Loading...
HomeMy WebLinkAboutSupporting Documentation - Drainage - 03/14/20251901 Bear Court / Fort Collins, Colorado 80525 (970) 590-1579 / paul@secengineering.net Sorensen Engineering & Construction, Inc. Civil/Environmental Engineering March 14, 2025 City of Fort Collins Stormwater Development Review Engineer 222 Laporte Ave. Fort Collins, CO 80524 Subject: Drainage Narrative Gilmartin Subdivision 341 South Taft Hill Road Larimer County Parcel No. 9709404005 Dear City of Fort Collins Stormwater, Sorensen Engineering & Construction, Inc. (SEC) is pleased to submit this Drainage Narrative for the proposed Gilmartin Subdivision. As shown on Figure 1, Vicinity Map, the site is located at 341 South Taft Hill Road, Fort Collins, Colorado. The site is located in the SE ¼, Section 9, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. The project site is located in the Mulberry Hill neighborhood and is bordered to the north by an existing single-family residential property, to the east by South Taft Hill Road and City Park Golf Course, to the west by single-family homes (Mulberry Hill) and Poudre High School, and to the south by single family homes (Mulberry Hill) and a church, and Mulberry Street. The site is currently covered with native grasses, with approximately 80% vegetative cover. The Site is located in the Canal Importation Basin. There are no existing stormwater drainage facilities on the subject property. The site is relatively flat, with existing drainage patterns flowing gently from west to east. The New Mercer Ditch is present about ¼-mile to the east; running through the City Park Nine golf course. The Site is currently vacant ground with native grasses and weeds across the property. As required, a Floodplain Use Permit will be acquired prior to any construction activities on the subject site. Additionally, in accordance with City of Fort Collins comments, the following notes shall apply: 1) A portion of this property is currently located in the city regulated, 100-year Canal Importation flood fringe and must comply with the safety regulations of Chapter 10 of City Municipal Code (in fact, the entire property lies within the 100 year Canal Importation Flood Fringe area). 2) Any construction activities in the flood fringe (e.g. structures, sidewalk or curb & gutter installation/replacement, utility work, landscaping, etc.) must be preceded by an approved floodplain use permit, the appropriate permit application fees, and approved plans. 3) The lowest finished floor elevation of a new residential structure, and all duct work, heating, ventilation, electrical systems, etc. must be elevated 18 inches above the highest Base Flood Elevation (BFE) within the footprint of the structure. 2 4) Any new crawl space must comply with venting and crawl space requirements from Sections 10 39 and 10 40 of City Municipal Code.” Hydrological Soil Type The NRCS Custom Soil Resource Report for the site is provided herein in Attachment A. As shown, the on-site soil is primarily a Nunn clay loam at 1 to 3% slope with a small section on the west side of the lot (west of the future Pennsylvania ROW) consisting of Altvan -Satanta loams at 0 to 3% slope. The entire area for this proposed project lies within the Nunn clay loam soils with a Hydrologic Soil Group B. Drainage Basin Description This project is located in the Canal Importation Basin in Fort Collins. The Canal Importation Basin encompasses almost five square miles (3,200 acres) of west-central Fort Collins. The basin is bounded generally by Laporte Avenue on the north, the foothills on the west, Drake Road to the south and extends almost to Shields Street on the east. Across the basin, a 100-year storm event could lead to flood-related damage to homes and other structures. There are no master planning improvements on or adjacent to the site. Historic drainage patterns within the basin are from west to east. There have been significant precipitation and flood events over the last 100 years that have caused property damage within the basin. There are no irrigation ditches, reservoirs, or other facilities that influence or are influenced by the local drainage. Project Description The proposed project contains approximately 0.71 acres; including the following characteristics: Lot One for a single-family home with a detached additional dwelling unit (ADU): .58 acre (includes the Pennsylvania Street ROW) Dedication of Pennsylvania Street: .09 acre Outlot: .13 acre Dedication of Public Right-of-Way for S. Taft Hill Road (Two-Lane Arteria): 12’ Dedication of Utility Easement along S. Taft Hill Road: 15’ The proposed project is to create one lot for a single-family home plus one additional dwelling unit (ADU). The proposed home and ADU are on Lot One, 0.58 acre, equaling approximately 3.45 dwelling units per acre which exceeds the LMN required minimum density of 3.00 dwelling units per acre. Existing Public Improvements in the project vicinity include Taft Hill Road to the east: a two-Lane arterial that includes a four-foot attached walk, vertical curb, gutter and striped bike lane. There is currently 30 feet of half-width as measured from the centerline. There are no overhead electric lines. The nearest fire hydrant is at the northeast corner of Taft Hill Road and Mulberry Street. The proposed home and ADU would be under one ownership. Lot One and the Outlot would be owned by a single entity. Therefore, there are no common areas and, therefore, no Homeowners’ Association. Right-of-Way for Pennsylvania Street is dedicated for 57 feet wide per the requirement for a Residential Local Street in accordance with LCUASS 7-9F, and aligns with three previous dedications (Farmstead, Stead and Cherokee Flying Heights Subdivisions). The proposed Outlot lies west of Pennsylvania Street and is not intended to be served by utilities until the 3 construction of this public street. As an Outlot, it is not intended to be a parcel eligible for a building permit at this time. Existing and Proposed Drainage Patterns The project site is currently vacant, covered with grass and weed vegetation, with approximately 2% impervious area. Drainage patterns are from west to east across the site, discharging in general via sheet flow to S. Taft Hill Road. Existing site conditions are presented on the preliminary plat, provided herein as Figure 2. As shown, no existing improvements are found on the subject property. Proposed site improvements and specific water quality (Low Impact Development – LID) measures include