Loading...
HomeMy WebLinkAboutReports - Utilities - 09/01/2025 PRELIMINARY UTILITY DEMAND REPORT STRAUSS LAKES ODP CITY OF FORT COLLINS COUNTY OF LARIMER STATE OF COLORADO PREPARED FOR: Cottonwood Land and Farms, LLC PO Box 229 Boulder, CO 80306 PREPARED BY: Civil Resources, LLC 8308 Colorado Blvd. Suite 200 Firestone, Colorado 80504 PREPARED: SEPTEMBER, 2025 Strauss Lakes PUD – Utility Demand Memo September, 2025 i TABLE OF CONTENTS Page 1.0 INTRODUCTION .............................................................................................................................................. 1 2.0 GENERAL LOCATION AND DESCRIPTION ................................................................................................... 1 2.1 Location .................................................................................................................................................... 1 2.2 Proposed Land Uses ................................................................................................................................ 2 3.0 EXISTING INFRASTRUCTURE ....................................................................................................................... 2 3.1 Water Distribution System ........................................................................................................................ 2 3.2 Wastewater Collection System ................................................................................................................. 2 4.0 DEMAND DESIGN CRITERIA .......................................................................................................................... 2 4.1 Reference Materials ................................................................................................................................. 2 5.0 ESTIMATED DEMANDS .................................................................................................................................. 2 5.1 Domestic Water and Fire Service ............................................................................................................. 2 5.2 Wastewater Demand ................................................................................................................................ 3 6.0 PROPOSED IMPROVEMENTS........................................................................................................................ 4 List of Tables Table 1 Assumed Land Uses Table 2 Estimated Domestic Water Demand Table 3 Summary of Estimated Wastewater Demand (including infiltration) List of Figures Figure 1 Project Location – Vicinity Map Exhibits 8 and 9 Sanitary And Water System Concepts (appendix) List of Appendices Appendix A Domestic Water Demand Calculations Appendix B Wastewater Demand and Lift Station Calculations Strauss Lakes ODP – Utility Demand Memo September, 2025 1 1.0 INTRODUCTION The purpose of this report is to accompany an annexation and ODP overlay application of approximately 165 acres of land to the City of Fort Collins, known as Strauss Lakes. The ODP establishes overall land use by zoning classification, but does not propose specific layouts or design. This report presents an estimate of the overall domestic water and sanitary sewer demand for the project. Detailed utility analysis will accompany future PDP applications. This Preliminary Utility Demand Report Supplement has been developed to address the following items: • Estimated domestic water demand • Estimated wastewater generation 2.0 GENERAL LOCATION AND DESCRIPTION 2.1 Location The Strauss Lakes project is located northeast of the intersection of Ziegler Road and East Horsetooth Road, and is situated in Section 28, Township 7 North, Range 68 West of the 6th Principal Meridian, County of Larimer, State of Colorado. The project area includes parcel 8728000003, located within the City of Fort Collins, and parcel 8728000009, located in unincorporated Larimer County. The Site is bounded by Ziegler Road to the west, East Horsetooth Road to the south, and the Boxelder Ditch to the northeast. Figure 1 – Vicinity Map Strauss Lakes ODP – Utility Demand Memo September, 2025 2 2.2 Proposed Land Uses The PUD includes a mix of affordable apartments, work force housing, various styles of attached and detached single-family housing, and retail and commercial units. A specific mix of units is not as part of the ODP, but the table below summarizes the mix assumed for utility demands: Table 1 - Assumed Land Use Mix 3.0 EXISTING INFRASTRUCTURE 3.1 Water Distribution System There is an existing 24-inch diameter water main in Ziegler Road, north of Horsetooth, and two 8-inch mains stubs terminating at or just east of Zeigler Road at the intersections with Percheron Drive and William Neal Parkway. New mains will be extended from the existing stubs through the main portion of the Site. A new tap will be made off the existing 24-inch main to serve the southwestern portion of the development, situated at the NE corner of Zeigler Road and Horsetooth Road. 3.2 Wastewater Collection System There is an existing 24-inch diameter sewer main in Ziegler Road, north of Horsetooth. This is the only available point of connection to the existing sewer system for this project. Zeigler Road is higher than most of the Site area; therefore, a sewer lift station will be required to serve this project. 