Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Plans - Architectural Elevation Plan - 02/06/2019
CHURCH MAIN LEVEL 5037'-0" CHURCH 2ND LEVEL 5053'-4" CHURCH TRANSEPT ROOF BRG 5066'-4" RECTORY LOWER LEVEL 5027'-6" CAST STONE PARAPET CAP ELEVATOR CORE, COVERED BY WHITE ROOF MEMBRANE CAST STONE CORBEL & ARCH CAST STONE CROSS CAST STONE MEDALLION BRICK CORBELLING CAST STONE BASE AND ARCHES BRICK COURSING BRICK CORBELLINGCAST STONE STATUARY NICHE STONE CORNICE CLAY TILE ROOF STONE COLUMNS, CAST STONE ARCHES BRICK BANDING 1 BRICK BANDING 2 METAL CLAD WOOD WINDOW W/CAST STONE TRIM BRASS CLAD ENTRY DOORS CAST STONE MEDALLION STONE VENEER BASE CLAY TILE ROOF CAST STONE CROSS CAST STONE ELEMENT BRASS CLAD ENTRY DOORS METAL CLAD WOOD WINDOWS METAL CROSS 5119'-5" 5069'-3" 5077'-8" PREFINISHED GUTTERS PREFINISHED DOWNSPOUTS MATERIAL CAST STONE PARAPET CAP BRICK CORBEL TILE ROOF STONE CORNICE CAST STONE ARCH CAST STONE FRAME BRICK CORNICE BRICK COURSING ROOF FASCIA GUTTER CAST STONE MEDALLION STONE VENEER BASE BRICK BANDING 1 BRICK BANDING 2 CAST STONE STATUARY CORBEL ARCHES LANDSCAPE RETAINING WALL CAST STONE CROSS STONE COLUMNS, CAST STONE ARCHES PRECAST ARCHWAY FRAME METAL SCREEN CAST STONE CAP STONE TRANSITION COLOR LIMESTONE ACME BRICK SMOOTH RIDGEMAR LUDOWICI ROOF TILE - CLAY RED TAN DAVIS CONCRETE COLOR - OUTBACK TAN ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR PAINT - DARK BRONZE PREFINISHED - DARK BRONZE DAVIS CONCRETE COLOR - OUTBACK LIMESTONE ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK LIMESTONE / DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK PREFINISHED - DARK BRONZE LIMESTONE LIMESTONE EXTERIOR FINISH SCHEDULE ISSUE DATE: PROJECT NO: SCALE: © INTEGRATION DESIGN GROUP PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SAINT JOHN XXIII CATHOLIC CHURCH As indicated BUILDING ELEVATIONS 1516 02/06/19 AE1 1/8" = 1'-0"1 WEST ELEVATION - CHURCH CHURCH MAIN LEVEL 5037'-0" CHURCH 2ND LEVEL 5053'-4" CHURCH LOWER LEVEL 5022'-9 1/2" CHURCH TRANSEPT ROOF BRG 5066'-4" RECTORY LOWER LEVEL 5027'-6" RECTORY SECOND LEVEL 5047'-8" RECTORY THIRD LEVEL 5058'-4" CAST STONE CROSS METAL CLAD WOOD WINDOW W/ CAST STONE TRIM BRICK COURSING BRICK BANDING 1 STONE CORNICE STONE COLUMNS, CAST STONE ARCHES PAINTED STEEL GARAGE DOOR LANDSCAPE RETAINING WALL CAST STONE PARAPET CAP CAST STONE MEDALLION BRICK CORBELLING PREFINISHED DOWNSPOUT PREFINISHED GUTTER CLAY TILE ROOF STONE TRANSITIONSTONE VENEER BELOW MAIN LEVEL 5082'-11" 5060'-8" 5063'-10" MATERIAL CAST STONE PARAPET CAP BRICK CORBEL TILE ROOF STONE CORNICE CAST STONE ARCH CAST STONE FRAME BRICK CORNICE BRICK COURSING ROOF FASCIA GUTTER CAST STONE MEDALLION STONE VENEER BASE BRICK BANDING 1 BRICK BANDING 2 CAST STONE STATUARY CORBEL ARCHES LANDSCAPE RETAINING WALL CAST STONE CROSS STONE COLUMNS, CAST STONE ARCHES PRECAST ARCHWAY FRAME METAL SCREEN CAST STONE CAP STONE TRANSITION COLOR LIMESTONE ACME BRICK SMOOTH RIDGEMAR LUDOWICI ROOF TILE - CLAY RED TAN DAVIS CONCRETE COLOR - OUTBACK TAN ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR PAINT - DARK BRONZE PREFINISHED - DARK BRONZE DAVIS CONCRETE COLOR - OUTBACK LIMESTONE ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK LIMESTONE / DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK PREFINISHED - DARK BRONZE LIMESTONE LIMESTONE EXTERIOR FINISH SCHEDULE ISSUE DATE: PROJECT NO: SCALE: © INTEGRATION DESIGN GROUP PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SAINT JOHN XXIII CATHOLIC CHURCH As indicated BUILDING ELEVATIONS 1516 02/06/19 AE2 1/8" = 1'-0"1 NORTH ELEVATION - CHURCH CHURCH MAIN LEVEL 5037'-0" CHURCH 2ND LEVEL 5053'-4" CHURCH TRANSEPT ROOF BRG 5066'-4" SONT CORBEL ARCHES CAST STONE ARCH CAST STONE CROSS STAINED GLASS WINDOW IN PREFINISHED METAL FRAME. (PATTERN SHOWN FOR CONCEPTUAL PURPOSES ONLY. FINAL DESIGN TBD.) METAL CLAD WOOD WINDOW W/ CAST STONE TRIM BRICK COURSING CAST STONE PARAPET CAP CAST STONE STATUARY NICHE BRICK CORNICE CLAY TILE ROOF BRICK BANDING 1 BRICK CORNICE CAST STONE PARAPET CAP PREFINISHED GUTTER AND DOWNSPOUT ELEVATOR CORE, COVERED BY WHITE ROOF MEMBRANE 5085'-4" 5062'-7" STONE VENEER STONE TRANSITION MATERIAL CAST STONE PARAPET CAP BRICK CORBEL TILE ROOF STONE CORNICE CAST STONE ARCH CAST STONE FRAME BRICK CORNICE BRICK COURSING ROOF FASCIA GUTTER CAST STONE MEDALLION STONE VENEER BASE BRICK BANDING 1 BRICK BANDING 2 CAST STONE STATUARY CORBEL ARCHES LANDSCAPE RETAINING WALL CAST STONE CROSS STONE COLUMNS, CAST STONE ARCHES PRECAST ARCHWAY FRAME METAL SCREEN CAST STONE CAP STONE TRANSITION COLOR LIMESTONE ACME BRICK SMOOTH RIDGEMAR LUDOWICI ROOF TILE - CLAY RED TAN DAVIS CONCRETE COLOR - OUTBACK TAN ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR PAINT - DARK BRONZE PREFINISHED - DARK BRONZE DAVIS CONCRETE COLOR - OUTBACK LIMESTONE ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK LIMESTONE / DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK PREFINISHED - DARK BRONZE LIMESTONE LIMESTONE EXTERIOR FINISH SCHEDULE ISSUE DATE: PROJECT NO: SCALE: © INTEGRATION DESIGN GROUP PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SAINT JOHN XXIII CATHOLIC CHURCH As indicated BUILDING ELEVATIONS 1516 02/06/19 AE3 1/8" = 1'-0"1 CHURCH - EAST ELEVATION CHURCH MAIN LEVEL 5037'-0" CHURCH 2ND LEVEL 5053'-4" CHURCH TRANSEPT ROOF BRG 5066'-4" BRICK CORBELLINGCLAY TILE ROOF BRICK COURSINGBRICK CORBELLING BRICK BANDING 1 STONE CORNICE STONE COLUMNS, CAST STONE ARCHES LANDSCAPE RETAINING WALL CAST STONE PARAPET CAP ALUMINUM GUTTER BRICK CORBEL ARCHES CAST STONE MEDALLION CAST STONE CROSS METAL CLAD WOOD WINDOW W/ CAST STONE TRIM PREFINISHED DOWNSPOUT BRICK COURSING STONE TRANSITION STONE VENEER MATERIAL CAST STONE PARAPET CAP BRICK CORBEL TILE ROOF STONE CORNICE CAST STONE ARCH CAST STONE FRAME BRICK CORNICE BRICK COURSING ROOF FASCIA GUTTER CAST STONE MEDALLION STONE VENEER BASE BRICK BANDING 1 BRICK BANDING 2 CAST STONE STATUARY CORBEL ARCHES LANDSCAPE RETAINING WALL CAST STONE CROSS STONE COLUMNS, CAST STONE ARCHES PRECAST ARCHWAY FRAME METAL SCREEN CAST STONE CAP STONE TRANSITION COLOR LIMESTONE ACME BRICK SMOOTH RIDGEMAR LUDOWICI ROOF TILE - CLAY RED TAN DAVIS CONCRETE COLOR - OUTBACK TAN ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR PAINT - DARK BRONZE PREFINISHED - DARK BRONZE DAVIS CONCRETE