Loading...
HomeMy WebLinkAboutReports - Drainage - 08/15/2025 Project No. 892-002 Date: August 2025 EPS Group Arizona | Greeley 970.221.4158 epsgroupinc.com Final Drainage Report: Gateway at Prospect Developer: Fort Collins/ I-25 Interchange, LLC 2 North Cascade Avenue Suite 1490 Colorado Springs, CO 80903 (719)-540-5800 Engineer: EPS Group 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 GATEWAY AT PROSPECT TABLE OF CONTENTS 1 of 22 epsgroupinc.com Arizona | Colorado August 15, 2025 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: FINAL DRAINAGE REPORT FOR GATEWAY TO PROSPECT Dear Staff: EPS Group is pleased to submit this Preliminary Drainage Report for your review. This report accompanies the Final Development Review submittal for the proposed Gateway at Prospect project. This report has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM) in conjunction with Mile High Flood Control District Stormwater Criteria and serves to document the stormwater impacts associated with the proposed Gateway at Prospect project. We understand review by the City is to assure general compliance with standardized criteria contained in the FCSCM and Mile High Flood Control District Stormwater Criteria Manual. If you should have any questions as you review this report, please feel free to contact us. Sincerely, EPS Group, Inc. Stephanie Thomas, PE Project Manager GATEWAY AT PROSPECT TABLE OF CONTENTS 2 of 22 epsgroupinc.com Arizona | Colorado TABLE OF CONTENTS 1.0 GENERAL LOCATION AND DESCRIPTION .......................................................................5 1.1 LOCATION ...................................................................................................................................................................................... 5 1.2 DESCRIPTION OF PROPERTY ................................................................................................................................................... 6 1.3 FLOODPLAIN ................................................................................................................................................................................. 6 2.0 DRAIN BASINS AND SUB-BASINS ...................................................................................8 2.1 MAJOR BASIN DESCRIPTION ................................................................................................................................................... 8 2.2 SUBBASIN DESCRIPTION........................................................................................................................................................... 8 3.0 DRAINAGE DESIGN CRITERIA ....................................................................................... 10 3.1 REGULATIONS ........................................................................................................................................................................... 10 3.2 FOUR STEP PROCESS ............................................................................................................................................................... 10 3.3 DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS ..................................................................................... 11 3.4 HYDROLOGICAL CRITERIA .................................................................................................................................................... 11 3.5 HYDRAULIC CRITERIA ............................................................................................................................................................. 11 3.6 FLOODPLAIN REGULATIONS COMPLIANCE ................................................................................................................... 12 3.7 MODIFICATIONS OF CRITERIA ............................................................................................................................................. 12 4.0 DRAINAGE FACILITY DESIGN ....................................................................................... 12 4.1 GENERAL CONCEPT ................................................................................................................................................................. 12 4.2 FULL SPECTRUM DETENTION, EURV, AND WQCV ....................................................................................................... 16 4.3 DETENTION POND CALCULATIONS .................................................................................................................................. 17 4.4 SPECIFIC DETAILS ..................................................................................................................................................................... 19 5.0 CONCLUSIONS .............................................................................................................. 21 5.1 COMPLIANCE WITH STANDARDS ...................................................................................................................................... 21 5.2 DRAINAGE CONCEPT .............................................................................................................................................................. 21 6.0 REFERENCES .................................................................................................................. 22 GATEWAY AT PROSPECT TABLE OF CONTENTS 3 of 22 epsgroupinc.com Arizona | Colorado APPENDICES APPENDIX A – Hydrologic Computations APPENDIX B – Low Impact Development Responsibility Exhibit APPENDIX C – Hydraulic Computations APPENDIX D – Cooper Slough HEC-RAS Model APPENDIX E – FEMA Firmette APPENDIX F – Erosion Control Report MAP POCKET DR1 –Drainage Exhibit GATEWAY AT PROSPECT FIGURES AND TABLES 4 of 22 epsgroupinc.com Arizona | Colorado TABLE OF FIGURES Figure 1 - Vicinity Map ............................................................................................................................................................... 5 Figure 3 - Existing FEMA Floodplains .................................................................................................................................. 7 Figure 2 - Existing City Floodplains ...................................................................................................................................... 7 Figure 4 - Snapshot of Existing Fort Collins SWMM Model ......................................................................................... 9 TABLE OF TABLES Table 1 - Land Use - Percent impervious (Per Table 4.1.2 FCSCM) ........................................................................... 6 Table 2 - Flowrates for Project Specific Nodes ................................................................................................................. 9 Table 3 - Pond Summaries .................................................................................................................................................... 19 GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 5 of 22 epsgroupinc.com Arizona | Colorado 1.0 GENERAL LOCATION AND DESCRIPTION 1.1 LOCATION 1. Gateway at Prospect is in Section 16, Township 7 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 2. The project site is located near the northwest corner of the Prospect Road and I-25 interchange. The site is situated along the existing I-25 west frontage road, just south of the existing Crossroads East Business Center and east of the existing Boxelder Estates 1st Replat. 3. Zoning across the site includes Low-Density Mixed Use (LMN), Medium-Density Mixed Use (MMN), Employment District (E), Commercial District (C), and Urban Estate (UE). The existing lot does not have any stormwater or water quality facilities. 4. The Boxelder Creek runs north to south through the middle of Gateway at Prospect project. Near the northern property line, the Cache La Poudre Inlet Canal runs west to east; the canal siphons under the Boxelder Creek and continues east of I-25. The Lake Canal runs northwest to southeast along the northern boundary of the site; this canal also siphons under the Boxelder Creek and continues east of I-25. Figure 1 - Vicinity Map GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 6 of 22 epsgroupinc.com Arizona | Colorado 1.2 DESCRIPTION OF PROPERTY 1. Gateway at Prospect is approximately 182.30 net acres, including the existing frontage road. 2. Gateway at Prospect proposes realigning the I-25 West Frontage Road and installing two connector streets with utilities using master planning concepts. A span bridge will also be installed with Gateway at Prospect, which will cross the Boxelder Creek. In the future, this area will consist of low-density and medium-density mixed-use districts and a small urban estate district, commercial districts, and an employment district. 3. The proposed development site is in the City of Fort Collins Boxelder Creek/Cooper Slough Basin. Detention and water quality requirements for each future development will be laid out within this report. Future developments will still be responsible for calculating and implementing LID requirements set forth in the City of Fort Collins Stormwater Criteria Manual. 4. Currently, Gateway at Prospect is proposing to detain and treat interim conditions. Therefore, the proposed connector roads will be detained, and water quality will also be provided via extended detention. LID will be provided for connector roadways that do not drain through a future development. Additionally, Gateway at Prospect will install storm lines sized for future developments to utilize. 5. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, a majority of the project site consists of Nunn clay loam and Satanta Variant clay loam which fall into Hydrologic Soil Groups C-D. 1.3 FLOODPLAIN 1. The FEMA regulated Boxelder Floodplain and Floodway is located within the eastern half of the project. This floodplain is found on panel 984 of 1420 of Map Number 08069C0984H revised February 21, 2019. 2. The FEMA regulated Cooper Slough Floodplain and Floodway exists in the northwest corner of the project. This floodplain is found on panel 984 of 1420 of Map Number 08069C0984H revised February 21, 2019. 3. The Gateway at Prospect project will be pursuing a CLOMR/LOMR with this project. This CLOMR/LOMR will revise the floodplain and floodway along the Boxelder Creek within the limits of this project. This CLOMR/LOMR will Table 1 - Land Use - Percent impervious (Per Table 4.1.2 FCSCM) GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 7 of 22 epsgroupinc.com Arizona | Colorado effectively limit the extent of the floodplain within the development parcels and allow for the installation of a bridge over Boxelder Creek. The CLOMR will be pursued with FEMA concurrently with this proposal. The CLOMR will not be detailed in this report but will instead be a separate report and model. Please see the “Boxelder Creek at Gateway at Prospect Conditional Letter of Map Revision Request” by Jacobs Engineering originally submitted August 2022, revised July 2025. A LOMR process through FEMA will be required after construction of this project. A floodplain use permit will be required for any construction within the floodplains of this project. Figure 2 - Existing FEMA Floodplains Figure 3 - Existing City Floodplains GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 8 of 22 epsgroupinc.com Arizona | Colorado An Erosion Buffer runs along the Boxelder Creek on the east side of the project site. The erosion buffer is regulated by the Fort Collins Municipal Code, Chapter 10 Flood Prevention and Protection, Division 7 Erosion Buffer Zones. Sec. 10-202 2J and 2K. This code section prohibits the grading, excavation and construction traffic within the erosion buffer. This portion of the Boxelder Creek was studied for erosion susceptibility in the report “Assessments and Rehabilitation Decision-Making Framework for the Streams of Fort Collins” (January 2012) and the subsequent “Boxelder Creek/Cooper Slough Basin Water Quality Master Plan” (March 30, 2012). As a part of this project, this section of the Boxelder Creek was studied in the Jacobs’ report “Boxelder Creek at Gateway at Prospect: Stream Stability Study”. The report concluded that there will need to be grading and excavation done on the Boxelder Creek to reduce velocities and shear stresses to match either existing conditions or the MHFD criteria during the 100-year event. 2.0 DRAIN BASINS AND SUB-BASINS 2.1 MAJOR BASIN DESCRIPTION 1. Gateway at Prospect is located within the Boxelder Creek/Cooper Slough Basin. Boxelder Creek/Cooper Slough Basin encompasses 265 square miles beginning north of the Colorado/Wyoming border and extending southward into east Fort Collins, ending at the Cache La Poudre River. 2. Improvements along the Boxelder Creek were recently constructed and detailed in the LOMR case number 17- 08-1354P. A 100-year overflow channel and box culverts under Prospect Road were constructed as a part of that project. 2.2 SUBBASIN DESCRIPTION 1. Historically the property generally drains south and towards the center of the property where the Boxelder Creek sits. The 100-year overflow channel is situated within the Gateway at Prospect site. In normal flowing conditions, the Boxelder Creek flows within its typical channel and heads south through a newly constructed box culvert under Prospect Road. Boxelder Creek continues south until it discharges into the Poudre River. During the 100-year event, an emergency overflow weir will reroute runoff to the west of the typical creek and into the overflow channel. Once runoff is routed to the overflow channel, it is conveyed south through a separate box culvert under Prospect Road. From there, the runoff will remain in the overflow channel until it enters the Poudre River. GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 9 of 22 epsgroupinc.com Arizona | Colorado In 2018 Ayers Associates, as a part of the previous LOMR effort, created a SWMM model that modeled existing flows for the 2-year, 5-year, 10-year, 25-year, 50-year, and 100-year events of the Boxelder Creek/Cooper Slough Basin with the proposed Boxelder Creek improvements. Gateway at Prospect property falls within this model. This model was used to verify downstream infrastructure will not be impacted by future developments within the Gateway at Prospect property. 2. There are some important Nodes to take note of within this model. Node 884 is the closest upstream node before Gateway at Prospect discharging into the Boxelder Creek. Divider 885 represents the previously described emergency overflow weir. Nodes 886 and 887 are the downstream nodes in both the normal conveyance path and the emergency overflow channel. A more in-depth explanation can be found later in the report. 3. Gateway at Prospect is located toward the lower end of the Boxelder Creek/Cooper Slough Basin. Traditionally new developments within Fort Collins must detain the difference between the 100-year developed inflow rate and the historic 2-year release rate. However, this location is optimal for the use of full spectrum detention. The City of Fort Collins has approved the use of full spectrum detention for this project with the caveat that it can be shown there are no “substantial” increases in flow to Boxelder Creek. 4. During the interim condition - when only connector streets, utilities, and the span bridge are installed, a portion of the ponds will be interim ponds with interim release rates. As stated previously, future developments must adhere to the recommendation made in this report when it comes to pond sizing and, more importantly, total full spectrum release rates. However, the ultimate storm line sizing will be installed with Gateway at Prospect to minimize future demolition and disturbance within the Boxelder Creek and 100-year overflow channel. 5. The detention ponds adjacent to Boxelder Creek have been sized for the ultimate condition. This is an attempt to limit and disturbance within the floodplain and natural habitat buffer zone in the future. 6. All future developments must follow Fort Collins Stormwater Criteria Manual for LID sizing and implementation. 7. A full-size copy of the Proposed Drainage Exhibit can be found in the Map Pocket at the end of this report. This Proposed Drainage Exhibit represents the interim condition. SWMM ID Ayers Associate Boxelder Basin Model 100-YR Flow Rates (cfs) Node 884 3377.99 Divider 885 3377.89 Node 886 950.98 Node 887 2426.9 Figure 4 - Snapshot of Existing Fort Collins SWMM Model Table 2 - Flowrates for Project Specific Nodes GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 10 of 22 epsgroupinc.com Arizona | Colorado 3.0 DRAINAGE DESIGN CRITERIA 3.1 REGULATIONS Gateway at Prospect proposes utilizing full spectrum for detention and traditional 40-hour water quality treatment for this site. By utilizing full spectrum, Gateway at Prospect will be able to “beat the peak” of the existing condition within the Boxelder Creek/Cooper Slough Basin. Therefore, it is expected the Gateway at Prospect project will not cause damage to downstream infrastructure and/or cause more maintenance than historical conditions. Full Spectrum design should improve stream stability by mimicking the historic conditions. Full spectrum guidelines laid out by Mile High Flood Control District were followed. 3.2 FOUR STEP PROCESS The overall stormwater management strategy employed with the Gateway at Prospect project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following describes how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Gateway at Prospect will be reducing peak flow rates by 10% of the historic value via full spectrum. Full spectrum detention is designed to address two limitations of traditional detention. First, it is focused on controlling peak discharges over the full spectrum of runoff events from small, frequent storms up to the 100-year storm event. Second, full spectrum detention facilities produce outflow hydrographs that, other than a small release rate of the excess urban runoff volume (EURV), replicate the shape of predevelopment hydrographs. Full spectrum detention modeling shows a reduction of urban runoff peaks to levels similar to predevelopment conditions over an entire watershed, even with multiple independent detention facilities. For a thorough, in-depth explanation of full spectrum, please refer to Volume 2, Chapter 12 of the Urban Drainage Stormwater Criteria Manual published by the Mile High Flood Control District. At the time of future development tracts within the Gateway at Prospect, each development will be responsible for implementing Low Impact Development (LID) measures. These measures can include rain gardens, grass buffers, underground infiltration and detention basins, permeable pavers, etc. These measures effectively work to reduce runoff from developed areas. Step 2 – Implement BMPs that Provide a Water Quality Capture Volume (WQCV) with Slow Release Water quality will be provided via extended detention per Mile High Flood Control District standards for full spectrum detention. Full spectrum water quality capture volume (WQCV) utilizes the same criteria the Fort Collins Stormwater Criteria Manual uses. Additionally, the lower portion of volume in a full spectrum detention facility is designed to capture and slowly release the excess urban runoff volume (EURV). The EURV is the difference between the developed condition runoff volume and the predevelopment volume. The EURV is typically two to three times the WQCV. However, no LID measures will be installed with Gateway at Prospect. Future developments will be responsible for sizing and implementing their own LID measures per the Fort Collins Stormwater Criteria Manual. However, there will be large swaths of greenspace during the interim condition, which will still absorb a large amount of interim runoff. Step 3 – Stabilize Drainageways The Gateway at Prospect proposes to limit the amount of disturbance to Boxelder Creek. By limiting disturbance to the creek banks, the project will effectively maintain the existing vegetation. In areas of disturbance, the banks will be stabilized via methods that include riprap pads, erosion control blankets, and scour pads. The Gateway at Prospect project aims to protect the existing Boxelder Creek by limiting any increases beyond the historical flow rates within the creek to a negligible amount. By utilizing a combination of full spectrum detention and the resulting “beat the peak” model, the peak discharge from the Gateway at Prospect project will be passed before the GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 11 of 22 epsgroupinc.com Arizona | Colorado peak of the creek. As such, the peak discharge from the Gateway at Prospect project will not be compounded with peak flow in the creek. Furthermore, this project will pay a one-time stormwater development fee, as well as ongoing monthly stormwater utility fees, both of which help achieve citywide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs This step typically applies to industrial and commercial developments. 3.3 DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 1. There are no known drainage studies for this specific property. However, it has been mentioned that Ayers Associates produced a SWMM model showing the 2-year, 5-year, 10-year, 25-year, 50-year, and 100-year events for the Boxelder Creek/Cooper Slough Basin. Gateway at Prospect is only analyzing the 100-year event for both the interim condition and future condition. 2. Gateway at Prospect is proposing to only install interim ponds via full spectrum criteria. Because full spectrum detention is based on predevelopment conditions, both the interim and future developments will have approximately the same release rates. Therefore, future developments will not be hindered by the storm line sizes that are installed by Gateway at Prospect. 3. Future developments are responsible for their own LID calculations and implementation. 3.4 HYDROLOGICAL CRITERIA 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with this development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables 4.1-2 and 4.1-3 of the FCSCM. 3. Full spectrum detention has been utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. 3.5 HYDRAULIC CRITERIA 1. As previously noted, the subject property historically drains towards its center, where the Boxelder Creek runs north to south through the site. Currently, a majority of the site drains stormwater via overland flow. It will continue to be mostly overland flow during the interim condition, but as the ultimate conditions come online, this will most likely change to concentrated flows within curb and gutter as well as storm line conveyance. 2. All drainage facilities proposed with Gateway at Prospect project are designed in accordance with criteria outlined in the Mile High Flood Control District’s “Urban Storm Drainage Criteria Manual.” 3. As stated in Section 1.3, above, the subject property is subject to regulatory floodplain restrictions and development code. GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 12 of 22 epsgroupinc.com Arizona | Colorado 4. HEC-RAS has been used to model the future Cooper Slough drainageway planned by Fort Collins along between Lake Canal and Timnath Reservoir Inlet Canal. 5. Gateway at Prospect design is intended to maintain the downstream integrity of the Boxelder Creek to fullest extent possible. 3.6 FLOODPLAIN REGULATIONS COMPLIANCE The project site is encroached by the FEMA designated 100- Year Floodway and Floodplain according to FIRM Panel 08069C098H for Larimer County. This map has been revised to reflect LOMR effective February 21, 2019. No occupied structures are being proposed with the Gateway Prospect project. This project is pursuing a CLOMR/LOMR to remove portions of the site from the 100-year floodplain, to provide for stream stabilization grading and to build a bridge spanning the floodplain/floodway. As per Section 10-103 (9), Critical Facilities are prohibited in the floodplain. The definition of Critical Facilities includes facilities for at-risk populations (daycares, schools, nursing homes, et.), facilities utilizing hazardous materials (gas stations, auto repair, laboratories), emergency services facilities (urgent care, hospitals, fire, police) and government services (municipal offices, library). A floodplain use permit is required prior to building permit issuance. Future developments proposed within the floodplain are subject to all floodplain regulations. Development within the floodplain must comply with Chapter 10 of the Municipal Code. Please see appendix for a Floodplain Exhibit and all regulatory notes regarding development within the floodplain. 3.7 MODIFICATIONS OF CRITERIA Gateway at Prospect requests full spectrum detention as laid out by the Mile High Flood Control District be substituted for the Fort Collins Stormwater Criteria detention requirements. A variance request has been provided for the use of Full Spectrum Detention. 4.0 DRAINAGE FACILITY DESIGN 4.1 GENERAL CONCEPT 1. The main objectives of Gateway at Prospect are to provide detention and water quality for the interim conditions further from Boxelder Creek and ultimate conditions near Boxelder Creek as well as layout a comprehensive master plan for future developments to utilize. Additionally, maintaining Boxelder Creek stabilization is of the utmost importance. 2. The Cooper Slough currently drains from north to south along the project’s western boundary. This flow impacts the northwestern and southwestern corners of the propety. Much of this flow is intercepted by the Timnath Reservoir Inlet Canal, but a portion may spill onto the Gateway project. Any development near this area will need to provide ample grade separation and conveyance for this potential spillage. 3. The Boxelder Creek, Timnath Reservoir Inlet Canal, and Lake Canal also drain through the project. 4. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 5. Gateway at Prospect project comprises ten major drainage basins, designated as Basins A, B, C, D, E, F, G, H, I, BOX, and PUD. The drainage patterns for each major basin are described below. Basin A GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 13 of 22 epsgroupinc.com Arizona | Colorado Basin A is encumbered by multiple easements and is challenged for access. As such, future development of this basin will be limited. If, in the future, this basin develops, it will need to be studied for full spectrum detention and water quality. If this basin is maintained as an undeveloped greenbelt or open space, it will not be subject to detention or water quality treatment. Basin A currently captures and conveys the existing and future Cooper Slough overflow. Basin B Basin B is composed of three subbasins, Basin B1, B2 and B3. Runoff from Basin B is conveyed to Pond B. Basin B1 During the interim condition, Basin B1 will be undeveloped. Ultimately, Basin B1 is zoned to have low-density residential and urban estate districts. Basin B1 will be detained and treated within Pond B and will discharge into the Boxelder Creek via pipe sized to the ultimate release rate of Pond B. Basin B2 and B3 Basins B2 and B3 include a small portion of the new connector street. Basin B2 will drain to a proposed rain garden prior to being detained and treated for additional water quality in Pond B. B3 will be detained and treated within Pond B and will discharge into the Boxelder Creek via an RCP pipe sized to the ultimate release rate of Pond B. Basin C Basin C is composed of two subbasins, Basin C1 and Basin C2. Runoff from Basin C is conveyed to Pond C. Basin C1 During the interim condition, Basin C1 be undeveloped. Basin C1 will overland flow from northwest to the southeast to Pond C. During the ultimate condition, Basin C1 is zoned to have an employment district. Basin C1 will be detained and treated within Basin C1 and will discharge via pipe to Boxelder Creek. Basin C2 Basin C2 encompasses half of the right of way for the new connector road and half of the span bridge. Basin C2 has the same condition in the interim and ultimate conditions. Basin C2 will convey runoff to Pond C via inlet and pipe culvert into a rain garden. Basin C2 will drain to a proposed rain garden prior to being detained and treated for additional water quality in Pond C. Basin D Basin D is composed of two subbasins, Basin D1 and Basin D2. Basin D does not have an interim condition. Runoff from Basin D is conveyed to Pond D. Basin D1 Basin D1 is composed of open space and Pond D. Basin D1 sheet flows towards Pond D, which discharges to the Boxelder Creek via pipe. Basin D2 Basin D2 encompasses a portion of the entire right-of-way (ROW) associated with the I-25 frontage road realignment. Runoff generated in Basin D2 is captured by inlets within the ROW and conveyed to a proposed rain garden prior to being detained and treated for additional water quality in Pond D. Basin E Basin E is composed of two subbasins, Basin E1 and E2. Basin E1 GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 14 of 22 epsgroupinc.com Arizona | Colorado During the interim condition, Basin E1 will remain undeveloped except for Pond E. In the ultimate condition, Basin E1 will be built out per its zoning designation of medium density mixed-use. Basin E2 Basin E2 is comprised of the connector road and Prospect Road as well as a small portion of open space adjacent to the southwest corner of the project site. Basin E2 has the same condition in the interim and ultimate condition. Runoff from Basin E2 is captured by inlets within the connector road and conveyed to a rain garden prior to being detained and treated for additional water quality in Pond E. Pond E discharges via pipe to the Boxelder Overflow Channel. This pipe is sized for the ultimate release of Pond E. Basin F Basin F is composed of five subbasins, Basin F1-F5. Runoff from Basin F is conveyed to Pond F. Basin F1 Basin F1 will remain undeveloped during the interim condition except for Pond F. In the ultimate condition, Basin F1 will be built out per its zoning designation of medium density residential. Basin F1 will be detained and treated within Basin F1 and will discharge via pipe to Boxelder Creek. This pipeline is sized for the ultimate release of Pond F. Basin F2 Basin F2 is comprised of half the right of way for the new connector road internal to the project site. Runoff is captured by an inlet and conveyed via temporary swale in Basin F1 to Pond F. Basin F2 does not have an interim condition. Basin F2 is detained and treated for water quality in Pond F. It is anticipated that LID treatment may be provided for this basin by the future development due to the available travel path through the parcel. Please see the LID exhibit for more information. Basin F3 Basin F3 is comprised of half the right of way for the new connector roads internal to the project site as well as half the span bridge. Runoff is captured by an inlet and conveyed via pipeline in Basin F1 to Pond F. Basin F3 does not have an interim condition. Basin F3 is detained and treated for water quality in Pond F. It is anticipated that LID treatment may be provided