Montava- Phase D and Irrigation Pond, BDR240006, Round Number 5 Responses to Staff Comments for Round Number 608-20-2025
July 06, 2025
Montava Development & Construction LLC
430 N. College Ave
#410
Fort Collins, CO 80524
RE: Montava - Phase D Core and Irrigation Pond, BDR240006, Round Number 5
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of Montava - Phase D Core and Irrigation Pond. If you have questions about any comments, you
may contact the individual commenter or direct your questions through your Development Review Coordinator,
Todd Sullivan via phone at 970-221-6695 or via email at tsullivan@fcgov.com.
No Response is necessary for Staff comments in Grey
Comment Summary:
Department: Development Review Coordinator
Contact: Todd Sullivan tsullivan@fcgov.com 970-221-6695
Topic: General
Comment Number: 1
INFORMATION:
I will be your primary point of contact throughout the development review and permitting process. If
you have any questions, need additional meetings with the project reviewers, or need assistance
throughout the process, please let me know and I can assist you and your team. Please include me in
all email correspondence with other reviewers and keep me informed of any phone conversations.
Comment Number: 2
SUBMITTAL:
As part of your resubmittal, you will respond to the comments provided in this letter. This letter is provided
to you in Microsoft Word format. Please use this document to insert responses to each comment for your
submittal, using a different font color. When replying to the comment letter please be detailed in your
Page 2 of 10
responses, as all comments should be thoroughly addressed. Comments requiring action should NOT
Comment Number: 3
Comment Number: 4
Comment Number: 5
Response: Noted and thank you for your comment. We have worked with city staff directly to do all we
can to insure we have addressed all comments.
Comment Number: 6
Comment Number: 8
Response: Noted- all signature blocks have been updated.
Page 3 of 10
Comment Number: 9
FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and resolved prior to moving
forward with the final documents and recording of this project. I will provide a recording checklist and
process information when we are closer to this step.
There is one (1) New comment added in this round of review, and four (4) Continued comments remaining.
Please let me know if you would like any focus meetings to work through resolving any comments.
Response: Thank you- Responses are included in this resubmittal.
Comment Number: 12
FOR RECORDING:
Once all comments have been resolved, we will move forward with the Final
Recording Documents process. At that time I will provide you with a detailed
checklist of the items we will need submitted with that Final Recording Documents Packet.
Please reach out with any questions.
Response: Noted and thank you.
Department: Engineering Development Review
Contact: Tim Dinger tdinger@fcgov.com
Topic: General
Comment Number: 10
09/24/2024: FOR DEVELOPMENT AGREEMENT - UPDATED:
Development Agreement draft in progress.
Response: Thank you. We continue to work with staff on the final DA language.
07/25/2024: FOR DEVELOPMENT AGREEMENT - UPDATED:
We received the first draft of the DA with the round 2 BDR submittal. We will
begin reviewing and provide a second draft once all departments are ready.
05/28/2024: FOR DEVELOPMENT AGREEMENT:
For Montava Phase G, the developer's team were the ones to draft the development agreement. We will
allow the Montava team to start drafting the Phase D Development agreement as well. Please collaborate
with all of the various departments on necessary language to be included as soon as possible. I will send a
base DA form to begin the draft from by Friday, 5/31/24.
Department: Erosion Control
Contact: Andrew Crecca acrecca@fcgov.com
Topic: Erosion Control
Comment Number: 23
10/04/2024: ACCEPTED:
Page 4 of 10
Thank you for providing the requested erosion control plans, report and escrow calculation. All submitted
Comment Number: 37
Department: Light And Power
Contact: Tyler Siegmund tsiegmund@fcgov.com 970-416-2772
Topic: General
Comment Number: 2
Comment Number: 3
Comment Number: 5
Comment Number: 6
Comment Number: 7
Page 5 of 10
05/28/2024: INFORMATION:
Comment Number: 8
Department: Environmental Planning
Contact: Kirk Longstein klongstein@fcgov.com 970-416-4325
Topic: General
Comment Number: 5
Response: We have met and worked with Staff directly to address the needs for fencing and prepared a
sample exhibit that staff has been able to review. We will present the exhibit to the Ditch company in
the very near future to make sure all parties are in agreement.
Department: Park Planning
Contact: Missy Nelson mnelson@fcgov.com
Topic: General
Comment Number: 6
Department: Internal Services
Contact: Russell Hovland rhovland@fcgov.com 970-416-2341
Page 6 of 10
Topic: Building Insp Plan Review
05/14/2024: Construction shall comply with adopted codes as amended.
