment Number: 2
On sheet Z-3, a cornice has been added into the elevation views of the proposed antenna shrouds to
mimic the existing building façade parapet.
Comment Number: 3
Photosims have been adjusted to be more detailed and to include the specific building façade
materials as well as the cornice in the proposed antenna shrouds.
Comment Number: 4
The antenna shroud heights on sheet Z-3 have been adjusted to be 12’ taller than the roof height based
on field collected elevation data.
Comment Number: 5
The wall height is called out as 6’-tall in the Scope of Work section on the Title sheet, as well as the
Compound Elevation, Detail D, on sheet Z-3.
Technical Services
Comment Number: 1
The Index of Sheets on the Title Sheet has been modified to include all sheets and their respective labels.
1
Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov.com/developmentreview
July 11th, 2025
Steve Kelly
Powder River Development
1660 S Albion St, Suite 317
Fort Collins, CO 80222
RE: AT&T WCF - 2602 S Timberline Road, BDR250014, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of AT&T WCF - 2602 S Timberline Road. If you have questions
about any comments, you may contact the individual commenter or direct your questions
through your Development Review Coordinator, Marissa Pomerleau via phone at (970)
416-8082 or via email at mpomerleau@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Marissa Pomerleau mpomerleau@fcgov.com (970) 416-8082
Topic: General
Comment Number: 1
06/23/2025: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Comment Number: 2
06/23/2025: SUBMITTAL:
As part of your submittal, a response to the comments provided in this letter and
a response to plan markups is required. The final letter is provided to you in
Microsoft Word format. Please use this letter to insert responses to each comment
for your submittal, using a different font color. Please use the markups to insert
responses to each comment on plans. Please do not flatten markup responses.
2
Provide a detailed response for any comment asking a question or requiring an
action. Any comment requesting a response or requiring action by you with a
response of noted, acknowledged etc. will be considered not addressed. You
will need to provide references to specific project plans, pages, reports, or
explanations of why comments have not been addressed [when applicable].
Comment Number: 3
06/23/2025: SUBMITTAL:
Correct file naming is required as part of a complete submittal. Please follow
the Electronic Submittal Requirements and File Naming Standards found here:
https://www.fcgov.com/developmentreview/files/electronic-submittal-requiremen
ts-and-file-naming-standards_v1_8-1-19.pdf?1703783275
-Applicant believes required naming standards have been met.
File names should have the corresponding number, followed by the file type
prefix, project information, and round number.
For example: 1_SITE PLAN_Project Name_FDP_Rd1.
A list of numbers and prefixes for each file can be found at the link above.
Comment Number: 4
06/23/2025: SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and
remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be
removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set, and
these must be removed prior to submittal as they can cause issues with the PDF file.
The default setting is "1" ("on") in AutoCAD. To change the setting and remove
this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and
newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-Aut
oCAD.html
-AE consultant has or is using optimized /flattened PDF versions for drawings.
Comment Number: 5
06/23/2025: SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are preparing to resubmit your
plans, please notify me with an expected submittal date with as much advanced
notice as possible.
Comment Number: 6
06/23/2025: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project.
Comment Number: 7
06/23/2025: INFORMATION:
ANY project that requires four or more rounds of review would be subject to an
additional fee of $3,000.00.
3
Comment Number: 8
06/23/2025: NOTICE:
A Development Review sign will be posted on the property. This sign will be posted
through the final decision and appeal process. A request for the removal of signs
will be made by your Development Review Coordinator at the appropriate time.
Comment Number: 9
06/23/2025: FOR RECORDING – PLANNING SET:
Could you please update the City signature blocks on the Planning Set? Instead
of using "this _______ day of ______A.D., 20____," could you opt for "on this
day, ____________" for the date? This alternative format facilitates smoother
date input with digital signatures.
Additionally, kindly ensure there is sufficient space between the signature line
and the title line to accommodate the digital signature.