for this basin by the future development due to the available travel path through the parcel. Please see the LID exhibit for more information. Basin F4 Basin F4 is comprised of half the right of way for the new connector roads internal to the project site. Runoff is captured by an inlet and conveyed via pipeline in Basin F1 to Pond F. Basin F4 does not have an interim condition. Basin F4 is detained and treated for water quality in Pond F. It is anticipated that LID treatment may be provided for this basin by the future development due to the available travel path through the parcel. Please see the LID exhibit for more information. Basin F5 Basin F5 is comprised of half the right of way for the new connector roads internal to the project site as well as the open space along the western boundary of the it. Runoff is captured by an inlet and conveyed via pipeline in Basin F1 to Pond F. Basin F5 does not have an interim condition. Basin F5 is detained and treated for water quality in Pond F. It is anticipated that LID treatment may be provided for this basin by the future development due to the available travel path through the parcel. Please see the LID exhibit for more information. Basin G Basin G is composed of three subbasins, Basin G1, G2 and G3. Runoff from Basin G is conveyed to Pond G. Basin G1 Basin G1 will remain undeveloped during the interim condition except for Pond G. In the ultimate condition, Basin G will be used for commercial land uses. Runoff in Basin G1 flows via sheet flow to Pond G. Pond G GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 15 of 22 epsgroupinc.com Arizona | Colorado discharges to Boxelder Creek via pipeline sized for the ultimate release rate for all of Basin G. Basin G1 is detained and treated for water quality in Pond G. Basin G2 Basin G2 is comprised of half of the right of way of the I-25 Frontage Road and a small portion of the roundabout. Runoff in Basin G2 is captured via sidewalk culvert and conveyed to Pond G via swale. Basin G2 is detained and treated for water quality in Pond G. It is anticipated that LID treatment may be provided for this basin by the future development due to the available travel path through the parcel. Please see the LID exhibit for more information. Basin G3 Basin G3 is comprised of a small portion of the roundabout. Runoff from Basin G3 is captured via inlet and conveyed to a rain garden prior to being detained and treated for additional water quality in Pond G. Basin G4 Basin G4 is comprised of half of the right of way of Prospect Road. Runoff in Basin G4 is captured via sidewalk culvert and conveyed to Pond G via swale. Basin G4 is detained and treated for water quality in Pond G. It is anticipated that LID treatment may be provided for this basin by the future development due to the available travel path through the parcel. Please see the LID exhibit for more information. Basin H Basin H is comprised of two subbasins, Basin H1 and Basin H2. Runoff from Basin H is conveyed to Pond I in the interim but will be directly to Pond H in the future. A storm pipe is proposed to serve as the release for Future Pond H to Boxelder Creek. This pipeline has been sized for the ultimate release rate for all of Basin H and I. In the interim a small culvert will convey the runoff from Basin H to Interim Pond I. Basin H1 Basin H1 will remain undeveloped during the interim condition except for a portion of Interim Pond I and a small portion of the roundabout. Interim Basin H1 will be detained and treated within Interim Pond I, located within Basin I1. Future Pond H will be located within Basin H1. Basin H2 Basin H2 encompasses a portion of the ROW associated with the I-25 frontage road realignment. Basin H2 does not have an interim condition. Runoff from Basin H2 will be captured by an inlet and conveyed to Interim Pond I via temporary swale. Basin H2 will be detained and treated during the interim condition within Interim Pond I. It is anticipated that LID treatment may be provided for this basin by the future development due to the available travel path through the parcel. Please see the LID exhibit for more information. Basin I Basin I is comprised of two subbasins, Basin I1 and Basin I2. Runoff from Basin I is conveyed to Pond I in the interim and ultimate conditions. A storm pipe is proposed to serve as the release for Future Pond I. This pipeline has been sized for the ultimate release rate for all of Basin I and Basin H. Basin I1 Basin I1 will remain undeveloped during the interim condition except for Pond I. Runoff from Basin I1 will be conveyed via surface flow to Interim Pond I. Interim Basin I1 will be detained and treated within Interim Pond I. Basin I2 GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 16 of 22 epsgroupinc.com Arizona | Colorado Basin I2 encompasses a portion of the ROW associated with the I-25 frontage road realignment. Basin I2 does not have an interim condition. Runoff from Basin I2 will be captured by an sidewalk culvert and conveyed to a rain garden prior to being detained and treated for additional water quality in Interim Pond I. Basin BOX Basin BOX is associated with the Boxelder Creek and is comprised of two subbasins, Basin BOX1 and Basin BOX2. As mentioned earlier, it is especially important to Gateway at Prospect to maintain stabilization within this drainageway. Jacobs has prepared a CLOMR Report and Stability Study which addresses Boxelder Creek stream stability impacts from the proposed improvements. Basin BOX1 Basin BOX1 is associated with Boxelder Creek downstream of the proposed span bridge that will be installed with Gateway at Prospect As mentioned earlier, there is an emergency overflow weir within Boxelder Creek on this site. This overflow weir has been included in the CLOMR Report and Boxelder Creek Stability Report by Jacobs, and is found within Basin BOX1. Basin BOX2 Basin BOX2 is associated with Boxelder Creek upstream of the proposed span bridge that will be installed with Gateway at Prospect. Basin PUD1 Basin PUD1 is associated with the Timnath Reservoir Inlet Canal. Basin PUD1 runs west to east and conveys off-site flows through the Gateway at Prospect site. These flows are siphoned under the Boxelder Creek and continue east of I-25. Gateway at Prospect does not propose to alter this drainageway/Irrigation ditch during the interim or ultimate condition. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. 4.2 FULL SPECTRUM DETENTION, EURV, AND WQCV 1. Gateway at Prospect is located near the downstream end of the Boxelder Creek/Cooper Slough Basin and will be discharging into Boxelder Creek. To maintain stream stability, full spectrum detention was utilized to size interim ponds and future release rates. The rationale behind this is to “beat the peak” and have the site drained before the peak flowrates within Boxelder Creek occur. In beating the peak, Gateway at Prospect can further avoid adversely impacting downstream infrastructure. 2. Gateway at Prospect proposes providing 100-year detention, detaining the EURV, and utilizing extended detention for water quality. However, storm lines have been sized for ultimate conditions unless otherwise stated. In the ultimate condition, all future parcels will be held to the ultimate release rates, WQCV, and EURV, as stated below. Additionally, future developments are responsible for sizing and implementing LID measures per the Fort Collins Stormwater Criteria Manual. 3. There will be two interim ponds (Interim Pond B and Interim Pond I) and five final Ponds (Pond C, Pond D, Pond E, Pond F and Pond G) installed with Gateway at Prospect. Pond H is a future Pond, not proposed to be built with the Gateway at Prospect project. 4. Information regarding future ponds for the ultimate condition for Pond B and Pond I are detailed below and in Appendix B. GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 17 of 22 epsgroupinc.com Arizona | Colorado 4.3 DETENTION POND CALCULATIONS Detention pond calculations were done via full spectrum method as described in Volume 2, Chapter 12, Section 3 in the Urban Strom Drainage Criteria Manual. Two ponds (Pond B and Pond I) will have interim ponds. Ponds C, D, E, F and G will be built out to its ultimate condition utilizing master planning assumptions. The Ultimate condition Ponds are designed to accommodate the future full buildout of their associated basins including water quality and detention volume without further modification. However, if future plans propose to modify these ultimate ponds, they may be subject to further floodplain review. Lastly, Pond D will not have an interim pond condition because Basin D during the interim condition remains unchanged from the existing condition. For interim ponds that will be fully constructed in the future and not with Gateway at Prospect (i.e., Pond B, Pond H and Pond I), the release rates stated in the proceeding paragraphs are the ultimate release rates. The corresponding ultimate detention volumes are only for conceptual purposes. Future developments might find it advantageous to have several ponds per basin instead of one large Pond. However, the summation of these pond volumes should be very close to the overall volumes as described below. Future Developments must provide for the WQCV and EURV as well. Please refer to Appendix B for additional information not captured in this narrative. Interim Pond B Pond B will provide detention and water quality for the interim condition of Basin B. Pond B has been sized for the interim condition to allow for more flexibility of the future development. LID treatment is proposed with this project to treat the adjacent connector roadway. The future development of basin B will need to reanalyze the detention requirements based on the proposed use and provide 100-year detention, detained EURV and WQCV per revised Full Spectrum Detention calculations along with LID measures as laid forth in the Fort Collins Stormwater Criteria Manual. Future LID facilities should be located upstream and outside of the detention pond. The ultimate release rate should closely match the Ultimate Condition as stated below; however, it may vary slightly due to outlet geometry. Pond C Pond C will provide detention and water quality for the interim condition of Basin C. Pond C has been sized for the ultimate condition in order to limit work in the floodplain and natural habitat buffer zone in the future. LID treatment is proposed with this project to treat the adjacent connector roadway. The future development of basin C will need to maintain Pond C in its proposed form or provide an equivalent level of Full Spectrum Detention along with LID measures as laid forth in the Fort Collins Stormwater Criteria Manual. Future LID facilities should be located upstream and outside of the detention pond. Pond D Pond D provides detention and water quality treatment for Basin D. Pond D has been sized for the ultimate condition. LID treatment is proposed with this project to treat the I-25 Frontage Road Improvements. The Metropolitan District will be responsible to maintain Pond D. Pond E Pond E provides detention and water quality treatment for Basin E. Pond E has been sized for the ultimate condition. LID treatment is proposed with this project to treat the adjacent connector roadway and a portion of Prospect Road. The future development of basin E will need to maintain Pond E in its proposed form or provide an equivalent level of Full Spectrum Detention along with LID measures as laid forth in the Fort Collins Stormwater Criteria Manual. Future LID facilities should be located upstream and outside of the detention pond. Pond F Pond F has been sized for the ultimate condition in order to limit work in the floodplain and natural habitat buffer zone in the future. The future development of basin F will need to maintain Pond F in its proposed form or provide an equivalent level of Full Spectrum Detention along with LID measures as laid forth in the Fort Collins Stormwater Criteria Manual. Future LID facilities should be located upstream and outside of the detention pond. GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 18 of 22 epsgroupinc.com Arizona | Colorado Pond G Pond G provides detention and water quality treatment for Basin G. Pond G has been sized for the ultimate condition in order to limit work in the floodplain and natural habitat buffer zone in the future. The future development of basin G will need to maintain Pond G in its proposed form or provide an equivalent level of Full Spectrum Detention along with LID measures as laid forth in the Fort Collins Stormwater Criteria Manual. Future LID facilities should be located upstream and outside of the detention pond. Future Pond H Future Pond H provides detention and water quality treatment for the future condition of Basin H. Future Pond H is being deferred until the time of development to allow for more flexibility of the future development. The future development of basin H will need to analyze the detention requirements based on the proposed use and provide 100-year detention, detained EURV and WQCV per revised Full Spectrum Detention calculations along with LID measures as laid forth in the Fort Collins Stormwater Criteria Manual. The development will be required to build an outlet structure to direct runoff from basin H around Pond I; thereby creating a separate Pond H. The ultimate release rate and volumes should closely match the Ultimate Condition as stated below; however, it may vary slightly due to outlet geometry. Future LID facilities should be located upstream and outside of the detention pond. Interim Pond I Interim Pond I will provide detention and water quality for the interim condition of Basins H and I. Pond I has been sized for the interim condition where Basin H is also draining to Pond I. LID treatment is proposed with this project to treat the adjacent I-25 Frontage Road improvements and a portion of Prospect Road. The future development of basin H and I will need to reanalyze the detention requirements of Pond I based on the proposed use and provide 100-year detention, detained EURV and WQCV per revised Full Spectrum Detention calculations along with LID measures as laid forth in the Fort Collins Stormwater Criteria Manual. The interim grading of Pond I was designed to accommodate the future volume needs of Pond I once Pond H discharge is bypassed. Future LID facilities should be located upstream and outside of the detention pond. GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 19 of 22 epsgroupinc.com Arizona | Colorado Pond Summary Pond sizing and associated release rates were calculated via full spectrum detention methods. All interim and final ponds will be released to Boxelder Creek. By utilizing full spectrum detention, it allows Gateway at Prospect and future developments to maintain downstream infrastructure within Boxelder Creek by beating the peak flows in the creek. Table 3 - Pond Summaries Pond Summaries Pond ID Tributary Area Interim Impervious Final Impervious Interim 100-yr Storage Interim WQCV + EURV Interim Release Rate Final 100-yr Storage Final WQCV + EURV Final Release Rate (acre) (%) (%) ac-ft (elev.) ac-ft (elev.) (cfs) ac-ft (elev.) ac-ft (elev.) (cfs) Pond B 67.23 3% 46% 1.726 (4908.38) 0.152 (4904.54) 96.00 7.07 (TBD)* 2.907 (TBD)* 103.7* Pond C 21.13 n/a 79% n/a n/a n/a 3.323 (4907.89) 1.638 (4906.47) 26.90 Pond D 2.94 n/a 27% n/a n/a n/a 0.222 (4904.69) 0.072 (4903.97) 4.50 Pond E 4.92 n/a 66% n/a n/a n/a 0.669 (4901.84) 0.314 (4900.70) 9.30 Pond F 12.20 n/a 77% n/a n/a n/a 1.878 (4905.02) 0.92 (4903.84) 14.00 Pond G 7.05 n/a 70% n/a n/a n/a 1.004 (4901.72) 0.48 (4901.04) 11.40 Pond H 16.72 13% 80% 1.067 (4902.80) 0.232 (4901.25) 25.70 2.658 (TBD)* 1.313 (TBD)* 20.9* Pond I 4.26 76% 0.648 (4903.13) 0.316 (4901.91) 3.30 * Future required pond volumes and WSELs to be determined at time of development and once pond layout and grading is known. It is evident that the final release rates between the interim condition and ultimate condition are slightly different. Due to how the full spectrum spreadsheet by Mile High Flood Control district is put together, it iterates the 100-year release rate to 0.90 of the predevelopment flows. The predevelopment flows are the same between the interim and final ponds on a per basin comparison. However, the WQCV, EURV, and total volume are different between interim and ultimate conditions. These differences in volumes impact the head pressure generated at the outfall structure. Because of this difference in head pressure the outlet structures are constructed differently, and thus, the ultimate release rate is slightly adjusted. It is also important to note that the full spectrum spreadsheet rounds the ratio peak outflow to predevelopment to 0.90 for the 100-year event. However, in most situations, the ratio peak outflow to predevelopment is rarely exactly 0.90 but somewhere within the range of 0.86 to 0.94. 4.4 SPECIFIC DETAILS 1. Stormline J was sized to convey the bypass from the Timnath Reservoir Inlet Canal. This bypass was estimated at approximately 203 cfs. This flow was provided in the City of Fort Collins 10-year SWMM model for the Boxelder Creek basin. The intent would be that the 10-year flow would be conveyed under the future Fort Collins trail and flow greater than 10-year would overtop the trail. 2. The Reservoir Company has confirmed that they do not discharge irrigation water from the Timnath Reservoir Inlet Canal at this location. When they are not filling the Timnath Reservoir, they keep the gate open to discharge any stormwater that gets intercepted by the ditch into Boxelder Creek. GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 20 of 22 epsgroupinc.com Arizona | Colorado 3. A future Cooper Slough drainage channel was modeled with this study. The Cooper Slough drainage channel is expected to be built by the City of Fort Collins in order to alleviate flooding upstream of this site. The future Cooper Slough channel is anticipated to be built within Basin A. The Cooper Slough channel was estimated by Fort Collins to divert a total flow of 1050 cfs in the 100-year event with an additional 224 cfs added just upstream of the confluence with Boxelder Creek. This project modeled both the 100-year and 10-year event. The 100-year event exceeded the banks of the formalized channel, but was still contained within the drainage tract. The 10- year event was well contained within the channel. 4. Due to concerns regarding shallow groundwater with higher hydraulic conductive potential, each detention pond has been outfitted with an underdrain to reduce the risk of groundwater exposure within the ponds. This underdrain section is generally located 2’ below the bottom flowline of each pond. The underdrain is designed to be encased in a gravel bedding. Please see the report by Miller Groundwater for additional information and modeling of the subsurface water. 5. To meet the City’s desires to limit the amount concrete pans within detention ponds, especially adjacent to environmentally sensitive areas, this project proposes a soft pan to be installed within the flowline of each detention pond. This soft pan is integrated with the underdrain network described above. The soft pan will allow the ponds to release any ponded water through the soil to the proposed underdrain system. GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 21 of 22 epsgroupinc.com Arizona | Colorado 5.0 CONCLUSIONS The outfall for most of the site south of the Welch Lateral will be Dry Creek. The outfall for the site north of the Welch Lateral will be the Town’s major drainageway at the intersection of Berthoud Parkway and Welch Avenue. 5.1 COMPLIANCE WITH STANDARDS 1. The drainage design proposed with the Gateway at Prospect project does not comply with the City of Fort Collins’ Stormwater Criteria Manual but does meet the Mile High Flood Control District Criteria Manual. However, the City of Fort Collins has approved this divergence from the detention standards set in the FCSCM. A variance request has been provided to the City. 2. The drainage design proposed with the Gateway at Prospect project complies with the City of Fort Collins’ Master Drainage Plan for the Boxelder and Cooper Slough Basin. 3. There are regulatory floodplains associated with the Gateway at Prospect development. 4. The drainage plan and stormwater management measures proposed with Gateway at Prospect development are compliant with all applicable State and Federal regulations governing stormwater discharge. 5.2 DRAINAGE CONCEPT 1. Gateway at Prospect project’s drainage infrastructure is designed based on the future the ultimate condition of the site, with the exception of two interim detention ponds. 2. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. 3. This drainage study has set out guidelines for future development to ensure the downstream integrity of Boxelder Creek. Gateway at Prospect utilized full spectrum detention as a mechanism to “beat the peak” of Boxelder Creek. 4. The proposed Gateway at Prospect development will not impact the Master Drainage Plan recommendations for the Boxelder and Cooper Slough major drainage basin. GATEWAY AT PROSPECT FINAL DRAINAGE REPORT 22 of 22 epsgroupinc.com Arizona | Colorado 6.0 REFERENCES 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Mile High Flood District, Wright-McLaughlin Engineers, Denver, Colorado, Revised September 2017. 6. SWMM Analysis for the Boxelder and Cooper Slough Major Basin, Ayers Associates, Fort Collins, Colorado, 2018. 7. Overall Drainage Report for Gateway at Prospect Overall Development Plan, by Northern Engineering, May 3, 2016. GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado APPENDIX A Hydrologic Computations Hydrologic Soil Group—Larimer County Area, Colorado (Gateway at Prospect) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/14/2025 Page 1 of 4 44 9 0 6 0 0 44 9 0 7 0 0 44 9 0 8 0 0 44 9 0 9 0 0 44 9 1 0 0 0 44 9 1 1 0 0 44 9 1 2 0 0 44 9 1 3 0 0 44 9 1 4 0 0 44 9 1 5 0 0 44 9 1 6 0 0 44 9 1 7 0 0 44 9 1 8 0 0 44 9 1 9 0 0 44 9 2 0 0 0 44 9 0 6 0 0 44 9 0 7 0 0 44 9 0 8 0 0 44 9 0 9 0 0 44 9 1 0 0 0 44 9 1 1 0 0 44 9 1 2 0 0 44 9 1 3 0 0 44 9 1 4 0 0 44 9 1 5 0 0 44 9 1 6 0 0 44 9 1 7 0 0 44 9 1 8 0 0 44 9 1 9 0 0 44 9 2 0 0 0 498900 499000 499100 499200 499300 499400 499500 499600 499700 499800 499900 498900 499000 499100 499200 499300 499400 499500 499600 499700 499800 499900 40° 34' 45'' N 10 5 ° 0 ' 5 0 ' ' W 40° 34' 45'' N 10 5 ° 0 ' 0 ' ' W 40° 33' 56'' N 10 5 ° 0 ' 5 0 ' ' W 40° 33' 56'' N 10 5 ° 0 ' 0 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 350 700 1400 2100 Feet 0 100 200 400 600 Meters Map Scale: 1:7,490 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 19, Aug 29, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 2, 2021—Aug 25, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Gateway at Prospect) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/14/2025 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 22 Caruso clay loam, 0 to 1 percent slope D 22.6 11.9% 24 Connerton-Barnum complex, 0 to 3 percent slopes C 5.0 2.6% 33 Fluvaquents, nearly level B 7.1 3.7% 35 Fort Collins loam, 0 to 3 percent slopes C 1.1 0.6% 54 Kim loam, 3 to 5 percent slopes B 3.8 2.0% 73 Nunn clay loam, 0 to 1 percent slopes C 4.2 2.2% 74 Nunn clay loam, 1 to 3 percent slopes C 2.5 1.3% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 92.6 48.7% 98 Satanta Variant clay loam, 0 to 3 percent slopes D 51.1 26.9% Totals for Area of Interest 190.2 100.0% Hydrologic Soil Group—Larimer County Area, Colorado Gateway at Prospect Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/14/2025 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Gateway at Prospect Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/14/2025 Page 4 of 4 Gateway at Prospect CHARACTER OF SURFACE1: Percentage Impervious Runoff Coefficient Developed Asphalt .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………100%0.95 Concrete .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………100%0.95 Gravel .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………40%0.50 Unimproved Areas Undeveloped, Greenbelts, agricultural .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.20 Lawns Sandy Soil .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.20 Notes: Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Gravel (ac) Area of Undeveloped, Greenbelts, Agricultural (ac) Composite % Imperv. 2-year Composite Runoff Coefficient 5-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient CxCf Cf=1.00 100-year Composite Runoff Coefficient CxCf Cf=1.25 EX1 29.57 0.00 0.00 1.34 28.23 4% 0.21 0.21 0.21 0.26 EX2 3.13 0.00 0.00 0.00 3.13 2% 0.20 0.20 0.20 0.25 EX3 21.62 0.00 0.00 0.42 21.19 3% 0.21 0.21 0.21 0.26 EX4A 43.42 0.00 0.00 0.88 42.55 3% 0.21 0.21 0.21 0.26 EX4B 4.21 0.00 0.00 0.09 4.13 3% 0.21 0.21 0.21 0.26 EX5 57.56 0.64 0.00 0.42 56.50 3% 0.21 0.21 0.21 0.26 EX6 17.31 0.42 0.00 0.00 16.89 4% 0.22 0.22 0.22 0.28 EXISTING BASIN % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 2) Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Chapter 3. Table 3.2-1 and 3.2-2 1) Percentage impervious taken from the Fort Collins Stormwater Criteria Manual, Chapter 5, Table 4.1-2 and Table 4.1-3 Gateway at Prospect Overland Flow, Time of Concentration: Channelized Flow, Time of Concentration: Total Time of Concentration : T c is the lesser of the values of Tc calculated using T c = T i + T t C2,10 C100 Length, L (ft) Slope, S (%) Ti2 Ti100 Length, L (ft) Slope, S (%) Roughness Coefficient Assumed Hydraulic Radius Velocity, V (ft/s) Tt (min)Tc (Eq. 3.3-5) Tc2 = Ti +Tt Tc100 = Ti +Tt Tc2,10 Tc100 EX1 EX1 NO 0.21 0.26 500 0.40%50.5 47.5 1700 0.29%0.025 0.59 2.26 12.5 N/A 63.0 60.0 63.0 60.0 EX2 EX2 NO 0.20 0.25 15 33.33%2.0 1.9 2561 0.08%0.025 0.59 1.17 36.6 N/A 38.6 38.5 38.6 38.5 EX3 EX3 NO 0.21 0.26 500 1.30%34.1 32.1 1050 0.62%0.025 0.59 3.28 5.3 N/A 39.4 37.4 39.4 37.4 EX4 EX4A NO 0.21 0.26 500 0.80%40.1 37.7 1800 0.40%0.025 0.59 2.64 11.4 N/A 51.5 49.1 51.5 49.1 EX4 EX4B NO 0.21 0.26 424 0.71%38.5 36.2 212 3.30%0.025 0.59 7.58 0.5 N/A 38.9 36.7 38.9 36.7 EX5 EX5 NO 0.21 0.26 500 0.64%43.2 40.6 1250 0.38%0.025 0.59 2.59 8.1 N/A 51.2 48.7 51.2 48.7 EX6 EX6 NO 0.22 0.28 500 1.40%32.9 30.8 152 0.66%0.025 0.59 3.38 0.7 N/A 33.6 31.6 33.6 31.6 EXISTING DEVELOPED DIRECT TIME OF CONCENTRATION Channelized Flow Design Point Basin Overland Flow Time of Concentration Urban? (Equation 3.3-2 FCSCM) (Equation 5-5 FCSCM) (Equation 5-4 FCSCM) (Equation 3.3-5 FCSCM) Gateway at Prospect Rational Method Equation: Rainfall Intensity: EX1 29.57 63.0 60.0 0.21 0.21 0.26 0.79 1.35 2.78 4.91 8.40 21.55 EX2 3.13 38.6 38.5 0.20 0.20 0.25 1.10 1.88 3.84 0.69 1.17 3.00 EX3 21.62 39.4 37.4 0.21 0.21 0.26 1.09 1.86 3.80 4.95 8.44 21.56 EX4A 43.42 51.5 49.1 0.21 0.21 0.26 0.91 1.56 3.18 8.30 14.22 36.25 EX4B 4.21 38.9 36.7 0.21 0.21 0.26 1.10 1.88 3.84 0.97 1.66 4.24 EX5 57.56 51.2 48.7 0.21 0.21 0.26 0.91 1.56 3.18 11.00 18.86 48.05 EX6 17.31 33.6 31.6 0.22 0.22 0.28 1.21 2.06 4.20 4.59 7.84 19.99 EXISTING DEVELOPED RUNOFF COMPUTATIONS Design Point Area, A (acres) Tc2,10 (min) Flow, Q2 (cfs) Flow, Q100 (cfs) C2 C100 IDF Table for Rational Method - Table 3.4-1 FCSCM Flow, Q10 (cfs) Intensity, i10 (in/hr) C10 Tc100 (min) Intensity, i2 (in/hr) Intensity, i100 (in/hr) ()()()AiCCQf= Gateway at Prospect CHARACTER OF SURFACE1: Percentage Impervious 2-yr Runoff Coefficient 5-yr Runoff Coefficient Developed ROW (Connector 63' ROW).…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………75%0.77 0.77 ROW (Connector 69' ROW).…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………77%0.79 0.79 ROW (Collector 92' ROW).…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………86%0.85 0.85 Urban Estate .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………30%0.30 0.30 Low Density Residential .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………50%0.55 0.55 Medium Density Residential .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………70%0.65 0.65 Commercial .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………80%0.85 0.85 Park .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………25%0.35 0.35 Unimproved Areas Undeveloped, Greenbelts, agricultural .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.20 0.20 Lawns Sandy Soil .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.20 0.20 Notes: Basin ID Basin Area (ac) Area of Connector 63' R.O.W (ac) Area of Connector 69' R.O.W (ac) Area of Collector 92' R.O.W (ac) Area of Urban Estate (ac) Area of Low Density Residential (ac) Area of Medium Density Residential (ac) Area of Commercia l (ac) Area of Park (ac) Area of Undeveloped, Greenbelts, Agricultural (ac) Composite % Imperv. 2-year Composite Runoff Coefficient 5-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient CxCf Cf=1.00 100-year Composite Runoff Coefficient CxCf Cf=1.25 A1 29.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.57 2%0.20 0.20 0.20 0.25 B1 66.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.71 2%0.20 0.20 0.20 0.25 B2 0.35 0.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75%0.77 0.77 0.77 0.97 B3 0.17 0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75%0.77 0.77 0.77 0.97 C1 20.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.77 2%0.20 0.20 0.20 0.25 C2 0.36 0.00 0.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77%0.79 0.79 0.79 0.98 D1 2.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.07 2%0.20 0.20 0.20 0.25 D2 0.86 0.00 0.00 0.86 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 E1 3.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.08 2%0.20 0.20 0.20 0.25 E2 1.85 0.62 0.00 0.73 0.00 0.00 0.00 0.00 0.00 0.50 60%0.65 0.65 0.65 0.81 F1 9.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.43 2%0.20 0.20 0.20 0.25 F2 0.36 0.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75%0.77 0.77 0.77 0.97 F3 0.42 0.00 0.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77%0.79 0.79 0.79 0.98 F4 0.79 0.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75%0.77 0.77 0.77 0.97 F5 1.20 0.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.67 34%0.45 0.45 0.45 0.57 G1 5.28 0.00 0.00 0.32 0.00 0.00 0.00 0.00 0.00 4.96 7%0.24 0.24 0.24 0.30 G2 0.92 0.00 0.00 0.92 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 G3 0.35 0.00 0.00 0.35 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 G4 0.51 0.00 0.00 0.51 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 H1 15.97 0.00 0.00 0.37 0.00 0.00 0.00 0.00 0.00 15.60 4%0.22 0.22 0.22 0.27 H2 0.75 0.00 0.00 0.75 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 I1 2.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.54 2%0.20 0.20 0.20 0.25 I2 1.72 0.00 0.00 1.72 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 BOX1 5.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.53 2%0.20 0.20 0.20 0.25 BOX2 4.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.66 2%0.20 0.20 0.20 0.25 PUD1 3.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.13 2%0.20 0.20 0.20 0.25 Basin B (B1, B2 and B3)67.23 0.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.71 3%0.20 0.20 0.20 0.26 Basin C (C1 and C2)21.