COLOR - OUTBACK LIMESTONE ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK LIMESTONE / DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK PREFINISHED - DARK BRONZE LIMESTONE LIMESTONE EXTERIOR FINISH SCHEDULE ISSUE DATE: PROJECT NO: SCALE: © INTEGRATION DESIGN GROUP PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SAINT JOHN XXIII CATHOLIC CHURCH As indicated BUILDING ELEVATIONS 1516 02/06/19 AE4 1/8" = 1'-0"1 SOUTH ELEVATION - CHURCH CHURCH MAIN LEVEL 5037'-0" NEWMAN CTR MAIN LEVEL 5030'-6" BRICK COURSING CAST STONE CAP METAL SCREENPRECAST ARCHWAY FRAME 5050'-11" MATERIAL CAST STONE PARAPET CAP BRICK CORBEL TILE ROOF STONE CORNICE CAST STONE ARCH CAST STONE FRAME BRICK CORNICE BRICK COURSING ROOF FASCIA GUTTER CAST STONE MEDALLION STONE VENEER BASE BRICK BANDING 1 BRICK BANDING 2 CAST STONE STATUARY CORBEL ARCHES LANDSCAPE RETAINING WALL CAST STONE CROSS STONE COLUMNS, CAST STONE ARCHES PRECAST ARCHWAY FRAME METAL SCREEN CAST STONE CAP STONE TRANSITION COLOR LIMESTONE ACME BRICK SMOOTH RIDGEMAR LUDOWICI ROOF TILE - CLAY RED TAN DAVIS CONCRETE COLOR - OUTBACK TAN ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR PAINT - DARK BRONZE PREFINISHED - DARK BRONZE DAVIS CONCRETE COLOR - OUTBACK LIMESTONE ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK LIMESTONE / DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK PREFINISHED - DARK BRONZE LIMESTONE LIMESTONE EXTERIOR FINISH SCHEDULE CHURCH MAIN LEVEL 5037'-0" NEWMAN CTR MAIN LEVEL 5030'-6" BRICK COURSINGCAST STONE CAPMETAL SCREEN PRECAST ARCHWAY FRAME TRASH ENCLOSURE 5027'-6" 5051'-0" ISSUE DATE: PROJECT NO: SCALE: © INTEGRATION DESIGN GROUP PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SAINT JOHN XXIII CATHOLIC CHURCH As indicated BUILDING ELEVATIONS 1516 02/06/19 AE5 1/8" = 1'-0"2 SOUTH ELEVATION - COVERED WALKWAY 1/8" = 1'-0"1 NORTH ELEVATION - COVERED WALKWAY 2 1 CHURCH MAIN LEVEL 5037'-0" NEWMAN CTR MAIN LEVEL 5030'-6" BRICK COURSING CAST STONE CAP METAL SCREENPRECAST ARCHWAY FRAME 5050'-11" MATERIAL CAST STONE PARAPET CAP BRICK CORBEL TILE ROOF STONE CORNICE CAST STONE ARCH CAST STONE FRAME BRICK CORNICE BRICK COURSING ROOF FASCIA GUTTER CAST STONE MEDALLION STONE VENEER BASE BRICK BANDING 1 BRICK BANDING 2 CAST STONE STATUARY CORBEL ARCHES LANDSCAPE RETAINING WALL CAST STONE CROSS STONE COLUMNS, CAST STONE ARCHES PRECAST ARCHWAY FRAME METAL SCREEN CAST STONE CAP STONE TRANSITION COLOR LIMESTONE ACME BRICK SMOOTH RIDGEMAR LUDOWICI ROOF TILE - CLAY RED TAN DAVIS CONCRETE COLOR - OUTBACK TAN ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR PAINT - DARK BRONZE PREFINISHED - DARK BRONZE DAVIS CONCRETE COLOR - OUTBACK LIMESTONE ACME BRICK SMOOTH RIDGEMAR ACME BRICK SMOOTH RIDGEMAR DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK LIMESTONE / DAVIS CONCRETE COLOR - OUTBACK DAVIS CONCRETE COLOR - OUTBACK PREFINISHED - DARK BRONZE LIMESTONE LIMESTONE EXTERIOR FINISH SCHEDULE CHURCH MAIN LEVEL 5037'-0" NEWMAN CTR MAIN LEVEL 5030'-6" BRICK COURSINGCAST STONE CAPMETAL SCREEN PRECAST ARCHWAY FRAME 5051'-0" 5028'-0" ISSUE DATE: PROJECT NO: SCALE: © INTEGRATION DESIGN GROUP PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SAINT JOHN XXIII CATHOLIC CHURCH As indicated BUILDING ELEVATIONS 1516 02/06/19 AE5 1/8" = 1'-0"2 SOUTH ELEVATION - COVERED WALKWAY 1/8" = 1'-0"1 NORTH ELEVATION - COVERED WALKWAY 2 1 ISSUE DATE: PROJECT NO: SCALE: © INTEGRATION DESIGN GROUP PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SAINT JOHN XXIII CATHOLIC CHURCH 12" = 1'-0" BUILDING PERSPECTIVES 1516 02/06/19 AE6 2 VIEW FROM SOUTHWEST 4 VIEW FROM NORTHWEST 3 VIEW FROM SHIELDS AND UNIVERSITY 1 VIEW FROM NEWMAN CENTER 12" = 1'-0"5 VIEW FROM SOUTHWEST WITH TREES SHOWN 12" = 1'-0"6 VIEW FROM SHIELDS AND UNIVERSITY WITH TREES SHOWN AE7 4 AE7 2 AE7 5 AE7 3 3 YARD TRASH CONTAINER 3 YARD RECYCLING CONTAINER BRICK 1 WALL W/ CMU CORE 9' - 4 " 4' - 4 " 2' - 0 " 12'-0" 15 ' - 8 " PAINTED STEEL GATE PAINTED STEEL DOOR NOTE: TRASH ENLOSURE SERVES CHURCH AND NEWMAN CENTER FUNCTIONS ONLY NEWMAN CTR MAIN LEVEL 5030'-6" TRASH ENCLOSURE 5027'-6" PAINTED STEEL GATE PRECAST CONCRETE CAP 12'-0" 7' - 0 "NEWMAN CTR MAIN LEVEL 5030'-6" TRASH ENCLOSURE 5027'-6" 7' - 0 " 12'-0" BRICK 1 W/ CMU BACKUP WALL PRECAST CONCRETE CAP NEWMAN CTR MAIN LEVEL 5030'-6" TRASH ENCLOSURE 5027'-6" BRICK 1 WALL W/ CMU CORE PRECAST CONCRETE CAP 15'-8"PAINTED STEEL GATE 7' - 0 "NEWMAN CTR MAIN LEVEL 5030'-6" TRASH ENCLOSURE 5027'-6" BRICK 1 WALL W/ CMU CORE PRECAST CONCRETE CAP PAINTED STEEL DOOR 7' - 0 " 9'-4"4'-4"2'-0" 15'-8" ISSUE DATE: PROJECT NO: SCALE: © INTEGRATION DESIGN GROUP PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SAINT JOHN XXIII CATHOLIC CHURCH 1/8" = 1'-0" TRASH ENCLOSURE 1516 02/06/19 AE7 1/8" = 1'-0"1 TRASH ENCLOSURE PLAN 1/8" = 1'-0"2 TRASH - NORTH ELEVATION 1/8" = 1'-0"3 TRASH - SOUTH ELEVATION 1/8" = 1'-0"4 TRASH - EAST ELEVATION 1/8" = 1'-0"5 TRASH - WEST ELEVATION KEYNOTE MATERIALS LIST SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" SOUTH ELEVATION (UNIVERSITY AVENUE)1 0701 09 05 11 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_MET1 Exterior metal panel assembly Color: Grey Annodized (Standing seam or corrugated) (-4" projection, typ.) 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-MET1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" EAST ELEVATION2 04 06 02 01 10 0507 07 02 10 01 01 0304 TOP OF STAIR 178'-8" 03 06 13 13 04 TYPICAL STONE STILL AT WS_MAS1 BASE3 TYPICAL WINDOW CONDITIONS4 04 05 01 02 09 04 11 01 04 07 07 04 04 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 02.06.2019 AW. © 2019 DAVIS PARTNERSHIP, P.C. PRELIMINARY DEVELOPMENT PLAN (PDP)3/32"=1'-0" 1BUILDING A - ELEVATIONS SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" NORTH ELEVATION1 01 090405 07 04 03 02 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" WEST ELEVATION2 TOP OF STAIR 178'-8" TOP OF STAIR 178'-8" 10 010704 01011004 11 10 10 04 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 02.06.2019 AW. © 2019 DAVIS PARTNERSHIP, P.C. PRELIMINARY DEVELOPMENT PLAN (PDP)3/32"=1'-0" 2BUILDING A - ELEVATIONS KEYNOTE MATERIALS LIST 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_MET1 Exterior metal panel assembly Color: Grey Annodized (Standing seam or corrugated) (-4" projection, typ.) 