Comment Number: 10
06/23/2025: FOR APPROVAL:
The Director shall issue a written decision to approve, approve with conditions,
or deny the development application based on compliance with the standards
referenced in Step 8 of the Common Development Review Procedures
(Section 6.3.8).
The written decision shall be mailed to the applicant, to any person who
provided comments during the comment period and to the abutting property
owners and shall also be posted on the City's website at
fcgov.com/developmentreview/proposals
Comment Number: 11
06/23/2025: FOR APPROVAL:
Once the decision has been finalized by the Director, there is a two-week
appeal period from the date of the signed decision. The project is not able to be
recorded until it is confirmed there are no appeals.
Comment Number: 12
06/23/2025: FOR APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information when we
are closer to this step.
Department: Planning Services
Contact: Jill Baty jbaty@fcgov.com
Topic: General
Comment Number: 1
07/07/2025: FOR APPROVAL - DEMONSTRATE MATCHING:
Please provide evidence showing compliance with Land Use Code sections
4.3.5(H)(4)(b), 4.3.5(H)(4)(d), 4.3.5(H)(4)(e), 4.3.5(H)(4)(i), 4.3.5(H)(4)(j),
4.3.5(H)(4)(r).
The Narrative and Comment Response files both say that the screen boxes are
4
planned to be of a texture and color to match and blend with the existing
building, but no documentation or evidence of this has been provided.
Please provide drawings and/or elevations that demonstrate compliance and
answer some of these questions:
- It is difficult to tell on the photo sims whether the screen boxes will match the
yellowish-tan of the penthouse/EFIS parts of the building or the light pinkish-tan
of the CMU, and it looks different in each view. What color will these boxes be?
- The building has quite a number of textures. Which will the screen boxes
match? The EFIS stucco system, the CMU blocks, the brick work, the tile work?
If the texture is intended to match the EFIS system, please include striping to
match the EFIS striping and cornices on the building.
Please see attached letter from AE in response to comment
Comment Number: 2
07/07/2025: FOR APPROVAL - CORNICE TREATMENT:
Please provide a cornice treatment on the screen boxes that matches or
speaks to the cornice treatments on the building itself. Please ensure that these
cornice treatments are shown in the drawings and/or elevations required in the
above comment. Please also ensure that these cornice treatments are shown in
the photo sims.
Please see attached letter from AE in response to comment
Comment Number: 3
07/07/2025: FOR APPROVAL - PHOTO SIMS:
-Please provide photo sims that are close enough and not pixilated to see the
proposed screening in sufficient detail to determine compliance with our standards.
-Please ensure that all of the equipment that would be visible from a particular
angle is shown on the photo sims. For example, on page 5, two of the boxes
(NW/ Alpha and SW/Delta) would be visible from this vantage point but only one
(SW/Delta) is shown. This is also the case on page 3. Page 7 shows two of the
boxes; the third would probably also be visible from this vantage point and
should be shown.
Please see attached letter from AE in response to comment
Comment Number: 4
07/07/2025: FOR APPROVAL - EQUIPMENT HEIGHT:
The elevations provided show that the antenna shrouds are proposed to be 12
feet taller than the building parapets. However, our standards speak to the
height of the antenna shrouds above the roof itself. Please provide information
on the height of the roof on these drawings and on how tall the antenna shrouds
are above the roof.
Please see attached letter from AE in response to comment
Comment Number: 5
07/07/2025: FOR APPROVAL - GROUND EQUIPMENT SCREENING WALL
HEIGHT:
Please call out the height of the proposed ground-level CMU screening wall in
your narrative and on the plan set. If the CMU wall is as high as the darker
horizontal striping, please make sure that the wall includes the striping as well.
Please see attached letter from AE in response to comment
5
Comment Number: 6
07/07/2025: FOR APPROVAL - EVIDENCE FOR REQUESTED LOCATION:
Please provide evidence as to why the equipment cannot be located further
back from the edge of the roof. This evidence could include a diagram of how
the array would emit signals. It could also include a structural report showing the
strength of the roof to support the equipment and screening.
