January 14, 1977 RECEIVEDDOH FILE 04-41
JAN 19 1977
Mr, Stephen Robinson
Pro j ect Manager
D. C. Miller said Company p u r m e n t
1635 13lue Spruce Drive p
Suite 101
Fort Collins, Colorado 80521
Dear Mr, Robinson:
This is written as a follow up to the meeting held in our offices concerning
Evergreen Park Subdivision and the Proposed alignment of the Fort Collins Central
Expressway.
You were concerned with the access to the Property lying south of the proposed
Expressway. Enclosed please find a 'xerox' copy of the aerial photograph on
display in our office showing the approximate alignment of the Expressway through
the Evergreen Paxk area. As you will note, the Division is proposing an inter-
change at College Avenue. The southerly right-of-way line of the Expressway has
left sufficient room for an access road to the properties which lie east of College
and south of the proposed Expressway.
The Division has no plans for providing for a crossing of Redwood, whether
at-grade or grade separation. The Division does plan to provide for a grade
separation at Lemay Avenue (Lindenmeir Lake Road) and East Vine Drive (not shown).
In either of the move, there are no plans for egress and ingress to the proposed
Expressway.
The Division had a land transaction with Mr. Lyle Carpenter, who had interests
in Evergreen Park, to provide access to East Vine Drive via the proposed Redwood
Street.
In July of 1976, this office met with representatives of Evergreen Park and
the City of Fort Collins in order to come to some agreement as to a corridor for
the Expressway. This was a result of the developers wishing to obtain the City's
approval of the plat of the Second filing. The Division, after a series of meet-
ings, agreed to the location as shown on the enclosure. The developer, Evergreen
Park (a joint venture), was represented by Mr. Lyle Carpenter. He requested that
the then proposed alignment be changed and was agreeable to the enclosed. He was
also agreeable that the developer would be responsible for providing access to
the properties on either side of the revised alignment.
S
Lari.mer County
Fort Collins
Evergreen Park
Subdivision
DOH FILE 04-00
MR. SWP#f�N ROBINSON
January 14, 1977
Page Two
You specif}cal?y requested a grade-separated crossing of Redwood Street with
the proposed Expressway, In my response, I stated there were no plans for such,
and if it were to happen, the embankment area necessary to provide .for the Express-
way to cross over Redwood Street would eliminate the possibility for Conifer Street
to pass to the south of the Bureau of Reclamation Substation.
You are aware, from our discussion, that any major changes in the alignment
as shown could seriously dwiia.ge the chances of this Expressway becoming a reality.
The Division has made certain commitments to the citizens of Alta Vista,
Andersonville, and Buckingham.
Please be aware that the Division is willing to work with you and your company
regarding the above. However, we do wish to emphasize the fact that the enclosed
alignment is prelimJ.nary in nature, and that the exact location and right-of-way
width needed can only be determined after specific design criteria have been
met. As you are aware, the Division has not received Federal approval of our
Environmental Impact Statement, and it is only after this approval that we can
start our location design study.
The Division does not see ourselves starting construction in the Evergreen
Park area within the next couple of years. As with any organization, we are
limited to monies being budgeted for this project,
I would like to take this opportunity to thank you for showing your company's
concern on this matter and look forward to working with you in the future.
Very truly yours,
E. N. HAASE
CHIEF ENGINEER
Z.
Dwight M. Bower
District Engineer
Uffl: da
,Enclosure
cc: Capron-Cox
L. Kaplan/City of Fort Collins - - -
Graham w/encl, via Finch-Patrick-Crier
File
1 11 y 1
,. ` (r .��,} ref• 1 } !; � rrll .•'1 `
,.f 1 il•r �'y ii M1j,l.�;,,: 'r:7 Y wLf hid 1 � �` �. iti,�• ��,�A' �. +4' +i
I` } W 41 y 1}R y pA.d ,_ , J r r .rrir r �f r �,�� �-�'. �• X"I'
i ' 1 F iY,
�' ' '!..'}► � � 4'"r� �i r•r}��`a `'}r:r�•�f*r'��' } F �y.. rP( - .� r' .1 if
r <.I. ,Y""hR''I ;�' �: t�' t��- + ..r A 1 ,,er if„ �.* ;y .�.1 .•fie - �r��k. ,
�r r C �t 1 , ti
i. fif R F�• f �,•} i ' ��i�� d i�4 r �r �,�a�����>/ jf , 1 "4 -� �.