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-MET1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill VIEW LOOKING NORTHEAST2 VIEW LOOKING NORTHWEST1 VIEW LOOKING SOUTHEAST3 VIEW LOOKING SOUTHWEST4 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 02.06.2019 AW. © 2019 DAVIS PARTNERSHIP, P.C. PRELIMINARY DEVELOPMENT PLAN (PDP)N.T.S. 3BUILDING A - PERSPECTIVES KEYNOTE MATERIALS LIST SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" SOUTH ELEVATION (UNIVERSITY AVENUE)1 04 01 04 02 05 09 06 07 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" EAST ELEVATION2 04 07 06 05 0104 03 10 03 08 02 10 TOP OF STAIR 178'-8" 02 05 02 10 13 13 05 04 05 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 02.06.2019 PRELIMINARY DEVELOPMENT PLAN (PDP)3/32"=1'-0" 4BUILDING B - ELEVATIONS 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_MET1 Exterior metal panel assembly Color: Grey Annodized (Standing seam or corrugated) (-4" projection, typ.) 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-MET1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" NORTH ELEVATION1 04 09 07 05 07 04 03 02 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" WEST ELEVATION2 TOP OF STAIR 178'-8" TOP OF STAIR 178'-8" 10 10 040905 010704 11 04 04 04 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 02.06.2019 PRELIMINARY DEVELOPMENT PLAN (PDP)3/32"=1'-0" 5BUILDING B - ELEVATIONS KEYNOTE MATERIALS LIST 11 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_MET1 Exterior metal panel assembly Color: Grey Annodized (Standing seam or corrugated) (-4" projection, typ.) 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-MET1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill 01 02 VIEW LOOKING NORTHEAST2 VIEW LOOKING NORTHWEST1 PERSPECTIVE LOOKING NORTHWEST3 PERSPECTIVE LOOKING NORTH4 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 02.06.2019 PRELIMINARY DEVELOPMENT PLAN (PDP)N.T.S. 6BUILDING B - PERSPECTIVES KEYNOTE MATERIALS LIST SOUTH ELEVATION (UNIVERSITY AVENUE)1 04 0110 02 05 09 EAST ELEVATION2 01 06 06 07 01 06 04 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" TOP OF STAIR 183'-2" SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" TOP OF STAIR 183'-2" 02 09050104 04 07 06 01100405 03 101010 12 10 02 13 05 11 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 02.06.2019 PRELIMINARY DEVELOPMENT PLAN (PDP)3/32"=1'-0" 7BUILDING C - ELEVATIONS 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_MET1 Exterior metal panel assembly Color: Grey Annodized (Standing seam or corrugated) (-4" projection, typ.) 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-MET1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill NORTH ELEVATION1 01 0901050704 06 02 WEST ELEVATION2 10 040901 010704 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" TOP OF STAIR 183'-2" SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" TOP OF STAIR 183'-2" 10 020406 03 0905 101004 02 01 06 10 12 05 04 13 11 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 02.06.2019 PRELIMINARY DEVELOPMENT PLAN (PDP)3/32"=1'-0" 8BUILDING C - ELEVATIONS KEYNOTE MATERIALS LIST 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_MET1 Exterior metal panel assembly Color: Grey Annodized (Standing seam or corrugated) (-4" projection, typ.) 