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.13 2%0.20 0.20 0.20 0.25 Basin D (D1 and D2)2.94 0.00 0.00 0.86 0.00 0.00 0.00 0.00 0.00 2.07 27%0.39 0.39 0.39 0.49 Basin E (E1 and E2)4.92 0.62 0.00 0.73 0.00 0.00 0.00 0.00 0.00 3.57 24%0.37 0.37 0.37 0.46 Basin F (F1, F2, F3, F4 and F5)12.20 1.68 0.42 0.00 0.00 0.00 0.00 0.00 0.00 10.52 15%0.31 0.31 0.31 0.38 Basin G (G1, G2, G3, G4)7.05 0.00 0.00 2.09 0.00 0.00 0.00 0.00 0.00 4.96 27%0.39 0.39 0.39 0.49 Basin H (H1 and H2)16.72 0.00 0.00 1.13 0.00 0.00 0.00 0.00 0.00 15.60 8%0.24 0.24 0.24 0.30 Basin I (I1 and I2)4.26 0.00 0.00 1.72 0.00 0.00 0.00 0.00 0.00 2.54 36%0.46 0.46 0.46 0.58 Basin H & I 20.98 0.00 0.00 2.84 0.00 0.00 0.00 0.00 0.00 18.14 13%0.29 0.29 0.29 0.36 INTERIM BASIN % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 2) Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Chapter 3. Table 3.2-1 and 3.2-2 1) Percentage impervious taken from the Fort Collins Stormwater Criteria Manual, Chapter 5, Table 4.1-2 and Table 4.1-3 Combined Basins Gateway at Prospect Overland Flow, Time of Concentration: Channelized Flow, Time of Concentration: Total Time of Concentration : T c is the lesser of the values of Tc calculated using T c = T i + T t C2 C100 Length, L (ft) Slope, S (%) Ti2 Ti100 Length, L (ft) Slope, S (%) Roughness Coefficient Assumed Hydraulic Radius Velocity, V (ft/s) Tt (min)Tc (Eq. 3.3-5) Tc2 = Ti +Tt Tc100 = Ti +Tt Tc2 Tc100 A1 0.20 0.25 489 0.40%50.6 47.8 200 2.00%0.025 0.55 5.66 0.6 13.8 51.2 48.3 13.8 13.8 Interim Pond B B1 0.20 0.25 100 3.00%11.7 11.0 1835 0.50%0.025 0.55 2.83 10.8 20.8 22.5 21.8 20.8 20.8 Interim Pond B B2 0.77 0.97 20 2.25%2.1 0.9 175 0.91%0.013 0.15 3.08 0.9 11.1 3.0 1.8 5.0 5.0 Interim Pond B B3 0.77 0.97 20 2.25%2.1 0.9 156 0.67%0.013 0.15 2.65 1.0 11.0 3.1 1.8 5.0 5.0 Pond C C1 0.20 0.25 100 2.50%12.4 11.7 700 0.50%0.025 0.55 2.83 4.1 14.4 16.5 15.8 14.4 14.4 Pond C C2 0.79 0.98 20 2.25%2.0 0.7 337 1.19%0.013 0.15 3.53 1.6 12.0 3.6 2.3 5.0 5.0 Pond D D1 0.20 0.25 110 1.60%15.1 14.3 50 0.50%0.025 0.55 2.83 0.3 10.9 15.4 14.5 10.9 10.9 Pond D D2 0.85 1.00 25 2.24%1.8 0.7 439 0.57%0.013 0.15 2.45 3.0 12.6 4.8 3.7 5.0 5.0 Pond E E1 0.20 0.25 100 2.00%13.4 12.6 400 0.50%0.025 0.55 2.83 2.4 12.8 15.7 15.0 12.8 12.8 Pond E E2 0.65 0.81 105 3.33%5.8 3.7 378 1.48%0.013 0.15 3.94 1.6 12.7 7.4 5.3 7.4 5.3 Pond F F1 0.20 0.25 100 2.00%13.4 12.6 600 0.50%0.025 0.55 2.83 3.5 13.9 16.9 16.2 13.9 13.9 Pond F F2 0.77 0.97 25 2.24%2.3 1.0 335 0.60%0.013 0.15 2.50 2.2 12.0 4.6 3.2 5.0 5.0 Pond F F3 0.79 0.98 20 2.25%2.0 0.7 337 1.19%0.013 0.15 3.53 1.6 12.0 3.6 2.3 5.0 5.0 Pond F F4 0.77 0.97 20 2.25%2.1 0.9 675 0.71%0.013 0.15 2.73 4.1 13.9 6.2 5.0 6.2 5.0 Pond F F5 0.45 0.57 20 2.25%4.1 3.4 564 0.71%0.013 0.15 2.72 3.5 13.2 7.6 6.9 7.6 6.9 Pond G G1 0.24 0.30 100 2.00%12.8 11.9 270 0.50%0.025 0.55 2.83 1.6 12.1 14.4 13.5 12.1 12.1 Pond G G2 0.85 1.00 25 3.00%1.6 0.6 560 1.87%0.013 0.15 4.42 2.1 13.3 3.7 2.8 5.0 5.0 Pond G G3 0.85 1.00 25 3.00%1.6 0.6 131 0.50%0.013 0.15 2.29 1.0 10.9 2.6 1.6 5.0 5.0 Pond G G4 0.85 1.00 96 1.56%3.9 1.6 132 0.53%0.013 0.15 2.36 0.9 11.3 4.9 2.5 5.0 5.0 Interim Pond I H1 0.22 0.27 100 2.00%13.1 12.3 750 0.50%0.025 0.55 2.83 4.4 14.7 17.6 16.8 14.7 14.7 Interim Pond I H2 0.85 1.00 35 2.25%2.1 0.8 334 0.95%0.013 0.15 3.15 1.8 12.1 3.9 2.6 5.0 5.0 Interim Pond I I1 0.20 0.25 35 2.25%7.6 7.2 250 0.58%0.025 0.55 3.06 1.4 11.6 9.0 8.5 9.0 8.5 Interim Pond I I2 0.85 1.00 25 3.14%1.6 0.6 593 1.81%0.013 0.15 4.35 2.3 13.4 3.9 2.9 5.0 5.0 BOX1 0.20 0.25 15 2.67%4.7 4.4 500 0.30%0.025 0.55 2.19 3.8 12.9 8.5 8.2 8.5 8.2 BOX2 0.20 0.25 15 2.67%4.7 4.4 500 0.30%0.025 0.55 2.19 3.8 12.9 8.5 8.2 8.5 8.2 PUD1 0.20 0.25 10 3.00%3.7 3.5 500 0.20%0.025 0.55 1.79 4.7 12.8 8.3 8.1 8.3 8.1 Interim Pond B Basin B (B1, B2 and B3)0.20 0.26 100 3.00%11.6 10.9 1835 0.50%0.025 0.55 0.28 108.1 20.8 119.7 119.1 20.8 20.8 Pond C Basin C (C1 and C2)0.20 0.25 100 2.50%12.4 11.7 700 0.50%0.025 0.55 0.28 41.2 14.4 53.6 53.0 14.4 14.4 Pond D Basin D (D1 and D2)0.39 0.49 110 1.60%11.9 10.2 50 0.50%0.025 0.55 0.28 2.9 10.9 14.8 13.2 10.9 10.9 Interim Pond E Basin E (E1 and E2)0.37 0.46 100 2.00%10.9 9.5 400 0.50%0.025 0.55 0.28 23.6 12.8 34.4 33.1 12.8 12.8 Pond F Basin F (F1, F2, F3, F4 and F5)0.31 0.38 100 2.00% 11.8 10.7 600 0.50% 0.025 0.55 0.28 35.3 13.9 47.1 46.0 13.9 13.9 Pond G Basin G (G1, G2, G3, G4)0.39 0.49 100 2.00%10.5 9.0 270 0.50%0.025 0.55 0.28 15.9 12.1 26.4 24.9 12.1 12.1 Interim Pond I Basin H (H1 and H2)0.24 0.30 100 2.00%12.7 11.8 750 0.50%0.025 0.55 0.28 44.2 14.7 56.9 56.0 14.7 14.7 Combined Basins INTERIM DEVELOPED DIRECT TIME OF CONCENTRATION Channelized Flow Design Point Basin Overland Flow Time of Concentration (Equation 3.3-2 FCSCM) (Equation 5-5 FCSCM) (Equation 5-4 FCSCM) (Equation 3.3-5 FCSCM) Gateway at Prospect Rational Method Equation: Rainfall Intensity: A1 29.57 13.8 13.8 0.20 0.25 1.95 6.82 11.53 50.39 Interim Pond B B1 66.71 20.8 20.8 0.20 0.25 1.59 5.53 21.15 92.22 B2 0.35 5.0 5.0 0.77 0.97 2.85 9.95 0.78 3.40 B3 0.17 5.0 5.0 0.77 0.97 2.85 9.95 0.38 1.67 Pond C C1 20.77 14.4 14.4 0.20 0.25 1.92 6.71 7.98 34.84 Pond C C2 0.36 5.0 5.0 0.79 0.98 2.85 9.95 0.82 3.57 Pond D D1 2.07 10.9 10.9 0.20 0.25 2.17 7.57 0.90 3.93 Pond D D2 0.86 5.0 5.0 0.85 1.00 2.85 9.95 2.09 8.59 Pond E E1 3.08 12.8 12.8 0.20 0.25 2.02 7.04 1.24 5.42 Pond E E2 1.85 5.3 5.3 0.65 0.81 2.85 9.95 3.42 14.92 Pond F F1 9.43 13.9 13.9 0.20 0.25 1.95 6.82 3.68 16.07 Pond F F2 0.36 5.0 5.0 0.77 0.97 2.85 9.95 0.80 3.47 Pond F F3 0.42 5.0 5.0 0.79 0.98 2.85 9.95 0.95 4.13 Pond F F4 0.79 5.0 5.0 0.77 0.97 2.85 9.95 1.73 7.57 Pond F F5 1.20 6.9 6.9 0.45 0.57 2.60 9.06 1.40 6.13 Pond G G1 5.28 12.1 12.1 0.24 0.30 2.05 7.16 2.59 11.30 Pond G G2 0.92 5.0 5.0 0.85 1.00 2.85 9.95 2.23 9.14 Pond G G3 0.35 5.0 5.0 0.85 1.00 2.85 9.95 0.84 3.45 Pond G G4 0.51 5.0 5.0 0.85 1.00 2.85 9.95 1.23 5.06 Interim Pond I H1 15.97 14.7 14.7 0.22 0.27 1.90 6.62 6.51 28.41 Interim Pond I H2 0.75 5.0 5.0 0.85 1.00 2.85 9.95 1.83 7.51 Interim Pond I I1 2.54 8.5 8.5 0.20 0.25 2.35 8.21 1.19 5.21 Interim Pond I I2 1.72 5.0 5.0 0.85 1.00 2.85 9.95 4.16 17.08 BOX1 5.53 8.2 8.2 0.20 0.25 2.40 8.38 2.65 11.58 BOX2 4.66 8.2 8.2 0.20 0.25 2.40 8.38 2.24 9.77 PUD1 3.13 8.1 8.1 0.20 0.25 2.40 8.38 1.50 6.55 Interim Pond B Basin B (B1, B2 and B3)67.23 20.8 20.8 0.20 0.26 1.59 5.53 21.79 95.04 Pond C Basin C (C1 and C2)21.13 14.4 14.4 0.20 0.25 1.92 6.71 8.12 35.45 Pond D Basin D (D1 and D2)2.94 10.9 10.9 0.39 0.49 2.17 7.57 2.50 10.88 Interim Pond E Basin E (E1 and E2)4.92 12.8 12.8 0.37 0.46 2.02 7.04 3.66 15.97 Pond F Basin F (F1, F2, F3, F4 and F5)12.20 13.9 13.9 0.31 0.38 1.95 6.82 7.28 31.79 Pond G Basin G (G1, G2, G3, G4)7.05 12.1 12.1 0.39 0.49 2.05 7.16 5.68 24.80 Interim Pond I Basin H (H1 and H2)16.72 14.7 14.7 0.24 0.30 1.90 6.62 7.73 33.72 Interim Pond I Basin I (I1 and I2)4.26 11.6 11.6 0.46 0.58 2.09 7.29 4.12 17.94 Combined Basins Tc100 (min) Intensity, i2 (in/hr) Intensity, i100 (in/hr) INTERIM DEVELOPED RUNOFF COMPUTATIONS Design Point Basin(s)Area, A (acres) Tc2 (min) Flow, Q2 (cfs) Flow, Q100 (cfs) C2 C100 IDF Table for Rational Method - Table 3.4-1 FCSCM AiCCQf Gateway at Prospect CHARACTER OF SURFACE1: Percentage Impervious 2-yr Runoff Coefficient 5-yr Runoff Coefficient Developed ROW (Connector 63' ROW).…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………75%0.77 0.77 ROW (Connector 69' ROW).…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………77%0.79 0.79 ROW (Collector 92' ROW).…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………86%0.85 0.85 Urban Estate .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………30%0.30 0.30 Low Density Residential .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………50%0.55 0.55 Medium Density Residential .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………70%0.65 0.65 Commercial .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………80%0.85 0.85 Park .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………25%0.35 0.35 Unimproved Areas Undeveloped, Greenbelts, agricultural .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.20 0.20 Lawns Sandy Soil .…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..……………………………………………….…………………………..………………………………………………2%0.20 0.20 Notes: Basin ID Basin Area (ac) Area of Connector 63' R.O.W (ac) Area of Connector 69' R.O.W (ac) Area of Collector 92' R.O.W (ac) Area of Urban Estate (ac) Area of Low Density Residential (ac) Area of Medium Density Residential (ac) Area of Commercia l (ac) Area of Park (ac) Area of Undeveloped, Greenbelts, Agricultural (ac) Composite % Imperv. 2-year Composite Runoff Coefficient 5-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient CxCf Cf=1.00 100-year Composite Runoff Coefficient CxCf Cf=1.25 A1 29.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.57 2%0.20 0.20 0.20 0.25 B1 66.71 0.00 0.00 0.00 13.56 53.14 0.00 0.00 0.00 13.56 46%0.54 0.54 0.54 0.67 B2 0.35 0.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75%0.77 0.77 0.77 0.97 B3 0.17 0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75%0.77 0.77 0.77 0.97 C1 20.77 0.00 0.00 0.00 0.00 0.00 0.00 20.77 0.00 0.00 80%0.85 0.85 0.85 1.00 C2 0.36 0.00 0.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77%0.79 0.79 0.79 0.98 D1 2.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.07 2%0.20 0.20 0.20 0.25 D2 0.86 0.00 0.00 0.86 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 E1 3.08 0.00 0.00 0.00 0.00 0.00 3.08 0.00 0.00 0.00 70%0.65 0.65 0.65 0.81 E2 1.85 0.62 0.00 0.73 0.00 0.00 0.00 0.00 0.00 0.50 60%0.65 0.65 0.65 0.81 F1 9.43 0.00 0.00 0.00 0.00 0.00 0.00 9.43 0.00 0.00 80%0.85 0.85 0.85 1.00 F2 0.36 0.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75%0.77 0.77 0.77 0.97 F3 0.42 0.00 0.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77%0.79 0.79 0.79 0.98 F4 0.79 0.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75%0.77 0.77 0.77 0.97 F5 1.20 0.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.67 34%0.45 0.45 0.45 0.57 G1 5.28 0.00 0.00 0.32 0.00 0.00 0.00 4.23 0.00 0.73 70%0.76 0.76 0.76 0.95 G2 0.92 0.00 0.00 0.92 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 G3 0.35 0.00 0.00 0.35 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 G4 0.51 0.00 0.00 0.51 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 H1 15.97 0.00 0.00 0.37 0.00 0.00 0.00 15.60 0.00 0.00 80%0.85 0.85 0.85 1.00 H2 0.75 0.00 0.00 0.75 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 I1 2.54 0.00 0.00 0.00 0.00 0.00 0.00 2.20 0.00 0.34 70%0.76 0.76 0.76 0.95 I2 1.72 0.00 0.00 1.72 0.00 0.00 0.00 0.00 0.00 0.00 86%0.85 0.85 0.85 1.00 BOX1 5.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.53 2%0.20 0.20 0.20 0.25 BOX2 4.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.66 2%0.20 0.20 0.20 0.25 PUD1 3.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.13 2%0.20 0.20 0.20 0.25 Basin B (B1, B2 and B3)67.23 0.53 0.00 0.00 13.56 53.14 0.00 0.00 0.00 0.00 46%0.50 0.50 0.50 0.63 Basin C (C1 and C2)21.13 0.00 0.00 0.00 0.00 0.00 0.00 20.77 0.00 0.36 79%0.84 0.84 0.84 1.00 Basin D (D1 and D2)2.94 0.00 0.00 0.86 0.00 0.00 0.00 0.00 0.00 2.07 27%0.39 0.39 0.39 0.49 Basin E (E1 and E2)4.92 0.62 0.00 0.73 0.00 0.00 3.08 0.00 0.00 0.50 66%0.65 0.65 0.65 0.81 Basin F (F1, F2, F3, F4 and F5)12.20 1.68 0.42 0.00 0.00 0.00 0.00 9.43 0.00 1.09 77%0.81 0.81 0.81 1.00 Basin G (G1, G2, G3, G4)7.05 0.00 0.00 2.09 0.00 0.00 0.00 4.23 0.00 0.73 70%0.78 0.78 0.78 0.98 Basin H (H1 and H2)16.72 0.00 0.00 1.13 0.00 0.00 0.00 15.60 0.00 0.00 80%0.85 0.85 0.85 1.00 Basin I (I1 and I2)4.26 0.00 0.00 1.72 0.00 0.00 0.00 2.20 0.00 0.34 76%0.80 0.80 0.80 1.00 FINAL BASIN % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 2) Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Chapter 3. Table 3.2-1 and 3.2-2 1) Percentage impervious taken from the Fort Collins Stormwater Criteria Manual, Chapter 5, Table 4.1-2 and Table 4.1-3 Combined Basins Gateway at Prospect Overland Flow, Time of Concentration: Channelized Flow, Time of Concentration: Total Time of Concentration : T c is the lesser of the values of Tc calculated using T c = T i + T t C2 C100 Length, L (ft) Slope, S (%) Ti2 Ti100 Length, L (ft) Slope, S (%) Roughness Coefficient Assumed Hydraulic Radius Velocity, V (ft/s) Tt (min)Tc (Eq. 3.3-5) Tc2 = Ti +Tt Tc100 = Ti +Tt Tc2 Tc100 A1 0.20 0.25 489 0.40%50.6 47.8 200 2.00%0.025 0.55 5.66 0.6 13.8 51.2 48.3 13.8 13.8 Final Pond B B1 0.54 0.67 100 3.00%7.3 5.5 1835 0.50%0.013 0.15 2.29 13.4 20.8 20.6 18.9 20.6 18.9 Final Pond B B2 0.77 0.97 20 2.25%2.1 0.9 175 0.91%0.013 0.15 3.08 0.9 11.1 3.0 1.8 5.0 5.0 Final Pond B B3 0.77 0.97 20 2.25%2.1 0.9 156 0.67%0.013 0.15 2.65 1.0 11.0 3.1 1.8 5.0 5.0 Pond C C1 0.85 1.00 100 2.50%3.4 1.4 700 0.50%0.013 0.15 2.29 5.1 14.4 8.5 6.5 8.5 6.5 Pond C C2 0.79 0.98 20 2.25%2.0 0.7 337 1.19%0.013 0.15 3.53 1.6 12.0 3.6 2.3 5.0 5.0 Pond D D1 0.20 0.25 110 1.60%15.1 14.3 50 0.50%0.025 0.55 2.83 0.3 10.9 15.4 14.5 10.9 10.9 Pond D D2 0.85 1.00 25 2.24%1.8 0.7 439 0.57%0.013 0.15 2.45 3.0 12.6 4.8 3.7 5.0 5.0 Pond E E1 0.65 0.81 100 2.00%6.7 4.3 400 0.50%0.013 0.15 2.29 2.9 12.8 9.6 7.2 9.6 7.2 Pond E E2 0.65 0.81 105 3.33%5.8 3.7 378 1.48%0.013 0.15 3.94 1.6 12.7 7.4 5.3 7.4 5.3 Pond F F1 0.85 1.00 100 2.00%3.7 1.5 600 0.50%0.013 0.15 2.29 4.4 13.9 8.1 5.9 8.1 5.9 Pond F F2 0.77 0.97 25 2.24%2.3 1.0 335 0.60%0.013 0.15 2.50 2.2 12.0 4.6 3.2 5.0 5.0 Pond F F3 0.79 0.98 20 2.25%2.0 0.7 337 1.19%0.013 0.15 3.53 1.6 12.0 3.6 2.3 5.0 5.0 Pond F F4 0.77 0.97 20 2.25%2.1 0.9 675 0.71%0.013 0.15 2.73 4.1 13.9 6.2 5.0 6.2 5.0 Pond F F5 0.45 0.57 20 2.25%4.1 3.4 564 0.71%0.013 0.15 2.72 3.5 13.2 7.6 6.9 7.6 6.9 Pond G G1 0.76 0.95 100 2.00%5.0 2.2 270 0.50%0.025 0.55 2.83 1.6 12.1 6.6 3.8 6.6 5.0 Pond G G2 0.85 1.00 25 3.00%1.6 0.6 560 1.87%0.013 0.15 4.42 2.1 13.3 3.7 2.8 5.0 5.0 Pond G G3 0.85 1.00 25 3.00%1.6 0.6 131 0.50%0.013 0.15 2.29 1.0 10.9 2.6 1.6 5.0 5.0 Pond G G4 0.85 1.00 96 1.56%3.9 1.6 132 0.53%0.013 0.15 2.36 0.9 11.3 4.9 2.5 5.0 5.0 Final Pond H H1 0.85 1.00 100 2.00%3.7 1.5 750 0.50%0.013 0.15 2.29 5.5 14.7 9.2 6.9 9.2 6.9 Final Pond H H2 0.85 1.00 35 2.25%2.1 0.8 334 0.95%0.013 0.15 3.15 1.8 12.1 3.9 2.6 5.0 5.0 Final Pond I I1 0.76 0.95 35 2.25%2.8 1.2 250 0.58%0.013 0.55 5.88 0.7 11.6 3.6 1.9 5.0 5.0 Final Pond I I2 0.85 1.00 25 3.14%1.6 0.6 593 1.81%0.013 0.15 4.35 2.3 13.4 3.9 2.9 5.0 5.0 BOX1 0.20 0.25 15 2.67%4.7 4.4 500 0.30%0.025 0.55 2.19 3.8 12.9 8.5 8.2 8.5 8.2 BOX2 0.20 0.25 15 2.67%4.7 4.4 500 0.30%0.025 0.55 2.19 3.8 12.9 8.5 8.2 8.5 8.2 PUD1 0.20 0.25 10 3.00%3.7 3.5 500 0.20%0.025 0.55 1.79 4.7 12.8 8.3 8.1 8.3 8.1 Final Pond B Basin B (B1, B2 and B3)0.50 0.63 100 3.00%7.8 6.1 1835 0.50%0.013 0.15 0.23 133.7 20.8 141.5 139.8 20.8 20.8 Pond C Basin C (C1 and C2)0.84 1.00 100 2.50%3.6 1.4 700 0.50%0.013 0.15 0.23 51.0 14.4 54.6 52.4 14.4 14.4 Pond D Basin D (D1 and D2)0.39 0.49 110 1.60%11.9 10.2 50 0.50%0.013 0.15 0.23 3.6 10.9 15.5 13.9 10.9 10.9 Pond E Basin E (E1 and E2)0.65 0.81 100 2.00%6.7 4.3 400 0.50%0.013 0.15 0.23 29.1 12.8 35.8 33.4 12.8 12.8 Pond F Basin F (F1, F2, F3, F4 and F5)0.81 1.00 100 2.00% 4.3 1.5 600 0.50% 0.013 0.15 0.23 43.7 13.9 48.0 45.2 13.9 13.9 Pond G Basin G (G1, G2, G3, G4)0.78 0.98 100 2.00%4.7 1.8 270 0.50%0.013 0.15 0.23 19.7 12.1 24.4 21.5 12.1 12.1 Final Pond H Basin H (H1 and H2)0.85 1.00 100 2.00%3.7 1.5 750 0.50%0.013 0.15 0.23 54.6 14.7 58.3 56.1 14.7 14.7 Combined Basins FINAL DEVELOPED DIRECT TIME OF CONCENTRATION Channelized Flow Design Point Basin Overland Flow Time of Concentration (Equation 3.3-2 FCSCM) (Equation 5-5 FCSCM) (Equation 5-4 FCSCM) (Equation 3.3-5 FCSCM) Gateway at Prospect Rational Method Equation: Rainfall Intensity: A1 29.57 13.8 13.8 0.20 0.25 1.95 6.82 11.53 50.39 Final Pond B B1 66.71 18.9 18.9 0.54 0.67 1.68 5.84 60.32 262.65 B2 0.35 5.0 5.0 0.77 0.97 2.85 9.95 0.78 3.40 B3 0.17 5.0 5.0 0.77 0.97 2.85 9.95 0.38 1.67 Pond C C1 20.77 6.5 6.5 0.85 1.00 2.67 9.31 47.13 193.35 Pond C C2 0.36 5.0 5.0 0.79 0.98 2.85 9.95 0.82 3.57 Pond D D1 2.07 10.9 10.9 0.20 0.25 2.17 7.57 0.90 3.93 Pond D D2 0.86 5.0 5.0 0.85 1.00 2.85 9.95 2.09 8.59 Pond E E1 3.08 7.2 7.2 0.65 0.81 2.52 8.80 5.04 22.00 Pond E E2 1.85 5.3 5.3 0.65 0.81 2.85 9.95 3.42 14.92 Pond F F1 9.43 5.9 5.9 0.85 1.00 2.76 9.63 22.12 90.81 Pond F F2 0.36 5.0 5.0 0.77 0.97 2.85 9.95 0.80 3.47 Pond F F3 0.42 5.0 5.0 0.79 0.98 2.85 9.95 0.95 4.13 Pond F F4 0.79 5.0 5.0 0.77 0.97 2.85 9.95 1.73 7.57 Pond F F5 1.20 6.9 6.9 0.45 0.57 2.60 9.06 1.40 6.13 Pond G G1 5.28 5.0 5.0 0.76 0.95 2.85 9.95 11.43 49.89 Pond G G2 0.92 5.0 5.0 0.85 1.00 2.85 9.95 2.23 9.14 Pond G G3 0.35 5.0 5.0 0.85 1.00 2.85 9.95 0.84 3.45 Pond G G4 0.51 5.0 5.0 0.85 1.00 2.85 9.95 1.23 5.06 Final Pond H H1 15.97 6.9 6.9 0.85 1.00 2.60 9.06 35.22 144.59 Final Pond H H2 0.75 5.0 5.0 0.85 1.00 2.85 9.95 1.83 7.51 Final Pond I I1 2.54 5.0 5.0 0.76 0.95 2.85 9.95 5.52 24.11 Final Pond I I2 1.72 5.0 5.0 0.85 1.00 2.85 9.95 4.16 17.08 BOX1 5.53 8.2 8.2 0.20 0.25 2.40 8.38 2.65 11.58 BOX2 4.66 8.2 8.2 0.20 0.25 2.40 8.38 2.24 9.77 PUD1 3.13 8.1 8.1 0.20 0.25 2.40 8.38 1.50 6.55 Final Pond B Basin B (B1, B2 and B3)67.23 20.8 20.8 0.50 0.63 1.59 5.53 53.42 232.99 Pond C Basin C (C1 and C2)21.13 14.4 14.4 0.84 1.00 1.92 6.71 34.03 141.80 Pond D Basin D (D1 and D2)2.94 10.9 10.9 0.39 0.49 2.17 7.57 2.50 10.88 Pond E Basin E (E1 and E2)4.92 12.8 12.8 0.65 0.81 2.02 7.04 6.45 28.16 Pond F Basin F (F1, F2, F3, F4 and F5)12.20 13.9 13.9 0.81 1.00 1.95 6.82 19.23 83.12 Pond G Basin G (G1, G2, G3, G4)7.05 12.1 12.1 0.78 0.98 2.05 7.16 11.32 49.41 Final Pond H Basin H (H1 and H2)16.72 14.7 14.7 0.85 1.00 1.90 6.62 26.94 110.62 Final Pond I Basin I (I1 and I2)4.26 11.6 11.6 0.80 1.00 2.09 7.29 7.10 30.98 FINAL DEVELOPED RUNOFF COMPUTATIONS Design Point Basin(s)Area, A (acres) Tc2 (min) Flow, Q2 (cfs) Flow, Q100 (cfs) C2 C100 IDF Table for Rational Method - Table 3.4-1 FCSCM Combined Basins Tc100 (min) Intensity, i2 (in/hr) Intensity, i100 (in/hr) AiCCQf GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado APPENDIX B Low Impact Development Responsibility Exhibit X X X X X / / / / / / / / FO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X 10 " S S FO FO FO T S VAULTELECT VAULT ELEC T S V.P. GASTESTSTA VAULT ELEC T S TESTSTA ELEC VAULT ELEC MH GAS GAS VAULT ELEC F.O. F.O. F.O. ELEC ELEC VAULT ELEC VAULT ELEC VAULTELEC VAULT ELEC VAULTELEC AC T ELEC VAULTELECVAULTELECTRAFFICVAULTE VAULTELECTRAFFICVAULT ELEC T ST S VAULTELEC ELEC VAULTELEC VAULTELEC E V.P. V.P. V.P. 6" W 12 " W T ST S BASIN D - ZONE GREENBELT AND OPEN SPACE RESPONSIBLE FOR 2.94 ACRES OF LID REQUIREMENTS PER CITY OF FORT COLLINS STANDARDS. BASIN G - ZONE CE RESPONSIBLE FOR 7.05 ACRES OF LID REQUIREMENTS PER CITY OF FORT COLLINS STANDARDS BASIN E - ZONE MMN RESPONSIBLE FOR 4.92 ACRES OF LID REQUIREMENTS PER CITY OF FORT COLLINS STANDARDS BASIN A - ZONE GREENBELT AND OPEN SPACE RESPONSIBLE FOR 0 ACRES OF LID REQUIREMENTS PER CITY OF FORT COLLINS STANDARDS AS LONG AS IT REMAINS UNDEVELOPED. BASIN F - ZONE MMN RESPONSIBLE FOR 12.20 ACRES OF LID REQUIREMENTS PER CITY OF FORT COLLINS STANDARDS BASIN B - ZONE LMN AND UE RESPONSIBLE FOR 67.23 ACRES OF LID REQUIREMENTS PER CITY OF FORT COLLINS STANDARDS BASIN C - ZONE E RESPONSIBLE FOR 21.13 ACRES OF LID REQUIREMENTS PER CITY OF FORT COLLINS STANDARDS PROSPECT ROAD BASIN H - ZONE CE RESPONSIBLE FOR 16.72 ACRES OF LID REQUIREMENTS PER CITY OF FORT COLLINS STANDARDS BASIN I - ZONE CE RESPONSIBLE FOR 4.26 ACRES OF LID REQUIREMENTS PER CITY OF FORT COLLINS STANDARDS LID/WQCV REQUIREMENTS FOR EACH PARCEL FORT COLLINS, CO GATEWAY AT PROSPECT 07.07.2025 P:\892-002\DWG\DRNG\892-002_LID.DWG NOTES: 1. EACH PARCEL IS RESPONSIBLE FOR THEIR LID AND WQCV SIZING BASED ON ACREAGE SIZE DEPICTED ON THIS EXHIBIT. THIS INCLUDES PORTIONS OF ADJACENT RIGHT-OF-WAYS. 2. LID AND WQCV REQUIREMENT AREAS ARE NOT EQUAL TO DETENTION AREA REQUIREMENTS. 3. FOR ADDITIONAL INFORMATION ON THE BASIN DELINEATIONS REFER TO THE DRAINAGE PLAN FROM GATEWAY AT PROSPECT UTILITY PLAN SET. 4. LID AND WQCV SIZING MUST FOLLOW CITY OF FORT COLLINS STANDARDS. 5. AT THE TIME OF EACH PARCELS DEVELOPMENT THE DESIGN ENGINEER SHALL CALCULATE THE PROPOSED PERCENT IMPERVIOUS AND NOT USE THE IMPERVIOUS LISTED IN THE FINAL DRAINAGE REPORT FOR GATEWAY AT PROSPECT BY EPS GROUP INC. LEGEND: BASIN B BASIN C BASIN D BASIN E BASIN F BASIN G BASIN H BASIN I TREATMENT PROPOSED AT INTERIM SUMMARY: Basin ID Area Minimum % of Imperv. Area Treated by LID A 29.57 0%, if remains Open Space B 67.23 75% C 21.13 75% D 2.94 75% E 4.92 75% F 12.20 75% G 7.05 75% H 16.72 75% I 4.26 75% Basin ID Area Land Use Impervious Impervious Area* LID Treatment? Percent Treatment Treated Area Land Use Impervious Impervious Area* LID Treatment? Percent Treatment Treated Area acres %acres %acres %acres %acres A1 29.57 Open Space/Undevel. 2% 0.00 No 0% 0.00 Open Space/Undevel. 2% 0.00 No 0% 0.00 B1 66.71 Open Space/Undevel. 2% 0.00 No 0% 0.00 Residential 46% 30.69 Yes 75% 23.01 B2 0.35 Roads 75% 0.27 Yes 100% 0.27 Roads 75% 0.27 Yes 100% 0.27 B3 0.17 Roads 75% 0.13 No 0% 0.00 Roads 75% 0.13 Yes 75% 0.10 C1 20.77 Open Space/Undevel. 2% 0.00 No 0% 0.00 Employment 80% 16.61 Yes 75% 12.46 C2 0.36 Roads 77% 0.28 Yes 100% 0.28 Roads 77% 0.28 Yes 100% 0.28 D1 2.07 Open Space/Undevel. 2% 0.00 No 0% 0.00 Open Space/Undevel. 2% 0.00 No 0% 0.00 D2 0.86 Roads 86% 0.74 Yes 100% 0.74 Roads 86% 0.74 Yes 100% 0.74 E1 3.08 Open Space/Undevel. 2% 0.00 No 0% 0.00 Residential 70% 2.15 Yes 75% 1.62 E2 1.85 Roads 60% 1.11 Yes 100% 1.11 Roads 60% 1.11 Yes 100% 1.11 F1 9.43 Open Space/Undevel. 2% 0.00 No 0% 0.00 Residential 80% 7.54 Yes 75% 5.66 F2 0.36 Roads 75% 0.27 No 0% 0.00 Roads 75% 0.27 Yes 75% 0.20 F3 0.42 Roads 77% 0.32 No 0% 0.00 Roads 77% 0.32 Yes 75% 0.24 F4 0.79 Roads 75% 0.59 No 0% 0.00 Roads 75% 0.59 Yes 75% 0.44 F5 1.20 Roads 34% 0.41 No 0% 0.00 Roads 34% 0.41 Yes 75% 0.30 G1 5.28 Open Space/Undevel. 7% 0.00 No 0% 0.00 Commercial 70% 3.69 Yes 75% 2.77 G2 0.92 Roads 86% 0.79 No 0% 0.00 Roads 86% 0.79 Yes 75% 0.59 G3 0.35 Roads 86% 0.30 Yes 100% 0.30 Roads 86% 0.30 Yes 100% 0.30 G4 0.51 Roads 86% 0.44 No 0% 0.00 Roads 86% 0.44 Yes 75% 0.33 H1 15.97 Open Space/Undevel. 4% 0.00 No 0% 0.00 Commercial 80% 12.77 Yes 75% 9.58 H2 0.75 Roads 86% 0.65 No 0% 0.00 Roads 86% 0.65 Yes 75% 0.49 I1 2.54 Open Space/Undevel. 2% 0.00 No 0% 0.00 Commercial 70% 1.78 Yes 75% 1.33 I2 1.72 Roads 86% 1.48 Yes 100% 1.48 Roads 86% 1.48 Yes 100% 1.48 Totals 166.03 7.77 4.17 83.01 63.30 Percent Treated Imperv. *Open Space and Undeveloped areas are excluded from impervious area calculation 54% 76% Interim Future LOW IMPACT DEVELOPMENT (LID) COMPLIANCE Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =75.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.750 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.24 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 15,410 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =308 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =231 sq ft D) Actual Flat Surface Area AActual =286 sq ft E) Area at Design Depth (Top Surface Area)ATop =618 sq ft F) Rain Garden Total Volume VT=452 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) S. Thomas EPS Group June 30, 2025 Gateway at Prospect Basin B2 Fort Collins UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 892-002_basin B2-UD-BMP_v3.07.xlsm, RG 6/30/2025, 2:07 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) S. Thomas EPS Group June 30, 2025 Gateway at Prospect Basin B2 Fort Collins Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 892-002_basin B2-UD-BMP_v3.07.xlsm, RG 6/30/2025, 2:07 PM Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 Rain Garden B2 Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 4.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 3.40 Highlighted Depth (ft) = 0.36 Q (cfs) = 3.400 Area (sqft) = 1.96 Velocity (ft/s) = 1.74 Top Width (ft) = 6.88 0 1 2 3 4 5 6 7 8 9 10 Depth (ft) Depth (ft)Rain Garden B2 Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =77.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.770 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.25 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 15,890 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =329 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =245 sq ft D) Actual Flat Surface Area AActual =248 sq ft E) Area at Design Depth (Top Surface Area)ATop =677 sq ft F) Rain Garden Total Volume VT=463 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) S. Thomas EPS Group June 30, 2025 Gateway at Prospect Basin C2 Fort Collins UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 892-002_basin C2-UD-BMP_v3.07.xlsm, RG 6/30/2025, 2:16 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) S. Thomas EPS Group June 30, 2025 Gateway at Prospect Basin C2 Fort Collins Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 892-002_basin C2-UD-BMP_v3.07.xlsm, RG 6/30/2025, 2:16 PM Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 Rain Garden C2 Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 4.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 3.57 Highlighted Depth (ft) = 0.37 Q (cfs) = 3.570 Area (sqft) = 2.03 Velocity (ft/s) = 1.76 Top Width (ft) = 6.96 0 1 2 3 4 5 6 7 8 9 10 Depth (ft) Depth (ft)Rain Garden C2 Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =86.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.860 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.30 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 37,617 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =927 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =647 sq ft D) Actual Flat Surface Area AActual =726 sq ft E) Area at Design Depth (Top Surface Area)ATop =1431 sq ft F) Rain Garden Total Volume VT=1,079 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) S. Thomas July 18, 2025 Gateway at Prospect Basin D2 Fort Collins UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 892-002_basin D2-UD-BMP_v3.07.xlsm, RG 7/18/2025, 4:07 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) S. Thomas July 18, 2025 Gateway at Prospect Basin D2 Fort Collins Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 892-002_basin D2-UD-BMP_v3.07.xlsm, RG 7/18/2025, 4:07 PM Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 Rain Garden D2 Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 12.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 8.59 Highlighted Depth (ft) = 0.36 Q (cfs) = 8.590 Area (sqft) = 4.84 Velocity (ft/s) = 1.78 Top Width (ft) = 14.88 0 2 4 6 8 10 12 14 16 18 20 Depth (ft) Depth (ft)Rain Garden D2 Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =60.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.600 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.19 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 80,407 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =1,519 cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =965 sq ft D) Actual Flat Surface Area AActual =1099 sq ft E) Area at Design Depth (Top Surface Area)ATop =1976 sq ft F) Rain Garden Total Volume VT=1,538 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) S. Thomas EPS Group June 25, 2025 Gateway at Prospect Basin E2 Fort Collins UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 892-002_basin E2-UD-BMP_v3.07.xlsm, RG 6/25/2025, 10:57 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) S. Thomas EPS Group June 25, 2025 Gateway at Prospect Basin E2 Fort Collins Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 892-002_basin E2-UD-BMP_v3.07.xlsm, RG 6/25/2025, 10:57 AM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =86.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.860 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.30 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 15,085 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =372 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =259 sq ft D) Actual Flat Surface Area AActual =310 sq ft E) Area at Design Depth (Top Surface Area)ATop =634 sq ft F) Rain Garden Total Volume VT=472 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) S. Thomas June 25, 2025 Gateway at Prospect Basin G3 Fort Collins UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 892-002_basin G3-UD-BMP_v3.07.xlsm, RG 6/25/2025, 1:36 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) S. Thomas June 25, 2025 Gateway at Prospect Basin G3 Fort Collins Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 892-002_basin G3-UD-BMP_v3.07.xlsm, RG 6/25/2025, 1:36 PM Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 Rain Garden G3 Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 4.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 3.45 Highlighted Depth (ft) = 0.37 Q (cfs) = 3.450 Area (sqft) = 2.03 Velocity (ft/s) = 1.70 Top Width (ft) = 6.96 0 1 2 3 4 5 6 7 8 9 10 Depth (ft) Depth (ft)Rain Garden G3 Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =86.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.860 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.30 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 74,778 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =1,842 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =1286 sq ft D) Actual Flat Surface Area AActual =1410 sq ft E) Area at Design Depth (Top Surface Area)ATop =3131 sq ft F) Rain Garden Total Volume VT=2,271 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) S. Thomas June 25, 2025 Gateway at Prospect Basin I2 Fort Collins UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 892-002_basin I2_v3.07.xlsm, RG 6/25/2025, 2:16 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) S. Thomas June 25, 2025 Gateway at Prospect Basin I2 Fort Collins Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 892-002_basin I2_v3.07.xlsm, RG 6/25/2025, 2:16 PM Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 Rain Garden I2 Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 15.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 17.08 Highlighted Depth (ft) = 0.49 Q (cfs) = 17.08 Area (sqft) = 8.31 Velocity (ft/s) = 2.06 Top Width (ft) = 18.92 0 2 4 6 8 10 12 14 16 18 20 22 24 Depth (ft) Depth (ft)Rain Garden I2 Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Gateway at Prospect Project: 892-002 Date: 07/02/2025 By: S. Thomas t=240 seconds Storm Line A E2 1.85 1,266 13 12 13 2.00 5 3 15 0.58 6.92 3.00 7.07 Storm Line D D2 0.86 927 10 12 10 1.25 3 4 12 0.46 5.54 3.00 7.07 Storm Line M C2 0.36 329 4 12 4 1.25 3 2 6 0.23 2.77 2.00 3.14 Storm Line N G3 0.35 372 4 12 4 1.25 3 2 6 0.23 2.77 2.00 3.14 Sidewalk Culvert B2 B2 0.35 308 4 12 4 2.00 4 2 8 0.31 3.69 2.00 3.14 Sidewalk Culvert I2 I2 1.72 1,842 19 12 19 4.00 6 4 24 0.92 11.08 4.00 12.57 Storm Line/Culvert Label Rain Garden WQCV (ft3) Depth, hmax (inches) Minimum Area (sf) Culvert Width (ft) Forebay Width (ft) 1% WQCV CALCULATIONS FOR FOREBAY AT RAIN GARDENS Forebay Length (ft) Forebay Volume (cf) Calc'd Notch Width, w (inches) Notch Open Area (sq inches) Pipe Equivalent (in. dia.) Pipe Area (sq. in.) Tributary Area (acres) 𝑤= 9.23 𝐴 𝑡 1 ℎ GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado APPENDIX C Hydraulic Computations C.1 – Storm Sewers (Future Use) C.2 – Inlets (Future Use) C.3 – Detention Facilities C.4 – Weir Calculations C.5 – Riprap Calculations GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado C.1 Storm Sewers GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado C.2 Inlets Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =11.