Loading...
HomeMy WebLinkAboutSupporting Documentation - Response to Comments - 08/13/2025 52 2 3 O L D E S T A G E R O A D , B O U L D E R C O 8 0 3 0 2 / 30 3 64 1 65 3 1 / WW W . C H R I S T O P H E R H E R R . C O M 426 E OAK COMMENT RESPONSES 2025.08.13 DEVELOPMENT REVIEW COORDINATOR, MARISSA POMERLEAU All comments are informational and are acknowledged. PLANNING SERVICES, ARLO SCHUMANN 1. Since the date of the comments, State law has changed and Fort Collins has updated zoning requirements in accord with State law, so the footprint limitation of 600sf no longer applies. 2. See 2/A1.00 Site Area Calculations. 3. See 1/A1.00 00 Site Plan. 4. The proposed ADU is single story and doesn’t challenge the eave height regulation. 5. Acknowledged. 6. Provided – see A1.00. 7. Acknowledged, parking is provided off of alley, see A1.00. 8. Acknowledged. 9. Acknowledged. ENGINEERING DEVELOPMENT REVIEW, SOPHIE BUCKINGHAM 1. A subdivision plat is provided. 2. Acknowledged. 3. Easements are provided and are shown in the subdivision plat. 4. Remaining comments 4 through 15 are informational and are acknowledged. HISTORIC PRESERVATION, JIM BERTOLINI 1. Acknowledged. 2. Acknowledged. 3. Acknowledged. TRAFFIC OPERATIONS, STEVE GILCHRIST 1. Acknowledged. STORMWATER ENGINEERING – EROSION CONTROL, ANDREW CRECCA 1. Acknowledged. STORMWATER ENGINEERING – FLOODPLAIN, KEVIN MEYER 2. Acknowledged. 3. Acknowledged. 4. Acknowledged. STORMWATER ENGINEERING – WATER UTILITIES, WEST LAMARQUE 5. The project adds more than 1,000sf of impervious area. See Drainage Memo prepared by Kevin Forbes, PE, and grading plans on C1.01 and pervious / impervious plans on C1.02. 6. Acknowledged. 7. Acknowledged, see memo and plans referenced above in item 5. 8. Acknowledged. 9. Acknowledged. 10. Acknowledged. 11. Acknowledged. WATER-WASTEWATER ENGINEERING, WES LAMARQUE 1. Acknowledged. 14 4 5 P E A R L S T R E E T S U I T E 2 0 8 B O U L D E R , C O 8 0 3 0 2 / 30 3 2 4 7 0 4 0 5 / WW W . C H R I S T O P H E R H E R R . C O M 2. Acknowledged, although the property Owner believes that the sewer tap is on Oak, not Riverside. There are no plans to change the sewer tap location nor size, to the location of the tap is not currently consequential. 3. Acknowledged. 4. Acknowledged. 5. Acknowledged, we are currently unclear about who should prepare the covenant agreement, and if there is specific verbiage required in the covenant, please advise. ELECTRIC ENGINEERING, LUKE UNRUH 1. Acknowledged. 2. Acknowledged. 3. Acknowledged. 4. Acknowledged. ENVIRONMENTAL PLANNING, KRISTIE RAYMOND 1. Acknowledged. 2. Acknowledged. FORESTRY, CHRISTINE HOLTZ 1. Acknowledged. 2. Acknowledged. PARK PLANNING, RACHEL WEAVER-EICH 1. Acknowledged. 2. Acknowledged. FIRE AUTHORITY, KATIE QUINTANA 1. Address location for new unit is noted on A1.00. BUILDING CODE REVIEW, RUSSELL HOVLAND 1. This has been addressed with the subdivision plat 2. Acknowledged. TECHNICAL SERVICES, JEFF COUNTY 1. Acknowledged. 2. Acknowledged. 3. Acknowledged. 4. Acknowledged. Sincerely, Christopher Herr