4.0 DEMAND DESIGN CRITERIA 4.1 Reference Materials The following documents were referenced in preparation of this report: • Fort Collins Utilities Water and Wastewater Design Criteria Manual • City of Fort Collins GIS utility mapping • City of Westminster Standards and Specifications, Chapters 3 and 4 (for estimated demand rates) • 2021 International Fire Code 5.0 ESTIMATED DEMANDS 5.1 Domestic Water and Fire Service Proposed land uses for the evaluation of domestic water demand were obtained from the anticipated maximum density achieved at full build-out of the project. The City of Ft. Collins Design Manual does not include generalized demand rates for planning purposes, therefore the estimated demand from each use was multiplied by a unit demand rate taken from the City of Westminster Standards and Specifications (Westminster Standards) to estimate the average daily flow. A peak day factor of 2.5 and peak hour factor of 4.0 was used to determine the peak domestic ESTIMATED DENSITY DU/AC A COMMERCIAL LMN 4.9 N/A N/A N/A N/A ALLOWED USES B RESIDENTIAL LMN 70.6 619 8.8 SF 2.5-3 STORIES** N/A C AFFORDABLE RESIDENTIAL MMN 7.6 144 18.9 MF 4 STORIES N/A D RESIDENTIAL LMN 6.4 47 7.3 SF 2.5-3 STORIES** N/A E COMMON AREAS LMN 69.4 N/A N/A N/A N/A N/A TOTAL 158.9 USE MAX BLDG. HEIGHT LAND USE STATISTICS PLANNING AREA ZONE DISTRICT TYPE GROSS ACREAGE ESTIMATED UNITS HOUSING TYPE BUSINESS TYPE Strauss Lakes ODP – Utility Demand Memo September, 2025 3 demands. Irrigation of public and commercial areas will be by ditch water, and is therefore not included in domestic demand estimates. The proposed IBC building construction types and maximum building size for uses within the property are not established as part of the PUD. The 2021 International Fire Code states that the maximum fire flow, regardless of square footage or building construction type, is 8,000 gpm. Using the maximum flow provides flexibility to accommodate a variety of construction types and building sizes within the development. It is anticipated that large buildings will be sprinklered, and as such a 50% reduction of fire flows will be allowed; therefore, the assumed fire flow for this project is 4,000 gpm. Refer to Appendix A for additional excerpts from the Westminster Standards and calculations for this project. The various residential typologies depicted in the PUD were applied based on anticipated densities (DU/AC) to correspond with the Westminster Standards. The estimated demands are included in Table 2: Table 2: Estimated Domestic Water Demand Gallons per Minute (GPM) Million Gallons per Day (MGD) Average Day 122 0.175 Maximum Day 304 0.438 Maximum Hour 486 0.700 Fire Service 4,000 - Design Flow Rate (Max Day + Fire Flow) 4,304 - 5.2 Wastewater Demand Proposed land uses for evaluation of wastewater demand were obtained from the anticipated maximum density achieved at full build-out of the project. The City of Ft. Collins Design Manual does not include generalized demand rates for planning purposes, therefore the estimated demand from each use was multiplied by a unit demand rate taken from the Westminster Standards to develop an estimated average daily flow. A peak day factor of 3.6 was used to estimate the maximum daily flow. Strauss Lakes ODP – Utility Demand Memo September, 2025 4 Figure 2 – Westminster Standards The Site is underlain by a high groundwater table. Basements will not be feasible for much of the project area. Infiltration was estimated to be 1,000 gpm/acre for the Site and undeveloped parcels within the tributary area. No peak factor was applied to infiltration values. Table 3 summarizes the estimated wastewater demands. Refer to Appendix B for additional excerpts from the Westminster Standards and calculations for this project. The various residential typologies depicted in the ODP were applied based on anticipated densities (DU/AC) to correspond with the Westminster Standards. The used in the commercial area are unknown; therefore the