Current adopted codes are:
2021 International Building Code (IBC) with local amendments
2021 International Residential Code (IRC) with local amendments
2021 International Existing Building Code (IEBC) with local amendments
2021 International Energy Conservation Code (IECC) with local amendments
2021 International Mechanical Code (IMC) with local amendments
2021 International Fuel Gas Code (IFGC) with local amendments
2021 International Swimming Pool and Spa Code (ISPSC) with local amendments
Colorado Plumbing Code (Currently the 2021 International Plumbing Code adopted by State of Colorado)
2020 National Electrical Code (NEC) as amended by the State of Colorado
Projects shall comply with the current adopted building codes, local
amendments and structural design criteria can be found here: https://www.fcgov.com/building/codes
New 2024 building codes will be adopted in 2025.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Ground Snow Load 35 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
• 140mph (Ultimate) exposure B or Front Range Gust Map published by SEAC.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code: 2021 IECC and local amendments.
INFORMATIONAL ITEMS:
• Electric vehicle charging parking spaces are required, see local amendment.
• This building is located within 250ft of a 4 lane road or 1000 ft of an active
railway, must provide exterior composite sound transmission of 39 STC min.
• Buildings must provide 10ft to 30ft of fire separation from property line and 20
feet between other buildings or provide fire rated walls and openings per
chapter 6 and 7 of the IBC.
• All multi-famliy buildings must be fire sprinkled. City of Fort Collins
amendments to the 2021 International Fire Code limit what areas can avoid fire
sprinklers with a NFPA 13R, see local IFC 903 amendment.
• If using electric systems to heat or cool the building, ground source heat pump
or cold climate heat pump technology is required.
• A City licensed commercial general contractor is required to construct any
new multi-family structure.
• For projects located in Metro Districts, there are special additional code
requirements for new buildings. Please contact the plan review team to obtain
the requirements for each district.
• City of Fort Collins amendments to the 2021 IFC require a full NFPA-13
sprinkler system in multifamily units with an exception to allow NFPA 13R
systems in buildings with no more than 6 dwelling units (or no more than 12
dwelling units where the building is divided by a 2 hour fire barrier with no more
than 6 dwelling units on each side).
Page 7 of 10
• A City licensed commercial general contractor is required to construct any new multi-family structure.
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970-221-6588
Topic: Plat
Comment Number: 1
Response: Our engineer has discussed the comments with Jon Von Nieda and we believe we have
addressed them in their entirety.
Page 8 of 10
were not made. Please provide any responses on redlined sheets and/or in response letter. If you have
Department: Outside Agencies
Contact: BNSF Railway, Rafer Nichols, PE, rafer.nichols@bnsf.com
Topic: General
Comment Number: 5
Response: We have been in direct communication with BNSF and have addressed their comments in
this resubmittal.
Contact: Boxelder Sanitation District, Daniel Richardson, PE,
drichardson@boxeldersanitation.org.
Topic: General
Comment Number: 1
Response: Thank you, all easements will be recorded prior to plat recordation so the reception
numbers can be included in the final recorded plat.
Page 9 of 10
10/11/2024: Boxelder Response (After Letter):
Boxelder (Jon Remmers) provide a separated letter that was provided to Montava group in a separate
email on 10/14/2024.
10/10/2024: City Response:
Have not received a response from the review request yet. Once received, we will forward this on.
05/31/2024:
Responses required for comments below (actual letter included with package):
1) Standalone easement will be required for all sewers that are not located in the public ROW and in alley
tracts. The easements are necessary to address access and maintenance issues that are not included on
the plat. Standard easement width for Boxelder is 30-feet. District Easement template is attached.
2) Add curb distance for sanitary sewer lines.
3) Terminate service lines in sanitary sewer manhole where possible.
4) Drawings show parallel sewer lines entering from Maple Hill. Edit drawing to
reflect that the southern line is abandoned.
5) District codes and regulations require sanitary sewer manholes to be
installed every 400 feet. Ensure that sanitary sewer lines meet District standards.
6) The planned sanitary sewer line crossing Giddings Rd. will need to be inside
a casing. Edit drawings to reflect this requirement.
7) Are there plans for an underdrain system for this phase? Space limitations
within the easement will need to be considered.
Contact: East Larimer County Water District, Randy Siddens,
randys@elcowater.org
Topic: General
Comment Number: 3
06/19/2025:
See attached for minor comments from ELCO, all related to recent updates to
our general notes and construction details (all available on our website).
From an infrastructure review standpoint once these final updates are
completed ELCO is good with the project proceeding to the drawing signature stage.
Let me know if you have any questions.
Response: Thank you. All ELCO comments have been addressed and the standards have been
updated.
11/29/2024:
Please see responses in Bluebeam Session.
11/01/2024:
Page 10 of 10
Notes provided by Randy Siddens forwarded directly to Forrest and Janelle.
Contact: Lawrence Custer Grasmick Jones & Donovan, LLP, Ryan Donovan,
ryan@lcwaterlaw.com
Topic: General
Comment Number: 2
Response: Thank you. The plans now include the following-
Settlement Agreement language has been added to sheet # 4 of 234 in the Utility Plans.
Design Criteria language and notes have been added to sheet # 228 of 234 in the Utility Plans.
The 6’ fence location is now called out on sheet # S25 in the Site Plans.