-The antennas/ and screen boxes cannot be further from the edge because of structural integrity of
the grocery store roof. Strongest structural location is at or near corners. Also, from an RF
engineering perspective the coverage objectives and quality of coverage for this site would be
diminished if 10’ or further back (see attached coverage prediction maps). To match the
coverage quality at roof edge would require a 20 foot tall structure. A structural analysis is in
process and should be available soon and will be submitted along with final construction
drawings when the structural report is complete. Coverage prediction plot map is attached
Comment Number: 7
07/07/2025: FOR APPROVAL - ENGINEER CREDENTIALS:
Please provide a written statement from a qualified radio frequency engineer
certifying that a technical evaluation of existing and proposed facilities indicates
no potential interference problems. The letter provided does not contain a seal
or signature of a Colorado professional engineer, as is required. Then content
of the letter looks fine. – A stamped letter is attached.
Comment Number: 8
07/07/2025: FOR APPROVAL - ENGINEER CREDENTIALS:
Is Troy Johnson a qualified radio frequency engineer? Is this what "Senior RAN
Engineer" means? Please provide more evidence that is understandable to
anyone outside of your specific field, or make sure that this letter comes from
someone with the appropriate credentials. The content of the letter looks fine.
-A stamped letter is attached
Department: Engineering Development Review
Contact: Tim Dinger tdinger@fcgov.com
Topic: General
Comment Number: 1
07/02/2025: FOR APPROVAL:
The Light & Power department is requiring a new transformer to provide 1
phase power for the project. The transformer will need to be within a utility
easement. Coordinate with Light & Power to determine the location of the new
transformer, and then have a licensed surveyor prepare a legal description and
sketch for the easement. All easement materials, including a review fee, need to
be submitted with Round 2. More information about the easement dedication
process is available at
6
https://www.fcgov.com/engineering/devrev#cb-38308-6601
-applicant will provide all required documents and will contact Light and Power regarding
scheduling a site walk to determine power needs, capability and to address Mr. Dominick’s comments
Department: Historic Preservation
Contact: Jim Bertolini jbertolini@fcgov.com 970-416-4250
Topic: General
Comment Number: 1
06/23/2025: NO HISTORIC REVIEW REQUIRED:
This proposal does not require historic review because there are no designated
historic resources, or resources that are at least 50 years old and would require
evaluation, on the development site or within 200 feet of the development site.
Department: Traffic Operation
Contact: Steve Gilchrist sgilchrist@fcgov.com 970-224-6175
Topic: General
Comment Number: 1
07/07/2025: Traffic Operations has no comments at this time. TIS waived previously.
Department: Stormwater Engineering – Erosion Control
Contact: Basil Hamdan bhamdan@fcgov.com 970-222-1801
Topic: Erosion Control
Comment Number: 1
07/07/2025: INFORMATION:
No comments from Erosion and Sediment Control as the site disturbs less than
10,000 sq. ft.
Department: Stormwater Engineering – Water Utilities
Contact: Wes Lamarque wlamarque@fcgov.com 970-416-2418
Topic: General
Comment Number: 2
07/08/2025: INFORMATION:
No comments from Stormwater Utility.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque wlamarque@fcgov.com 970-416-2418
Topic: General
Comment Number: 1
07/08/2025: INFORMATION:
No comments from Water/Wastewater Utility.
7
Department: Light And Power
Contact: Doug Dominick ddominick@fcgov.com
Topic: Fees
Comment Number: 5
06/30/2025: INFORMATION: The service to the equipment will be considered a
commercial service; therefore, the applicant is responsible for installing the
secondary service from the transformer, or first point of connection to the
meter(s) and will be owned and maintained by the individual equipment owner.
Topic: General
Comment Number: 1
06/30/2025: INFORMATION: The existing transformer feeding King Soopers
provides 3 phase 277/480V power. In order to provide the requested 1 phase
120/240V power, a new transformer will be need to be installed.
