☐ BNSF Engineering Services-Structures Review Comments
MPP Review Items; KC Structures Review / 3rd Party Items Check for compliance with BNSF H&H Design Criteria and Union Pacific – BNSF Railway Guidelines for Railroad Grade Separation Projects
Project Name:Montava Development – Phase D Core & Irrigation Pond – Ft. Collins Colorado BNSF Point of Contact:Rafer Nichols
Submittal Name:Phase D Core & Irrigation Pond – Responses to [City of Ft. Collins, CO] Staff for Round 1 Project CM Contact:N/A
Plan File Name:2_SITE PLANS_Montava PhD Core_BDR_Rd2; 5_DRAINAGE_Montava Phase D Core_BDR_Rd2.
2025.02.12_MontavaPhaseD_InterimStormOutfall.pdf
Asset MP Name:78.3
Plan File Date:07/17/2024, 3/13/2020 Plan %:30%
*BNSF has reviewed these submittals and no exceptions are taken with regard to BNSF’s ability to use or accommodate the project as intended. BNSF has not reviewed the design details or calculations for structural integrity or engineering
accuracy. BNSF accepts no responsibility for errors or omissions in the design or execution of the project.
** Check Submittal Essentials prior to transmittal to Structures Review. If not included, Project Engineer to reject and request resubmittal.
Provide EGL and WSE of existing and proposed openings
☐No Exceptions Taken ☒ Comments Below ☐ N/A
Agency to provide Hydraulic Model to BNSF for 3rd Party Review
☒ No Exceptions Taken ☐ Comments Below ☐ N/A
PE Seal & Signature (In State of Project)
☐No Exceptions Taken ☒ Comments Below ☐ N/A
Check Adjacent Structure Separation Clearance
☐No Exceptions Taken ☐ Comments Below ☒ N/A
Require Right of Entry Agreement from BNSF (BNSF PE to capture)
☐No Exceptions Taken ☒ Comments Below ☐ N/A
ROW Fencing Limits Shown and Min Height 8’ (trespassing prevention)
☐No Exceptions Taken ☐ Comments Below ☒ N/A
Existing and New Structure(s) in plan, location and elevation views
☐No Exceptions Taken ☒ Comments Below ☐ N/A
Channel Mtce Agreement Established (Debris Accrual Evaluated)
☐No Exceptions Taken ☒ Comments Below ☐ N/A
Requirements of UPRR/BNSF Grade Separation Guidelines referenced
☐No Exceptions Taken ☒ Comments Below ☐ N/A
Analyze Proposed Design for Possible Detrimental Effects to BNSF Assets
☐No Exceptions Taken ☒ Comments Below ☐ N/A
EGL < Subgrade Elevation for 100-yr Return
☐No Exceptions Taken ☒ Comments Below ☐ N/A
Design Discharges should be based on peak discharge computation
☒ No Exceptions Taken ☐ Comments Below ☐ N/A
Consideration to Previous Flooding in the area and around / over tracks
☐No Exceptions Taken ☒ Comments Below ☐ N/A
Review embankment stability and overall long-term performance
☐No Exceptions Taken ☐ Comments Below ☒ N/A
Scour protection Countermeasures using FHWA HEC-23 (or BNSF approved
alt.)
☐ No Exceptions Taken ☐ Comments Below ☒ N/A
Review capacity of BNSF Culvert(s) according to BNSF H&H Design Criteria
☐No Exceptions Taken ☒ Comments Below ☐ N/A
Review capacity of BNSF Bridge(s) according to BNSF H&H Design Criteria
☐No Exceptions Taken ☐ Comments Below ☒ N/A
Item
No.Sheet No.Reviewer Comment
Date: 8/5/2024 Initial Designer's Response
Date:
Reviewer’s Comment
Date: 03/26/2025 Initial Designer's Response
Date: 4/18/2025
Reviewer’s Comment
Date: Initial Designer's Response
Date:
Reviewer’s Comment
Date: Initial Status (Open
or Closed
1.
Drainage
Report/Plans
General
Note that these comments may not be all-
inclusive and are based on the amount of
information that is furnished at the time of
the review.
AJR Comment noted. Thank you.
Note overall interim solution
with improvements on BNSF
ROW added 2-12-2025 which is
what this review focuses on.
AJR Comment noted. Thank
you.Comment closed.Closed
2.
Drainage
Report /
Plans
General
Provide PE Seal & Signature (In State of
Project) for the drainage report.AJR PE Seal and Signature to be provided
once requested by the City of Fort Collins
PE Seal and signature required
for any temp or permanent work
on BNSF ROW, including interim
improvements.
