February 28, 1977
��DOH FILE 04-41
Mr. Les Kaplan
Planning Commission Director M AIlk 3 1917
City of Fort Collins
P. 0. Box 580
Fort Collins, Colorado 80521
Dear Mr. Kaplan:
Do ,,- _. ( . inent
This letter is written as a follow up to Mr. Steve Robinson's and your
telephone conversations, on February 23, with Mr. Robert Patrick of this
office concerning the proposed Fort Collins Expressway's proposed alignment
through Evergreen Park Subdivision.
Mr. Robinson has made application for a zoning change for properties
located in the southwest corner of the subdivision, west of Redwood and south
of Conifer. The Division has no objections to the zoning proposal . ter.
Robinson has been working with the Division by setting aside a corridor through
the subdivision for the proposed Fort Collins Expressway. As the Expressway
is a proposal only, Mr. Dwight Bower, Division of Highways District Engineer,
has asked the developers to manage their land development in such a manner
as to preserve a corridor for the possible highway use, keeping in mind the
possibility that the proposed Expressway may not be constructed in this area.
If the proposed Expressway were not to be constructed in this area, the land
could easily be developed as originally intended. Mr. Bower stated that a
program for construction of the Expressway in this area is some years away.
At that time, we did not have an approved Environmental Impact Statement.
To demonstrate the above, the following is an excerpt from the Division's
Five-Year Highway Construction Program (Jan. , 1977) .
Fiscal Year 76-77 - Preliminary engineering to determine right of way
and construction needs. Hold Public Hearings,
advance toward final design.
77-78 - Purchase right of way around Laporte.
78-79 - Construct interchanges around Laporte.
79-80 - Continue construction grade around Laporte.
80-81 - No funds budgeted.
81-82 - Right of way and construction from Laporte toward
Fort Collins.
Larimer County
US 287
Evergreen Park
TQFC 287-3(10)
Fort Collins
Expressway
DOH FILE 04-41
MR. LES KAPLAN
February 28, 1977
Page Two
The above are our proposed requests for budgeting for highway construction;
whether funding becomes available is up to monies available and Highway Commission
actions. Thus, the Expressway is only a proposal until actual funding becomes
available.
The Division, in working with Mr. Robinson, has submitted to him a corridor
in which the proposed Expressway could be constructed. The corridor was to
parallel Bureau of Reclamation Easement as near as possible. With the northern
boundary of 300 feet, right of way is to be 80 feet from the property line
of the existing substation to allow for continuity of Conifer Street. Another
constraint includes an area for an interchange at North College while allowing
Conifer Street to access North College as previously platted.
Mr. Robinson has stated in telephone conversations with Mr. Patrick that
the developers will limit their development from Redwood west to a line 50
feet each side of the proposed boundary lines of the corridor and from Redwood
east to a line 50 feet south of the boundary line of the proposed corridor.
This would not only allow for future frontage roads, but would provide an
area in which the proposed Expressway alignment could be shifted.
If you or your staff have any questions on the above, please feel free
to contact either me or Mr. Robert Patrick.
Very truly yours,
DWIGHT M. BOWER
DISTRICT ENGINEER
Albert Chotva
Assistant District Engineer
AC: da
cc: D. M. Bower
File: Graham via Finch-Patrick-Crier
Steve Robinson/D. C. Miller and Company
1635 Blue Spruce Drive, Suite 101 , Ft. Collins 80521