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.025 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.2 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Version 4.06 Released August 2018 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Gateway at Prospect Inlet A2 1 Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.2 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.35 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.57 0.58 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.93 0.95 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =10.5 11.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.7 7.5 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.06 Released August 2018 H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =12.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.025 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =19.0 19.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Version 4.06 Released August 2018 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Gateway at Prospect Inlet D3 1 Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.57 0.57 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.93 0.93 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =10.5 10.5 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =2.1 8.6 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.06 Released August 2018 H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =11.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.025 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Version 4.06 Released August 2018 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Gateway at Prospect Inlet F7 1 Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.589 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.40 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.71 0.80 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.71 0.80 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.3 7.5 cfs WARNING: Inlet Capacity less than Q Peak for Major Storm Q PEAK REQUIRED =1.7 7.6 cfs CDOT/Denver 13 Combination INLET IN A SUMP OR SAG LOCATION Version 4.06 Released August 2018 H-VertH-Curb W Lo (C) Lo (G) W o WP CDOT/Denver 13 Combination Override Depths 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =11.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.002 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.025 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Version 4.06 Released August 2018 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Gateway at Prospect Inlet F8 1 Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.589 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.40 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.71 0.80 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.71 0.80 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.3 7.5 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.4 6.1 cfs CDOT/Denver 13 Combination INLET IN A SUMP OR SAG LOCATION Version 4.06 Released August 2018 H-VertH-Curb W Lo (C) Lo (G) W o W P CDOT/Denver 13 Combination Override Depths 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =21.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.025 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 21.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 12.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Version 4.06 Released August 2018 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Gateway at Prospect Inlet K5 1 Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 7.7 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.664 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.48 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.94 1.00 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.94 1.00 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =3.6 5.7 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.0 4.1 cfs CDOT/Denver 13 Combination INLET IN A SUMP OR SAG LOCATION Version 4.06 Released August 2018 H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT/Denver 13 Combination Override Depths 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =11.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.025 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.2 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Version 4.06 Released August 2018 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Gateway at Prospect Inlet O2 1 Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.2 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =0.523 0.539 ft Depth for Curb Opening Weir Equation dCurb =0.33 0.35 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.94 0.97 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.94 0.97 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =3.6 3.9 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =0.8 3.5 cfs CDOT/Denver 13 Combination INLET IN A SUMP OR SAG LOCATION Version 4.06 Released August 2018 H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT/Denver 13 Combination Override Depths 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =12.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =25.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.025 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =19.0 19.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Version 4.06 Released August 2018 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Gateway at Prospect Inlet L1 1 Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.57 0.57 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.93 0.93 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =10.5 10.5 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.8 7.5 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.06 Released August 2018 H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =21.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.025 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 21.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 12.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Qallow =10.4 23.6 cfs Version 4.06 Released August 2018 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Gateway at Prospect Inlet N2 & N3 Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' 1 Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 2 2 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf-G =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf-C =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =0.5 1.6 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.0 0.1 cfs Capture Percentage = Qa/Qo = C% = 100 92 % INLET ON A CONTINUOUS GRADE Version 4.06 Released August 2018 CDOT/Denver 13 CombinationCDOT/Denver 13 Combination 1 Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK =11.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.015 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.083 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.2 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =SUMP SUMP cfs Version 4.06 Released August 2018 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Gateway at Prospect Inlet A3 1 Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 2 2 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.2 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.35 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.57 0.58 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.93 0.95 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =10.5 11.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK)Q PEAK REQUIRED =1.7 7.5 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION Version 4.06 Released August 2018 H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado C.3 Detention Facilities Gateway at Prospect Pond ID Tributary Area Interim Impervious Final Impervious Interim 100-yr Storage Interim WQCV + EURV Interim Release Rate Final 100-yr Storage Final WQCV + EURV Final Release Rate (acre) (%) (%) ac-ft (elev.) ac-ft (elev.) (cfs) ac-ft (elev.) ac-ft (elev.) (cfs) Pond B 67.23 3% 46% 1.726 (4908.38) 0.152 (4904.54) 96.00 7.07 (TBD)* 2.907 (TBD)* 103.7* Pond C 21.13 n/a 79% n/a n/a n/a 3.323 (4907.89) 1.638 (4906.47) 26.90 Pond D 2.94 n/a 27% n/a n/a n/a 0.222 (4904.69) 0.072 (4903.97) 4.50 Pond E 4.92 n/a 66% n/a n/a n/a 0.669 (4901.84) 0.314 (4900.70) 9.30 Pond F 12.20 n/a 77% n/a n/a n/a 1.878 (4905.02) 0.92 (4903.84) 14.00 Pond G 7.05 n/a 70% n/a n/a n/a 1.004 (4901.72) 0.48 (4901.04) 11.40 Pond H 16.72 80% 2.658 (TBD)* 1.313 (TBD)* 20.9* Pond I 4.26 76% 0.648 (4903.13) 0.316 (4901.91) 3.30 * Future required pond volumes and WSELs to be determined at time of development and once pond layout and grading is known. Pond Summaries 13% 1.067 (4902.80) 0.232 (4901.25) 25.70 Project: Basin ID: Depth Increment = 0.20 ft Watershed Information Top of Micropool -- 0.00 -- -- -- 15 0.000 Selected BMP Type =EDB -- 0.20 -- -- -- 758 0.017 77 0.002 Watershed Area = 67.23 acres -- 0.40 -- -- -- 1,288 0.030 282 0.006 Watershed Length = 2,370 ft -- 0.60 -- -- -- 1,755 0.040 586 0.013 Watershed Length to Centroid = 1,150 ft -- 0.80 -- -- -- 2,266 0.052 988 0.023 Watershed Slope = 0.010 ft/ft -- 1.00 -- -- -- 2,786 0.064 1,493 0.034 Watershed Imperviousness = 3.00% percent -- 1.20 -- -- -- 3,348 0.077 2,107 0.048 Percentage Hydrologic Soil Group A = 0.0% percent -- 1.40 -- -- -- 3,963 0.091 2,838 0.065 Percentage Hydrologic Soil Group B = 0.0% percent -- 1.60 -- -- -- 4,620 0.106 3,696 0.085 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 1.80 -- -- -- 5,306 0.122 4,689 0.108 Target WQCV Drain Time = 40.0 hours -- 2.00 -- -- -- 6,008 0.138 5,820 0.134 Location for 1-hr Rainfall Depths = User Input -- 2.20 -- -- -- 6,732 0.155 7,094 0.163 -- 2.40 -- -- -- 7,459 0.171 8,513 0.195 -- 2.60 -- -- -- 8,225 0.189 10,082 0.231 Optional User Overrides -- 2.80 -- -- -- 8,975 0.206 11,802 0.271 Water Quality Capture Volume (WQCV) = 0.125 acre-feet acre-feet -- 3.00 -- -- -- 9,812 0.225 13,680 0.314 Excess Urban Runoff Volume (EURV) = 0.152 acre-feet acre-feet -- 3.20 -- -- -- 10,758 0.247 15,737 0.361 2-yr Runoff Volume (P1 = 0.82 in.) = 0.079 acre-feet 0.82 inches -- 3.40 -- -- -- 11,816 0.271 17,995 0.413 5-yr Runoff Volume (P1 = 1.14 in.) = 0.675 acre-feet 1.14 inches -- 3.60 -- -- -- 12,983 0.298 20,475 0.470 10-yr Runoff Volume (P1 = 1.4 in.) = 1.730 acre-feet 1.40 inches -- 3.80 -- -- -- 14,262 0.327 23,199 0.533 25-yr Runoff Volume (P1 = 1.81 in.) = 4.340 acre-feet 1.81 inches -- 4.00 -- -- -- 15,652 0.359 26,191 0.601 50-yr Runoff Volume (P1 = 2.27 in.) = 6.831 acre-feet 2.27 inches -- 4.20 -- -- -- 17,156 0.394 29,471 0.677 100-yr Runoff Volume (P1 = 2.86 in.) = 10.591 acre-feet 2.86 inches -- 4.40 -- -- -- 18,777 0.431 33,065 0.759 500-yr Runoff Volume (P1 = 4.39 in.) = 19.805 acre-feet 4.39 inches -- 4.60 -- -- -- 20,519 0.471 36,994 0.849 Approximate 2-yr Detention Volume = 0.080 acre-feet -- 4.80 -- -- -- 22,395 0.514 41,286 0.948 Approximate 5-yr Detention Volume = 0.406 acre-feet -- 5.00 -- -- -- 24,383 0.560 45,963 1.055 Approximate 10-yr Detention Volume = 0.685 acre-feet -- 5.20 -- -- -- 26,481 0.608 51,050 1.172 Approximate 25-yr Detention Volume = 0.875 acre-feet -- 5.40 -- -- -- 28,701 0.659 56,568 1.299 Approximate 50-yr Detention Volume = 0.956 acre-feet -- 5.60 -- -- -- 31,040 0.713 62,542 1.436 Approximate 100-yr Detention Volume = 1.663 acre-feet -- 5.80 -- -- -- 33,490 0.769 68,995 1.584 -- 6.00 -- -- -- 36,031 0.827 75,947 1.744 Define Zones and Basin Geometry -- 6.20 -- -- -- 38,481 0.883 83,399 1.915 Zone 1 Volume (WQCV) = 0.125 acre-feet -- 6.40 -- -- -- 40,681 0.934 91,315 2.096 Zone 2 Volume (EURV - Zone 1) = 0.027 acre-feet -- 6.60 -- -- -- 42,578 0.977 99,641 2.287 Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 1.574 acre-feet -- 7.60 -- -- -- 50,000 1.148 145,929 3.350 Total Detention Basin Volume = 1.726 acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) =user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) =user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) =user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) =user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond B - Interim MHFD-Detention, Version 4.06 (July 2022) Volume (ft 3) Volume (ac-ft) Area (acre) After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond B (Interim) - Full Spectrum Detention.xlsm, Basin 7/1/2025, 5:40 PM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.94 Zone 1 (WQCV) 1.94 Zone 1 (WQCV) 2.14 Zone 2 (EURV) 2.14 Zone 2 (EURV) 5.98 Z3 (100+1/2WQCV)5.98 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.840 1.680 2.520 3.360 0.000 0.290 0.580 0.870 1.160 0.00 2.00 4.00 6.00 8.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 12500 25000 37500 50000 0 5 10 15 20 0.00 2.00 4.00 6.00 8.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond B (Interim) - Full Spectrum Detention.xlsm, Basin 7/1/2025, 5:40 PM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 1.94 0.125 Orifice Plate Zone 2 (EURV) 2.14 0.027 Orifice Plate Z3 (100+1/2WQCV) 5.98 1.574 Weir&Pipe (Restrict) Total (all zones) 1.726 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 5.000E-03 ft2 Depth at top of Zone using Orifice Plate = 2.30 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 9.00 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 0.72 sq. inches (diameter = 15/16 inch) Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 0.80 1.60 Orifice Area (sq. inches) 0.72 0.72 0.72 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 2.30 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =4.30 N/A feet Overflow Weir Front Edge Length = 11.00 N/A feet Overflow Weir Slope Length = 6.32 N/A feet Overflow Weir Grate Slope = 3.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 4.24 N/A Horiz. Length of Weir Sides = 6.00 N/A feet Overflow Grate Open Area w/o Debris = 48.42 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 48.42 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 11.43 N/A ft2 Outlet Pipe Diameter = 48.00 N/A inches Outlet Orifice Centroid = 1.84 N/A feet Restrictor Plate Height Above Pipe Invert = 41.00 inches Half-Central Angle of Restrictor Plate on Pipe = 2.36 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 6.00 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.39 feet Spillway Crest Length = 130.00 feet Stage at Top of Freeboard = 6.89 feet Spillway End Slopes = 30.00 H:V Basin Area at Top of Freeboard = 1.03 acres Freeboard above Max Water Surface = 0.50 feet Basin Volume at Top of Freeboard = 2.58 acre-ft Max Ponding Depth of Target Storage Volume =5.44 feet Discharge at Top of Freeboard = 505.00 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =0.125 0.152 0.079 0.675 1.730 4.340 6.831 10.591 19.805 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.079 0.675 1.730 4.340 6.831 10.591 19.805 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.6 7.6 18.5 45.9 69.4 103.5 183.2 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.11 0.27 0.68 1.03 1.54 2.72 Peak Inflow Q (cfs) =N/A N/A 0.9 8.0 18.9 46.3 69.8 103.9 183.5 Peak Outflow Q (cfs) =0.1 0.1 0.0 4.8 15.3 42.0 64.0 96.0 187.3 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.6 0.8 0.9 0.9 0.9 1.0 Structure Controlling Flow =Plate Plate Plate Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Spillway Max Velocity through Grate 1 (fps) =N/A N/A N/A 0.1 0.3 0.9 1.3 2.0 2.4 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =39 42 32 40 29 12 4 3 3 Time to Drain 99% of Inflow Volume (hours) =41 45 34 49 42 31 25 17 4 Maximum Ponding Depth (ft) =1.94 2.13 1.45 2.84 3.39 4.25 4.79 5.44 6.31 Area at Maximum Ponding Depth (acres) =0.13 0.15 0.09 0.21 0.27 0.40 0.51 0.67 0.91 Maximum Volume Stored (acre-ft) =0.125 0.152 0.070 0.277 0.410 0.696 0.943 1.325 2.004 The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond B - Interim Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond B (Interim) - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 5:39 PM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 195 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 146 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 214 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 285 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 340 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 426 0.39 WQ Plate Flow at 100yr depth = 0.16 0.97(diameter = 1-1/8 inches)50 Year 480 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 545 1 Z1_Boolean n*Cdw #1 = 0.18 1.20(diameter = 1-1/4 inches)500 Year 632 1 Z2_Boolean n*Cdo #1 = 1.78 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.322 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 0 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 8.00 120,000 510 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound MHFD-Detention, Version 4.06 (July 2022) DETENTION BASIN OUTLET STRUCTURE DESIGN 0 20 40 60 80 100 120 140 160 180 200 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 7 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 100 200 300 400 500 0 20,000 40,000 60,000 80,000 100,000 120,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond B (Interim) - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 5:39 PM Project: Basin ID: Depth Increment = 0.10 ft Watershed Information Top of Micropool 0.00 17.8 17.8 318 0.007 Selected BMP Type =EDB ISV 0.45 17.8 17.8 318 0.007 143 0.003 Watershed Area = 67.23 acres 0.50 17.8 17.8 318 0.007 159 0.004 Watershed Length = 2,370 ft 0.60 17.8 17.8 318 0.007 191 0.004 Watershed Length to Centroid = 1,150 ft 0.70 17.8 17.8 318 0.007 223 0.005 Watershed Slope = 0.015 ft/ft 0.80 17.8 17.8 318 0.007 255 0.006 Watershed Imperviousness = 46.00% percent 0.90 17.8 17.8 318 0.007 286 0.007 Percentage Hydrologic Soil Group A = 0.0% percent 1.00 28.1 21.8 613 0.014 325 0.007 Percentage Hydrologic Soil Group B = 0.0% percent 1.10 48.6 29.8 1,450 0.033 426 0.010 Percentage Hydrologic Soil Groups C/D = 100.0% percent 1.20 69.1 37.8 2,614 0.060 626 0.014 Target WQCV Drain Time = 40.0 hours 1.30 89.6 45.8 4,107 0.094 959 0.022 Location for 1-hr Rainfall Depths = Thornton - Civic Center 1.40 110.1 53.8 5,927 0.136 1,458 0.033 1.50 130.6 61.8 8,075 0.185 2,156 0.049 1.60 151.1 69.8 10,552 0.242 3,084 0.071 Optional User Overrides 1.70 171.6 77.8 13,356 0.307 4,277 0.098 Water Quality Capture Volume (WQCV) = 1.096 acre-feet acre-feet 1.80 192.1 85.8 16,488 0.379 5,766 0.132 Excess Urban Runoff Volume (EURV) = 2.906 acre-feet acre-feet 1.90 212.6 93.8 19,949 0.458 7,586 0.174 2-yr Runoff Volume (P1 = 0.82 in.) = 1.881 acre-feet 0.82 inches 2.00 233.1 101.8 23,737 0.545 9,767 0.224 5-yr Runoff Volume (P1 = 1.14 in.) = 3.138 acre-feet 1.14 inches 2.10 253.6 109.8 27,854 0.639 12,344 0.283 10-yr Runoff Volume (P1 = 1.4 in.) = 4.449 acre-feet 1.40 inches 2.20 274.1 117.8 32,298 0.741 15,349 0.352 25-yr Runoff Volume (P1 = 1.81 in.) = 6.992 acre-feet 1.81 inches 2.30 294.6 125.8 37,070 0.851 18,814 0.432 50-yr Runoff Volume (P1 = 2.27 in.) = 9.650 acre-feet 2.27 inches 2.40 315.1 133.8 42,171 0.968 22,774 0.523 100-yr Runoff Volume (P1 = 2.86 in.) = 13.328 acre-feet 2.86 inches 2.50 335.6 141.8 47,599 1.093 27,260 0.626 500-yr Runoff Volume (P1 = 4.39 in.) = 22.605 acre-feet 4.39 inches 2.60 356.1 149.8 53,355 1.225 32,305 0.742 Approximate 2-yr Detention Volume = 1.760 acre-feet 2.70 376.6 157.8 59,440 1.365 37,942 0.871 Approximate 5-yr Detention Volume = 2.942 acre-feet 2.80 397.1 165.8 65,852 1.512 44,203 1.015 Approximate 10-yr Detention Volume = 3.534 acre-feet Zone 1 (WQCV)2.86 409.4 170.6 69,857 1.604 48,274 1.108 Approximate 25-yr Detention Volume = 4.349 acre-feet 2.90 417.6 173.8 72,593 1.666 51,123 1.174 Approximate 50-yr Detention Volume = 5.032 acre-feet Floor 2.91 419.6 174.6 73,285 1.682 51,852 1.190 Approximate 100-yr Detention Volume = 6.522 acre-feet 3.00 420.5 175.5 73,820 1.695 58,472 1.342 3.10 421.5 176.5 74,417 1.708 65,884 1.512 Define Zones and Basin Geometry 3.20 422.5 177.5 75,016 1.722 73,356 1.684 Zone 1 Volume (WQCV) = 1.096 acre-feet 3.30 423.5 178.5 75,618 1.736 80,887 1.857 Zone 2 Volume (EURV - Zone 1) = 1.811 acre-feet 3.40 424.5 179.5 76,221 1.750 88,479 2.031 Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 4.163 acre-feet 3.50 425.5 180.5 76,826 1.764 96,131 2.207 Total Detention Basin Volume = 7.070 acre-feet 3.60 426.5 181.5 77,433 1.778 103,844 2.384 Initial Surcharge Volume (ISV) = 143 ft 3 3.70 427.5 182.5 78,042 1.792 111,618 2.562 Initial Surcharge Depth (ISD) = 0.45 ft 3.80 428.5 183.5 78,653 1.806 119,453 2.742 Total Available Detention Depth (Htotal) =6.00 ft Zone 2 (EURV)3.90 429.5 184.5 79,266 1.820 127,349 2.924 Depth of Trickle Channel (HTC) = 0.50 ft 4.00 430.5 185.5 79,881 1.834 135,306 3.106 Slope of Trickle Channel (STC) =0.005 ft/ft 4.10 431.5 186.5 80,498 1.848 143,325 3.290 Slopes of Main Basin Sides (Smain) =5 H:V 4.20 432.5 187.5 81,117 1.862 151,406 3.476 Basin Length-to-Width Ratio (RL/W) =2.5 4.30 433.5 188.5 81,738 1.876 159,548 3.663 4.40 434.5 189.5 82,361 1.891 167,753 3.851 Initial Surcharge Area (AISV) =318 ft 2 4.50 435.5 190.5 82,986 1.905 176,021 4.041 Surcharge Volume Length (LISV) =17.8 ft 4.60 436.5 191.5 83,614 1.920 184,351 4.232 Surcharge Volume Width (WISV) =17.8 ft 4.70 437.5 192.5 84,243 1.934 192,744 4.425 Depth of Basin Floor (HFLOOR) =1.96 ft 4.80 438.5 193.5 84,874 1.948 201,199 4.619 Length of Basin Floor (LFLOOR) =419.6 ft 4.90 439.5 194.5 85,507 1.963 209,718 4.814 Width of Basin Floor (WFLOOR) =174.6 ft 5.00 440.5 195.5 86,142 1.978 218,301 5.011 Area of Basin Floor (AFLOOR) =73,285 ft 2 5.10 441.5 196.5 86,779 1.992 226,947 5.210 Volume of Basin Floor (VFLOOR) =51,242 ft 3 5.20 442.5 197.5 87,418 2.007 235,657 5.410 Depth of Main Basin (HMAIN) =3.09 ft 5.30 443.5 198.5 88,059 2.022 244,430 5.611 Length of Main Basin (LMAIN) =450.5 ft 5.40 444.5 199.5 88,702 2.036 253,269 5.814 Width of Main Basin (WMAIN) =205.5 ft 5.50 445.5 200.5 89,347 2.051 262,171 6.019 Area of Main Basin (AMAIN) =92,603 ft 2 5.60 446.5 201.5 89,994 2.066 271,138 6.224 Volume of Main Basin (VMAIN) =255,715 ft 3 5.70 447.5 202.5 90,643 2.081 280,170 6.432 Calculated Total Basin Volume (Vtotal) =7.054 acre-feet 5.80 448.5 203.5 91,294 2.096 289,267 6.641 5.90 449.5 204.5 91,948 2.111 298,429 6.851 6.00 450.5 205.5 92,603 2.126 307,656 7.063 Z3 (100+1/2WQCV)6.01 450.6 205.6 92,668 2.127 308,583 7.084 6.10 451.5 206.5 93,260 2.141 316,949 7.276 6.20 452.5 207.5 93,919 2.156 326,308 7.491 6.30 453.5 208.5 94,580 2.171 335,733 7.707 6.40 454.5 209.5 95,243 2.186 345,224 7.925 6.50 455.5 210.5 95,908 2.202 354,782 8.145 6.60 456.5 211.5 96,575 2.217 364,406 8.366 6.70 457.5 212.5 97,244 2.232 374,097 8.588 6.80 458.5 213.5 97,915 2.248 383,855 8.812 6.90 459.5 214.5 98,588 2.263 393,680 9.038 7.00 460.5 215.5 99,263 2.279 403,573 9.265 7.10 461.5 216.5 99,940 2.294 413,533 9.493 7.20 462.5 217.5 100,619 2.310 423,561 9.724 7.30 463.5 218.5 101,301 2.326 433,657 9.955 7.40 464.5 219.5 101,984 2.341 443,821 10.189 7.50 465.5 220.5 102,669 2.357 454,054 10.424 7.60 466.5 221.5 103,356 2.373 464,355 10.660 7.70 467.5 222.5 104,045 2.389 474,725 10.898 7.80 468.5 223.5 104,736 2.404 485,164 11.138 7.90 469.5 224.5 105,429 2.420 495,672 11.379 8.00 470.5 225.5 106,124 2.436 506,250 11.622 8.10 471.5 226.5 106,821 2.452 516,897 11.866 8.20 472.5 227.5 107,520 2.468 527,614 12.112 8.30 473.5 228.5 108,221 2.484 538,401 12.360 8.40 474.5 229.5 108,924 2.501 549,258 12.609 8.50 475.5 230.5 109,629 2.517 560,186 12.860 8.60 476.5 231.5 110,337 2.533 571,184 13.113 8.70 477.5 232.5 111,046 2.549 582,253 13.367 8.80 478.5 233.5 111,757 2.566 593,393 13.622 8.90 479.5 234.5 112,470 2.582 604,605 13.880 9.00 480.5 235.5 113,185 2.598 615,887 14.139 9.10 481.5 236.5 113,902 2.615 627,242 14.399 9.20 482.5 237.5 114,621 2.631 638,668 14.662 9.30 483.5 238.5 115,342 2.648 650,166 14.926 9.40 484.5 239.5 116,065 2.664 661,736 15.191 9.50 485.5 240.5 116,790 2.681 673,379 15.459 9.60 486.5 241.5 117,517 2.698 685,095 15.728 9.70 487.5 242.5 118,246 2.715 696,883 15.998 9.80 488.5 243.5 118,977 2.731 708,744 16.271 After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond B - Future MHFD-Detention, Version 4.06 (July 2022) Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond B (Future) - Full Spectrum Detention.xlsm, Basin 6/26/2025, 10:23 AM 0 User Defined Stage-Area Booleans for Message 0 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete 1.96 H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.45 ISV 0.45 ISV 2.91 Floor 2.86 Zone 1 (WQCV) 2.86 Zone 1 (WQCV) 2.91 Floor 3.90 Zone 2 (EURV) 3.90 Zone 2 (EURV) 6.01 Z3 (100+1/2WQCV)6.01 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 4.070 8.140 12.210 16.280 0.000 0.685 1.370 2.055 2.740 0.00 2.50 5.00 7.50 10.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 29800 59600 89400 119200 0 125 250 375 500 0.00 2.50 5.00 7.50 10.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond B (Future) - Full Spectrum Detention.xlsm, Basin 6/26/2025, 10:23 AM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 2.86 1.096 Orifice Plate Zone 2 (EURV) 3.90 1.811 Orifice Plate Z3 (100+1/2WQCV) 6.01 4.163 Weir&Pipe (Restrict) Total (all zones) 7.070 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = N/A ft2 Depth at top of Zone using Orifice Plate = 3.90 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 16.00 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = N/A sq. inches Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 1.30 2.60 Orifice Area (sq. inches) 3.80 3.80 9.00 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 3.90 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =4.90 N/A feet Overflow Weir Front Edge Length = 20.00 N/A feet Overflow Weir Slope Length = 6.08 N/A feet Overflow Weir Grate Slope = 6.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 7.74 N/A Horiz. Length of Weir Sides = 6.00 N/A feet Overflow Grate Open Area w/o Debris = 84.67 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 84.67 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 10.94 N/A ft2 Outlet Pipe Diameter = 48.00 N/A inches Outlet Orifice Centroid = 1.77 N/A feet Restrictor Plate Height Above Pipe Invert = 39.00 inches Half-Central Angle of Restrictor Plate on Pipe = 2.25 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 7.00 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.58 feet Spillway Crest Length = 130.00 feet Stage at Top of Freeboard = 8.08 feet Spillway End Slopes = 30.00 H:V Basin Area at Top of Freeboard = 2.45 acres Freeboard above Max Water Surface = 0.50 feet Basin Volume at Top of Freeboard = 11.82 acre-ft Max Ponding Depth of Target Storage Volume =5.65 feet Discharge at Top of Freeboard = 657.28 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =1.096 2.906 1.881 3.138 4.449 6.992 9.650 13.328 22.605 Inflow Hydrograph Volume (acre-ft) =N/A N/A 1.881 3.138 4.449 6.992 9.650 13.328 22.605 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.6 8.3 20.2 49.3 74.8 110.9 196.9 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.12 0.30 0.73 1.11 1.65 2.93 Peak Inflow Q (cfs) =N/A N/A 25.6 44.2 63.2 104.7 143.0 195.5 325.0 Peak Outflow Q (cfs) =0.5 0.8 0.6 1.1 11.5 41.7 74.0 103.7 202.1 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.1 0.6 0.8 1.0 0.9 1.0 Structure Controlling Flow =Plate Overflow Weir 1 Plate Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) =N/A N/A N/A 0.0 0.1 0.5 0.9 1.2 1.5 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =38 68 53 71 71 68 64 60 50 Time to Drain 99% of Inflow Volume (hours) =40 71 56 75 75 74 73 71 68 Maximum Ponding Depth (ft) =2.86 3.90 3.25 3.93 4.25 4.71 5.05 5.65 7.33 Area at Maximum Ponding Depth (acres) =1.60 1.82 1.73 1.82 1.87 1.94 1.98 2.07 2.33 Maximum Volume Stored (acre-ft) =1.108 2.924 1.753 2.978 3.569 4.444 5.091 6.307 10.002 The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond B - Future Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond B (Future) - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 5:21 PM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 287 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 326 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 391 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 394 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 426 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 472 0.58 WQ Plate Flow at 100yr depth = 1.09 0.97(diameter = 1-1/8 inches)50 Year 506 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 566 1 Z1_Boolean n*Cdw #1 = 0.44 1.20(diameter = 1-1/4 inches)500 Year 734 1 Z2_Boolean n*Cdo #1 = 1.17 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.165 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 0 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 10.00 520,000 660 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound MHFD-Detention, Version 4.06 (July 2022) DETENTION BASIN OUTLET STRUCTURE DESIGN 0 50 100 150 200 250 300 350 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 7 8 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 100 200 300 400 500 600 700 800 0 100,000 200,000 300,000 400,000 500,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond B (Future) - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 5:21 PM Project: Basin ID: Depth Increment = 0.20 ft Watershed Information Top of Micropool -- 0.00 -- -- -- 14 0.000 Selected BMP Type =EDB -- 0.20 -- -- -- 1,865 0.043 170 0.004 Watershed Area = 21.13 acres -- 0.40 -- -- -- 4,172 0.096 750 0.017 Watershed Length = 1,750 ft -- 0.60 -- -- -- 7,183 0.165 1,927 0.044 Watershed Length to Centroid = 850 ft -- 0.80 -- -- -- 9,767 0.224 3,622 0.083 Watershed Slope = 0.015 ft/ft -- 1.00 -- -- -- 12,333 0.283 5,832 0.134 Watershed Imperviousness = 79.00% percent -- 1.20 -- -- -- 15,138 0.348 8,428 0.193 Percentage Hydrologic Soil Group A = 0.0% percent -- 1.40 -- -- -- 17,964 0.412 11,710 0.269 Percentage Hydrologic Soil Group B = 0.0% percent -- 1.60 -- -- -- 19,986 0.459 15,684 0.360 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 1.80 -- -- -- 22,042 0.506 19,887 0.457 Target WQCV Drain Time = 40.0 hours -- 2.00 -- -- -- 24,117 0.554 24,503 0.563 Location for 1-hr Rainfall Depths = User Input -- 2.01 -- -- -- 24,224 0.556 24,745 0.568 -- 2.20 -- -- -- 26,255 0.603 29,278 0.672 -- 2.40 -- -- -- 28,496 0.654 34,731 0.797 Optional User Overrides -- 2.60 -- -- -- 30,484 0.700 40,913 0.939 Water Quality Capture Volume (WQCV) = 0.567 acre-feet acre-feet -- 2.80 -- -- -- 32,585 0.748 47,220 1.084 Excess Urban Runoff Volume (EURV) = 1.638 acre-feet acre-feet -- 3.00 -- -- -- 34,807 0.799 53,959 1.239 2-yr Runoff Volume (P1 = 0.82 in.) = 1.076 acre-feet 0.82 inches -- 3.20 -- -- -- 37,206 0.854 60,789 1.396 5-yr Runoff Volume (P1 = 1.14 in.) = 1.610 acre-feet 1.14 inches -- 3.40 -- -- -- 39,975 0.918 68,480 1.572 10-yr Runoff Volume (P1 = 1.4 in.) = 2.076 acre-feet 1.40 inches -- 3.60 -- -- -- 42,839 0.983 77,160 1.771 25-yr Runoff Volume (P1 = 1.81 in.) = 2.863 acre-feet 1.81 inches -- 3.80 -- -- -- 45,495 1.044 85,994 1.974 50-yr Runoff Volume (P1 = 2.27 in.) = 3.728 acre-feet 2.27 inches -- 4.00 -- -- -- 48,322 1.109 95,375 2.190 100-yr Runoff Volume (P1 = 2.86 in.) = 4.867 acre-feet 2.86 inches -- 4.20 -- -- -- 51,345 1.179 104,829 2.407 500-yr Runoff Volume (P1 = 4.39 in.) = 7.790 acre-feet 4.39 inches -- 4.40 -- -- -- 54,508 1.251 115,383 2.649 Approximate 2-yr Detention Volume = 1.021 acre-feet -- 4.60 -- -- -- 58,077 1.333 127,186 2.920 Approximate 5-yr Detention Volume = 1.537 acre-feet -- 4.80 -- -- -- 62,331 1.431 139,227 3.196 Approximate 10-yr Detention Volume = 1.863 acre-feet -- 5.00 -- -- -- 66,137 1.518 152,073 3.491 Approximate 25-yr Detention Volume = 2.234 acre-feet -- 5.20 -- -- -- 70,281 1.613 165,715 3.804 Approximate 50-yr Detention Volume = 2.551 acre-feet -- 6.40 -- -- -- 102,601 2.355 269,444 6.186 Approximate 100-yr Detention Volume = 3.039 acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Zone 1 Volume (WQCV) = 0.567 acre-feet -- -- -- -- Zone 2 Volume (EURV - Zone 1) = 1.071 acre-feet -- -- -- -- Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 1.685 acre-feet -- -- -- -- Total Detention Basin Volume = 3.323 acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) =user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) =user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) =user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) =user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond C MHFD-Detention, Version 4.06 (July 2022) Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond C - Full Spectrum Detention.xlsm, Basin 7/1/2025, 11:53 AM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 2.01 Zone 1 (WQCV) 2.01 Zone 1 (WQCV) 3.47 Zone 2 (EURV) 3.47 Zone 2 (EURV) 4.89 Z3 (100+1/2WQCV)4.89 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 1.550 3.100 4.650 6.200 0.000 0.590 1.180 1.770 2.360 0.00 2.00 4.00 6.00 8.