HomeMy WebLinkAboutProject Narratives - 09/03/2025 Mike Hutsell | Architect, NCARB, CPHT
Phone: 720-227-8894 | Email: mike@mhdesignco.com
Project Narrative
Project Title:
ADU at 609 S. Meldrum St
Past Meeting Dates:
•Conceptual Review: February 20, 2025
General Project Information:
•Location: 609 S. Meldrum Street, Fort Collins, CO 80521
•Lot Size: Approx. 9,500 sq ft
•Zoning: Old Town (OT-C)
•Proposed Use: Single Family Residence with detached ADU
•Residential Units: One existing single-family home + one proposed detached ADU
•Stories: 1.5-story detached garage/ADU (under 25'-8" height); two-story future addition
to primary home (not part of this application)
•Parking: Existing driveway retained; garage to provide off-street parking
•Land Use Code Modifications: Requesting allowance to exceed height limit by 1'-8" for
detached structure, under threshold allowed by ultimate primary residence height. Also
requesting allowance to exceed detached accessory garage area from 600 square feet to
640
Existing Owner:
Cindy and Jim Bair
609 S. Meldrum Street
Fort Collins, CO 80521
Applicant:
MH Design (Mike Hutsell, Architect)
Project Intent and Design Narrative:
This project proposes construction of a detached garage with an upper-level Accessory
Dwelling Unit (ADU) at the rear of the lot. The ADU will serve as transitional housing for Cindy
during the future remodel of the primary home and will ultimately become her long-term
accessible residence. While the current application includes only the ADU, the design is
intentionally coordinated with a planned future addition to the primary home to ensure
compatibility in scale, aesthetics, and accessibility.
Site Constraints and Design Considerations:
•Lot Constraints: A relatively narrow 9,500 sq ft lot with rear alley access and historic
context
•Zoning Limits: Per Section 2.1.6 of the Land Use Code, the OT-C district imposes a 24-
foot maximum height for detached accessory structures or the height of the primary
structure, whichever is less. Our proposed garage/ADU is under the ultimate height of
the future remodeled primary structure (25'-11")
Page of 1 2
Mike Hutsell | Architect, NCARB, CPHT
Phone: 720-227-8894 | Email: mike@mhdesignco.com
•Accessibility: The ADU includes accessibility considerations for Cindy, including ground-
level entry and efficient circulation, including parking for her mobility van.
•Height Compliance: The proposed structure height (25'-8") is under the planned
ultimate height of the primary home (25'-11"), aligning with the zoning intent and compliant
with Section 2.1.6 if interpreted in context with future buildout
Site Design and Circulation:
•Building Placement: The garage/ADU sits at the rear of the lot with alley access,
maintaining required setbacks
•Circulation: Accessible connections between the ADU and the existing home will be
completed during the full site buildout
•Natural Features: The site is fully urbanized with no wetlands or natural habitats present
Architectural Design:
•The ADU is designed to complement the existing Folk Victorian home while introducing
modern elements appropriate for long-term accessibility and energy efficiency
•Exterior materials include lap siding, compatible trim and window proportions, and gable
rooflines in line with Old Town design standards
•The design addresses privacy, massing, and scale relative to surrounding properties and
to the future buildout of the site
Transition Techniques and Buffers:
•The rear detached structure is buffered from neighbors by alley access and side/rear
setbacks
•Height transitions are minimized by aligning the ADU height with the ultimate planned
primary home
•Window placement is sensitive to privacy concerns
Transportation and Access:
•Vehicle access via the alley; garage parking provided
Development Phasing:
•Phase 1: Construction of the detached garage with ADU. Cindy will temporarily reside
here
•Phase 2 (not part of this submittal): Remodel and addition to the primary home for full
accessibility
•Target start: Fall 2025
•Shared outdoor improvements to be completed in coordination with Phase 2.
Page of 2 2