HomeMy WebLinkAboutSupporting Documentation - Response to Comments - 02/19/20253201 East Mulberry, Unit Q – P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 •Fax (970) 498-0701 •www.boxeldersanitation.org
February 19, 2025
Todd Sullivan
Development Review Coordinator
City of Fort Collins
281 North College Avenue, PO Box 580
Fort Collins, CO 80522
RE: Case Number: BDR240010
Title: Montava Phase D Infrastructure
Engineering/Survey: TST, Inc.
Engineer Contact: Tim Dinger
Applicant: Montava Development & Construction LLC
Parcel Number(s): 8832000001, 8832000002
Boxelder Sanitation District (BSD) has reviewed the proposed project identified as:
Infrastructure upgrades along N. Giddings Rd. and other infrastructure additions
required by Phase D of Montava PUD.
The District hereby advises as follows:
There is no objection to this proposal.
Responses required to comments below.
The District will respond at the hearing date of ______________.
Comments:
General
1) Add curb distance for sanitary sewer lines.
2) Add 30’ sanitary sewer easement callout.
3) The manholes preceding and proceeding the casing at the N. Giddings Rd. crossing
are not described in the Phase D – Core and Irrigation (BDR240006) utility plan.
Both utility plans should be uniform.
4) The proposed sanitary sewer is also described in Phase D – Core and Irrigation
(BDR240006). In which project will the Right of Way easements be
described/dedicated? Will there be a separate plat for this project?
Please feel free to contact me if you have any questions.
Sincerely,
Daniel Richardson, PE
District Engineer