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 25700 51400 77100 102800 0 5 10 15 20 0.00 2.00 4.00 6.00 8.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond C - Full Spectrum Detention.xlsm, Basin 7/1/2025, 11:53 AM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 2.01 0.567 Orifice Plate Zone 2 (EURV) 3.47 1.071 Orifice Plate Z3 (100+1/2WQCV) 4.89 1.685 Weir&Pipe (Restrict) Total (all zones) 3.323 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 2.632E-02 ft2 Depth at top of Zone using Orifice Plate = 3.60 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 14.00 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 3.79 sq. inches (use rectangular openings) Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 1.20 2.40 Orifice Area (sq. inches) 3.79 3.79 3.79 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 3.60 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =4.85 N/A feet Overflow Weir Front Edge Length = 10.00 N/A feet Overflow Weir Slope Length = 5.15 N/A feet Overflow Weir Grate Slope = 4.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 12.66 N/A Horiz. Length of Weir Sides = 5.00 N/A feet Overflow Grate Open Area w/o Debris = 35.87 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 35.87 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 2.83 N/A ft2 Outlet Pipe Diameter = 27.00 N/A inches Outlet Orifice Centroid = 0.85 N/A feet Restrictor Plate Height Above Pipe Invert = 18.10 inches Half-Central Angle of Restrictor Plate on Pipe = 1.92 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 5.30 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.50 feet Spillway Crest Length = 68.00 feet Stage at Top of Freeboard = 6.30 feet Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 2.29 acres Freeboard above Max Water Surface = 0.50 feet Basin Volume at Top of Freeboard = 5.95 acre-ft Max Ponding Depth of Target Storage Volume =4.73 feet Discharge at Top of Freeboard = 245.46 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =0.567 1.638 1.076 1.610 2.076 2.863 3.728 4.867 7.790 Inflow Hydrograph Volume (acre-ft) =N/A N/A 1.076 1.610 2.076 2.863 3.728 4.867 7.790 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.2 2.1 5.1 12.9 19.5 29.1 51.5 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.10 0.24 0.61 0.92 1.38 2.44 Peak Inflow Q (cfs) =N/A N/A 16.2 24.0 30.4 43.5 56.5 74.4 117.8 Peak Outflow Q (cfs) =0.3 0.6 0.4 0.5 1.7 7.5 15.5 26.9 54.8 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.3 0.3 0.6 0.8 0.9 1.1 Structure Controlling Flow =Plate Plate Plate Plate Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A 0.0 0.2 0.4 0.7 0.8 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =38 64 54 65 70 69 66 63 56 Time to Drain 99% of Inflow Volume (hours) =40 69 57 69 76 75 74 73 70 Maximum Ponding Depth (ft) =2.01 3.47 2.70 3.33 3.76 4.09 4.38 4.73 5.55 Area at Maximum Ponding Depth (acres) =0.56 0.94 0.72 0.90 1.03 1.14 1.24 1.40 1.82 Maximum Volume Stored (acre-ft) =0.568 1.646 1.003 1.518 1.922 2.291 2.636 3.097 4.389 DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond C The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond C - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 3:50 PM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 202 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 271 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 348 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 334 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 377 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 410 0.50 WQ Plate Flow at 100yr depth = 0.71 0.97(diameter = 1-1/8 inches)50 Year 439 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 474 1 Z1_Boolean n*Cdw #1 = 0.32 1.20(diameter = 1-1/4 inches)500 Year 556 1 Z2_Boolean n*Cdo #1 = 1.45 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.245 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 0 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 8.00 260,000 250 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) 0 20 40 60 80 100 120 140 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 50 100 150 200 250 0 50,000 100,000 150,000 200,000 250,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond C - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 3:50 PM Project: Basin ID: Depth Increment = ft Watershed Information Top of Micropool -- 0.00 -- -- -- 169 0.004 Selected BMP Type =EDB -- 0.20 -- -- -- 354 0.008 49 0.001 Watershed Area = 2.94 acres -- 0.40 -- -- -- 835 0.019 163 0.004 Watershed Length = 560 ft -- 0.60 -- -- -- 1,458 0.033 386 0.009 Watershed Length to Centroid = 200 ft -- 0.80 -- -- -- 2,297 0.053 753 0.017 Watershed Slope = 0.010 ft/ft -- 1.00 -- -- -- 3,408 0.078 1,346 0.031 Watershed Imperviousness = 27.00% percent -- 1.20 -- -- -- 4,850 0.111 2,124 0.049 Percentage Hydrologic Soil Group A = 0.0% percent -- 1.32 -- -- -- 5,903 0.136 2,759 0.063 Percentage Hydrologic Soil Group B = 0.0% percent -- 1.40 -- -- -- 6,658 0.153 3,254 0.075 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 1.60 -- -- -- 8,491 0.195 4,750 0.109 Target WQCV Drain Time = 40.0 hours -- 1.80 -- -- -- 9,861 0.226 6,572 0.151 Location for 1-hr Rainfall Depths = User Input -- 2.00 -- -- -- 10,783 0.248 8,734 0.201 -- 2.20 -- -- -- 11,581 0.266 10,855 0.249 -- 2.40 -- -- -- 12,391 0.284 13,244 0.304 Optional User Overrides -- 3.40 -- -- -- 16,490 0.379 27,809 0.638 Water Quality Capture Volume (WQCV) = 0.035 acre-feet acre-feet -- -- -- -- Excess Urban Runoff Volume (EURV) = 0.071 acre-feet acre-feet -- -- -- -- 2-yr Runoff Volume (P1 = 0.82 in.) = 0.042 acre-feet 0.82 inches -- -- -- -- 5-yr Runoff Volume (P1 = 1.14 in.) = 0.086 acre-feet 1.14 inches -- -- -- -- 10-yr Runoff Volume (P1 = 1.4 in.) = 0.138 acre-feet 1.40 inches -- -- -- -- 25-yr Runoff Volume (P1 = 1.81 in.) = 0.249 acre-feet 1.81 inches -- -- -- -- 50-yr Runoff Volume (P1 = 2.27 in.) = 0.360 acre-feet 2.27 inches -- -- -- -- 100-yr Runoff Volume (P1 = 2.86 in.) = 0.520 acre-feet 2.86 inches -- -- -- -- 500-yr Runoff Volume (P1 = 4.39 in.) = 0.918 acre-feet 4.39 inches -- -- -- -- Approximate 2-yr Detention Volume = 0.042 acre-feet -- -- -- -- Approximate 5-yr Detention Volume = 0.080 acre-feet -- -- -- -- Approximate 10-yr Detention Volume = 0.098 acre-feet -- -- -- -- Approximate 25-yr Detention Volume = 0.126 acre-feet -- -- -- -- Approximate 50-yr Detention Volume = 0.147 acre-feet -- -- -- -- Approximate 100-yr Detention Volume = 0.205 acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Zone 1 Volume (WQCV) = 0.035 acre-feet -- -- -- -- Zone 2 Volume (EURV - Zone 1) = 0.037 acre-feet -- -- -- -- Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 0.151 acre-feet -- -- -- -- Total Detention Basin Volume = 0.222 acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) =user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) =user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) =user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) =user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond D MHFD-Detention, Version 4.06 (July 2022) Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond D - Full Spectrum Detention.xlsm, Basin 7/1/2025, 12:19 PM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.05 Zone 1 (WQCV) 1.05 Zone 1 (WQCV) 1.37 Zone 2 (EURV) 1.37 Zone 2 (EURV) 2.09 Z3 (100+1/2WQCV)2.09 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.160 0.320 0.480 0.640 0.000 0.095 0.190 0.285 0.380 0.00 1.00 2.00 3.00 4.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 4200 8400 12600 16800 0 5 10 15 20 0.00 1.00 2.00 3.00 4.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond D - Full Spectrum Detention.xlsm, Basin 7/1/2025, 12:19 PM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 1.05 0.035 Orifice Plate Zone 2 (EURV) 1.37 0.037 Orifice Plate Z3 (100+1/2WQCV) 2.09 0.151 Weir&Pipe (Restrict) Total (all zones) 0.222 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 1.875E-03 ft2 Depth at top of Zone using Orifice Plate = 1.50 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 5.55 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 0.27 sq. inches (diameter = 9/16 inch) Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 0.50 1.00 Orifice Area (sq. inches) 0.27 0.27 0.27 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 1.50 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =2.75 N/A feet Overflow Weir Front Edge Length = 9.00 N/A feet Overflow Weir Slope Length = 5.15 N/A feet Overflow Weir Grate Slope = 4.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 42.54 N/A Horiz. Length of Weir Sides = 5.00 N/A feet Overflow Grate Open Area w/o Debris = 32.28 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 32.28 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 0.76 N/A ft2 Outlet Pipe Diameter = 18.00 N/A inches Outlet Orifice Centroid = 0.39 N/A feet Restrictor Plate Height Above Pipe Invert = 8.00 inches Half-Central Angle of Restrictor Plate on Pipe = 1.46 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 2.40 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.37 feet Spillway Crest Length = 7.50 feet Stage at Top of Freeboard = 3.27 feet Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 0.37 acres Freeboard above Max Water Surface = 0.50 feet Basin Volume at Top of Freeboard = 0.59 acre-ft Max Ponding Depth of Target Storage Volume =1.91 feet Discharge at Top of Freeboard = 31.24 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =0.035 0.071 0.042 0.086 0.138 0.249 0.360 0.520 0.918 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.042 0.086 0.138 0.249 0.360 0.520 0.918 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.0 0.4 0.9 2.1 3.2 4.8 8.4 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.12 0.30 0.72 1.09 1.62 2.87 Peak Inflow Q (cfs) =N/A N/A 0.5 1.0 1.5 2.9 4.2 5.9 10.1 Peak Outflow Q (cfs) =0.0 0.0 0.0 0.0 0.4 1.6 2.8 4.5 6.2 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.1 0.5 0.8 0.9 0.9 0.7 Structure Controlling Flow =Plate Plate Plate Plate Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A 0.0 0.0 0.1 0.1 0.2 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =39 56 44 63 66 60 56 51 41 Time to Drain 99% of Inflow Volume (hours) =42 60 47 68 73 70 68 64 58 Maximum Ponding Depth (ft) =1.05 1.37 1.09 1.43 1.58 1.71 1.80 1.91 2.51 Area at Maximum Ponding Depth (acres) =0.09 0.15 0.09 0.16 0.19 0.21 0.22 0.24 0.29 Maximum Volume Stored (acre-ft) =0.035 0.072 0.038 0.079 0.107 0.131 0.151 0.176 0.336 The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond D Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond D - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 3:52 PM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 106 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 110 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 138 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 144 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 159 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 172 0.37 WQ Plate Flow at 100yr depth = 0.03 0.97(diameter = 1-1/8 inches)50 Year 181 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 192 1 Z1_Boolean n*Cdw #1 = 0.32 1.20(diameter = 1-1/4 inches)500 Year 252 1 Z2_Boolean n*Cdo #1 = 1.45 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.245 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 0 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 4.00 30,000 40 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound MHFD-Detention, Version 4.06 (July 2022) DETENTION BASIN OUTLET STRUCTURE DESIGN 0 2 4 6 8 10 12 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 5 10 15 20 25 30 35 40 0 5,000 10,000 15,000 20,000 25,000 30,000 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond D - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 3:52 PM Project: Basin ID: Depth Increment = ft Watershed Information Top of Micropool -- 0.00 -- -- -- 76 0.002 Selected BMP Type =EDB -- 0.20 -- -- -- 258 0.006 31 0.001 Watershed Area = 4.92 acres -- 0.40 -- -- -- 528 0.012 107 0.002 Watershed Length = 469 ft -- 0.60 -- -- -- 832 0.019 240 0.006 Watershed Length to Centroid = 230 ft -- 0.80 -- -- -- 1,109 0.025 431 0.010 Watershed Slope = 0.015 ft/ft -- 1.00 -- -- -- 1,362 0.031 689 0.016 Watershed Imperviousness = 66.00% percent -- 1.20 -- -- -- 1,613 0.037 971 0.022 Percentage Hydrologic Soil Group A = 0.0% percent -- 1.40 -- -- -- 1,894 0.043 1,319 0.030 Percentage Hydrologic Soil Group B = 0.0% percent -- 1.60 -- -- -- 2,228 0.051 1,728 0.040 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 1.80 -- -- -- 2,615 0.060 2,208 0.051 Target WQCV Drain Time = 40.0 hours -- 2.00 -- -- -- 7,389 0.170 3,234 0.074 Location for 1-hr Rainfall Depths = User Input -- 2.20 -- -- -- 8,251 0.189 4,716 0.108 -- 2.40 -- -- -- 9,069 0.208 6,440 0.148 -- 2.60 -- -- -- 9,848 0.226 8,324 0.191 Optional User Overrides -- 2.80 -- -- -- 10,591 0.243 10,360 0.238 Water Quality Capture Volume (WQCV) = 0.106 acre-feet acre-feet -- 3.00 -- -- -- 11,286 0.259 12,654 0.290 Excess Urban Runoff Volume (EURV) = 0.314 acre-feet acre-feet -- 3.20 -- -- -- 11,906 0.273 14,854 0.341 2-yr Runoff Volume (P1 = 0.82 in.) = 0.194 acre-feet 0.82 inches -- 3.40 -- -- -- 12,522 0.287 17,291 0.397 5-yr Runoff Volume (P1 = 1.14 in.) = 0.299 acre-feet 1.14 inches -- 3.60 -- -- -- 13,138 0.302 19,851 0.456 10-yr Runoff Volume (P1 = 1.4 in.) = 0.396 acre-feet 1.40 inches -- 3.80 -- -- -- 13,932 0.320 22,550 0.518 25-yr Runoff Volume (P1 = 1.81 in.) = 0.570 acre-feet 1.81 inches -- 4.00 -- -- -- 14,800 0.340 25,562 0.587 50-yr Runoff Volume (P1 = 2.27 in.) = 0.757 acre-feet 2.27 inches -- 4.20 -- -- -- 15,740 0.361 28,459 0.653 100-yr Runoff Volume (P1 = 2.86 in.) = 1.007 acre-feet 2.86 inches -- 4.40 -- -- -- 16,789 0.385 31,701 0.728 500-yr Runoff Volume (P1 = 4.39 in.) = 1.647 acre-feet 4.39 inches -- 4.60 -- -- -- 18,007 0.413 35,169 0.807 Approximate 2-yr Detention Volume = 0.194 acre-feet -- 4.80 -- -- -- 20,261 0.465 39,176 0.899 Approximate 5-yr Detention Volume = 0.302 acre-feet -- 5.80 -- -- -- 27,505 0.631 63,059 1.448 Approximate 10-yr Detention Volume = 0.363 acre-feet -- -- -- -- Approximate 25-yr Detention Volume = 0.438 acre-feet -- -- -- -- Approximate 50-yr Detention Volume = 0.503 acre-feet -- -- -- -- Approximate 100-yr Detention Volume = 0.616 acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Zone 1 Volume (WQCV) = 0.106 acre-feet -- -- -- -- Zone 2 Volume (EURV - Zone 1) = 0.208 acre-feet -- -- -- -- Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 0.355 acre-feet -- -- -- -- Total Detention Basin Volume = 0.669 acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) =user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) =user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) =user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) =user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond E MHFD-Detention, Version 4.06 (July 2022) Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond E - Full Spectrum Detention.xlsm, Basin 7/1/2025, 1:54 PM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 2.18 Zone 1 (WQCV) 2.18 Zone 1 (WQCV) 3.10 Zone 2 (EURV) 3.10 Zone 2 (EURV) 4.24 Z3 (100+1/2WQCV)4.24 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.365 0.730 1.095 1.460 0.000 0.160 0.320 0.480 0.640 0.00 1.50 3.00 4.50 6.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 6900 13800 20700 27600 0 5 10 15 20 0.00 1.50 3.00 4.50 6.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond E - Full Spectrum Detention.xlsm, Basin 7/1/2025, 1:54 PM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 2.18 0.106 Orifice Plate Zone 2 (EURV) 3.10 0.208 Orifice Plate Z3 (100+1/2WQCV) 4.24 0.355 Weir&Pipe (Restrict) Total (all zones) 0.669 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 3.889E-03 ft2 Depth at top of Zone using Orifice Plate = 3.30 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 13.00 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 0.56 sq. inches (diameter = 13/16 inch) Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 1.10 2.20 Orifice Area (sq. inches) 0.56 0.56 0.56 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 3.30 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =4.05 N/A feet Overflow Weir Front Edge Length = 10.00 N/A feet Overflow Weir Slope Length = 5.06 N/A feet Overflow Weir Grate Slope = 6.66 N/A H:V Grate Open Area / 100-yr Orifice Area = 33.27 N/A Horiz. Length of Weir Sides = 5.00 N/A feet Overflow Grate Open Area w/o Debris = 35.19 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 35.19 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 1.06 N/A ft2 Outlet Pipe Diameter = 18.00 N/A inches Outlet Orifice Centroid = 0.49 N/A feet Restrictor Plate Height Above Pipe Invert = 10.40 inches Half-Central Angle of Restrictor Plate on Pipe = 1.73 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 4.60 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.42 feet Spillway Crest Length = 18.00 feet Stage at Top of Freeboard = 5.52 feet Spillway End Slopes = 20.00 H:V Basin Area at Top of Freeboard = 0.58 acres Freeboard above Max Water Surface = 0.50 feet Basin Volume at Top of Freeboard = 1.28 acre-ft Max Ponding Depth of Target Storage Volume =3.85 feet Discharge at Top of Freeboard = 98.04 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =0.106 0.314 0.194 0.299 0.396 0.570 0.757 1.007 1.647 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.194 0.299 0.396 0.570 0.757 1.007 1.647 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.1 0.8 1.9 4.6 7.0 10.2 18.0 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.17 0.39 0.94 1.42 2.07 3.65 Peak Inflow Q (cfs) =N/A N/A 3.9 6.0 7.9 11.6 15.5 20.5 32.6 Peak Outflow Q (cfs) =0.0 0.1 0.1 0.1 0.2 2.5 5.9 9.3 13.0 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.1 0.1 0.6 0.8 0.9 0.7 Structure Controlling Flow =Plate Plate Plate Plate Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A 0.0 0.1 0.2 0.3 0.3 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =38 72 55 71 82 79 76 73 67 Time to Drain 99% of Inflow Volume (hours) =41 77 59 76 88 87 86 84 80 Maximum Ponding Depth (ft) =2.18 3.09 2.56 2.99 3.33 3.50 3.64 3.85 4.72 Area at Maximum Ponding Depth (acres) =0.19 0.27 0.22 0.26 0.28 0.29 0.31 0.32 0.44 Maximum Volume Stored (acre-ft) =0.106 0.314 0.184 0.285 0.380 0.429 0.471 0.537 0.863 DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond E The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond E - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 1:55 PM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 219 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 257 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 310 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 300 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 334 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 351 0.42 WQ Plate Flow at 100yr depth = 0.09 0.97(diameter = 1-1/8 inches)50 Year 365 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 386 1 Z1_Boolean n*Cdw #1 = 0.46 1.20(diameter = 1-1/4 inches)500 Year 473 1 Z2_Boolean n*Cdo #1 = 1.12 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.149 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 0 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 6.00 60,000 100 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) 0 5 10 15 20 25 30 35 40 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 10 20 30 40 50 60 70 80 90 100 0 10,000 20,000 30,000 40,000 50,000 60,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond E - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 1:55 PM Project: Basin ID: Depth Increment = ft Watershed Information Top of Micropool -- 0.00 -- -- -- 119 0.003 Selected BMP Type =EDB -- 0.20 -- -- -- 196 0.004 30 0.001 Watershed Area = 12.20 acres -- 0.40 -- -- -- 904 0.021 133 0.003 Watershed Length = 1,180 ft -- 0.60 -- -- -- 2,402 0.055 472 0.011 Watershed Length to Centroid = 420 ft -- 0.80 -- -- -- 4,647 0.107 1,177 0.027 Watershed Slope = 0.010 ft/ft -- 1.00 -- -- -- 7,558 0.174 2,398 0.055 Watershed Imperviousness = 77.00% percent -- 1.20 -- -- -- 10,960 0.252 4,141 0.095 Percentage Hydrologic Soil Group A = 0.0% percent -- 1.40 -- -- -- 15,242 0.350 6,718 0.154 Percentage Hydrologic Soil Group B = 0.0% percent -- 1.60 -- -- -- 17,770 0.408 10,171 0.233 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 1.80 -- -- -- 20,063 0.461 13,954 0.320 Target WQCV Drain Time = 40.0 hours -- 1.99 -- -- -- 22,029 0.506 17,733 0.407 Location for 1-hr Rainfall Depths = User Input -- 2.00 -- -- -- 22,128 0.508 18,174 0.417 -- 2.20 -- -- -- 24,022 0.551 22,549 0.518 -- 2.40 -- -- -- 25,964 0.596 27,528 0.632 Optional User Overrides -- 2.60 -- -- -- 27,901 0.641 33,174 0.762 Water Quality Capture Volume (WQCV) = 0.316 acre-feet acre-feet -- 2.80 -- -- -- 29,838 0.685 38,948 0.894 Excess Urban Runoff Volume (EURV) = 0.920 acre-feet acre-feet -- 3.00 -- -- -- 31,783 0.730 45,110 1.036 2-yr Runoff Volume (P1 = 0.82 in.) = 0.590 acre-feet 0.82 inches -- 3.20 -- -- -- 33,447 0.768 51,299 1.178 5-yr Runoff Volume (P1 = 1.14 in.) = 0.886 acre-feet 1.14 inches -- 3.40 -- -- -- 35,173 0.807 58,143 1.335 10-yr Runoff Volume (P1 = 1.4 in.) = 1.147 acre-feet 1.40 inches -- 3.60 -- -- -- 36,975 0.849 65,709 1.508 25-yr Runoff Volume (P1 = 1.81 in.) = 1.592 acre-feet 1.81 inches -- 3.80 -- -- -- 38,858 0.892 73,293 1.683 50-yr Runoff Volume (P1 = 2.27 in.) = 2.078 acre-feet 2.27 inches -- 4.00 -- -- -- 40,904 0.939 81,269 1.866 100-yr Runoff Volume (P1 = 2.86 in.) = 2.720 acre-feet 2.86 inches -- 4.20 -- -- -- 42,789 0.982 89,211 2.048 500-yr Runoff Volume (P1 = 4.39 in.) = 4.367 acre-feet 4.39 inches -- 5.20 -- -- -- 50,249 1.154 136,157 3.126 Approximate 2-yr Detention Volume = 0.573 acre-feet -- -- -- -- Approximate 5-yr Detention Volume = 0.866 acre-feet -- -- -- -- Approximate 10-yr Detention Volume = 1.049 acre-feet -- -- -- -- Approximate 25-yr Detention Volume = 1.258 acre-feet -- -- -- -- Approximate 50-yr Detention Volume = 1.437 acre-feet -- -- -- -- Approximate 100-yr Detention Volume = 1.720 acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Zone 1 Volume (WQCV) = 0.316 acre-feet -- -- -- -- Zone 2 Volume (EURV - Zone 1) = 0.604 acre-feet -- -- -- -- Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 0.958 acre-feet -- -- -- -- Total Detention Basin Volume = 1.878 acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) =user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) =user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) =user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) =user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond F MHFD-Detention, Version 4.06 (July 2022) Volume (ft 3) Volume (ac-ft) Area (acre) After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond F - Full Spectrum Detention.xlsm, Basin 7/1/2025, 1:37 PM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.79 Zone 1 (WQCV) 1.79 Zone 1 (WQCV) 2.84 Zone 2 (EURV) 2.84 Zone 2 (EURV) 4.02 Z3 (100+1/2WQCV)4.02 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.785 1.570 2.355 3.140 0.000 0.290 0.580 0.870 1.160 0.00 1.50 3.00 4.50 6.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 12600 25200 37800 50400 0 5 10 15 20 0.00 1.50 3.00 4.50 6.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond F - Full Spectrum Detention.xlsm, Basin 7/1/2025, 1:37 PM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 1.79 0.316 Orifice Plate Zone 2 (EURV) 2.84 0.604 Orifice Plate Z3 (100+1/2WQCV) 4.02 0.958 Weir&Pipe (Restrict) Total (all zones) 1.878 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = ft (distance below the filtration media surface) Underdrain Orifice Area =ft2 Underdrain Orifice Diameter = inches Underdrain Orifice Centroid = feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 1.285E-02 ft2 Depth at top of Zone using Orifice Plate = 3.00 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 12.00 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 1.85 sq. inches (diameter = 1-1/2 inches) Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 1.00 2.00 Orifice Area (sq. inches) 1.85 1.85 1.85 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 3.20 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =4.20 N/A feet Overflow Weir Front Edge Length = 5.00 N/A feet Overflow Weir Slope Length = 5.10 N/A feet Overflow Weir Grate Slope = 5.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 8.51 N/A Horiz. Length of Weir Sides = 5.00 N/A feet Overflow Grate Open Area w/o Debris = 17.74 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 17.74 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 2.09 N/A ft2 Outlet Pipe Diameter = 21.00 N/A inches Outlet Orifice Centroid = 0.77 N/A feet Restrictor Plate Height Above Pipe Invert = 17.00 inches Half-Central Angle of Restrictor Plate on Pipe = 2.24 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 4.20 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.49 feet Spillway Crest Length = 32.00 feet Stage at Top of Freeboard = 5.69 feet Spillway End Slopes = 29.00 H:V Basin Area at Top of Freeboard = 1.15 acres Freeboard above Max Water Surface = 1.00 feet Basin Volume at Top of Freeboard = 3.13 acre-ft Max Ponding Depth of Target Storage Volume =4.04 feet Discharge at Top of Freeboard = 186.74 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =0.316 0.920 0.590 0.886 1.147 1.592 2.078 2.720 4.367 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.590 0.886 1.147 1.592 2.078 2.720 4.367 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.1 1.4 3.4 8.4 12.8 19.1 33.8 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.12 0.28 0.69 1.05 1.56 2.77 Peak Inflow Q (cfs) =N/A N/A 9.8 14.6 18.6 26.6 34.5 45.8 72.5 Peak Outflow Q (cfs) =0.1 0.2 0.2 0.2 0.3 2.3 6.2 14.0 37.3 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.2 0.1 0.3 0.5 0.7 1.1 Structure Controlling Flow =Plate Plate Plate Plate Plate Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Spillway Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A N/A 0.1 0.3 0.8 1.1 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =38 72 57 71 82 86 84 82 76 Time to Drain 99% of Inflow Volume (hours) =40 76 60 75 87 93 93 91 88 Maximum Ponding Depth (ft) =1.80 2.84 2.27 2.73 3.09 3.49 3.74 4.04 4.49 Area at Maximum Ponding Depth (acres) =0.46 0.69 0.56 0.67 0.75 0.82 0.88 0.95 1.03 Maximum Volume Stored (acre-ft) =0.320 0.922 0.557 0.847 1.102 1.408 1.621 1.903 2.340 The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond F Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond F - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 1:40 PM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 181 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 228 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 285 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 274 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 310 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 350 0.49 WQ Plate Flow at 100yr depth = 0.32 0.97(diameter = 1-1/8 inches)50 Year 375 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 405 1 Z1_Boolean n*Cdw #1 = 0.39 1.20(diameter = 1-1/4 inches)500 Year 450 1 Z2_Boolean n*Cdo #1 = 1.28 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.197 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 1 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 6.00 140,000 190 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound MHFD-Detention, Version 4.06 (July 2022) DETENTION BASIN OUTLET STRUCTURE DESIGN 0 10 20 30 40 50 60 70 80 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 20 40 60 80 100 120 140 160 180 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond F - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 1:40 PM Project: Basin ID: Depth Increment = ft Watershed Information Top of Micropool -- 0.00 -- -- -- 42 0.001 Selected BMP Type =EDB -- 0.20 -- -- -- 665 0.015 64 0.001 Watershed Area = 7.05 acres -- 0.40 -- -- -- 1,977 0.045 315 0.007 Watershed Length = 570 ft -- 0.60 -- -- -- 3,802 0.087 913 0.021 Watershed Length to Centroid = 310 ft -- 0.80 -- -- -- 6,199 0.142 1,913 0.044 Watershed Slope = 0.010 ft/ft -- 1.00 -- -- -- 8,719 0.200 3,405 0.078 Watershed Imperviousness = 70.00% percent -- 1.20 -- -- -- 11,510 0.264 5,313 0.122 Percentage Hydrologic Soil Group A = 0.0% percent -- 1.40 -- -- -- 14,444 0.332 7,879 0.181 Percentage Hydrologic Soil Group B = 0.0% percent -- 1.50 -- -- -- 16,089 0.369 9,549 0.219 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 1.60 -- -- -- 17,784 0.408 11,243 0.258 Target WQCV Drain Time = 40.0 hours -- 1.80 -- -- -- 21,572 0.495 15,178 0.348 Location for 1-hr Rainfall Depths = User Input -- 2.00 -- -- -- 25,847 0.593 19,920 0.457 -- 2.20 -- -- -- 30,277 0.695 25,231 0.579 -- 2.40 -- -- -- 34,455 0.791 31,662 0.727 Optional User Overrides -- 2.60 -- -- -- 38,605 0.886 39,312 0.902 Water Quality Capture Volume (WQCV) = 0.162 acre-feet acre-feet -- 2.80 -- -- -- 42,530 0.976 47,425 1.089 Excess Urban Runoff Volume (EURV) = 0.480 acre-feet acre-feet -- 3.80 -- -- -- 55,247 1.268 96,314 2.211 2-yr Runoff Volume (P1 = 0.82 in.) = 0.299 acre-feet 0.82 inches -- -- -- -- 5-yr Runoff Volume (P1 = 1.14 in.) = 0.457 acre-feet 1.14 inches -- -- -- -- 10-yr Runoff Volume (P1 = 1.4 in.) = 0.600 acre-feet 1.40 inches -- -- -- -- 25-yr Runoff Volume (P1 = 1.81 in.) = 0.851 acre-feet 1.81 inches -- -- -- -- 50-yr Runoff Volume (P1 = 2.27 in.) = 1.123 acre-feet 2.27 inches -- -- -- -- 100-yr Runoff Volume (P1 = 2.86 in.) = 1.486 acre-feet 2.86 inches -- -- -- -- 500-yr Runoff Volume (P1 = 4.39 in.) = 2.414 acre-feet 4.39 inches -- -- -- -- Approximate 2-yr Detention Volume = 0.297 acre-feet -- -- -- -- Approximate 5-yr Detention Volume = 0.457 acre-feet -- -- -- -- Approximate 10-yr Detention Volume = 0.551 acre-feet -- -- -- -- Approximate 25-yr Detention Volume = 0.664 acre-feet -- -- -- -- Approximate 50-yr Detention Volume = 0.760 acre-feet -- -- -- -- Approximate 100-yr Detention Volume = 0.923 acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Zone 1 Volume (WQCV) = 0.162 acre-feet -- -- -- -- Zone 2 Volume (EURV - Zone 1) = 0.318 acre-feet -- -- -- -- Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 0.524 acre-feet -- -- -- -- Total Detention Basin Volume = 1.004 acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) =user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) =user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) =user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) =user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond G MHFD-Detention, Version 4.06 (July 2022) Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond G - Full Spectrum Detention.xlsm, Basin 7/1/2025, 4:04 PM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.33 Zone 1 (WQCV) 1.33 Zone 1 (WQCV) 2.04 Zone 2 (EURV) 2.04 Zone 2 (EURV) 2.72 Z3 (100+1/2WQCV)2.72 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.555 1.110 1.665 2.220 0.000 0.320 0.640 0.960 1.280 0.00 1.00 2.00 3.00 4.