Comment Number: 2
06/30/2025: INFORMATION: Transformer locations will need to be coordinated
with Light & Power. Transformers must be placed within 10 ft of a drivable
surface for installation and maintenance purposes. The transformer must also
have a front clearance of 10 ft and side/rear clearance of 3 ft minimum. The
transformer must have 2 ft clearance from sidewalks and from the front face of
the curb face. When located close to a building, please provide required
separation from building openings as defined in Figures ESS4 - ESS7 within
the Electric Service Standards. The transformer can likely be installed adjacent
to the existing transformer feeding King Soopers.
Comment Number: 3
06/30/2025: FOR APPROVAL: A commercial service information form (C-1
form) and a one line diagram for all commercial meters will need to be
completed and submitted to Light & Power Engineering for review. A C-1 form
can be found here: https://www.fcgov.com/utilities/business/builders-and-
developers/development-forms-guidelines-regulations
Comment Number: 4
06/30/2025: FOR APPROVAL: Meter location(s) will need to be coordinated
with Light and Power. Please show proposed meter location on the utility plan.
Reference Section 8 of our Electric Service Standards for electric metering
standards. A link has been provided below.
https://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStanda
rds_FINAL_18November2016_Amendment.pdf
Comment Number: 6
06/30/2025: INFORMATION: Electric capacity fees, development fees, building
site charges and any system modification charges necessary to feed the site
will apply to this development. All charges related to extending primary wire and
setting transformer will be at the developer's expense. Please contact me to
discuss development fees or visit the following website for an estimate of
charges and fees related to this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Comment Number: 7
8
06/30/2025: INFORMATION: Any existing and/or proposed Light and Power
electric facilities that are within the limits of the project must be located within a
utility easement or public right-of-way. The utility easement for the transformer
shall extent 3 feet past all sides of the transformer pad.
Department: Environmental Planning
Contact: Clint Anders canders@fcgov.com
Topic: General
Comment Number: 1
07/08/2025: INFORMATION: There doesn't appear to be any changes to the
landscape or surrounding trees. Environmental Planning does not have any site
specific comments at this time. Please route EP for future reviews if anything
changes to the landscape adjacent to the building.
Comment Number: 2
07/08/2025: FOR APPROVAL: During the conceptual review for this project,
the applicant stated that the rooftop infrastructure was screened in a way that
would prevent raptors and songbirds from nesting in the infrastructure. Please
confirm in your comment response that this is still the case. Please reference
the plan note or detail that shows the infrastructure as enclosed for wildlife.
Thank you.
Department: PFA
Contact: Marcus Glasgow marcus.glasgow@poudre-fire.org 970-416-2869
Topic: General
Comment Number: 1
07/08/2025: PFA has no comments on the installation of the rooftop cellular towers.
Department: Internal Services
Contact: Russell Hovland rhovland@fcgov.com 970-416-2341
Topic: Building Insp Plan Review
Comment Number: 1
06/30/2025: A new communication tower requires and building permit and
must be designed to meet the current 35 psf ground snow load and 140mph
wind load. New towers and/or antenna mounted to buildings must provided
engineered plans to show connection of this equipment meets the above
loading requirements.
Monday, June 23, 2025
4:41 PM
A permit is required for new equipment added to a existing communications
tower. If older equipment is replaced in the same location and is similar size
and lighter or same weight does not required a permit.
-A building permit application including stamped signed drawings, will be submitted upon completion of a
rooftop mapping and subsequent Structural report,
9
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970-221-6588
Topic: General
Comment Number: 1
07/02/2025: FOR FINAL APPROVAL:
There are sheets in the plan set missing from the sheet index.
-All sheets including equipment specs for antennas, cabinets and cabling will be part of final Cd’s
Department: Outside Agencies
Contact: Jacy McNulty, Larimer County Planning
Topic: General
Comment Number: 1
07/09/2025: INFORMATION:
Larimer County does not have any concerns with this project.