AJR
Signed and sealed plans will
be provided prior to
construction.
Pending submittal.
Signed and sealed
plans will be provided
prior to construction Open
Version Dated 2017-09-22
☐ BNSF Engineering Services-Structures Review Comments
MPP Review Items; KC Structures Review / 3rd Party Items Check for compliance with BNSF H&H Design Criteria and Union Pacific – BNSF Railway Guidelines for Railroad Grade Separation Projects
Project Name:Montava Development – Phase D Core & Irrigation Pond – Ft. Collins Colorado BNSF Point of Contact:Rafer Nichols
Submittal Name:Phase D Core & Irrigation Pond – Responses to [City of Ft. Collins, CO] Staff for Round 1 Project CM Contact:N/A
Plan File Name:2_SITE PLANS_Montava PhD Core_BDR_Rd2; 5_DRAINAGE_Montava Phase D Core_BDR_Rd2.
2025.02.12_MontavaPhaseD_InterimStormOutfall.pdf
Asset MP Name:78.3
Plan File Date:07/17/2024, 3/13/2020 Plan %:30%
*BNSF has reviewed these submittals and no exceptions are taken with regard to BNSF’s ability to use or accommodate the project as intended. BNSF has not reviewed the design details or calculations for structural integrity or engineering
accuracy. BNSF accepts no responsibility for errors or omissions in the design or execution of the project.
** Check Submittal Essentials prior to transmittal to Structures Review. If not included, Project Engineer to reject and request resubmittal.
3.
Drainage
Report /
Plans
General
Provide an estimated timeframe for Phase D
full buildout (post core/irrigation pond
portion).
AJR
Infrastructure development is expected
to take 16 months and is planned to start
in Q1, 2025. Home construction is
expected to start in mid 2026 and is not
expected to be complete until
approximately 2029.
Provided updated timeframe
including estimate on ultimate
outfall design vs interim
condition.
This review only assumes Phase
D will be complete prior to the
construction of the ultimate
outfall. If additional phases
would like to be completed prior,
further review may be required.
AJR
The goal is to construct the
interim outfall
improvements while the
ultimate design is being
reviewed by the City of Fort
Collins and BNSF. The
ultimate design concept is
currently being coordinated
with the city and will be
provided to BNSF as soon
as possible. The ultimate
crossing will be constructed
once approved by the city
and BNSF.
Contractor to provide
updates as available.
Draft submittal for
reference only would be
appreciated.
The ultimate crossing
design is being
coordinated with the
city prior to submittal
to BNSF.
Closed
4.
Drainage
Report /
Plans
General
Utility relocation, removal or placement on
BNSF ROW requires separate permit through
JLL.
AJR
No utility relocation, removal or
placement on BNSF ROW is proposed
with the development of Phase D.
FOCO to apply for a permit using
below links for the interim
solution.
AJR/RDN
Permit application is being
coordinated with the city
for the interim solution.
Submittal pending.
Permit application has
been submitted by the
city. Permit Number
25W-25556
Closed
5.
Drainage
Report /
Plans
General
Any proposed grading or drainage
infrastructure along or underneath BNSF
Railway and/or within BNSF right of way
requires BNSF review and approval.
AJR
No grading or drainage infrastructure
along or underneath BNSF Railway
and/or within BNSF right of way is being
proposed with the development of Phase
D.
FOCO to apply for a permit using
below links for the interim
solution. BNSF will insert
assurances into that permit such
that we are confident that the
ultimate solution will be built.
AJR/RDN
Permit application is being
coordinated with the city
for the interim solution.
Submittal pending.
Permit application has
been submitted by the
city. Permit Number
25W-25556 Closed
6.
Drainage
Report /
Plans
General
An analysis is required to show the adequacy
of the existing BNSF 2’X1’ wooden box
culvert to allow discharge from further
development to this location. We do not
believe it is possible to show the structural
adequacy of the existing wooden box
structure as there is no way to test the
soundness of the interior. A drainage analysis
would be required showing this location can
meet 100- and 50- year criteria to allow
discharge directed towards this existing
structure.
AJR
The proposed Phase D development will
be implementing stormwater detention
to reduce developed 100-year discharges
to historic 2-year flow rates. The
proposed detention facility located
northwest of the intersection of
Mountain Vista Blvd. and Giddings Road
will discharge through a pipe daylighting
at the southeast corner of the
intersection, at which point flows will
follow existing drainage patterns, which
ultimately drain to the location of the
existing 24”x12” box culvert under the
railroad. By reducing developed
discharges at or below historic rates,
Montava is effectively improving the
existing condition at the BNSF crossing.