generation rate was assumed to be the average of Restaurant, Service and Retail. Table 3: Summary of Estimated Wastewater Demand (including infiltration) (CFS) (MGD) Average Day 0.16 0.105 Maximum Day 0.52 0.339 6.0 PROPOSED IMPROVEMENTS The ODP does not require a detailed utility plan: however, a conceptual layout of water distribution and sanitary sewer collection piping has been prepared to develop preliminary cost estimates for the project. These layouts are included in the Appendix. Detailed designs and hydraulic analysis of all infrastructure will be prepared as part of future PDP and Plat applications. Land Use Category Unit Demand Units Demand Demand Notes (GPD/unit) (GPD) (MGD) Commercial AC 1430 5 7,150 0.007 Multifamily Affordable UNIT 129.6 144 18,662 0.019 1.8 occupants per unit, 72 gpd per occupant Townhomes UNIT 178 447 79,566 0.080 2.0 occupants per unit, 90 gpd per occupant Detached Homes UNIT 258 270 69,687 0.070 2.9 occupants per unit, 89 gpd per occupant GPM GPD MGD Peak Factor Total Average Daily Demand 122 175,065 0.175 Maximum Day 304 437,664 0.438 2.5 Maximum Hour 486 700,262 0.700 4.0 Fire Flow (GPM) 4000 5,760,000 5.760 Max fire flow per IFC with 50% sprinkler reduction Design Point (Max Day + Fire Flow) 4304 6,197,664 6.198 Domestic Water Demand Strauss Lakes ODP water sewer demand 11-2024.xlsx 9/22/2025 Land Use Category Unit Demand Units Demand Demand Notes (/unit) (GPD) (MGD) Commercial General AC 1.01 5.00 7,296 0.007 Average of Restaurant, Service and Retail Aaffordable (R36) UNIT 0.07 144 14,515 0.015 Townhomes (R18) UNIT 0.07 447 45,058 0.045 Detached Homes (R8) UNIT 0.07 270 27,216 0.027 Infiltration/Inflow AC 800 14 11,200 0.011 Excludes open space areas not sewered GPM CFS GPD MGD Total Average Daily Demand 73.1 0.16 105,285 0.105 Maximum Day 235.2 0.52 338,705 0.339 peak factor 3.6, no peak on infiltration Sewer Demand Strauss Lakes ODP water sewer demand 11-2024.xlsx 9/22/2025 February 2023 3-4 corresponding node locations, distribution of fire flows among hydrants, and maximum pipe velocities. Data should be presented in table format. Reference shall be made to modeling data in the appendix and a figure of the pipe and node network provided. f) Conclusions – a description of the results and how they follow the CITY criteria shall be provided. Any deviations from the CITY criteria shall be described and applicable variances requested. f) Appendices - Printed data output from the modeling results shall be provided in the appendix and shall correspond with a figure of the pipe and node network. The appendix shall also include hydrant flow test results, hand calculations and any other pertinent data. A large size figure (24” x 36”) illustrating the existing and proposed utility improvements shall be provided and shall conform to the CITY’s latest master plan. The drawing shall include pressure zone boundaries, building finished floor elevations, elevation contours and locations of proposed and existing utility easements and right-of-way. In situations where a previous utility study was conducted and is still applicable, a utility conformance letter may be submitted in place of the Utility Study, at the discretion and with written authorization of the CITY ENGINEER. 3.13.0 DESIGN DEMAND The domestic demands for a particular development vary depending on the type of development, land use density, irrigation demand and building fire sprinkler flow requirements. However, the demand used to design a water system is largely a function of the required fire flow for a particular development. There are two general categories of development for which domestic flow rates are determined: residential and commercial/industrial. Domestic demands for these developments are determined from Tables 3.13.A, 3.13.B and 3.13.C below and then peaking factors are applied to develop the Maximum Day Demand and Peak Hour Demand as follows: Maximum Day Demand = 2.5 x Average Day Demand Peak Hour Demand = 4.0 x Average Day Demand Domestic demands for a development shall be combined with peak irrigation demand, building fire sprinkler demand and the project fire flow. The peak irrigation demand shall be determined by the irrigation designer and the fire sprinkler demand shall be determined by the fire sprinkler Engineer. The fire flow for a project is determined from the International Fire Code (Edition currently approved by the CITY Building Department) and requires the approval of the CITY Fire Marshal. Factors such as building area and construction type are required to determine the fire flow for a structure. The design of the water distribution system shall be based on the higher of the two