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 13900 27800 41700 55600 0 5 10 15 20 0.00 1.00 2.00 3.00 4.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond G - Full Spectrum Detention.xlsm, Basin 7/1/2025, 4:04 PM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 1.33 0.162 Orifice Plate Zone 2 (EURV) 2.04 0.318 Orifice Plate Z3 (100+1/2WQCV) 2.72 0.524 Weir&Pipe (Restrict) Total (all zones) 1.004 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 8.472E-03 ft2 Depth at top of Zone using Orifice Plate = 2.20 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 9.00 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 1.22 sq. inches (diameter = 1-1/4 inches) Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 0.80 1.60 Orifice Area (sq. inches) 1.22 1.22 1.22 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 2.22 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =2.62 N/A feet Overflow Weir Front Edge Length = 14.00 N/A feet Overflow Weir Slope Length = 4.02 N/A feet Overflow Weir Grate Slope = 10.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 21.78 N/A Horiz. Length of Weir Sides = 4.00 N/A feet Overflow Grate Open Area w/o Debris = 39.17 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 39.17 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 1.80 N/A ft2 Outlet Pipe Diameter = 21.00 N/A inches Outlet Orifice Centroid = 0.68 N/A feet Restrictor Plate Height Above Pipe Invert = 14.70 inches Half-Central Angle of Restrictor Plate on Pipe = 1.98 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 2.80 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.51 feet Spillway Crest Length = 24.00 feet Stage at Top of Freeboard = 4.31 feet Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 1.27 acres Freeboard above Max Water Surface = 1.00 feet Basin Volume at Top of Freeboard = 2.21 acre-ft Max Ponding Depth of Target Storage Volume =2.61 feet Discharge at Top of Freeboard = 96.89 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =0.162 0.480 0.299 0.457 0.600 0.851 1.123 1.486 2.414 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.299 0.457 0.600 0.851 1.123 1.486 2.414 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.1 1.0 2.4 5.9 8.9 13.0 23.1 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.15 0.35 0.83 1.26 1.85 3.27 Peak Inflow Q (cfs) =N/A N/A 5.6 8.5 11.0 15.9 20.9 28.1 44.7 Peak Outflow Q (cfs) =0.1 0.1 0.1 0.1 0.1 2.2 5.7 11.4 19.5 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.1 0.1 0.4 0.6 0.9 0.8 Structure Controlling Flow =Plate Plate Plate Plate Plate Overflow Weir 1 Overflow Weir 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A N/A 0.0 0.1 0.3 0.3 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =38 71 56 70 81 82 79 75 69 Time to Drain 99% of Inflow Volume (hours) =40 76 59 74 86 89 88 86 83 Maximum Ponding Depth (ft) =1.34 2.04 1.66 1.97 2.19 2.35 2.47 2.61 3.00 Area at Maximum Ponding Depth (acres) =0.31 0.61 0.43 0.57 0.68 0.77 0.82 0.89 1.03 Maximum Volume Stored (acre-ft) =0.165 0.481 0.283 0.434 0.572 0.696 0.791 0.902 1.280 DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond G The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond G - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 4:03 PM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 135 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 167 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 205 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 198 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 220 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 236 0.51 WQ Plate Flow at 100yr depth = 0.16 0.97(diameter = 1-1/8 inches)50 Year 248 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 262 1 Z1_Boolean n*Cdw #1 = 0.52 1.20(diameter = 1-1/4 inches)500 Year 301 1 Z2_Boolean n*Cdo #1 = 0.97 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.100 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 1 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 6.00 100,000 100 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) 0 5 10 15 20 25 30 35 40 45 50 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 10 20 30 40 50 60 70 80 90 100 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond G - Full Spectrum Detention.xlsm, Outlet Structure 7/1/2025, 4:03 PM Project: Basin ID: Depth Increment = 0.20 ft Watershed Information Top of Micropool 0.00 11.5 11.5 133 0.003 Selected BMP Type =EDB ISV 0.45 11.5 11.5 133 0.003 60 0.001 Watershed Area = 16.72 acres 0.60 25.5 18.2 464 0.011 90 0.002 Watershed Length = 1,500 ft 0.80 67.1 38.2 2,564 0.059 365 0.008 Watershed Length to Centroid = 850 ft 1.00 108.7 58.2 6,327 0.145 1,226 0.028 Watershed Slope = 0.015 ft/ft 1.20 150.3 78.2 11,754 0.270 3,007 0.069 Watershed Imperviousness = 80.00% percent 1.40 191.9 98.2 18,846 0.433 6,039 0.139 Percentage Hydrologic Soil Group A = 0.0% percent 1.60 233.5 118.2 27,601 0.634 10,656 0.245 Percentage Hydrologic Soil Group B = 0.0% percent Floor 1.63 239.7 121.2 29,058 0.667 11,506 0.264 Percentage Hydrologic Soil Groups C/D = 100.0% percent 1.80 243.0 124.2 30,180 0.693 16,551 0.380 Target WQCV Drain Time = 40.0 hours Zone 1 (WQCV)1.92 244.9 126.1 30,889 0.709 20,215 0.464 Location for 1-hr Rainfall Depths = Thornton - Civic Center 2.00 246.2 127.4 31,365 0.720 22,705 0.521 2.20 249.4 130.6 32,571 0.748 29,098 0.668 2.40 252.6 133.8 33,797 0.776 35,735 0.820 Optional User Overrides 2.60 255.8 137.0 35,044 0.804 42,619 0.978 Water Quality Capture Volume (WQCV) = 0.457 acre-feet acre-feet 2.80 259.0 140.2 36,311 0.834 49,754 1.142 Excess Urban Runoff Volume (EURV) = 1.314 acre-feet acre-feet 3.00 262.2 143.4 37,599 0.863 57,144 1.312 2-yr Runoff Volume (P1 = 0.82 in.) = 0.862 acre-feet 0.82 inches Zone 2 (EURV)3.01 262.4 143.6 37,664 0.865 57,521 1.320 5-yr Runoff Volume (P1 = 1.14 in.) = 1.287 acre-feet 1.14 inches 3.20 265.4 146.6 38,907 0.893 64,795 1.487 10-yr Runoff Volume (P1 = 1.4 in.) = 1.657 acre-feet 1.40 inches 3.40 268.6 149.8 40,235 0.924 72,708 1.669 25-yr Runoff Volume (P1 = 1.81 in.) = 2.280 acre-feet 1.81 inches 3.60 271.8 153.0 41,585 0.955 80,890 1.857 50-yr Runoff Volume (P1 = 2.27 in.) = 2.964 acre-feet 2.27 inches 3.80 275.0 156.2 42,954 0.986 89,344 2.051 100-yr Runoff Volume (P1 = 2.86 in.) = 3.864 acre-feet 2.86 inches 4.00 278.2 159.4 44,344 1.018 98,073 2.251 500-yr Runoff Volume (P1 = 4.39 in.) = 6.175 acre-feet 4.39 inches 4.20 281.4 162.6 45,755 1.050 107,083 2.458 Approximate 2-yr Detention Volume = 0.820 acre-feet Z3 (100+1/2WQCV)4.39 284.4 165.6 47,114 1.082 115,905 2.661 Approximate 5-yr Detention Volume = 1.231 acre-feet 4.40 284.6 165.8 47,186 1.083 116,376 2.672 Approximate 10-yr Detention Volume = 1.493 acre-feet 4.60 287.8 169.0 48,637 1.117 125,958 2.892 Approximate 25-yr Detention Volume = 1.790 acre-feet 4.80 291.0 172.2 50,109 1.150 135,833 3.118 Approximate 50-yr Detention Volume = 2.043 acre-feet 5.00 294.2 175.4 51,602 1.185 146,003 3.352 Approximate 100-yr Detention Volume = 2.429 acre-feet 5.20 297.4 178.6 53,115 1.219 156,475 3.592 5.40 300.6 181.8 54,648 1.255 167,251 3.840 Define Zones and Basin Geometry 5.60 303.8 185.0 56,202 1.290 178,335 4.094 Zone 1 Volume (WQCV) = 0.457 acre-feet 5.80 307.0 188.2 57,776 1.326 189,733 4.356 Zone 2 Volume (EURV - Zone 1) = 0.856 acre-feet 6.00 310.2 191.4 59,371 1.363 201,447 4.625 Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 1.344 acre-feet 6.20 313.4 194.6 60,987 1.400 213,483 4.901 Total Detention Basin Volume = 2.658 acre-feet 6.40 316.6 197.8 62,622 1.438 225,843 5.185 Initial Surcharge Volume (ISV) = 60 ft 3 6.60 319.8 201.0 64,279 1.476 238,533 5.476 Initial Surcharge Depth (ISD) = 0.45 ft 6.80 323.0 204.2 65,955 1.514 251,556 5.775 Total Available Detention Depth (Htotal) =4.40 ft 7.00 326.2 207.4 67,653 1.553 264,916 6.082 Depth of Trickle Channel (HTC) = 0.08 ft 7.20 329.4 210.6 69,371 1.593 278,618 6.396 Slope of Trickle Channel (STC) =0.005 ft/ft 7.40 332.6 213.8 71,109 1.632 292,666 6.719 Slopes of Main Basin Sides (Smain) =8 H:V 7.60 335.8 217.0 72,867 1.673 307,063 7.049 Basin Length-to-Width Ratio (RL/W) =2 7.80 339.0 220.2 74,647 1.714 321,814 7.388 8.00 342.2 223.4 76,446 1.755 336,923 7.735 Initial Surcharge Area (AISV) =133 ft 2 8.20 345.4 226.6 78,266 1.797 352,394 8.090 Surcharge Volume Length (LISV) =11.5 ft 8.40 348.6 229.8 80,107 1.839 368,231 8.453 Surcharge Volume Width (WISV) =11.5 ft 8.60 351.8 233.0 81,968 1.882 384,438 8.825 Depth of Basin Floor (HFLOOR) =1.10 ft 8.80 355.0 236.2 83,850 1.925 401,020 9.206 Length of Basin Floor (LFLOOR) =240.3 ft 9.00 358.2 239.4 85,752 1.969 417,980 9.595 Width of Basin Floor (WFLOOR) =121.5 ft 9.20 361.4 242.6 87,674 2.013 435,322 9.994 Area of Basin Floor (AFLOOR) =29,206 ft 2 9.40 364.6 245.8 89,617 2.057 453,051 10.401 Volume of Basin Floor (VFLOOR) =11,480 ft 3 9.60 367.8 249.0 91,581 2.102 471,170 10.817 Depth of Main Basin (HMAIN) =2.77 ft 9.80 371.0 252.2 93,565 2.148 489,685 11.242 Length of Main Basin (LMAIN) =284.6 ft 10.00 374.2 255.4 95,569 2.194 508,598 11.676 Width of Main Basin (WMAIN) =165.8 ft 10.20 377.4 258.6 97,594 2.240 527,914 12.119 Area of Main Basin (AMAIN) =47,186 ft 2 10.40 380.6 261.8 99,640 2.287 547,637 12.572 Volume of Main Basin (VMAIN) =104,698 ft 3 10.60 383.8 265.0 101,706 2.335 567,771 13.034 Calculated Total Basin Volume (Vtotal) =2.669 acre-feet 10.80 387.0 268.2 103,792 2.383 588,320 13.506 11.00 390.2 271.4 105,899 2.431 609,289 13.987 11.20 393.4 274.6 108,026 2.480 630,681 14.478 11.40 396.6 277.8 110,174 2.529 652,501 14.979 11.60 399.8 281.0 112,342 2.579 674,752 15.490 11.80 403.0 284.2 114,531 2.629 697,439 16.011 12.00 406.2 287.4 116,740 2.680 720,566 16.542 12.20 409.4 290.6 118,970 2.731 744,137 17.083 12.40 412.6 293.8 121,220 2.783 768,155 17.634 12.60 415.8 297.0 123,491 2.835 792,626 18.196 12.80 419.0 300.2 125,782 2.888 817,553 18.768 13.00 422.2 303.4 128,094 2.941 842,941 19.351 13.20 425.4 306.6 130,426 2.994 868,792 19.945 13.40 428.6 309.8 132,779 3.048 895,112 20.549 13.60 431.8 313.0 135,152 3.103 921,905 21.164 13.80 435.0 316.2 137,545 3.158 949,174 21.790 14.00 438.2 319.4 139,959 3.213 976,925 22.427 14.20 441.4 322.6 142,394 3.269 1,005,160 23.075 14.40 444.6 325.8 144,849 3.325 1,033,884 23.735 14.60 447.8 329.0 147,325 3.382 1,063,101 24.405 14.80 451.0 332.2 149,821 3.439 1,092,815 25.088 15.00 454.2 335.4 152,337 3.497 1,123,030 25.781 15.20 457.4 338.6 154,874 3.555 1,153,751 26.486 15.40 460.6 341.8 157,431 3.614 1,184,981 27.203 15.60 463.8 345.0 160,009 3.673 1,216,725 27.932 15.80 467.0 348.2 162,608 3.733 1,248,986 28.673 16.00 470.2 351.4 165,227 3.793 1,281,769 29.425 16.20 473.4 354.6 167,866 3.854 1,315,078 30.190 16.40 476.6 357.8 170,526 3.915 1,348,917 30.967 16.60 479.8 361.0 173,206 3.976 1,383,290 31.756 16.80 483.0 364.2 175,907 4.038 1,418,201 32.557 17.00 486.2 367.4 178,628 4.101 1,453,654 33.371 17.20 489.4 370.6 181,370 4.164 1,489,653 34.198 17.40 492.6 373.8 184,132 4.227 1,526,203 35.037 17.60 495.8 377.0 186,915 4.291 1,563,308 35.889 17.80 499.0 380.2 189,718 4.355 1,600,971 36.753 18.00 502.2 383.4 192,542 4.420 1,639,196 37.631 18.20 505.4 386.6 195,386 4.485 1,677,989 38.521 18.40 508.6 389.8 198,250 4.551 1,717,352 39.425 18.60 511.8 393.0 201,135 4.617 1,757,290 40.342 18.80 515.0 396.2 204,041 4.684 1,797,807 41.272 19.00 518.2 399.4 206,967 4.751 1,838,908 42.216 After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond H - Future MHFD-Detention, Version 4.06 (July 2022) Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond H (Future) - Full Spectrum Detention.xlsm, Basin 6/25/2025, 10:03 AM 0 User Defined Stage-Area Booleans for Message 0 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete 1.10 H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.45 ISV 0.45 ISV 1.63 Floor 1.63 Floor 1.92 Zone 1 (WQCV) 1.92 Zone 1 (WQCV) 3.01 Zone 2 (EURV) 3.01 Zone 2 (EURV) 4.39 Z3 (100+1/2WQCV)4.39 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 10.555 21.110 31.665 42.220 0.000 1.190 2.380 3.570 4.760 0.00 5.00 10.00 15.00 20.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 51800 103600 155400 207200 0 130 260 390 520 0.00 5.00 10.00 15.00 20.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond H (Future) - Full Spectrum Detention.xlsm, Basin 6/25/2025, 10:03 AM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 1.92 0.457 Orifice Plate Zone 2 (EURV) 3.01 0.856 Orifice Plate Z3 (100+1/2WQCV) 4.39 1.344 Weir&Pipe (Restrict) Total (all zones) 2.658 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = ft (distance below the filtration media surface) Underdrain Orifice Area =ft2 Underdrain Orifice Diameter = inches Underdrain Orifice Centroid = feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = N/A ft2 Depth at top of Zone using Orifice Plate = 3.02 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = N/A inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = N/A sq. inches Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 1.00 2.00 Orifice Area (sq. inches) 2.25 2.25 4.00 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 3.10 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =4.10 N/A feet Overflow Weir Front Edge Length = 3.00 N/A feet Overflow Weir Slope Length = 6.08 N/A feet Overflow Weir Grate Slope = 6.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 5.44 N/A Horiz. Length of Weir Sides = 6.00 N/A feet Overflow Grate Open Area w/o Debris = 12.70 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 12.70 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 2.33 N/A ft2 Outlet Pipe Diameter = 24.00 N/A inches Outlet Orifice Centroid = 0.78 N/A feet Restrictor Plate Height Above Pipe Invert = 16.70 inches Half-Central Angle of Restrictor Plate on Pipe = 1.97 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 4.50 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.91 feet Spillway Crest Length = 19.00 feet Stage at Top of Freeboard = 5.91 feet Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 1.35 acres Freeboard above Max Water Surface = 0.50 feet Basin Volume at Top of Freeboard = 4.50 acre-ft Max Ponding Depth of Target Storage Volume =4.23 feet Discharge at Top of Freeboard = 143.55 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =0.457 1.314 0.862 1.287 1.657 2.280 2.964 3.864 6.175 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.862 1.287 1.657 2.280 2.964 3.864 6.175 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.1 1.6 3.9 9.9 15.0 22.4 39.8 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.10 0.24 0.59 0.90 1.34 2.38 Peak Inflow Q (cfs) =N/A N/A 12.7 18.8 23.8 33.9 44.0 57.9 91.6 Peak Outflow Q (cfs) =0.2 0.4 0.3 0.4 1.1 5.2 11.8 20.9 44.7 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.2 0.3 0.5 0.8 0.9 1.1 Structure Controlling Flow =Plate Plate Plate Plate Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A 0.1 0.4 0.9 1.6 1.8 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =38 71 58 71 79 78 76 74 68 Time to Drain 99% of Inflow Volume (hours) =40 75 61 75 83 84 83 82 79 Maximum Ponding Depth (ft) =1.92 3.01 2.39 2.90 3.28 3.61 3.90 4.23 5.00 Area at Maximum Ponding Depth (acres) =0.71 0.86 0.77 0.85 0.90 0.96 1.00 1.05 1.18 Maximum Volume Stored (acre-ft) =0.464 1.320 0.813 1.226 1.550 1.867 2.140 2.479 3.340 The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond H - Future Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond H (Future) - Full Spectrum Detention.xlsm, Outlet Structure 7/2/2025, 11:46 AM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 193 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 240 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 302 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 291 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 329 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 362 0.91 WQ Plate Flow at 100yr depth = 0.49 0.97(diameter = 1-1/8 inches)50 Year 391 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 424 1 Z1_Boolean n*Cdw #1 = 0.44 1.20(diameter = 1-1/4 inches)500 Year 501 1 Z2_Boolean n*Cdo #1 = 1.17 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.165 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 0 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 6.00 200,000 150 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound MHFD-Detention, Version 4.06 (July 2022) DETENTION BASIN OUTLET STRUCTURE DESIGN 0 10 20 30 40 50 60 70 80 90 100 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 20 40 60 80 100 120 140 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond H (Future) - Full Spectrum Detention.xlsm, Outlet Structure 7/2/2025, 11:46 AM Outflow Hydrograph Workbook Filename: Inflow Hydrographs The user can override the calculated inflow hydrographs from this workbook with inflow hydrographs developed in a separate program. SOURCE CUHP CUHP CUHP CUHP CUHP CUHP CUHP CUHP CUHP Time Interval TIME WQCV [cfs] EURV [cfs] 2 Year [cfs] 5 Year [cfs] 10 Year [cfs] 25 Year [cfs] 50 Year [cfs] 100 Year [cfs] 500 Year [cfs] 5.00 min 0:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.27 0.44 2.32 0:15:00 0.00 0.00 0.55 1.96 2.89 2.36 3.72 4.42 8.28 0:20:00 0.00 0.00 4.48 7.08 9.05 6.56 8.87 11.18 19.39 0:25:00 0.00 0.00 10.45 15.77 20.48 14.64 19.61 24.51 41.20 0:30:00 0.00 0.00 12.73 18.81 23.77 30.11 39.46 49.67 79.51 0:35:00 0.00 0.00 11.88 17.35 21.75 33.91 44.01 57.89 91.60 0:40:00 0.00 0.00 10.67 15.29 19.15 32.51 42.00 55.22 87.08 0:45:00 0.00 0.00 9.23 13.43 16.97 28.99 37.42 50.38 79.38 0:50:00 0.00 0.00 7.96 11.85 14.78 26.27 33.88 45.45 71.55 0:55:00 0.00 0.00 6.90 10.27 12.89 22.68 29.25 40.05 63.04 1:00:00 0.00 0.00 6.16 9.13 11.60 19.55 25.23 35.41 55.76 1:05:00 0.00 0.00 5.66 8.35 10.72 17.35 22.41 32.16 50.67 1:10:00 0.00 0.00 4.98 7.69 9.95 15.17 19.62 27.48 43.37 1:15:00 0.00 0.00 4.35 6.85 9.19 13.26 17.18 23.33 36.87 1:20:00 0.00 0.00 3.76 5.90 8.06 11.18 14.45 18.92 29.95 1:25:00 0.00 0.00 3.23 5.08 6.74 9.33 12.05 15.08 23.93 1:30:00 0.00 0.00 2.83 4.46 5.72 7.51 9.68 11.85 18.88 1:35:00 0.00 0.00 2.62 4.14 5.14 6.10 7.88 9.41 15.12 1:40:00 0.00 0.00 2.52 3.71 4.77 5.27 6.82 7.96 12.87 1:45:00 0.00 0.00 2.46 3.37 4.51 4.74 6.13 7.02 11.40 1:50:00 0.00 0.00 2.42 3.13 4.32 4.38 5.67 6.36 10.39 1:55:00 0.00 0.00 2.14 2.95 4.09 4.12 5.34 5.90 9.67 2:00:00 0.00 0.00 1.89 2.73 3.73 3.96 5.12 5.56 9.14 2:05:00 0.00 0.00 1.46 2.11 2.87 3.05 3.95 4.23 6.96 2:10:00 0.00 0.00 1.10 1.57 2.14 2.26 2.92 3.11 5.12 2:15:00 0.00 0.00 0.82 1.17 1.59 1.69 2.18 2.32 3.82 2:20:00 0.00 0.00 0.61 0.87 1.17 1.25 1.62 1.73 2.85 2:25:00 0.00 0.00 0.45 0.63 0.85 0.91 1.18 1.28 2.10 2:30:00 0.00 0.00 0.32 0.45 0.62 0.66 0.85 0.92 1.52 2:35:00 0.00 0.00 0.23 0.32 0.44 0.48 0.62 0.67 1.10 2:40:00 0.00 0.00 0.15 0.22 0.31 0.34 0.44 0.47 0.78 2:45:00 0.00 0.00 0.09 0.14 0.20 0.22 0.29 0.31 0.51 2:50:00 0.00 0.00 0.05 0.08 0.11 0.13 0.17 0.18 0.30 2:55:00 0.00 0.00 0.02 0.04 0.05 0.06 0.08 0.09 0.14 3:00:00 0.00 0.00 0.01 0.01 0.01 0.02 0.02 0.03 0.04 3:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:15:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:20:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:25:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:30:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:35:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:40:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:45:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:15:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:20:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:25:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:30:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:35:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:40:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:45:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:15:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:20:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:25:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:30:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:35:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:40:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:45:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention_v4-06 Pond H (Future) - Full Spectrum Detention.xlsm, Outlet Structure 7/2/2025, 11:46 AM Summary Stage-Area-Volume-Discharge Relationships The user can create a summary S-A-V-D by entering the desired stage increments and the remainder of the table will populate automatically. The user should graphically compare the summary S-A-V-D table to the full S-A-V-D table in the chart to confirm it captures all key transition points. Stage Area Area Volume Volume Total Outflow [ft][ft 2][acres][ft 3][ac-ft] [cfs] MHFD-Detention, Version 4.06 (July 2022) DETENTION BASIN OUTLET STRUCTURE DESIGN Stage - Storage Description For best results, include the stages of all grade slope changes (e.g. ISV and Floor) from the S-A-V table on Sheet 'Basin'. Also include the inverts of all outlets (e.g. vertical orifice, overflow grate, and spillway, where applicable). MHFD-Detention_v4-06 Pond H (Future) - Full Spectrum Detention.xlsm, Outlet Structure 7/2/2025, 11:46 AM Project: Basin ID: Depth Increment = ft Watershed Information Top of Micropool -- 0.00 -- -- -- 18 0.000 Selected BMP Type =EDB -- 0.20 -- -- -- 307 0.007 29 0.001 Watershed Area = 20.98 acres -- 0.40 -- -- -- 755 0.017 131 0.003 Watershed Length = 1,500 ft -- 0.60 -- -- -- 1,436 0.033 358 0.008 Watershed Length to Centroid = 850 ft -- 0.80 -- -- -- 2,229 0.051 724 0.017 Watershed Slope = 0.010 ft/ft -- 1.00 -- -- -- 3,078 0.071 1,255 0.029 Watershed Imperviousness = 13.00% percent -- 1.20 -- -- --3,985 0.091 1,922 0.044 Percentage Hydrologic Soil Group A = 0.0% percent -- 1.40 -- -- -- 5,117 0.117 2,821 0.065 Percentage Hydrologic Soil Group B = 0.0% percent -- 1.60 -- -- -- 6,013 0.138 3,984 0.091 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 1.80 -- -- -- 7,676 0.176 5,353 0.123 Target WQCV Drain Time = 40.0 hours -- 1.96 -- -- -- 9,627 0.221 6,738 0.155 Location for 1-hr Rainfall Depths = Thornton - Civic Center -- 2.00 -- -- -- 10,186 0.234 7,134 0.164 -- 2.20 -- -- -- 13,064 0.300 9,329 0.214 -- 2.40 -- -- -- 15,805 0.363 12,188 0.280 Optional User Overrides -- 2.60 -- -- -- 18,439 0.423 15,770 0.362 Water Quality Capture Volume (WQCV) = 0.146 acre-feet acre-feet -- 2.80 -- -- -- 20,978 0.482 19,712 0.453 Excess Urban Runoff Volume (EURV) = 0.232 acre-feet acre-feet -- 3.00 -- -- -- 23,455 0.538 24,155 0.555 2-yr Runoff Volume (P1 = 0.82 in.) = 0.124 acre-feet 0.82 inches -- 3.20 -- -- -- 25,804 0.592 28,824 0.662 5-yr Runoff Volume (P1 = 1.14 in.) = 0.373 acre-feet 1.14 inches -- 3.40 -- -- -- 28,102 0.645 34,191 0.785 10-yr Runoff Volume (P1 = 1.4 in.) = 0.727 acre-feet 1.40 inches -- 3.60 -- -- -- 30,343 0.697 40,316 0.926 25-yr Runoff Volume (P1 = 1.81 in.) = 1.536 acre-feet 1.81 inches -- 3.80 -- -- -- 32,460 0.745 46,597 1.070 50-yr Runoff Volume (P1 = 2.27 in.) = 2.330 acre-feet 2.27 inches -- 4.00 -- -- -- 38,309 0.879 53,673 1.232 100-yr Runoff Volume (P1 = 2.86 in.) = 3.497 acre-feet 2.86 inches -- 4.20 -- -- -- 40,837 0.937 61,180 1.405 500-yr Runoff Volume (P1 = 4.39 in.) = 6.381 acre-feet 4.39 inches -- -- -- -- Approximate 2-yr Detention Volume = 0.131 acre-feet ---- -- -- Approximate 5-yr Detention Volume = 0.311 acre-feet ---- -- -- Approximate 10-yr Detention Volume = 0.417 acre-feet -- -- -- -- Approximate 25-yr Detention Volume = 0.562 acre-feet -- -- -- -- Approximate 50-yr Detention Volume = 0.653 acre-feet -- -- -- -- Approximate 100-yr Detention Volume = 0.994 acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Zone 1 Volume (WQCV) = 0.146 acre-feet -- -- -- -- Zone 2 Volume (EURV - Zone 1) = 0.086 acre-feet -- -- ---- Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 0.835 acre-feet -- -- -- -- Total Detention Basin Volume = 1.067 acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) = user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) = user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) = user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) = user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond I - Interim (Basins H & I) MHFD-Detention, Version 4.06 (July 2022) Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond I (Interim) - Full Spectrum Detention, Basin 8/14/2025, 11:22 AM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.92 Zone 1 (WQCV) 1.92 Zone 1 (WQCV) 2.25 Zone 2 (EURV) 2.25 Zone 2 (EURV) 3.80 Z3 (100+1/2WQCV)3.80 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.355 0.710 1.065 1.420 0.000 0.235 0.470 0.705 0.940 0.00 1.50 3.00 4.50 6.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 10300 20600 30900 41200 0 5 10 15 20 0.00 1.50 3.00 4.50 6.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond I (Interim) - Full Spectrum Detention, Basin 8/14/2025, 11:22 AM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 1.92 0.146 Orifice Plate Zone 2 (EURV) 2.25 0.086 Orifice Plate Z3 (100+1/2WQCV) 3.80 0.835 Weir&Pipe (Restrict) Total (all zones) 1.067 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row =5.278E-03 ft2 Depth at top of Zone using Orifice Plate = 2.30 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 9.00 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 0.76 sq. inches (diameter = 1 inch) Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 0.80 1.60 Orifice Area (sq. inches) 0.76 0.76 0.76 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area =N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 2.80 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =3.80 N/A feet Overflow Weir Front Edge Length = 10.00 N/A feet Overflow Weir Slope Length = 6.08 N/A feet Overflow Weir Grate Slope = 6.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 11.78 N/A Horiz. Length of Weir Sides = 6.00 N/A feet Overflow Grate Open Area w/o Debris = 42.34 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 42.34 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 3.59 N/A ft2 Outlet Pipe Diameter = 30.00 N/A inches Outlet Orifice Centroid = 0.96 N/A feet Restrictor Plate Height Above Pipe Invert = 20.60 inches Half-Central Angle of Restrictor Plate on Pipe =1.95 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 4.20 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 1.08 feet Spillway Crest Length = 8.00 feet Stage at Top of Freeboard = 5.94 feet Spillway End Slopes = 1.00 H:V Basin Area at Top of Freeboard = 0.94 acres Freeboard above Max Water Surface = 0.66 feet Basin Volume at Top of Freeboard = 1.41 acre-ft Max Ponding Depth of Target Storage Volume =3.65 feet Discharge at Top of Freeboard = 31.14 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =0.146 0.232 0.124 0.373 0.727 1.536 2.330 3.497 6.381 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.124 0.373 0.727 1.536 2.330 3.497 6.381 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.2 2.0 5.0 12.5 19.0 28.3 50.3 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.10 0.24 0.60 0.90 1.35 2.40 Peak Inflow Q (cfs) =N/A N/A 1.1 3.4 6.4 14.0 20.6 30.1 52.4 Peak Outflow Q (cfs) =0.1 0.1 0.1 0.1 1.9 8.7 15.4 25.7 31.1 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.0 0.4 0.7 0.8 0.9 0.6 Structure Controlling Flow =Plate Plate Plate Plate Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 N/A Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A 0.0 0.2 0.4 0.6 0.7 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =38 49 36 65 73 66 60 53 39 Time to Drain 99% of Inflow Volume (hours) =40 52 38 69 81 77 73 70 62 Maximum Ponding Depth (ft) =1.92 2.25 1.72 2.57 2.97 3.25 3.43 3.65 4.20 Area at Maximum Ponding Depth (acres) =0.21 0.32 0.16 0.41 0.53 0.60 0.65 0.71 0.94 Maximum Volume Stored (acre-ft) =0.146 0.233 0.109 0.345 0.539 0.692 0.804 0.954 1.414 DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond I - Interim (Basins H & I) The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond I (Interim) - Full Spectrum Detention, Outlet Structure 8/14/2025, 11:23 AM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 193 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 173 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 226 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 258 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 298 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 326 1.08 WQ Plate Flow at 100yr depth = 0.13 0.97(diameter = 1-1/8 inches)50 Year 344 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 366 1 Z1_Boolean n*Cdw #1 = 0.44 1.20(diameter = 1-1/4 inches)500 Year 421 1 Z2_Boolean n*Cdo #1 = 1.17 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.165 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 1 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 6.00 70,000 40 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) 0 10 20 30 40 50 60 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 5 10 15 20 25 30 35 40 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond I (Interim) - Full Spectrum Detention, Outlet Structure 8/14/2025, 11:23 AM Project: Basin ID: Depth Increment = ft Watershed Information Top of Micropool -- 0.00 -- -- -- 18 0.000 Selected BMP Type =EDB -- 0.20 -- -- -- 307 0.007 32 0.001 Watershed Area = 4.26 acres -- 0.40 -- -- -- 755 0.017 139 0.003 Watershed Length = 712 ft -- 0.60 -- -- -- 1,436 0.033 358 0.008 Watershed Length to Centroid = 504 ft -- 0.80 -- -- -- 2,229 0.051 724 0.017 Watershed Slope = 0.020 ft/ft -- 1.00 -- -- -- 3,078 0.071 1,255 0.029 Watershed Imperviousness = 76.00% percent -- 1.20 -- -- --3,985 0.091 1,961 0.045 Percentage Hydrologic Soil Group A = 0.0% percent -- 1.40 -- -- -- 5,117 0.117 2,871 0.066 Percentage Hydrologic Soil Group B = 0.0% percent -- 1.60 -- -- -- 5,849 0.134 3,968 0.091 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 1.80 -- -- -- 6,372 0.146 5,190 0.119 Target WQCV Drain Time = 40.0 hours -- 1.96 -- -- -- 6,794 0.156 6,243 0.143 Location for 1-hr Rainfall Depths = User Input -- 2.00 -- -- -- 6,900 0.158 6,517 0.150 -- 2.20 -- -- -- 7,414 0.170 7,949 0.182 -- 2.40 -- -- -- 7,915 0.182 9,481 0.218 Optional User Overrides -- 2.60 -- -- -- 8,420 0.193 11,115 0.255 Water Quality Capture Volume (WQCV) = 0.108 acre-feet acre-feet -- 2.80 -- -- -- 8,951 0.205 12,852 0.295 Excess Urban Runoff Volume (EURV) = 0.317 acre-feet acre-feet -- 3.00 -- -- -- 9,520 0.219 14,699 0.337 2-yr Runoff Volume (P1 = 0.82 in.) = 0.202 acre-feet 0.82 inches -- 3.20 -- -- -- 10,117 0.232 16,663 0.383 5-yr Runoff Volume (P1 = 1.14 in.) = 0.305 acre-feet 1.14 inches -- 3.40 -- -- -- 10,732 0.246 18,748 0.430 10-yr Runoff Volume (P1 = 1.4 in.) = 0.395 acre-feet 1.40 inches -- 3.60 -- -- -- 11,361 0.261 20,957 0.481 25-yr Runoff Volume (P1 = 1.81 in.) = 0.550 acre-feet 1.81 inches -- 3.80 -- -- -- 12,003 0.276 23,294 0.535 50-yr Runoff Volume (P1 = 2.27 in.) = 0.719 acre-feet 2.27 inches -- 4.00 -- -- -- 16,511 0.379 26,145 0.600 100-yr Runoff Volume (P1 = 2.86 in.) = 0.943 acre-feet 2.86 inches -- 4.20 -- -- -- 17,632 0.405 29,559 0.679 500-yr Runoff Volume (P1 = 4.39 in.) = 1.516 acre-feet 4.39 inches -- -- -- -- Approximate 2-yr Detention Volume = 0.197 acre-feet ---- -- -- Approximate 5-yr Detention Volume = 0.299 acre-feet ---- -- -- Approximate 10-yr Detention Volume = 0.361 acre-feet -- -- -- -- Approximate 25-yr Detention Volume = 0.434 acre-feet -- -- -- -- Approximate 50-yr Detention Volume = 0.496 acre-feet -- -- -- -- Approximate 100-yr Detention Volume = 0.594 acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Zone 1 Volume (WQCV) = 0.108 acre-feet -- -- -- -- Zone 2 Volume (EURV - Zone 1) = 0.208 acre-feet -- -- ---- Zone 3 (100yr + 1 / 2 WQCV - Zones 1 & 2) = 0.332 acre-feet -- -- -- -- Total Detention Basin Volume = 0.648 acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) = user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) = user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) = user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) = user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Gateway at Prospect Pond I - Future MHFD-Detention, Version 4.06 (July 2022) Volume (ft 3) Volume (ac-ft) Area (acre) After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond I (Future) - Full Spectrum Detention, Basin 8/14/2025, 11:24 AM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.73 Zone 1 (WQCV) 1.73 Zone 1 (WQCV) 2.91 Zone 2 (EURV) 2.91 Zone 2 (EURV) 4.13 Z3 (100+1/2WQCV)4.13 Z3 (100+1/2WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.170 0.340 0.510 0.680 0.000 0.105 0.210 0.315 0.420 0.00 1.50 3.00 4.50 6.