Update drainage report or
provide a memo documenting
the approach for the interim
condition that addresses the
following comments (comment 9
and beyond) for the interim
solution.
AJR
Interim crossing design
memorandum has been
provided and will be
included in the Phase D
drainage report.
No exceptions.
No updates.
Closed
Version Dated 2017-09-22
☐ BNSF Engineering Services-Structures Review Comments
MPP Review Items; KC Structures Review / 3rd Party Items Check for compliance with BNSF H&H Design Criteria and Union Pacific – BNSF Railway Guidelines for Railroad Grade Separation Projects
Project Name:Montava Development – Phase D Core & Irrigation Pond – Ft. Collins Colorado BNSF Point of Contact:Rafer Nichols
Submittal Name:Phase D Core & Irrigation Pond – Responses to [City of Ft. Collins, CO] Staff for Round 1 Project CM Contact:N/A
Plan File Name:2_SITE PLANS_Montava PhD Core_BDR_Rd2; 5_DRAINAGE_Montava Phase D Core_BDR_Rd2.
2025.02.12_MontavaPhaseD_InterimStormOutfall.pdf
Asset MP Name:78.3
Plan File Date:07/17/2024, 3/13/2020 Plan %:30%
*BNSF has reviewed these submittals and no exceptions are taken with regard to BNSF’s ability to use or accommodate the project as intended. BNSF has not reviewed the design details or calculations for structural integrity or engineering
accuracy. BNSF accepts no responsibility for errors or omissions in the design or execution of the project.
** Check Submittal Essentials prior to transmittal to Structures Review. If not included, Project Engineer to reject and request resubmittal.
7.
Drainage
Report
General
The drainage report should document
existing and proposed discharges at discharge
points to the canal.
AJR
As discussed, Phase D will provide
detention to attenuate developed
discharges at or below historic flow rates,
which will effectively improve the
existing condition at the BNSF crossing.
Suggest adding this language to
the drainage memo for interim
condition.
AJR
Phase D drainage report
has been updated to
include stormwater
attenuation language.
No exceptions.
No Updates.
Closed
8.General
Existing 2 X 1 box is not for drainage, it was
permitted for irrigation. Developer has not
assumed that right and doesn’t have
permission or easement to utilize. BNSF will
need to be satisfied that the drainage plan is
acceptable and enter into new agreement
with Developer.
RDN
The existing 24”x12” box culvert is
located at the natural low point of the
roughly 28 square mile Upper Cooper
Slough watershed and represents the
historic discharge point, as identified in
numerous hydrologic studies, including
the City of Fort Collins Upper Cooper
Slough Selected Plan of Improvements
(2022). If the 24”x12” culvert is not
intended to convey stormwater, where
did BNSF plan for the existing stormwater
discharge from this watershed?
As discussed, Phase D of Montava is
reducing stormwater discharges at or
below historic rates prior to being
conveyed via the existing drainage
patterns to the BNSF ROW. Based on this,
stormwater discharges from Phase D of
Montava do not adversely impact the
BNSF right of way. In fact, the proposed
detention facilities will improve the
stormwater runoff conditions at the
railroad.
Update drainage report or
provide a memo documenting
the approach for the interim
condition that addresses the
following comments (comment 9
and beyond) for the interim
solution.
AJR
Interim crossing design
memorandum has been
included with the Phase D
drainage report.
No exceptions.
No updates.
Closed
9.Interim
Solution
Include a statement that the
interim condition does not
impact the existing culvert's
capacity due to the grading and
cleaning improvements or
provide other justification for no
loss in hydraulic performance.
AJR
The interim crossing design
memorandum addresses
the existing and proposed
capacity of the culvert. In
general, the improved
entrance conditions will
result in no loss in hydraulic
performance.
No exceptions.
No updates.
Closed
Version Dated 2017-09-22
☐ BNSF Engineering Services-Structures Review Comments
MPP Review Items; KC Structures Review / 3rd Party Items Check for compliance with BNSF H&H Design Criteria and Union Pacific – BNSF Railway Guidelines for Railroad Grade Separation Projects
Project Name:Montava Development – Phase D Core & Irrigation Pond – Ft. Collins Colorado BNSF Point of Contact:Rafer Nichols
Submittal Name:Phase D Core & Irrigation Pond – Responses to [City of Ft. Collins, CO] Staff for Round 1 Project CM Contact:N/A
Plan File Name:2_SITE PLANS_Montava PhD Core_BDR_Rd2; 5_DRAINAGE_Montava Phase D Core_BDR_Rd2.