demand scenarios: February 2023 3-5 Maximum Day Demand + project fire flow + building fire sprinkler flow + peak irrigation flow, or Peak Hour Demand + peak irrigation flow. The CITY shall be consulted for design criteria with regard to non-standard developments, design of municipal infrastructure such as transmission mains, pump stations, etc. and for developments with unusually high demands. The CITY ENGINEER shall have final input in these instances. Residential Average Day Demand shall be based on density, and zoning as determined by the Preliminary Development Plan and Official Development Plan for the project and the proposed number of units. This estimate is to be used solely for the purposes of planning and design infrastructure. The CITY PWU’s Water Resources Division shall be contacted to determine tap size and fees. Table 3.13.A – Residential Average Day Demand Data. Zoning Type of Development Units per Acre People per Unit Gallons per person per day R-1 to R-5 Single Family Detached Up to 5 2.90 89 R-8 to R-18 and District Center Single Family Attached Up to 18 2.00 90 R-36 Attached, Multi-family Up to 36 1.80 72 Commercial and industrial Average Day Demands will vary widely depending on the type of development. The following criteria in Table 3.13.B is based on historic information from the CITY’s water records and can be used to estimate the water usage for the various developments listed for the purposes of infrastructure design. The CITY PWU’s Water Resources Division shall be contacted to determine tap size and fees. Table 3.13.B – Commercial/Industrial Average Day Demand Data Type of Development Unit Indoor Design Demand (gallons/unit- day) Auto Service and Repair sf 0.12 Car Wash bay 528 Childcare sf 0.32 Church sf 0.18 Grocery Store sf 0.22 Gas Station with Car Wash sf 8 Gas Station without Car Wash sf 1.32 February 2023 3-6 Hospital sf 0.32 Hotel/Motel room 130 Medical Office sf 0.2 General Offices sf 0.04 Restaurant sf 1.1 Retail/Shopping Center sf 0.16 School sf 0.06 Warehouse/Industrial sf 0.04 For commercial and industrial planning purpose, where specific densities and building uses are not yet known, average day demands can be calculated on an acreage basis as specified in Table 3.13.C. Table 3.13.C – Commercial/Industrial Average Day Demand Data (Based on Acreage) Type of Development Gallons per Acre-Day Retail Commercial 1430 Office 1430 Office – High density 2480 Mixed-Use 4100 Industrial 1430 School/Church 1260 If the developer has specific information for their proposal that is different from the above, and the developer wishes to design using the different information, the developer must contact PWU to discuss and obtain approval. 3.14.00 HYDRAULIC DESIGN A computer generated hydraulic analysis of the proposed infrastructure, or “model”, shall be developed using standard industry software such as WaterCAD or CITY approved equal. In order for the model to properly correlate with the CITY’s distribution system, a hydrant flow test needs to be performed on nearby hydrants and static and residual pressures obtained as a function of flow rate. This data shall be used in the model to develop a water source curve, represented by a reservoir and pump, and this will allow modeled pressures to vary over a range of imposed demands. The water source curve functions as a boundary condition in the model where proposed piping interfaces with the existing distribution system at this boundary. For purposes of hydraulic modeling, Hagen Williams C coefficient shall be 130 for PVC pipe, lined ductile iron pipe, and lined steel pipe. For any other condition, coordination with the PWU is required. The objective during hydrant flow testing is to obtain a flow rate similar to the design demand required for the proposed development. The hydrants to be tested shall be determined by the PWU and data obtained during this test shall be valid for up to one-year, unless otherwise approved in writing by the PWU. Distribution system factors may require that a fire flow be increased for a particular area of the March 2022 4-5 (D) Appendices and Figures - Printed data output from any pipe flow analysis shall be provided in the Appendix and shall correspond with a figure of the pipe network. The Appendix shall also include hand calculations and any other pertinent data. A large size figure (24” x 36”) illustrating the existing and proposed utility improvements may be required and should include building finished floor elevations, elevation contours and locations of proposed and existing utility easements and right-of-way as necessary. 