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 4500 9000 13500 18000 0 5 10 15 20 0.00 1.50 3.00 4.50 6.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4-06 Pond I (Future) - Full Spectrum Detention, Basin 8/14/2025, 11:24 AM Project: Basin ID: Estimated Estimated Stage (ft) Volume (ac-ft) Outlet Type Zone 1 (WQCV) 1.73 0.108 Orifice Plate Zone 2 (EURV) 2.91 0.208 Orifice Plate Z3 (100+1/2WQCV) 4.13 0.332 Weir&Pipe (Restrict) Total (all zones) 0.648 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row =4.931E-03 ft2 Depth at top of Zone using Orifice Plate = 3.00 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = 11.50 inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 0.71 sq. inches (diameter = 15/16 inch) Elliptical Slot Area = N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 1.00 2.00 Orifice Area (sq. inches) 0.71 0.71 0.71 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area =N/A N/A ft2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 3.00 N/A ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =4.00 N/A feet Overflow Weir Front Edge Length = 10.00 N/A feet Overflow Weir Slope Length = 6.08 N/A feet Overflow Weir Grate Slope = 6.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 121.91 N/A Horiz. Length of Weir Sides = 6.00 N/A feet Overflow Grate Open Area w/o Debris = 42.34 N/A ft2 Overflow Grate Type = Type C Grate N/A Overflow Grate Open Area w/ Debris = 42.34 N/A ft2 Debris Clogging % = 0% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area = 0.35 N/A ft2 Outlet Pipe Diameter = 30.00 N/A inches Outlet Orifice Centroid = 0.18 N/A feet Restrictor Plate Height Above Pipe Invert = 3.70 inches Half-Central Angle of Restrictor Plate on Pipe = 0.72 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage= 4.20 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.68 feet Spillway Crest Length = 8.00 feet Stage at Top of Freeboard = 5.54 feet Spillway End Slopes = 1.00 H:V Basin Area at Top of Freeboard = 0.40 acres Freeboard above Max Water Surface = 0.66 feet Basin Volume at Top of Freeboard = 0.68 acre-ft Max Ponding Depth of Target Storage Volume =4.09 feet Discharge at Top of Freeboard = 3.35 cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.14 1.40 1.81 2.27 2.86 4.39 CUHP Runoff Volume (acre-ft) =0.108 0.317 0.202 0.305 0.395 0.550 0.719 0.943 1.516 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.202 0.305 0.395 0.550 0.719 0.943 1.516 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.0 0.4 1.1 2.6 3.9 5.9 10.5 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.10 0.25 0.61 0.93 1.38 2.46 Peak Inflow Q (cfs) =N/A N/A 3.0 4.6 5.8 8.4 10.9 14.4 23.0 Peak Outflow Q (cfs) =0.1 0.1 0.1 0.1 0.7 2.9 3.1 3.3 3.4 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.2 0.7 1.1 0.8 0.6 0.3 Structure Controlling Flow =Plate Plate Plate Plate Overflow Weir 1 Outlet Plate 1 Outlet Plate 1 Outlet Plate 1 N/A Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A 0.0 0.1 0.1 0.1 0.1 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =38 69 56 68 73 70 68 65 60 Time to Drain 99% of Inflow Volume (hours) =40 73 59 72 78 77 76 75 74 Maximum Ponding Depth (ft) =1.73 2.91 2.25 2.77 3.08 3.23 3.56 4.09 4.20 Area at Maximum Ponding Depth (acres) =0.14 0.21 0.17 0.20 0.22 0.23 0.26 0.39 0.40 Maximum Volume Stored (acre-ft) =0.109 0.318 0.189 0.289 0.355 0.387 0.468 0.635 0.679 The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Gateway at Prospect Pond I - Future Example Zone Configuration (Retention Pond) MHFD-Detention_v4-06 Pond I (Future) - Full Spectrum Detention, Outlet Structure 8/14/2025, 12:02 PM COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain = 0 0.11(diameter = 3/8 inch)2 1 1 Count_WQPlate = 1 0.14(diameter = 7/16 inch) Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch)4 1 5yr, <72hr 0 Count_Weir1 = 1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 = 0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch)WQCV 174 Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch)2 Year 226 COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch)EURV 292 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 278 MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch)10 Year 309 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 324 0.68 WQ Plate Flow at 100yr depth = 0.12 0.97(diameter = 1-1/8 inches)50 Year 357 CLOG #1= 100% 1.08(diameter = 1-3/16 inches)100 Year 410 1 Z1_Boolean n*Cdw #1 = 0.44 1.20(diameter = 1-1/4 inches)500 Year 421 1 Z2_Boolean n*Cdo #1 = 1.17 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.165 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2= N/A 1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 = N/A 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 = N/A 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = N/A 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 1 1 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 1 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) = 1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 6.00 30,000 10 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound MHFD-Detention, Version 4.06 (July 2022) DETENTION BASIN OUTLET STRUCTURE DESIGN 0 5 10 15 20 25 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 1 2 3 4 5 6 7 8 9 10 0 5,000 10,000 15,000 20,000 25,000 30,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] MHFD-Detention_v4-06 Pond I (Future) - Full Spectrum Detention, Outlet Structure 8/14/2025, 12:02 PM GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado C.3 Weir Calculations Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 1 2025 Pond C - Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 68.00 Total Depth (ft) = 1.00 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 74.40 Highlighted Depth (ft) = 0.50 Q (cfs) = 74.40 Area (sqft) = 35.00 Velocity (ft/s) = 2.13 Top Width (ft) = 72.00 0 10 20 30 40 50 60 70 80 90 100 Depth (ft) Depth (ft)Pond C - Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 Length (ft)Weir W.S. Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 1 2025 Pond D - Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 4.00 Total Depth (ft) = 1.00 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 4.50 Highlighted Depth (ft) = 0.42 Q (cfs) = 4.500 Area (sqft) = 2.39 Velocity (ft/s) = 1.89 Top Width (ft) = 7.36 0 2 4 6 8 10 12 14 16 Depth (ft) Depth (ft)Pond D - Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 Length (ft)Weir W.S. Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 1 2025 Pond E - Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 18.00 Total Depth (ft) = 1.00 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 20.50 Highlighted Depth (ft) = 0.49 Q (cfs) = 20.50 Area (sqft) = 9.78 Velocity (ft/s) = 2.10 Top Width (ft) = 21.92 0 5 10 15 20 25 30 35 40 Depth (ft) Depth (ft)Pond E - Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 Length (ft)Weir W.S. Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 1 2025 Pond F - Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 32.00 Total Depth (ft) = 1.00 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 45.80 Highlighted Depth (ft) = 0.58 Q (cfs) = 45.80 Area (sqft) = 19.91 Velocity (ft/s) = 2.30 Top Width (ft) = 36.64 0 5 10 15 20 25 30 35 40 45 50 Depth (ft) Depth (ft)Pond F - Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 Length (ft)Weir W.S. Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 1 2025 Pond G - Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 24.00 Total Depth (ft) = 1.00 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 28.10 Highlighted Depth (ft) = 0.51 Q (cfs) = 28.10 Area (sqft) = 13.28 Velocity (ft/s) = 2.12 Top Width (ft) = 28.08 0 5 10 15 20 25 30 35 40 45 Depth (ft) Depth (ft)Pond G - Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 Length (ft)Weir W.S. Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 B2 Sidewalk Culvert Channel Rectangular Bottom Width (ft) = 4.00 Total Depth (ft) = 0.66 Invert Elev (ft) = 1.00 Slope (%) = 0.60 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 3.40 Highlighted Depth (ft) = 0.25 Q (cfs) = 3.400 Area (sqft) = 1.00 Velocity (ft/s) = 3.40 Wetted Perim (ft) = 4.50 Crit Depth, Yc (ft) = 0.29 Top Width (ft) = 4.00 EGL (ft) = 0.43 0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5 Elev (ft) Depth (ft)Section 0.75 -0.25 1.00 0.00 1.25 0.25 1.50 0.50 1.75 0.75 2.00 1.00 Reach (ft) Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 Sidewalk Culvert B2 - 100-year Rectangular Weir Crest = Sharp Bottom Length (ft) = 4.00 Total Depth (ft) = 0.66 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 3.40 Highlighted Depth (ft) = 0.40 Q (cfs) = 3.400 Area (sqft) = 1.61 Velocity (ft/s) = 2.11 Top Width (ft) = 4.00 0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5 Depth (ft) Depth (ft)Sidewalk Culvert B2 - 100-year -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 G2 Sidewalk Culvert Channel Rectangular Bottom Width (ft) = 4.00 Total Depth (ft) = 0.66 Invert Elev (ft) = 1.00 Slope (%) = 0.60 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 9.14 Highlighted Depth (ft) = 0.46 Q (cfs) = 9.140 Area (sqft) = 1.84 Velocity (ft/s) = 4.97 Wetted Perim (ft) = 4.92 Crit Depth, Yc (ft) = 0.55 Top Width (ft) = 4.00 EGL (ft) = 0.84 0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5 Elev (ft) Depth (ft)Section 0.75 -0.25 1.00 0.00 1.25 0.25 1.50 0.50 1.75 0.75 2.00 1.00 Reach (ft) Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 Sidewalk Culvert G2 Curb Opening - 100-year Rectangular Weir Crest = Sharp Bottom Length (ft) = 8.00 Total Depth (ft) = 0.66 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 9.14 Highlighted Depth (ft) = 0.49 Q (cfs) = 9.140 Area (sqft) = 3.92 Velocity (ft/s) = 2.33 Top Width (ft) = 8.00 0 1 2 3 4 5 6 7 8 9 10 Depth (ft) Depth (ft)Sidewalk Culvert G2 Curb Opening - 100-year -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 G4 Sidewalk Culvert Channel Rectangular Bottom Width (ft) = 4.00 Total Depth (ft) = 0.66 Invert Elev (ft) = 1.00 Slope (%) = 0.60 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 5.06 Highlighted Depth (ft) = 0.32 Q (cfs) = 5.060 Area (sqft) = 1.28 Velocity (ft/s) = 3.95 Wetted Perim (ft) = 4.64 Crit Depth, Yc (ft) = 0.37 Top Width (ft) = 4.00 EGL (ft) = 0.56 0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5 Elev (ft) Depth (ft)Section 0.75 -0.25 1.00 0.00 1.25 0.25 1.50 0.50 1.75 0.75 2.00 1.00 Reach (ft) Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 Sidewalk Culvert G4 Curb Opening - 100-year Rectangular Weir Crest = Sharp Bottom Length (ft) = 4.00 Total Depth (ft) = 0.66 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 5.06 Highlighted Depth (ft) = 0.52 Q (cfs) = 5.060 Area (sqft) = 2.10 Velocity (ft/s) = 2.41 Top Width (ft) = 4.00 0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5 Depth (ft) Depth (ft)Sidewalk Culvert G4 Curb Opening - 100-year -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 I2 Sidewalk Culvert Channel Rectangular Bottom Width (ft) = 8.00 Total Depth (ft) = 0.66 Invert Elev (ft) = 1.00 Slope (%) = 0.60 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 17.08 Highlighted Depth (ft) = 0.43 Q (cfs) = 17.08 Area (sqft) = 3.44 Velocity (ft/s) = 4.97 Wetted Perim (ft) = 8.86 Crit Depth, Yc (ft) = 0.53 Top Width (ft) = 8.00 EGL (ft) = 0.81 0 1 2 3 4 5 6 7 8 9 10 Elev (ft) Depth (ft)Section 0.75 -0.25 1.00 0.00 1.25 0.25 1.50 0.50 1.75 0.75 2.00 1.00 Reach (ft) Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Jul 7 2025 Sidewalk Culvert I2 Curb Opening - 100-year Rectangular Weir Crest = Sharp Bottom Length (ft) = 12.00 Total Depth (ft) = 0.66 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 17.08 Highlighted Depth (ft) = 0.57 Q (cfs) = 17.08 Area (sqft) = 6.81 Velocity (ft/s) = 2.51 Top Width (ft) = 12.00 0 2 4 6 8 10 12 14 16 Depth (ft) Depth (ft)Sidewalk Culvert I2 Curb Opening - 100-year -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado C.5 Riprap Calculations Gateway at Prospect Circular D or Da, Pipe Diameter (ft) H or Ha, Culvert Height (ft) W, Culvert Width (ft) Yt/D Q/D1.5 Q/D2.5 Yt/H Q/WH0.5 Storm Line A 14.92 2.00 0.80 0.40 5.28 2.64 N/A N/A 5.00 2.64 2.98 8.65 Type M 9.00 8.00 2.0 Storm Line B 9.30 1.50 0.60 0.40 5.06 3.37 N/A N/A 4.70 3.37 1.86 7.52 Type M 8.00 6.00 2.0 Storm Line C 36.61 2.50 1.00 0.40 9.26 3.70 N/A N/A 3.70 3.70 7.32 17.84 Type M 18.00 10.00 2.0 Storm Line D 8.59 1.25 0.50 0.40 6.15 4.92 N/A N/A 2.40 4.92 1.72 5.25 Type M 6.00 5.00 2.0 Storm Line E 103.70 4.00 1.60 0.40 12.96 3.24 N/A N/A 4.20 3.24 20.74 37.64 Type M 38.00 18.00 2.0 Storm Line F 13.70 2.50 1.00 0.40 3.47 1.39 N/A N/A 6.40 1.39 2.74 1.54 Type M 8.00 10.00 2.0 Storm Line G 26.90 2.25 0.90 0.40 7.97 3.54 N/A N/A 4.00 3.54 5.38 14.91 Type M 15.00 9.00 2.0 Storm Line H 4.50 1.50 0.60 0.40 2.45 1.63 N/A N/A 6.20 1.63 0.90 0.00 Type M 5.00 6.00 2.0 Storm Line I 14.00 1.75 0.70 0.40 6.05 3.46 N/A N/A 4.00 3.46 2.80 9.00 Type M 9.00 7.00 2.0 Storm Line J 67.70 3.00 1.20 0.40 13.03 4.34 N/A N/A 3.10 4.34 13.54 25.68 Type M 26.00 15.00 2.0 Storm Line K 4.13 1.25 0.50 0.40 2.96 2.36 N/A N/A 5.20 2.36 0.83 2.09 Type M 4.00 5.00 2.0 Date: 07/02/2025 Spec Length of Riprap (ft) Box Culvert Yt, Tailwater Depth (ft) Culvert Parameters At=Q/V (ft) By: S. Thomas CALCULATE Froude Parameter Q/D2.5 Max 6.0 or Q/WH1.5 Max 8.0 Riprap Type (From Figure MD-21 or MD-22) Project: 892-002 Urban Drainage pg MD-107 L= 1/(2tanq)* [At/Yt)-W] (ft) INPUT Storm Line/Culvert Label Design Discharge (cfs) Expansion Factor 1/(2tanq) (From Figure MD-23 or MD-24) OUTPUT CALCULATIONS FOR RIPRAP PROTECTION AT PIPE OUTLETS Circular Pipe (Figure MD-21) Rectangular Pipe (Figure MD-22)Spec Width of Riprap (ft) 2*d50, Depth of Riprap (ft) for L/2 GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado APPENDIX D Cooper Slough HEC-RAS Model COOPER SLOUGH CO 2698.69 2400 2100 1800 1500 1200 900 600 300 0 COOPER SLOUGH CO Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) COOPER SLOUGH CO 2698.69 10-yr 474 4910.86 4915.5 4913.55 4915.67 0.002726 3.31 143.11 69.39 0.35 COOPER SLOUGH CO 2400 10-yr 474 4910.64 4915.18 4912.38 4915.25 0.000773 2.03 232.94 85.79 0.2 COOPER SLOUGH CO 2100 10-yr 474 4910.43 4914.95 4912.16 4915.01 0.000779 2.04 232.65 87.11 0.2 COOPER SLOUGH CO 1800 10-yr 474 4910.21 4914.78 4911.68 4914.82 0.00048 1.66 285.76 222.4 0.16 COOPER SLOUGH CO 1500 10-yr 474 4909.99 4914.63 4911.51 4914.67 0.000524 1.68 282.22 101.85 0.16 COOPER SLOUGH CO 1200 10-yr 474 4909.77 4914.51 4911.11 4914.55 0.000337 1.42 333.82 134.31 0.13 COOPER SLOUGH CO 900 10-yr 474 4909.4 4914.24 4911.78 4914.35 0.001445 2.66 177.95 105.62 0.26 COOPER SLOUGH CO 600 10-yr 474 4909.01 4913.49 4911.88 4913.71 0.003392 3.75 131.83 93.76 0.4 COOPER SLOUGH CO 300 10-yr 474 4908.43 4912.35 4910.93 4912.59 0.004076 3.94 120.38 48.43 0.43 COOPER SLOUGH CO 0 10-yr 474 4907.72 4909.45 4909.45 4909.97 0.029383 5.79 81.84 78.93 1 Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) COOPER SLOUGH CO 2698.69 100-yr 1274 4910.86 4917.85 4915.4 4918.13 0.002878 4.19 305.46 117.31 0.38 COOPER SLOUGH CO 2400 100-yr 1274 4910.64 4917.42 4913.77 4917.57 0.001172 3.12 408.25 109.49 0.25 COOPER SLOUGH CO 2100 100-yr 1274 4910.43 4917.04 4913.58 4917.2 0.001252 3.21 399.2 126.65 0.26 COOPER SLOUGH CO 1800 100-yr 1274 4910.21 4916.97 4912.94 4917 0.000299 1.68 1011.91 394.96 0.13 COOPER SLOUGH CO 1500 100-yr 1274 4909.99 4916.77 4912.79 4916.87 0.000691 2.51 559.99 210.46 0.2 COOPER SLOUGH CO 1200 100-yr 1274 4909.77 4916.6 4912.26 4916.68 0.000562 2.3 579.91 207.88 0.18 COOPER SLOUGH CO 900 100-yr 1274 4909.4 4916.06 4913.48 4916.35 0.0025 4.29 308.92 162.48 0.37 COOPER SLOUGH CO 600 100-yr 1274 4909.01 4915.28 4913.99 4915.52 0.002953 4.38 370.07 211.51 0.39 COOPER SLOUGH CO 300 100-yr 1274 4908.43 4913.65 -4914.23 0.006392 6.4 242.84 150.66 0.57 COOPER SLOUGH CO 0 100-yr 1274 4907.72 4913.91 4910.49 4913.93 0.000144 1.15 1239.46 300 0.09 10-Year HEC-RAS Results 100-Year HEC-RAS Results 0 500 1000 1500 2000 2500 3000 4906 4908 4910 4912 4914 4916 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Main Channel Distance (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground COOPER SLOUGH CO COOPER SLOUGH CO 0 50 100 150 200 250 300 4910 4912 4914 4916 4918 4920 4922 4924 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4904 4906 4908 4910 4912 4914 4916 4918 4920 4922 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4900 4905 4910 4915 4920 4925 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Ineff Bank Sta .045 .045 .045 0 100 200 300 400 500 4910 4912 4914 4916 4918 4920 4922 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4910 4912 4914 4916 4918 4920 4922 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4910 4912 4914 4916 4918 4920 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4910 4912 4914 4916 4918 4920 4922 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4910 4912 4914 4916 4918 4920 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4909 4910 4911 4912 4913 4914 4915 4916 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4907.5 4908.0 4908.5 4909.0 4909.5 4910.0 4910.5 4911.0 4911.5 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 10-yr WS 10-yr Crit 10-yr Ground Bank Sta .045 .045 .045 0 500 1000 1500 2000 2500 3000 4906 4908 4910 4912 4914 4916 4918 4920 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Main Channel Distance (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground COOPER SLOUGH CO COOPER SLOUGH CO 0 50 100 150 200 250 300 4910 4912 4914 4916 4918 4920 4922 4924 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4904 4906 4908 4910 4912 4914 4916 4918 4920 4922 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4900 4905 4910 4915 4920 4925 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground Ineff Bank Sta .045 .045 .045 0 100 200 300 400 500 4910 4912 4914 4916 4918 4920 4922 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4910 4912 4914 4916 4918 4920 4922 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4910 4912 4914 4916 4918 4920 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4910 4912 4914 4916 4918 4920 4922 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4910 4912 4914 4916 4918 4920 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground Ineff Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4908 4909 4910 4911 4912 4913 4914 4915 4916 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Ground Bank Sta .045 .045 .045 0 50 100 150 200 250 300 4907 4908 4909 4910 4911 4912 4913 4914 COOPER SLOUGH CORRIDOR Plan: Plan 01 8/13/2025 Station (ft) El e v a t i o n ( f t ) Legend EG 100-yr WS 100-yr Crit 100-yr Ground Bank Sta .045 .045 .045       CITY OF FORT COLLINS  UPPER COOPER SLOUGH BASIN  SELECTED PLAN OF IMPROVEMENTS      February 2021    Prepared for:  Department of Utilities  700 Wood Street  Fort Collins, CO 80522  (970) 221‐6589      Prepared by:      7000 S. Yosemite Street, Suite 120  Centennial CO 80112  (303) 221‐0802  www.iconeng.com      ANHEUSER BUSCH (AB) PLANT Sod Farm Diversion Q diverted = 752 cfs Proposed Sod Farm Pond S = 164 AF Max WSE = 5033.2 ft Berm along southern end at 5037.0 ft Sod Farm Pond Outlet Pipe into No. 8 Outlet Ditch 36" RCP with a 33.6" Orifice Q = 54 cfs Mountain Vista Diversion From No8 Outlet Ditch Q = 2 5 0 c f s Q = 8 9 c f s Assume Full Development of AB Lands with 100yr -> 2yr Detention (On-Site) Mountain Vista Diversion May Be Conveyed In Open Channel or Pipe through Montava Development Proposed C&S/ Crumb Detention Pond (426) S = 193 AF WSE = 4987.0 ft Qin = 903 cfs New AB Pond Outfall Overflow Flume Discharges into Cooper Slough Q = 304 cfs Existing AB 425 Pond Outlet Remains Connected to L&W Canal Q = 385 cfs Existing AB Pond 425 S = 47 AF Max WSE = 4983.5 Qin = 732 cfs Remove Existing Flow Spill At CSRR Provide Open Channel to Convey Flows on West Side of RR Combined Outlow From C&S/ Crumb and L&W Canal Spill Q = 639 cfs Proposed E. Vine Dr. Culverts (3) 8' x 4' RCBC Q = 678 cfs Proposed E. Mulberry St. Culverts (2) 6' x 11' RCBC Q = 1050 cfs COOPER SLOUGH Canal Spill to Dry Creek Q = 0 cfs Canal Spill Q = 421 cfs Q = 7 7 8 c f s Q = 3 5 7 c f s Q = 2 2 9 c f s Q = 3 3 9 c f s Q = 1 0 0 2 c f s Q = 3 7 4 c f s NO . 8 O U T L E T D I T C H LARIME R & W E L D C A N A L CO L O R A D O & S O U T H E R N R A I L R O A D BOXELDER WATERSHED DRY CREEK WATERSHED COOPER SLOUGH WATERSHED BLACK HOLLOW OUTFALL CHANNEL IMPROVEMENTS FROM 2006 MASTER PLAN NOT INCLUDED IN 2021 UPDATE Q = 2 5 0 c f s N. Poudre Reservoir No. 6 Add 8-inch Iron Sill Plate to Spillway Q = 547 cfs S = 679 AF Max WSE = 5163.2' Proposed (2) 6'x11' RCBC to Lake Canal SH-14 Proposed Channel to Box Elder Creek Channel and Bank Improvements along Cooper Slough Pond A S = 82 AF Max WSE = 5019.6 ft Qout = 778 cfs Montava Swale Q = 778 cfs Q = 1 4 9 c f s Overflow Pond S = 20.3 AF WSE = 4980.2 ft Qin = 112 cfs Proposed C&S/ Crumb Outfalls: 42" RCP to AB Pond = 102 cfs 3ft x 13.5ft RCBC to AB Pond (3ft above Pond inv) = 331 cfs Spill to Overflow Pond = 112cfs Overflow Pond Outfall into L&W Canal 48" RCP with a 44.4" Orifice Qout = 103 cfs Proposed (3) 3'x15' RCBC under Lake Canal Proposed Channel Proposed culverts for local drainage MONTAVA DEVELOPMENT MT VISTA AND TIMBERLINE ROAD MIXED-USED DEVELOPMENT WATER'S EDGE DEVELOPMENT COUNTRY CLUB RESERVE DEVELOPMENT Existing 24-in Culvert Capaity = 21cfs Culvert Crossing (3) 10'X3' RCBC Q = 888cfs Proposed Channel Formalize Spill from Lake Canal E VINE DR IN T E R S T A T E 2 5 S B E MULBERRY ST GI D D I N G S R D TU R N B E R R Y R D RICHARDS LAKE RD MOUNTAIN VISTA DR E LIN C O L N A V E S TIMB E R L I N E R D COUNTRY CLUB RD E COUNTY ROAD 48 §¨¦25 §¨¦25 Cooper Slough Selected Plan (2021) Figure 3: Selected Plan Projects $ 0 0.5 Miles Legend swale Overflow_Pond Pond_A C&S_Pond AB_Pond CRUMB_OUTLET Sod Farm Pond Proposed_Channel Proposed Culvert Montava Dev Boundary Waters Edge Dev Boundary Cooper Slough Basin Boundary MtVista ! ! ! ! !Anheuser Busch Property       Cooper Slough 23    Selected Plan    February 2021      Figure 15: Mountain Vista and Timberline Road Mixed‐Use Development  2.9 Improvements South of Mulberry Street (SH‐14) Approximately 1050 cfs flows south along Cooper Slough to Mulberry Street. There, the flow is currently  conveyed under Mulberry Street (SH‐14) through dual 48‐inch diameter culverts with approximately 200  cfs capacity.   All  flow in excess of this 200 cfs backs up and overtops the roadway.   Commercial   development upstream and downstream of Mulberry are at risk of flooding as a result.  Floodwater  overtopping Mulberry ultimately enters and spills from the Lake Canal prior to reaching Boxelder Creek.   The following improvements are proposed to convey the 100‐year storm event from Mulberry Street to  Boxelder Creek.  2.9.1 Mulberry Street (SH‐14) Crossing At Mulberry Street (EPA SWMM node 406. Lower Model), dual (2) 6ft high by 11ft wide RCBCs are  proposed to convey the 1050 cfs discharge without overtopping.  The installation of these culverts will  remove the existing Cooper Slough split flow path to the east of the crossing location.    The water can be conveyed to the Lake Canal through either an open channel or culvert system.  The   Cooper Slough channel improvements would consist of a channel 6 feet deep, with a bottom width of 13  feet. The channel would contain a low flow channel in the bottom to convey the base flows.  Due to the  size of the channel, and land acquisition required, the extension of the dual (2) 6ft high by 11ft   1 Blaine Mathisen From:Craig Jacobson <cjacobson@iconeng.com> Sent:Thursday, April 1, 2021 6:23 PM To:Stephanie Thomas; Daniel Evans; jim@tbgroup.us Cc:Jaclyn Michaelsen; Blaine Mathisen; Adam Boese Subject:RE: Gateway - Cooper Slough Improvements Hi Stephanie, In essence you are correct in that statement. Our models for the master plan direct all of the stormwater into the proposed culvert systems and downstream into the Cooper Slough Channel. The 100-year flow is 1050cfs at Mulberry and increases to 1274cfs further downstream as shown in the figure below. It was noted in the report that the existing pipes could be used to take on the base flows to maintain water rights. This flow would ultimately follow the Lake Canal towards BEC. This could reduce the overall flow in the channel by approximately 200cfs as you indicated. However, you should note that we have not confirmed the actual capacity of the Lake Canal and that the entirety of the 200cfs can fit and will not spill back out to Cooper Slough, and that a control structure from the Lake Canal does exist about half way down, as shown by the figure where the flow change is at. So from that perspective, it a bit hard to say if the flow reduction would exist continuously all the way to BEC. Let us know if you have any questions. Thanks. Craig To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. Craig Jacobson, PE, CFM Principal 7000 S. Yosemite St, Suite 120, Centennial, CO 80112 (303) 221-0802(o) (303) 898-9717(c) | www.iconeng.com | cjacobson@iconeng.com The information contained in this e-mail is confidential and may be protected by legal privilege. If you are not the intended recipient of this e- mail, the use of this information is prohibited. If you have received this in error, please notify us immediately and delete this copy from your system. Thank you for your cooperation. ICON Engineering, Inc. 2 From: Stephanie Thomas <stephanie@northernengineering.com> Sent: Thursday, April 1, 2021 11:09 AM To: Daniel Evans <daevans@fcgov.com>; jim@tbgroup.us Cc: Craig Jacobson <cjacobson@iconeng.com>; Jaclyn Michaelsen <jmichaelsen@iconeng.com>; Blaine Mathisen <blaine@northernengineering.com>; Adam Boese <adam@northernengineering.com> Subject: RE: Gateway - Cooper Slough Improvements Dan I can’t help but notice that the 100-year flow increased from 1050 cfs to 1274 cfs. This is an increase of 224 cfs or 21%. The Cooper Slough report indicated that about 200 cfs would still pass through the 48” dual culverts. Is this 224 cfs related to the amount that would continue through the existing culverts? If that is the case, it would seem to me that the channel through Gateway would be required to pass the events shown below minus 200 cfs? Am I interpreting this correctly? Thank you. Stephanie Thomas, PE Project Manager 301 N. Howes Street, Suite 100 | Fort Collins, CO 80521 D: 970.568.5412 O: 970.221.4158 Home Office: 970-658-1035 northernengineering.com Improving quality of life in our communities. 