2025.02.12_MontavaPhaseD_InterimStormOutfall.pdf
Asset MP Name:78.3
Plan File Date:07/17/2024, 3/13/2020 Plan %:30%
*BNSF has reviewed these submittals and no exceptions are taken with regard to BNSF’s ability to use or accommodate the project as intended. BNSF has not reviewed the design details or calculations for structural integrity or engineering
accuracy. BNSF accepts no responsibility for errors or omissions in the design or execution of the project.
** Check Submittal Essentials prior to transmittal to Structures Review. If not included, Project Engineer to reject and request resubmittal.
10.Interim
Solution
Provide change in hydraulic
opening from existing to
proposed interim condition.
AJR
With the proposed
concrete headwalls and
wingwalls, the culvert
entrance condition will be
improved with a section
that is equal to or better
than the existing condition,
which will result in no loss
in hydraulic performance.
No exceptions.
No updates.
Closed
11.Interim
Solution
Liner is called out to reinforce
the existing timber box. Provide
what portion of the loading the
CIPP will handle.
AJR/JH
The intent of the liner is to
hydraulically improve the
existing culvert and is not
intended to provide
structural support for
anticipated loading. The
existing timber box appears
to be in fair condition and
does not require structural
reinforcement.
Reinforcement language
has been removed from the
plans.
No exceptions.
Assurances to be added
in permit for full buildout
and scheduling.
No updates.
Closed
12.Interim
Solution
Include the depth of the existing
sanitary sewer to the ditch
profile sheet. The designer will
need to ensure compliance with
the BNSF utility accommodation
policy, as the proposed grading
appears to reduce cover.
AJR
Depth to the existing 21-
inch sanitary main is now
shown on the plans. Based
on the depth of the existing
sewer, the proposed
interim solution appears to
meet the BNSF utility
accommodation policy, as it
will not require relocation
or be adversely impacted
by changes to grade.
No exceptions.
No updates.
Closed
Version Dated 2017-09-22
☐ BNSF Engineering Services-Structures Review Comments
MPP Review Items; KC Structures Review / 3rd Party Items Check for compliance with BNSF H&H Design Criteria and Union Pacific – BNSF Railway Guidelines for Railroad Grade Separation Projects
Project Name:Montava Development – Phase D Core & Irrigation Pond – Ft. Collins Colorado BNSF Point of Contact:Rafer Nichols
Submittal Name:Phase D Core & Irrigation Pond – Responses to [City of Ft. Collins, CO] Staff for Round 1 Project CM Contact:N/A
Plan File Name:2_SITE PLANS_Montava PhD Core_BDR_Rd2; 5_DRAINAGE_Montava Phase D Core_BDR_Rd2.
2025.02.12_MontavaPhaseD_InterimStormOutfall.pdf
Asset MP Name:78.3
Plan File Date:07/17/2024, 3/13/2020 Plan %:30%
*BNSF has reviewed these submittals and no exceptions are taken with regard to BNSF’s ability to use or accommodate the project as intended. BNSF has not reviewed the design details or calculations for structural integrity or engineering
accuracy. BNSF accepts no responsibility for errors or omissions in the design or execution of the project.
** Check Submittal Essentials prior to transmittal to Structures Review. If not included, Project Engineer to reject and request resubmittal.
13.Interim
Solution
Verify train movement does not
impact the curing process as any
disruptions to train traffic will
not be approved.
AJR/JH
Based on correspondence
with the CIPP vendor, they
do not anticipate train
traffic to interfere with the
CIPP curing process, as the
existing timber box appears
to be in good condition and
does not shift during
loading. Pre-construction
observation will be
conducted prior to
placement of CIPP liner to
verify this is not a concern.
No exceptions.Closed
14.Interim
Solution
Provide documentation that
existing culvert is in fair to good
condition as there is no way to
inspect the existing culvert once
it's lined. Including photos would
be helpful.
AJR/JH
Photos of existing timber
box culvert are included in
the interim design
memorandum
documenting that the
structure is in good
condition.
No exceptions.Closed
15.Interim
Solution
Reduce proposed grading on
BNSF embankment to top of
proposed headwall. There does
not appear to be a need to grade
up towards the track.
AJR/JH
Design has been updated to
reduce embankment
grading and maximize the
limits of disturbance from
the existing tracks.
No exceptions.Closed
Add Row