4.13.00 DESIGN FLOW Projected flows used to design the sanitary sewer system for a particular development vary depending on the type of development and land use. Six general categories of development for which typical average flow rates are given below include residential, restaurants, service, retail, office, hotel and industrial uses. For non-residential and non-hotel uses, apply the factor to the total area of the lot. Once the specific type of development is determined, peak design flows are calculated by multiplying the average flow with the peaking factor and then adding infiltration and inflow. Typical Average Flow Uses: Restaurants 1.24 Gallons/Minute/Acre* Service 0.99 Gallons/Minute/Acre* Retail 0.81 Gallons/Minute/Acre* Office 0.40 Gallons/Minute/Acre* Industrial 0.22 Gallons/Minute/Acre* Hotel 5.16 Gallons/Minute/100 rooms* R-36 residential zoning 0.07 Gallons/Minute/Unit* R-18 residential zoning 0.07 Gallons/Minute/Unit* R-8 residential zoning 0.09 Gallons/Minute/Unit* R-3.5 residential zoning 0.10 Gallons/Minute/Unit* Peaking Factor 3.6 × [Average Flow (mgd)]-0.12, maximum value of 4** Infiltration and Inflow 1000 Gallons/Acre/Day *** Some development projects may not be considered “typical” as they may be infill type projects and capacities of the downstream sewer may be limited. In these cases, design flows must be calculated using historic flow data available from the CITY for various use types projected and available capacities in the downstream sewers may need to be modeled as described in section 4.12.02 (B) g. Refer to the “Orchard Town Center Sanitary Sewer System Analysis”, February, 2013 by J&T. Flow rates in pipelines downstream of lift stations shall take into account the maximum pumping rate generated by the pump station plus peak daily flow plus Infiltration and Inflow. N9 0 ° 0 0 ' 0 0 " W 1 2 9 . 1 3 ' CITY OF FT COLLINS FUTURE PARK SITE FOS S I L C R E E K R E S E R V O I R I N L E T D I T C H (IR R I G A T I O N ) BOXEL D E R D I T C H (IRRIG A T I O N ) RIG D E N F A R M O U T F A L L C H A N N E L ZIEGLER ROAD WI L L I A M N E A L PA R K W A Y PE R C H E R O N D R I V E FLATIRONS POND E H O R S E T O O T H R O A D FO O T H I L L S C H A N N E L O U T F A L L DETENTION PONDDETENTION POND DETENTION POND CONSTRUCTED WETLAND POND EXISTING WATER IN ZIEGLER RD EXISTING WATER IN PERCHERON DR EXISTING WATER IN WILLIAM NEAL PARKWAY CONNECT TO EXISTING DETENTION POND DETENTION POND REVISIONS NO.DESCRIPTION DATE DATE: SHEET: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NO.: DWG NAME:37200101WAT_EXHIB JAB CMH CMH 11/18/2024 ME T R O D I S T R I C T M A P S ST R A U S S L A K E 372.001.01 7 OF 9 WATER EXHIBIT 8308 COLORADO BLVD SUITE 200 FIRESTONE, CO 80530 303.833.1416 WWW.CIVILRESOURCES.COM J: \ C O T T O N W O O D L A N D - 3 7 2 \ 3 7 2 . 0 0 1 . 0 1 S T R A U S S L A K E S \ D R A W I N G S \ S H E E T S \ 0 0 - P R E L I M \ M E T R O D I S T R I C T M A P S \ 3 7 2 0 0 1 0 1 W A T _ E X H I B (1"=250') BOULDER, CO 80306 PO BOX 229 ATTN: BILL MCDOWELL COTTONWOOD LAND AND FARMS, LLC N E W S PROPERTY LINE WATER LINE ASPHALT CONCRETE LEGEND PROPOSED BORE NOTE: WATER MAINS IN STREETS DEPICTED IN APPROXIMATE LOCATIONS ONLY. ADDITIONAL PUBLIC MAINS WILL BE REQUIRED WITHIN INDIVIDUAL DEVELOPMENT BLOCKS, BASED ON SITE PLAN AND HYDRANT COVERAGE TO BE DETERMINED AS PART OF FUTURE SITE SPECIFIC DEVELOPMENT PLANS. LIFT STATION CITY OF FT COLLINS FUTURE PARK SITE FOS S I L C R E E K R E S E R V O I R I N L E T D I T C H (IR R I G A T I O N ) BOXEL D E R D I T C H (IRRIG A T I O N ) RIG D E N F A R M O U T F A L L C H A N N E L ZIEGLER ROAD WI L L I A M N E A L PA R K W A Y PE R C H E R O N D R I V E FLATIRONS POND E H O R S E T O O T H R O A D FO O T H I L L S C H A N N E L O U T F A L L EXISTING SANITARY SEWER IN ZIEGLER RD FORCE MAIN FROM LIFT STATION REVISIONS NO.DESCRIPTION DATE DATE: SHEET: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NO.: DWG NAME:37200101SAN_EXHIB JAB CMH CMH 11/18/2024 ME T R O D I S T R I C T M A P S ST R A U S S L A K E 372.001.01 8 OF 9 SANITARY SEWER EXHIBIT 8308 COLORADO BLVD SUITE 200 FIRESTONE, CO 80530 303.833.1416 WWW.CIVILRESOURCES.COM J: \ C O T T O N W O O D L A N D - 3 7 2 \ 3 7 2 . 0 0 1 . 0 1 S T R A U S S L A K E S \ D R A W I N G S \ S H E E T S \ 0 0 - P R E L I M \ M E T R O D I S T R I C T M A P S \ 3 7 2 0 0 1 0 1 S A N _ E X H I B (1"=250') BOULDER, CO 80306 PO BOX 229 ATTN: BILL MCDOWELL COTTONWOOD LAND AND FARMS, LLC N E W S PROPERTY LINE SANITARY SEWER ASPHALT CONCRETE LEGEND PROPOSED FORCE MAIN BORE NOTE: SEWER MAINS IN STREETS DEPICTED IN APPROXIMATE LOCATIONS ONLY. ADDITIONAL PUBLIC MAINS WILL BE REQUIRED WITHIN INDIVIDUAL DEVELOPMENT BLOCKS, BASED ON FUTURE SITE SPECIFIC DEVELOPMENT PLANS.