3 From: Daniel Evans <daevans@fcgov.com> Sent: Wednesday, March 31, 2021 5:09 PM To: Stephanie Thomas <stephanie@northernengineering.com>; jim@tbgroup.us Cc: Craig Jacobson <cjacobson@iconeng.com>; Jaclyn Michaelsen <jmichaelsen@iconeng.com> Subject: FW: Gateway - Cooper Slough Improvements Stephanie and Jim, Icon ran the 2, 5, 10, 25, 50 and 100-year flows for the Upper Cooper Slough channel and are highlighted in yellow below. Let us know if the need anything else. Dan From: Craig Jacobson <cjacobson@iconeng.com> Sent: Wednesday, March 31, 2021 2:09 PM To: Daniel Evans <daevans@fcgov.com>; Jaclyn Michaelsen <jmichaelsen@iconeng.com> Subject: [EXTERNAL] RE: Gateway - Cooper Slough Improvements Hey Dan, Here are the flows that Jackie came up with. We just went ahead and modeled them top to bottom, including through the LWC. Let me know if you need any of the models. We can discuss later today. Thanks Craig Low Flow Summary - Upper Cooper Slough (DS of Larimer and Weld Canal) Junction/Link ID Description 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr Junction 866 US Vine Drive 15 24 31 246 419 678 Junction 413 US Railroad 81 126 160 253 438 680 Junction 7417 DS Railroad 13 16 20 246 418 678 Junction 928 US Mulberry 202 317 415 579 775 1048 Link C4 Channel DS Lake Canal 219 352 474 685 935 1274 Junction 884 Confluence with BEC 494 723 945 1586 2403 3157 From: Daniel Evans <daevans@fcgov.com> Sent: Wednesday, March 17, 2021 9:51 AM To: Craig Jacobson <cjacobson@iconeng.com>; Jaclyn Michaelsen <jmichaelsen@iconeng.com> Cc: Ken Sampley <KSampley@fcgov.com> Subject: RE: Gateway - Cooper Slough Improvements Yes, we did evaluate the 2 and 10-year from Montava. Looks like there are No Spills from the L&W in the 2-year so flow to the outfall channel will just be from downstream contributing basins, and not a lot of flow from the 10-year…. From: Daniel Evans Sent: Wednesday, March 17, 2021 9:11 AM To: Craig Jacobson <cjacobson@iconeng.com>; Jaclyn Michaelsen <jmichaelsen@iconeng.com> 4 Cc: Ken Sampley <KSampley@fcgov.com> Subject: FW: Gateway - Cooper Slough Improvements Craig and Jackie, Northern is requesting the full range of flows to design the outfall channel for Upper Cooper. I don’t see that in the Selected Plan as we only evaluated the 100-year. I know we looked at the more frequent events during the Montava analysis to make sure they did not adversely impact downstream properties so do we have these flow values? If not, how much of an effort would it be to get those to Northern? Dan From: Stephanie Thomas <stephanie@northernengineering.com> Sent: Tuesday, March 16, 2021 1:34 PM To: Matt Simpson <masimpson@fcgov.com>; Daniel Evans <daevans@fcgov.com>; Theodore Bender <tbender@fcgov.com> Cc: Blaine Mathisen <blaine@northernengineering.com> Subject: [EXTERNAL] Gateway - Cooper Slough Improvements Matt, Dan and Ted We are looking at the Cooper Slough improvements along the Gateway north parcel. We would like to look at a tiered channel with a 2-yr, 10-yr, and 100-yr channel. We will be looking at other storm events for comparison as well. The Cooper Slough report doesn’t have any flow data for events other than the 100-year in this reach. Would you please tell us what flow is expected for the 2-yr, 10-yr, 25-yr, 50-yr and 100-yr? Or can you please contact ICON and ask them to send us this information? Thank you. Stephanie Thomas, PE Project Manager 301 N. Howes Street, Suite 100 | Fort Collins, CO 80521 D: 970.568.5412 O: 970.221.4158 Home Office: 970-658-1035 northernengineering.com Improving quality of life in our communities. GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado APPENDIX E FEMA Firmette PANEL LOCATOR NATIONAL FLOOD INSURANCE PROGRAMFLOOD INSURANCE RATE MAP LARIMER COUNTY, COLORADO Panel Contains: COMMUNITY NUMBER PANEL SUFFIX VERSION NUMBER MAP NUMBER EFFECTIVE DATE 1.1.1.0 08069C0984H MAY 2, 2012 NOTES TO USERS FE M A Na t i o n a l F l o o d I n s u r a n c e P r o g r a m FEMA LARIMER COUNTYFORT COLLINS, CITY OF County Name SCALE Map Projection:Universal Transverse MercatorNAD 1983 UTM Zone 13NWestern Hemisphere; Vertical Datum: NAVD 88 FLOOD HAZARD INFORMATION 080101080102 09840984 HH )))) )))) )))) Larimer CountyUnincorporated Areas080101 Larimer CountyUnincorporated Areas080101 Larimer CountyUnincorporated Areas080101 Larimer CountyUnincorporated Areas080101 City of Fort Collins080102 City of Fort Collins080102 City of Fort Collins080102 City of Fort Collins080102 22 8 9 20 16 17 10 15 21 CO U N T R Y S I D E D R GR E E N B R I A R ANNABEL AVE Larimer CountyUnincorporated Areas080101 DAR R E N DRIV E Sherry DriveOverflow INTERSTATE25FRONTAGE ROAD FRONTAGE ROAD NFRONTAGE ROAD S COUNTRYSIDE DELOZIER DR KENWOOD DR MAR C H C T JO H N D E E R E D R I V E JAY DR JENNIE DR TANA DR TR A C E Y P K W Y HARVESTER CT EAST PROSPECT ROAD COLLINS AIRE LN INTERNATIONAL BOULEVARD DONELLA CT ANDREAST JO A N N E S T SURREY LANE GR E E N F I E L D S C T SUM M I T C T DE L O Z I E R D R SUM M I T V I E W D R I V E SU N R I S E A V E VE R D E A V E GR E E N B R I A R D R CE N T R O W A Y HO R I Z O N A V E N U E CL I F F O R D A V E N U E HARVESTER STREET TIMBERLINEROAD LINCOLN AVE RE N E D R I V E BOX ELDER DRIVE KI M B E R L Y D R WEICKER DRIVE BUCKEYE ST REDMAN DRIVE STOCKTON AVE ALA N S T JOHN DEERE DR DA W N A V E N U E RIV E R B E N D D R GR E E N F I E L D SH E R R Y D R CHERLY ST Larimer CountyUnincorporated Areas080101 SH A R P P O I N T D R CAN A L D R SM I T H F I E L D D R PLEASANT ACRES LOCUST ST FRONTAGE ROAD IN T E R S T A T E 2 5 F R O N T A G E R O A D FRONTAGE ROAD PLE A S A N T A C R E S D R Sherry DriveOverflow BOXELDER DRIVE SUM M I T V I E W D R I V E MULBERRY ST MULBERRY STREET DR I V E RAILR O A D RIVERBEND CT. 40°33'45.0" 105°01'52.5"498000mE 499000mE 105°00'00" 40°33'45.0" 4491000mN 4492000mN 4493000mN 40°35'37.5" 105°00'00"3135000 FT105°01'52.5" 40°35'37.5" 1455000 FT 1450000 FT §¨¦25 RAILROAD NOTE: MAP AREA SHOWN ON THIS PANEL IS LOCATED WITHIN TOWNSHIP 7 NORTH, RANGE 68 WEST. REVISED AREA 4896.1 4923.0 4898.6 4898.1 4920.7 4898.4 4913.0 4923.1 491 3 . 6 490 9 . 7 4905.2 FLOODING EFFECTS FROM CACHE LA POUDRE RIVER SPLIT R PATH 4919.9 4921.3 49 1 6 . 9 4940.0 4917.5 Cache LaPoudre River 49 2 4 . 8 %,BG 4939 . 1 4920.5 FLOODWAY CONTAINED IN CULVERT 4916.9 %,BF 4903.7 ST R E E T 4923.6 4918.9 4916.9 4945.7 Cache La PoudreRiver L Path 4930.5 49 1 4 . 3 4942.0 4930.7 4945.6 4937.7 %,Z %,T %,S %,BH %,D %,M %,BJ %,BK %,P %,N %,O %,U %,B %,V %,Y %,A %,X %,H %,B %,C %,G %,D %,C %,M %,E%,BI %,A %,F %,G %,R %,L %,N %,C %,B %,K %,A %,K %,J %,I %,W %,I %,E %,H %,J %,F 48874890 4884 4892 4891 4886 4892 4902 4903 Bridge Boxelder DitchDiversion Dam 4904 4905 4904 4893 4906 490 8 4893 4901 4884 48854899 49 0 9 4898 4894 490 4 489548964897 4891 4897 4900 4896 4892 4894 4895 Cache La PoudreRiver L Path Boxelder Creek Boxelder Creek Cache La PoudreRiver Lake Ca n a l Cache La Poudre Reservoir Inlet BoxelderCreek CooperSlough %,BL ZONE AE SpringCreek ZONE AE ZONE AE ZONE AO (DEPTH 2) Cache La PoudreReservoir Inlet ZONE AE ZONE AE ZONE A City of Fort Collins080102 ZONE AE ZONE AE %,A ZONE AE ZONE AE Cache La Poudre RiverSplit R Path BoxelderCreek ZONE AE ZONE AE ZONE AE DRIVE %,AA ZONE AE 1%-ANNUAL-CHANCE FLOOD DISCHARGE CONTAINED IN CULVERT ZONE AE CooperSlough CO U R T ZONE AE ZONE AE ZONE AE ZONE AE ZONE AO (DEPTH 2) ZONE AE ZONE AE ZONE AE FI E L D R I D G E A V E 4949.2 4930.5 4920.6 %,D 4928.3 %,E 1%-ANNUAL-CHANCE FLOOD DISCHARGE CONTAINED IN CULVERT 4902.3%,F %,E 4900.9 1%-ANNUAL-CHANCE FLOOD DISCHARGE CONTAINED IN CULVERT Bridge 490 0 . 5 %,Q 4897.1%,D 4895.7%,C 48 9 2 . 9 %,B Bridge Cooper SloughOverflow Culvert Culvert Culvert PANEL OF 1420 9840250500125 Meters 0 1,000 2,000500 Feet 1 inch = 500 feet 1:6,000 1001 1011 0981 0982 0992 0983 10030984 LarimerCounty *PANEL NOT PRINTED SPECIAL FLOODHAZARD AREAS OTHER AREAS OFFLOOD HAZARD OTHERAREAS GENERALSTRUCTURES Without Base Flood Elevation (BFE) With BFE or Depth Regulatory Floodway Area of Undetermined Flood Hazard Area of Minimal Flood Hazard Zone A,V, A99 Zone AE, AO, AH, VE, AR Zone X Zone D HTTP://MSC.FEMA.GOV THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTINGDOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Cross Sections with 1% Annual ChanceWater Surface Elevation Coastal Transect OTHERFEATURES Profile BaselineHydrographic FeatureBase Flood Elevation Line (BFE)Limit of StudyJurisdiction Boundary Coastal Transect Baseline 17.5 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileFuture Conditions 1% Annual Chance Flood HazardArea with Reduced Flood Risk due to LeveeSee Notes. Zone X Zone X Zone X !(8 %,E 18.2 NO SCREEN Levee, Dike, or Floodwall Channel, Culvert, or Storm Sewer Area with Flood Risk due to Levee Zone D This map includes approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the date(s) indicated on the map. For more information see http://www.fws.gov/cbra, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1-800-344-WILD. CBRS Area Otherwise Protected Area For information and questions about this Flood Insurance Rate Map (FIRM), available products associated with this FIRM, including historic versions, the current map date for each FIRM panel, how to order products, or the National Flood Insurance Program (NFIP) in general, please call the FEMA Map Information eXchange at 1-877-FEMA-MAP (1-877-336-2627) or visit the FEMA Flood Map Service Center website at http://msc.fema.gov. Available products may include previously issued Letters of Map Change, a Flood Insurance Study Report, and/or digital versions of this map. Many of these products can be ordered or obtained directly from the website. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Flood Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study Report for this jurisdiction. To determine if flood insurance is available in this community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Base map information shown on this FIRM was derived from U.S. Census Bureau TIGER files, dated 2010, and digital data provided by Flood County Geospatial Coordinator, dated 2010. Local vertical monuments were used to create this map. To obtain current monument information, please contact the [community contact information, phone number] or visit the website at [website address]. ACCREDITED LEVEE: Check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1-percent-annual-chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection for areas on this panel. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit http://www.fema.gov/national-flood-insurance-program. PROVISIONALLY ACCREDITED LEVEE: Check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1-percent- annual-chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection for areas on this panel. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations by (_____, _____). If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicate the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de-accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit http://www.fema.gov/national-flood-insurance-program. LIMIT OF MODERATE WAVE ACTION: Zone AE has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5-foot breaking wave. The effects of wave hazards between the Zone VE and the LiMWA (or between the shoreline and the LiMWA for areas where Zone VE is not identified) will be similar to, but less severe than, those in the Zone VE. and Incorporated Areas COASTAL BARRIER RESOURCES SYSTEM (CBRS) Limit of Moderate Wave Action (LiMWA)# # REVISED TO REFLECT LOMR EFFECTIVE: February 21, 2019 GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado APPENDIX F Erosion Control Report GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) has been included with the final construction drawings. It should be noted; however, any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed, or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing and/or wattles along the disturbed perimeter, gutter protection in the adjacent roadways, and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet 3 of the PICP. The Final Utility Plans will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project may be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive Storm Water Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. GATEWAY AT PROSPECT APPENDIX epsgroupinc.com Arizona | Colorado MAP POCKET DR1- Drainage Exhibit W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W X X X FO FO FO FO FO X X X X X X X X X X X X X X XX X X X X X X X X X X X X XXX X X X X XXX X X X OHE OHU / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / XX X X X X X X X X X T T T T OH E OH E OH E OH E OH E OH E SS SS 10 " S S 10 " S S 10 " S S 10 " S S 10 " S S 10 " S S 10 " S S 10" SS 10" SS 27 " A B D N S S 27 " A B D N S S 27 " A B D N S S 27 " A B D N S S 27" A B D N S S 27" S S 27" S S 27" S S 27" S S 27" S S 27 " S S 27 " S S 27 " S S 27 " S S 27 " S S 24" S S 24" S S E E E E E / / / / / / / / T W T W W W W W W W W S W I W W SS SS 24 " S S 24 " S S 8" SS 8" SS ELEC VAULT ELEC X OHU OHU OHU / / / / / / / / / / / / / / / // / / / / / / // / / / / / / / GAS GAS CONTROL IRR CONTROL IRR VAULT ELECH2O H2O H2O H2O H2O H2O H2O H2O H2O H2O H2O H2O H2O F.O. F.O. ELEC ELEC VAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC AC W W W BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL BL SS SS SS SS SS SD SD SD SD SD SD SD S H2O H2O W T FES H2O W H2O H2O W ELEC FES VAULTELECVAULTELEC TRAFFIC VAULTE VAULTELECTRAFFIC VAULT ELEC H2OHYD T ST S VAULT ELEC ELEC VAULT ELEC VAULT ELEC S FE S D X X X X X X X W W TT OHU OHU 30" SS S S 12" W 12" W 12" W FE S W W H2O H2O H2O H2O HYD W W ST ST ST 12" W 12" W W HYD V.P. V.P. H2O 6" W 6" W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / / 12" W 12" W ST ST ST ST NIS P NIS P NIS P NIS P NIS P NISP 24" CASING 12" CARRIER E E T ST S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X X X X X X X OHU OHU OHU OHU OH U OHU OHU OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U OWNER: ANDERSON KENNTH E & JULIE ANN OWNER: DEADMOND LARRY L & NANCY K OWNER: CULBERT SON DAVID M OWNER: SEA STAR LIMITED PARTNERSHIP OWNER: DESELMS ROBERT A & K DENISE OWNER: 1303 FRONTAGE HOLDINGS LLC OWNER: GLANZ THOMAS J/LAURA P OWNER: MOODY MARILYN JOANNE OWNER: WHITE WESLEY R ANGELA M OWNER: BADE CARLA M OWNER: K AND M COMPANY OWNER: BOARD OF GOVERNORS CSU SYSTEM PROSPECT ROAD FR O N T A G E R O A D BOX E L D E R C R E E K EXISTING 79.98' ROW TRACT F FUTURE DEVELOPMENT TRACT J OPEN SPACE DETRACT G OPEN SPACE TRACT H FUTURE DEVELOPMENT TRACT B FUTURE DEVELOPMENT TRACT C FUTURE DEVELOPMENT TRACT E OPEN SPACE DE TRACT A OPEN SPACE DE TRACT K FUTURE DEVELOPMENT ST R E E T B STR E E T E STREET D EROSION BUFFER LIMITS (TYP.) FEMA 100-YR FLOODWAY FEMA 100-YR FLOODPLAIN BOXELDER CREEK NATURAL HABITAT BUFFER ZONE (NHBZ) EXISTING CDOT ROW FEMA 100-YR FLOODPLAIN FEMA 100-YR FLOODPLAIN CDOT ROW DRAINAGE EASEMENT TO THE CITY OF FORT COLLINS RECEPTION NO. 20160018474 NATURAL HABITAT BUFFER ZONE (NHBZ) EX. TOP OF BANK NATURAL HABITAT BUFFER ZONE (NHBZ) EX. TOP OF BANK INTERIM POND B POND C INTERIM POND I POND E POND D POND F POND G 7087 BFE=4903.00 7342 R BFE=4903.63 7749 S BFE=4904.69 7999. 7 BFE= 4 9 0 5 . 8 5 8153 . 7 BFE= 4 9 0 5 . 9 1 823 9 . 3 BFE = 4 9 0 6 . 7 5 836 9 . 8 BFE = 4 9 0 8 . 0 5 87 6 5 T BF E = 4 9 0 8 . 8 8 90 0 3 BF E = 4 9 0 9 . 3 9 940 1BFE = 4 9 1 0 . 2 3 9686 BFE= 4 9 1 0 . 9 4 10058 BFE=491 2 . 2 4 10230 U BFE=4913.12 10739 BFE=4913.50 BFE=4913.7 3 42 8 4 BF E = 4 9 0 3 . 0 7 42 4 6 BF E = 4 9 0 3 . 0 3 41 7 9 BF E = 4 9 0 2 . 9 9 4030 BFE = 4 9 0 2 . 2 4 3804 BFE=4901.05 3742 BFE=4900.80 PROPOSED 100-YR FLOODPLAIN PROPOSED 100-YR FLOODWAY TRACT D FUTURE DEVELOPMENT TRACT I OPEN SPACE DE BOXELDER CREEK 100-YEAR OVERFLOW CHANNEL PROPOSED 100-YR FLOODPLAIN PROPOSED 100-YR FLOODWAY Sheet GA T E W A Y A T P R O S P E C T Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y E P S G r o u p , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f E P S G r o u p , In c . NO T F O R C O N S T R U C T I O N RE V I E W S E T of 168 AR I Z O N A | C O L O R A D O ep s g r o u p i n c . c o m 97 0 . 2 2 1 . 4 1 5 8 FLD1 FL O O D P L A I N E X H B I T 127 NORTH CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R KEYMAP / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD IN T E R S T A T E - 2 5 ( IN FEET ) 1 inch = ft. Feet0100100 100 200 300 EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER ST EXISTING TELEPHONE EXISTING GAS NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4.ALL ACTIVITIES WITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. 5.ANY CONSTRUCTION ACTIVITIES, NONSTRUCTURAL DEVELOPMENT (ROADS, CURB CUTS, DRIVEWAYS, SIDEWALKS, TRAILS, VEGETATION, ETC.) IN THE REGULATORY FLOODWAY MUST BE PRECEDED BY A NO RISE CERTIFICATION, WHICH MUST BE PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. 6.ANY WORK WITHIN THE MAPPED BOXELDER CREEK EROSION BUFFER ZONE MUST BE PRECEDED BY A CHANNEL STABILITY ANALYSIS PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. 7.NO STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODWAY, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 BUFFER ZONE BL FEMA 100-YR HIGH-RISK FLOODPLAIN FEMA 100-YR FLOODWAY EXISTING TOP OF BANK EXISTING EDGE OF WATER NATURAL HABITAT BUFFER ZONE PROPOSED 100-YR FLOODPLAIN PROPOSED CROSS-SECTION 9314 BFE=4910.77 PROPOSED 100-YR FLOODWAY FLD1 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W W X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / XX X OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E XX T TT T S FO S W S W W S W W W S W W W S W FO W W H2O W W W W V.P. OWNER: NORMANDIN KIM WOWNER: JORDAN DAVID W OWNER: SILVERTIP REALTY LLC OWNER: HIXON TIMOTHY R OWNER: 913 SMITHFIELD LLC OWNER: R W PROPERTIES OWNER: AMERIGAS PROPANE LP OWNER: SCHNORR GARY L TRUST OWNER: CT ENTERPRISES LLC OWNER: 901 HOLDING COMPANY LLP OWNER: DAKA PROPERTIES LLC OWNER: FORNEY INDUSTRIES INC OWNER: 3824 CANAL LLC OWNER: 3800 CANAL DR LLC OWNER: AMERICAN BUILDERS AND CONTRACTORS OWNER: CANAL HOLDINGS LLC OWNER: BALLA INVESTMENTS LLC OWNER: RASS HOLDINGS LLC OWNER: RASS HOLDINGS LLC OWNER:DEAN ANDREW G OWNER: BALDWIN R/JANELLE R OWNER: CROISSANT OWNER: SLATE ROBERT STEPHEN OW N E R : S H E A F O R SH E R Y L OWNER: SLATE ROBERT STEPHEN OWNER: MARTINEZ RONALD A/LINDA OWNER: GONZALES M/CAROLINA G OWNER: US MOBILE MODULAR OWNER: US MODULAR SALES CO OWNER: AMERIGAS PROPANE LP TRACT B FUTURE DEVELOPMENT TIMNATH R E S E R V O I R I N L E T C A N A L IRRIGATION POND TRACT A OPEN SPACE DE TRACT D FUTURE DEVELOPMENT A1 PUD1 a1 B1 C1 BO X E L D E R C R E E K TIM N A T H R E S E R V O I R I N L E T C A N A L LAKE C A N A L LAK E C A N A L FUTURE COOPER SLOUGH BOX CULVERT (TO BE BUILT BY OTHERS) 1050 CFS (100-YR) FUT U R E C O O P E R S L O U G H ( B Y O T H E R S ) FUTU R E C O O P E R S L O U G H ( B Y O T H E R S ) COOPER SLOUGH ADDITIONAL 224 CFS (100-YR) FUTURE COOPER SLOUGH GRADING (BY OTHERS) TRACT C FUTURE DEVELOPMENT Rational Flow Summary | Final Basin Flow Rates BASIN TOTAL AREA (acres) Tc2 (min) Tc100 (min) C2 C100 Q2 (cfs) Q100 (cfs) A1 29.57 13.8 13.8 0.20 0.25 11.53 50.39 B1 66.71 18.9 18.9 0.54 0.67 60.32 262.65 B2 0.35 5.0 5.0 0.77 0.97 0.78 3.40 B3 0.17 5.0 5.0 0.77 0.97 0.38 1.67 C1 20.77 6.5 6.5 0.85 1.00 47.13 193.35 C2 0.36 5.0 5.0 0.79 0.98 0.82 3.57 D1 2.07 10.9 10.9 0.20 0.25 0.90 3.93 D2 0.86 5.0 5.0 0.85 1.00 2.09 8.59 E1 3.08 7.2 7.2 0.65 0.81 5.04 22.00 E2 1.85 5.3 5.3 0.65 0.81 3.42 14.92 F1 9.43 5.9 5.9 0.85 1.00 22.12 90.81 F2 0.36 5.0 5.0 0.77 0.97 0.80 3.47 F3 0.42 5.0 5.0 0.79 0.98 0.95 4.13 F4 0.79 5.0 5.0 0.77 0.97 1.73 7.57 F5 1.20 6.9 6.9 0.45 0.57 1.40 6.13 G1 5.28 5.0 5.0 0.76 0.95 11.43 49.89 G2 0.92 5.0 5.0 0.85 1.00 2.23 9.14 G3 0.35 5.0 5.0 0.85 1.00 0.84 3.45 G4 0.51 5.0 5.0 0.85 1.00 1.23 5.06 H1 15.97 6.9 6.9 0.85 1.00 35.22 144.59 H2 0.75 5.0 5.0 0.85 1.00 1.83 7.51 I1 2.54 5.0 5.0 0.76 0.95 5.52 24.11 I2 1.72 5.0 5.0 0.85 1.00 4.16 17.08 BOX1 5.53 8.2 8.2 0.20 0.25 2.65 11.58 BOX2 4.66 8.2 8.2 0.20 0.25 2.24 9.77 PUD1 3.13 8.1 8.1 0.20 0.25 1.50 6.55 Combined Basins Basin B (B1, B2 and B3)67.23 20.8 20.8 0.20 0.25 53.42 232.99 Basin C (C1 and C2)21.13 14.4 14.4 0.54 0.67 34.03 141.80 Basin D (D1 and D2)2.94 10.9 10.9 0.77 0.97 2.50 10.88 Basin E (E1 and E2)4.92 12.8 12.8 0.77 0.97 6.45 28.16 Basin F (F1, F2, F3, F4 and F5)12.20 13.9 13.9 0.85 1.00 19.23 83.12 Basin G (G1, G2, G3, G4)7.05 12.1 12.1 0.79 0.98 11.32 49.41 Basin H (H1 and H2)16.72 14.7 14.7 0.20 0.25 26.94 110.62 Basin I (I1 and I2)4.26 11.6 11.6 0.85 1.00 7.10 30.98 Rational Flow Summary | Interim Basin Flow Rates BASIN TOTAL AREA (acres) Tc2 (min) Tc100 (min) C2 C100 Q2 (cfs) Q100 (cfs) A1 29.57 13.8 13.8 0.20 0.25 11.53 50.39 B1 66.71 20.8 20.8 0.20 0.25 21.15 92.22 B2 0.35 5.0 5.0 0.77 0.97 0.78 3.40 B3 0.17 5.0 5.0 0.77 0.97 0.38 1.67 C1 20.77 14.4 14.4 0.20 0.25 7.98 34.84 C2 0.36 5.0 5.0 0.79 0.98 0.82 3.57 D1 2.07 10.9 10.9 0.20 0.25 0.90 3.93 D2 0.86 5.0 5.0 0.85 1.00 2.09 8.59 E1 3.08 12.8 12.8 0.20 0.25 1.24 5.42 E2 1.85 5.3 5.3 0.65 0.81 3.42 14.92 F1 9.43 13.9 13.9 0.20 0.25 3.68 16.07 F2 0.36 5.0 5.0 0.77 0.97 0.80 3.47 F3 0.42 5.0 5.0 0.79 0.98 0.95 4.13 F4 0.79 5.0 5.0 0.77 0.97 1.73 7.57 F5 1.20 6.9 6.9 0.45 0.57 1.40 6.13 G1 5.28 12.1 12.1 0.24 0.30 2.59 11.30 G2 0.92 5.0 5.0 0.85 1.00 2.23 9.14 G3 0.35 5.0 5.0 0.85 1.00 0.84 3.45 G4 0.51 5.0 5.0 0.85 1.00 1.23 5.06 H1 15.97 14.7 14.7 0.22 0.27 6.51 28.41 H2 0.75 5.0 5.0 0.85 1.00 1.83 7.51 I1 2.54 8.5 8.5 0.20 0.25 1.19 5.21 I2 1.72 5.0 5.0 0.85 1.00 4.16 17.08 BOX1 5.53 8.2 8.2 0.20 0.25 2.65 11.58 BOX2 4.66 8.2 8.2 0.20 0.25 2.24 9.77 PUD1 3.13 8.1 8.1 0.20 0.25 1.50 6.55 Combined Basins Basin B (B1, B2 and B3)67.23 20.8 20.8 0.20 0.25 21.79 95.04 Basin C (C1 and C2)21.13 14.4 14.4 0.20 0.25 8.12 35.45 Basin D (D1 and D2)2.94 10.9 10.9 0.77 0.97 2.50 10.88 Basin E (E1 and E2)4.92 12.8 12.8 0.77 0.97 3.66 15.97 Basin F (F1, F2, F3, F4 and F5)12.20 13.9 13.9 0.20 0.25 7.28 31.79 Basin G (G1, G2, G3, G4)7.05 12.1 12.1 0.79 0.98 5.68 24.80 Basin H (H1 and H2)16.72 14.7 14.7 0.20 0.25 7.73 33.72 Basin I (I1 and I2)4.26 11.6 11.6 0.85 1.00 4.12 17.94 Basin H & I 20.98 16.9 16.9 0.20 0.25 10.76 46.87 Pond Summaries Pond ID Tributary Area Interim Impervious Final Impervious Interim 100-yr Storage Interim WQCV + EURV Interim Release Rate Final 100-yr Storage Final WQCV + EURV Final Release Rate (acre)(%)(%)ac-ft (elev.)ac-ft (elev.)(cfs)ac-ft (elev.)ac-ft (elev.)(cfs) Pond B 67.23 3%46%1.726 (4908.38)0.152 (4904.54)96.00 7.07 (TBD)*2.907 (TBD)*103.7* Pond C 21.13 n/a 79%n/a n/a n/a 3.323 (4907.89)1.638 (4906.47)26.90 Pond D 2.94 n/a 27%n/a n/a n/a 0.222 (4904.69)0.072 (4903.97)4.50 Pond E 4.92 n/a 66%n/a n/a n/a 0.669 (4901.84)0.314 (4900.70)9.30 Pond F 12.20 n/a 77%n/a n/a n/a 1.878 (4905.02)0.92 (4903.84)14.00 Pond G 7.05 n/a 70%n/a n/a n/a 1.004 (4901.72)0.48 (4901.04)11.40 Pond H 16.72 13% 80%1.067 (4902.80)0.232 (4901.25)25.70 2.658 (TBD)*1.313 (TBD)*20.9* Pond I 4.26 76%0.648 (4903.13)0.316 (4901.91)3.30 * Future required pond volumes and WSELs to be determined at time of development and once pond layout and grading is known. KEYMAP / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD IN T E R S T A T E - 2 5 DR1 DR A I N A G E E X H I B I T 125 LEGEND: PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED STORM INLET EXISTING CURB & GUTTER PROPOSED OVERLAND FLOW EXISTING MAJOR CONTOUR PROPOSED MAJOR CONTOUR RUNOFF SUMMARY: A2 a3 DRAINAGE BASIN ID EXISTING STORM SEWER PROPOSED DIRECT FLOW BASIN DELINEATION 1. REFER TO "DRAINAGE REPORT FOR GATEWAY AT PROSPECT DATED 08/15/2025" PREPARED BY EPS GROUP FOR ADDITIONAL INFORMATION. 2. REFER TO FLOODPLAIN EXHIBIT ON SHEET FLD1 FOR MORE INFORMATION ON THE FLOODPLAIN. NOTES: ( IN FEET ) 0 1 INCH = 100 FEET 100 100 200 300 Sheet GA T E W A Y A T P R O S P E C T Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y E P S G r o u p , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f E P S G r o u p , In c . NO T F O R C O N S T R U C T I O N RE V I E W S E T of 168 AR I Z O N A | C O L O R A D O ep s g r o u p i n c . c o m 97 0 . 2 2 1 . 4 1 5 8 DRAINAGE BASIN AREA DR1 DETENTION SUMMARY: MATCHLINE - SEE SHEET DR2 FEMA 100-YR FLOODPLAIN FEMA 100-YR FLOODWAY EROSION BUFFER LIMITS BL PROPOSED 100-YR FLOODPLAIN PROPOSED 100-YR FLOODWAY NATURAL HABITAT BUFFER ZONE T ST S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X X X X X X X OHU OHU OHU OHU OH U OHU OHU OH U OH U OH U OH U OH U OH U OH U OH U OH U OH U W W W W W W W W X X X / / / / / / / / / / / / / / / / FO FO FO FO FO X X X X X X X X X X X X X X XX X X X X X X X X X X X X XX X X XXXX X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / XX X X X X X X X X X T T T T OH E OH E OH E OH E OH E OH E OH E OH E OH E SS 10 " S S 10 " S S 10 " S S 10 " S S 10 " S S 10 " S S 10 " S S 10" SS 27 " A B D N S S 27 " A B D N S S 27 " A B D N S S 27 " A B D N S S 27" A B D N S S E E E E E / / / / / / / / T T W W W W W S W FO I W / / / / / / / / / / / / / / / / / / / / / / / // / / / / / / // / / / / / / / GAS GAS CONTROL IRR CONTROL IRR VAULT ELEC F.O. F.O. F.O. ELEC ELEC VAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC VAULT ELEC AC S H2O H2O W T FES H2O H2O W H2O H2O W ELEC FE S VAULT ELECVAULT ELEC TRAFFICVAULTE VAULT ELECTRAFFIC VAULT ELEC H2OHYD T ST S VAULTELEC ELEC VAULTELEC VAULTELEC S FES D X X X X X X X W W TT OHU OHU 30" SS S S 12" W 12" W 12" W FES W W H2O H2O H2O H2O HYD W W ST ST ST 12" W 12" W W HYD V.P. V.P. H2O 6" W 6" W 6" W / / / / / / / / / / / / / / / / / / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / / 12" W 12" W ST ST ST ST / / / / / / / / E E OW N E R : C U L B E R T SO N D A V I D M OWNER: 1303 FRONTAGE HOLDINGS LLC OWNER: GLANZ THOMAS J/LAURA P WESLEY R ANGELA M OW N E R : B A D E CA R L A M OWNER: K AND M COMPANY OWNER: BOARD OF GOVERNORS CSU SYSTEM OWNER: 1303 FRONTAGE HOLDINGS LLC OW N E R : 1 3 0 3 FR O N T A G E HO L D I N G S L L C ST R E E T B FRONTAGE ROAD SW FR O N T A G E R D TEMPORARY SWALE EXISTING BOX CULVERTS EXISTING BOX CULVERTS FR O N T A G E R O A D BO X E L D E R C R E E K BOXELDER CREEK NATURAL HABITAT BUFFER ZONE TRACT H FUTURE DEVELOPMENT NODE 887 (PER FORT COLLINS SWMM MODEL)NODE 886 (PER FORT COLLINS SWMM MODEL) BOXELDER CREEK 100-YR OVERFLOW CHANNEL 0.3% PROSPECT ROAD STORM DRAIN A SEE SHEET ST1 STORM DRAIN B SEE SHEET ST1 STORM DRAIN C SEE SHEET ST2 STORM DRAIN E SEE SHEET ST4 STORM DRAIN L SEE SHEET ST6 STORM DRAIN G SEE SHEET ST5 STORM DRAIN H SEE SHEET ST5 STORM DRAIN I SEE SHEET ST5 STORM DRAIN J SEE SHEET ST5 INLET A3 INLET A2 OUTLET B2 OUTLET E4 4.4% OUTLET H2 OUTFALL G2 TRACT J OPEN SPACE DE TRACT K FUTURE DEVELOPMENT TRACT F FUTURE DEVELOPMENT TRACT E OPEN SPACE DE TRACT I OPEN SPACE DE BOXELDER CREEK NATURAL HABITAT BUFFER ZONE STR E E T E STREET D PROPOSED BRIDGE STORM DRAIN K SEE SHEET ST6 STORM DRAIN C2 SEE SHEET ST3 PROPOSED 100-YR FLOODPLAIN STORM DRAIN N SEE SHEET ST7 STORM DRAIN F SEE SHEET ST4 STORM DRAIN O SEE SHEET ST7 STORM DRAIN D SEE SHEET ST3 OUTLET C7 OUTLET C2.2 B1 C1 E1 G1 H1 D1 D2 F3 C2 E2 BOX1 F1 F2 BOX2 H2 F4 F5 G2 G3 B2 B3 b1 f2 d1 I1 e1 f1 c2 c1 h2 d2 e2 g1 g2 I2 g3 b2 b3 f4 f5 f3 I1 H1 I2 G4 POND D INTERIM POND I POND E POND F INTERIM POND B POND G POND C g4 FUTURE POND H (LAYOUT DEPENDENT ON FUTURE SITE PLAN) PUD1 RAIN GARDEN E2 RAIN GARDEN I2 RAIN GARDEN D2 RAIN GARDEN G3 RAIN GARDEN C2 RAIN GARDEN B2 EXISTING INLET DIVERTS FLOW TO SOUTH STORM DRAIN M SEE SHEET ST6 PUD IRRIGATION DITCH GATE IS OPEN WHEN DITCH IS NOT RUNNING. EXISTING FLOWS IN DITCH ARE EXISTING INTERCEPTED COOPER SLOUGH STORMWATER FLOWS PER FC MODEL= 203 CFS (10-YR) INLET O2 INLET K5 PIPE END M1 INLET L1 INLET D3 INLET N2 INLET N3 INLET F8 INLET F7 FUTURE POND B (LAYOUT DEPENDENT ON FUTURE SITE PLAN) TRACT C FUTURE DEVELOPMENT Rational Flow Summary | Final Basin Flow Rates BASIN TOTAL AREA (acres) Tc2 (min) Tc100 (min) C2 C100 Q2 (cfs) Q100 (cfs) A1 29.57 13.8 13.8 0.20 0.25 11.53 50.39 B1 66.71 18.9 18.9 0.54 0.67 60.32 262.65 B2 0.35 5.0 5.0 0.77 0.97 0.78 3.40 B3 0.17 5.0 5.0 0.77 0.97 0.38 1.67 C1 20.77 6.5 6.5 0.85 1.00 47.13 193.35 C2 0.36 5.0 5.0 0.79 0.98 0.82 3.57 D1 2.07 10.9 10.9 0.20 0.25 0.90 3.93 D2 0.86 5.0 5.0 0.85 1.00 2.09 8.59 E1 3.08 7.2 7.2 0.65 0.81 5.04 22.00 E2 1.85 5.3 5.3 0.65 0.81 3.42 14.92 F1 9.43 5.9 5.9 0.85 1.00 22.12 90.81 F2 0.36 5.0 5.0 0.77 0.97 0.80 3.47 F3 0.42 5.0 5.0 0.79 0.98 0.95 4.13 F4 0.79 5.0 5.0 0.77 0.97 1.73 7.57 F5 1.20 6.9 6.9 0.45 0.57 1.40 6.13 G1 5.28 5.0 5.0 0.76 0.95 11.43 49.89 G2 0.92 5.0 5.0 0.85 1.00 2.23 9.14 G3 0.35 5.0 5.0 0.85 1.00 0.84 3.45 G4 0.51 5.0 5.0 0.85 1.00 1.23 5.06 H1 15.97 6.9 6.9 0.85 1.00 35.22 144.59 H2 0.75 5.0 5.0 0.85 1.00 1.83 7.51 I1 2.54 5.0 5.0 0.76 0.95 5.52 24.11 I2 1.72 5.0 5.0 0.85 1.00 4.16 17.08 BOX1 5.53 8.2 8.2 0.20 0.25 2.65 11.58 BOX2 4.66 8.2 8.2 0.20 0.25 2.24 9.77 PUD1 3.13 8.1 8.1 0.20 0.25 1.50 6.55 Combined Basins Basin B (B1, B2 and B3)67.23 20.8 20.8 0.20 0.25 53.42 232.99 Basin C (C1 and C2)21.13 14.4 14.4 0.54 0.67 34.03 141.80 Basin D (D1 and D2)2.94 10.9 10.9 0.77 0.97 2.50 10.88 Basin E (E1 and E2)4.92 12.8 12.8 0.77 0.97 6.45 28.16 Basin F (F1, F2, F3, F4 and F5)12.20 13.9 13.9 0.85 1.00 19.23 83.12 Basin G (G1, G2, G3, G4)7.05 12.1 12.1 0.79 0.98 11.32 49.41 Basin H (H1 and H2)16.72 14.7 14.7 0.20 0.25 26.94 110.62 Basin I (I1 and I2)4.26 11.6 11.6 0.85 1.00 7.10 30.98 Rational Flow Summary | Interim Basin Flow Rates BASIN TOTAL AREA (acres) Tc2 (min) Tc100 (min) C2 C100 Q2 (cfs) Q100 (cfs) A1 29.57 13.8 13.8 0.20 0.25 11.53 50.39 B1 66.71 20.8 20.8 0.20 0.25 21.15 92.22 B2 0.35 5.0 5.0 0.77 0.97 0.78 3.40 B3 0.17 5.0 5.0 0.77 0.97 0.38 1.67 C1 20.77 14.4 14.4 0.20 0.25 7.98 34.84 C2 0.36 5.0 5.0 0.79 0.98 0.82 3.57 D1 2.07 10.9 10.9 0.20 0.25 0.90 3.93 D2 0.86 5.0 5.0 0.85 1.00 2.09 8.59 E1 3.08 12.8 12.8 0.20 0.25 1.24 5.42 E2 1.85 5.3 5.3 0.65 0.81 3.42 14.92 F1 9.43 13.9 13.9 0.20 0.25 3.68 16.07 F2 0.36 5.0 5.0 0.77 0.97 0.80 3.47 F3 0.42 5.0 5.0 0.79 0.98 0.95 4.13 F4 0.79 5.0 5.0 0.77 0.97 1.73 7.57 F5 1.20 6.9 6.9 0.45 0.57 1.40 6.13 G1 5.28 12.1 12.1 0.24 0.30 2.59 11.30 G2 0.92 5.0 5.0 0.85 1.00 2.23 9.14 G3 0.35 5.0 5.0 0.85 1.00 0.84 3.45 G4 0.51 5.0 5.0 0.85 1.00 1.23 5.06 H1 15.97 14.7 14.7 0.22 0.27 6.51 28.41 H2 0.75 5.0 5.0 0.85 1.00 1.83 7.51 I1 2.54 8.5 8.5 0.20 0.25 1.19 5.21 I2 1.72 5.0 5.0 0.85 1.00 4.16 17.08 BOX1 5.53 8.2 8.2 0.20 0.25 2.65 11.58 BOX2 4.66 8.2 8.2 0.20 0.25 2.24 9.77 PUD1 3.13 8.1 8.1 0.20 0.25 1.50 6.55 Combined Basins Basin B (B1, B2 and B3)67.23 20.8 20.8 0.20 0.25 21.79 95.04 Basin C (C1 and C2)21.13 14.4 14.4 0.20 0.25 8.12 35.45 Basin D (D1 and D2)2.94 10.9 10.9 0.77 0.97 2.50 10.88 Basin E (E1 and E2)4.92 12.8 12.8 0.77 0.97 3.66 15.97 Basin F (F1, F2, F3, F4 and F5)12.20 13.9 13.9 0.20 0.25 7.28 31.79 Basin G (G1, G2, G3, G4)7.05 12.1 12.1 0.79 0.98 5.68 24.80 Basin H (H1 and H2)16.72 14.7 14.7 0.20 0.25 7.73 33.72 Basin I (I1 and I2)4.26 11.6 11.6 0.85 1.00 4.12 17.94 Basin H & I 20.98 16.9 16.9 0.20 0.25 10.76 46.87 Pond Summaries Pond ID Tributary Area Interim Impervious Final Impervious Interim 100-yr Storage Interim WQCV + EURV Interim Release Rate Final 100-yr Storage Final WQCV + EURV Final Release Rate (acre)(%)(%)ac-ft (elev.)ac-ft (elev.)(cfs)ac-ft (elev.)ac-ft (elev.)(cfs) Pond B 67.23 3%46%1.726 (4908.38)0.152 (4904.54)96.00 7.07 (TBD)*2.907 (TBD)*103.7* Pond C 21.13 n/a 79%n/a n/a n/a 3.323 (4907.89)1.638 (4906.47)26.90 Pond D 2.94 n/a 27%n/a n/a n/a 0.222 (4904.69)0.072 (4903.97)4.50 Pond E 4.92 n/a 66%n/a n/a n/a 0.669 (4901.84)0.314 (4900.70)9.30 Pond F 12.20 n/a 77%n/a n/a n/a 1.878 (4905.02)0.92 (4903.84)14.00 Pond G 7.05 n/a 70%n/a n/a n/a 1.004 (4901.72)0.48 (4901.04)11.40 Pond H 16.72 13% 80%1.067 (4902.80)0.232 (4901.25)25.70 2.658 (TBD)*1.313 (TBD)*20.9* Pond I 4.26 76%0.648 (4903.13)0.316 (4901.91)3.30 * Future required pond volumes and WSELs to be determined at time of development and once pond layout and grading is known. LEGEND: RUNOFF SUMMARY: Sheet GA T E W A Y A T P R O S P E C T Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y E P S G r o u p , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f E P S G r o u p , In c . NO T F O R C O N S T R U C T I O N RE V I E W S E T of 168 AR I Z O N A | C O L O R A D O ep s g r o u p i n c . c o m 97 0 . 2 2 1 . 4 1 5 8 DR2 DR A I N A G E E X H I B I T 126 ( IN FEET ) 0 1 INCH = 100 FEET 100 100 200 300 DETENTION SUMMARY: KEYMAP / / / / / / / / / / / / / / / / / / / / / / / / PROSPECT RD IN T E R S T A T E - 2 5 DR2 MATCHLINE - SEE SHEET DR1 PROPOSED STORM SEWER PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED STORM INLET EXISTING CURB & GUTTER PROPOSED OVERLAND FLOW EXISTING MAJOR CONTOUR PROPOSED MAJOR CONTOUR A2 a3 DRAINAGE BASIN ID EXISTING STORM SEWER PROPOSED DIRECT FLOW BASIN DELINEATION 1. REFER TO "DRAINAGE REPORT FOR GATEWAY AT PROSPECT DATED 08/15/2025" PREPARED BY EPS GROUP FOR ADDITIONAL INFORMATION. 2. REFER TO FLOODPLAIN EXHIBIT ON SHEET FLD1 FOR MORE INFORMATION ON THE FLOODPLAIN. NOTES: DRAINAGE BASIN AREA FEMA 100-YR FLOODPLAIN FEMA 100-YR FLOODWAY EROSION BUFFER LIMITS BL PROPOSED 100-YR FLOODPLAIN PROPOSED 100-YR FLOODWAY NATURAL HABITAT BUFFER ZONE