Loading...
HomeMy WebLinkAboutCorrespondence - 03/07/1977 �cs STATE v ���EPARTMENT OF I'� IGHWAYS Larimer County JACK KINSTLINGER �..t EXECUTIVE DIRECTOR Ft. Collins Planning & Zonil DIVISION OF HIGHWAYS DISTRICT 4 Board E. N. HAASE `?� DWIGHT M. BOWER CHIEF ENGINEER N�<JNE��``�E DISTRICT ENGINEER STATE OF COLORADO US287-Evergree P.O. BOX 850-1420 - 2ND ST. • GREELEY• COLORADO 80631 • (303) 353.1232 #28-77 March 7, 1977 US 287-S.Colleg Comm. P.U.D. Final Plat US 287-Harvard � , -, ;. ; •, Sub. ,2nd Filing Mr. Les Kaplan Director DOH FILE 04-41 Planning and Zoning Department MAR fi UN City of Fort Collins P. 0. Box 580 Fort Collins, Colorado 80521 Dear Mr. Kaplan: The Colorado Division of Highways has reviewed the March 7th and 14th agenda of the Fort Collins Planning and Zoning Board and has the following comments for your due consideration. Item #28-77, Miller-Wainwright Associates - Conifer Street Rezoning - US 287 - Evergreen Park The Division has been in contact with Mr. Steve Robinson, Project Manager for D. C. Miller and Associates, concerning the proposed location of the proposed Fort Collins Expressway in the area. Enclosed is a copy of our letter to your office dated February 28th concerning the above. Item #39-77, South College Commercial P.U.D. , Final Plat and Plans - US 287 The Division has no objections to the concept. However, we would suggest that one of the driveways onto the frontage road be moved to Thunderbird Drive. This could relieve some of the congestion of the intersections of the frontage road, Thunderbird Drive, and South College. It would allow for greater storage for vehicles wishing to cross or enter South College. The driveway should be a minimum of 50 feet from the intersection. It would be desirable to have it greater than 100 feet from the intersection. Item #42-77, Amendment to Harvard Subdivision Second Filing P.U.D. - US 287 The driveway which is located within 50 feet of the intersection of the frontage road, Harvard Street, and South College should either be moved to the west or eliminated, as it will not provide for adequate storage space for vehicles wishing to enter South College Avenue. Also, it could cause conflicts of vehicles waiting to enter South College and those vehicles wishing to enter the driveway from the east, thus restricting flow of traffic to the west on Harvard. s Larimer County Ft. Collins Planning & Zoning Board D MR. LES KAPLAN OH FILE 04-41 March 7, 1977 Page Two The Division has no comments on the remaining items. Thank you for allowing us to review the above. Very truly yours, DWIGHT M. BOWER DISTRICT ENGINEER Albert Cho acs Assistant District Engineer AC: da Enclosure cc: D. M. Bower D. N. Fraser File: Graham w/encl . via Finch-Patrick-Crier Nei 40 Ix ID Larimer Count3 US 287 NEAR 977 Evergreen Park D e p,. i- .men t TQ FC 287-3(10) Fort Collins February 28, 1977 Expressway DOH FILE 04-41 Mr. Les Kaplan Planning Commission Director s : City of Fort Collins f P. 0. Box 580 Fort Collins, Colorado 80521 Dear Mr. Kaplan: This letter is written as a follow up to Mr. Steve Robinson's and your telephone conversations, on February 23, with Mr. Robert Patrick of this office concerning the proposed Fort Collins Expressway's proposed alignment through Evergreen Park Subdivision. Mr. Robinson has made application for a zoning change for praaerties located in the southwest corner of the subdivision, west of Redwood and south of Conifer. The Division has no objections to the zoning proposal . Mr. Robinson has been working with the Division by setting aside a corridor through the subdivision for the proposed Fort Collins Expressway. As the Expressway is a proposal only, Mr. Dwight Bower, Division of Iiighways District Engineer, has asked the developers to manage their land development in such a manner as to preserve a corridor for the possible highway use, keeping in mind the possibility that the proposed Expressway may not be constructed in this area. If the proposed Expressway were not to be constructed in this area, the land could easily be developed as originally intended. Mr. Bower stated that a program for construction of the Expressway in this area is some years away. At that time, we did not have an approved Environmental Impact Statement. To demonstrate the above, the following is an excerpt from the Division's Five-Year Highway Construction Program (Jan. , 1977). Fiscal Year 76-77 - Preliminary engineering to determine right of way and construction needs. Hold Public Hearings, advance toward final design. 77-78 - Purchase right of way around Laporte. 78-79 - Construct interchanges around Laporte. 19-80 - Continue construction grade around Laporte. 80-81 - No funds budgeted. 81-82 - .Right of way and construction from Laporte toward Fort Collins. Larimer Count, US 287 Evergreen Par' TQFC 287-3(10 Fort Collins Expressway DOH FILE 04-4 MR. LES KAPLAN February 28. 1977 Page Two The above are our proposed requests for budgeting for highway construction; whether funding becomes available is up to monies available and Highway Commission actions. Thus, the Expressway is only a proposal until actual funding becomes available. The Division, in working with Mr. Robinson, has submitted to him a corridor in which the proposed Expressway could be constructed. The corridor was to parallel Bureau of Reclamation Easement as near as possible. With the northern boundary of 300 feet, right of way is to be 80 feet from the property line of the existing substation to allow for continuity of Conifer Street. Another constraint includes an area for an interchange at North College while allowing Conifer Street to access North College as previously platted. Mr. Robinson has stated in telephone conversations with Mr. Patrick that the developers will limit their development from Redwood west to a line 50 feet each side of the proposed boundary lines of the corridor and from Redwood east to a line 50 feet south of the boundary line of the proposed corridor. This would not only allow for future frontage roads, but would provide an area in which the proposed Expressway alignment could be shifted. If you or your staff have any questions on the above, please feel free to contact either me or Mr. Robert Patrick. Very truly yours, DWIGHT M. DOWER DISTRICT ENGINEER � Albert Chotvacs Assistant District Engineer AC:RKP:da cc: D. M. Bower -- File: Graham via Finch-Patrick-Crier Steve Robinson/D. C. Miller and Company 1635 Blue Spruce Drive, Suite 101 , Ft. Collins 80521