Loading...
HomeMy WebLinkAboutPlans - Utility Plan - 06/01/2025     - The electric main line to the transformer was potholed and the line was measured at 42” below grade. Our plan is to run the water supply to the ADU 2’ below this, and to run the sewer a minimum of 2’ above. Where the sewer crossed the utility easement, we will sleeve the sewer line in steel pipe to protect the line in the event that future excavation of the electric main line in performed. Construction Note: Secondary electric vault to house connection to home and separate connection to ADU/ garage. e e