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-MET1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill VIEW LOOKING SOUTHWEST2 VIEW LOOKING SOUTHEAST1 VIEW LOOKING NORTHWEST3 VIEW LOOKING NORTHEAST4 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 02.06.2019 PRELIMINARY DEVELOPMENT PLAN (PDP)N.T.S. 9BUILDING C - PERSPECTIVES ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING SOLAR STUDY 18923.00.000 02/06/19 AW.10 2019 PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SOLAR SHADOW STUDY ON 3.21 AT 8AM, 12PM, & 5PMSOLAR SHADOW STUDY ON 6.21 AT 8AM, 12PM, & 5PM SOLAR SHADOW STUDY ON 12.21 AT 6AM, 12PM, & 4PMSOLAR SHADOW STUDY ON 9.21 AT 8AM, 12PM, & 5PM UNIVERSITY AVENUE S. S H I E L D S S T R E E T CI T Y P A R K A V E N U E WEST ELIZABETH STREET UNIVERSITY AVENUE S. S H I E L D S S T R E E T CI T Y P A R K A V E N U E WEST ELIZABETH STREET UNIVERSITY AVENUE S. S H I E L D S S T R E E T CI T Y P A R K A V E N U E WEST ELIZABETH STREET UNIVERSITY AVENUE S. S H I E L D S S T R E E T CI T Y P A R K A V E N U E WEST ELIZABETH STREET BUILDING A BUILDING B BUILDING C CHURCH BUILDING A BUILDING B BUILDING C CHURCH BUILDING A BUILDING B BUILDING C CHURCH BUILDING A BUILDING B BUILDING C CHURCH N.T.S N N N N RECYCLE TRASH ADD. TRASH 16' - 6 3/4" 14 ' - 0 1 / 4 " 3' - 0" 3' - 0 " 6' - 0 " R T 6' - 2 1/4" 12 ' - 4 5 / 8 " 7 3 / 4 " 2' - 6 " ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 1/4" = 1'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING TRASH DETAILS 18923.00 02/06/19 AW.11 PRELIMINARY DEVELOPMENT PROPOSAL (PDP) 1/4" = 1'-0"1 BUILDING A TRASH ROOM LEVEL 1 1/4" = 1'-0"2 BUILDING A - TRASH ROOMS - LEVELS 2-5 RECYCLE TRASH ADD. TRASH ADD. TRASH 24 ' - 4 1 / 4 " 25' - 9 1/4" 3' - 0" R T 5' - 6 1/8" 9' - 1 1 1 / 4 " 2' - 1 0 " ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 1/4" = 1'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING BUILDING B - TRASH DETAILS 18923.00 02/04/19 EX. 7 1/4" = 1'-0"1 BUILDING B - TRASH ROOM 1/4" = 1'-0"2 BUILDING B - TRASH CHUTES - LEVELS 2-5 RECYCLE TRASH ADD. TRASH 11' - 5 3/4" 31 ' - 3 1 / 4 " R T 10' - 10" 5' - 0 " 11 ' - 0 1 / 4 " 11' - 3 1/8" ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 1/4" = 1'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING BUILDING C - TRASH DETAILS 18923.00 02/04/19 EX. 9 PRELIMINARY DEVELOPMENT PLAN (PDP) 1/4" = 1'-0"1 BUILDING C - TRASH ROOM 1/4" = 1'-0"2 BUILDING C - TRASH CHUTES - LEVEL 2-5 Trash and Recycling Narrative: Per coordination with Waste Management, the project will utilize 3-yard dumpsters for both trash and recycling. Trash and Recycling service will take place 5 days per week. Dumpsters will be rolled out to the service road east of Building A and north of Buildings B&C at the time of trash pick- up. Building A: (2) 3-Yard Dumpsters / (1) 3-Yard Recycling Container Building B: (3) 3-Yard Dumpsters / (1) 3-Yard Recycling Container Building C: (2) 3-Yard Dumpsters / (1) 3-Yard Recycling Container