the following: • A total estimated area of disturbance, including a staging area on the west side of the proposed home and ADU buildings is approximately 21,375.65 square feet (0.49 acres) (the disturbed area is limited to Lot 1, minus the proposed Pennsylvania Street ROW); • Construction of the access driveway along the north side of the subject property. The driveway will be constructed of gravel or recycled asphalt with subbase preparation as detailed on the construction civil plan set. The driveway will encompass an area of 150- feet long by 12-feet wide (1,800-sf). Additional gravel or recycled asphalt surface will include the parking area on the west side of the home and ADU of approximately 50-ft x 50-ft (2,500 sf), for a total area of approximately 4,300 square feet (sf), or 0.10 acres(AC); • One single family home, with a building footprint of 35-feet x 60-feet (2,100 sf), plus one ADU with a building footprint of 25-feet x 40-feet (1,000 sf), including area within that footprint for a 10-ft x 10-ft “room” for the fire suppressant sprinkler system tank and pump for a total rooftop area of 3,100-sf (0.07 AC); • Direct building downspouts into landscaped areas; • Site grading will be accomplished to provide disconnection of impervious areas to the extent possible; and • The remaining portions of the subject property will be landscaped with grass and plantings or remain as native, undisturbed grass. As indicated above, this site is in the Fort Collins Canal Importation Basin. Figure 3, City of Fort Collins Flood Risk Map, provides the corresponding flood map, showing the City-provided 100- year flood fringe depth of flow across the site. Figure 4, Grading, Drainage, and Erosion Control Plan presents details of the proposed drainage facilities for this project. As shown, the proposed structures are structurally independent and are elevated so that the lowest floor, including HVAC ductwork, are at least 18-inches above the 100-year Base Flood Elevation (BFE) as defined. The basic drainage plan for this project is to maintain the existing drainage pattern : sheet flow across the property from west to east. Flood vents will be installed in the upstream and downstream sides of both the proposed ADU and single family home foundations to allow flood water to flow via its natural course unobstructed by the structures, thence discharging via sheet flow across landscaped areas into the curb and gutter flow in Taft Hill Road and flowing to the existing storm sewer inlet south of the site along the west side on Taft Hill Road. The flood vents will be sized to provide at least 1- square inch of vent area per 1-square foot of floor area, and the crawlspace in each unit will be graded to promote flood water drainage following a major precipitation event. Off-site flow to adjacent properties will be mitigated by grading to direct flow from the west side of the proposed housing structures to the inverted crown driveway, and thence to S Taft Hill Road. 4 Hydrologic Criteria Rainfall runoff date used are as described in the Fort Collins Stormwater Criteria Manual, Chapter 5, Hydrology Standards. The “minor storm” analysis is the 2-year event, and the “major storm” even is the 100-year event. The 2-year drainage system is designed to transport stormwater runoff from the site with minimal disruption to neighbors or the urban environment. This minor storm runoff will be conveyed in the curb and gutter of Taft Hill Road to the nearby storm sewer inlet. The 100-year drainage system is designed to eliminate the loss of life and to minimize adjacent property damage and to convey runoff to the Taft Hill curb and gutter and thence to the storm sewer inlet. The hydrologic calculations for this drainage investigation are based on the historic and proposed percent impervious areas shown in Table 1. Table 1. Existing and Proposed % Impervious Calculations Total Drainage Area = 0.71 Acres = 30,809 square feet (sf) Surface Cover/Use Defined % i1 Area (sf) Historical/Existing Proposed Historical Flow Analysis 0.02 30,809 0 Parking and drive area (gravel) 0.80 0 4,900 Rooftop 0.95 0 3,100 Undisturbed or Decompacted soil 0.05 0 15,000 Landscape/grasses2 0.20 0 7,809 Historical % i 2.00 Proposed % i 29.8 1. Reference: MHFD Stormwater Criteria Manual, Volume 3, Chapter 6, Table 6-3. 2. Assume landscape area around buildings; overall impervious areas to be more precisely defined and presented in an exhibit prior to building permit application. The Rational Method is used to calculate both the minor and major runoff events. The one -hour point rainfall depth used for the 2-year event is 0.98 inches and for the 100-year event is 3.67 inches. The Rational Method is used to analyze the existing and fully developed conditions. The MHFD hydrologic runoff calculations are presented in Attachment B. The hydrological analysis was computed using the Peak Runoff Prediction by the Rational Method spreadsheet developed by the Urban Drainage and Flood Control District (Mile High Flood District) as described in the Urban Storm Drainage Criteria Manual (USDCM), Volume 1. The Hydrologic Calculations are presented in Appendix B, the results of which are summarized in Table 2. Table 2. Results of Peak Runoff Flow Prediction by the Rational Method Basin Runoff Coefficients Peak Runoff Flowrate (cfs) Existing Developed Existing Developed 2-yr 100-yr 2-yr 100-yr 2-yr 100-yr 2-yr 100-yr Project 0.01 0.49 0.21 0.61 0.01 2.03 0.30 3.21 5 Erosion and Sediment Control Plan Proposed ground disturbance on this lot will basically be limited to the new access driveway and for the construction of two new residential structures. Erosion control measures to be implemented include the following: •Silt fencing shall be placed along the property perimeter to control off-site stormwater and sediment runoff. •Vehicle Tracking Pad shall be placed at the proposed new access point off of Taft Hill Road near the northeast corner of the lot. •Concrete Washout Pits shall be placed adjacent to the new homes construction sites. The specific locations shall be determined by the building contractor. •Sediment Straining will occur naturally with the maintenance of existing native grasses along most of the western half of the property. With construction activities limited to the central and eastern portion of the property, the natural grass buffer will filter runoff as it flows across the existing native grasses, effectively straining and providing physical removal or retention of particulates from the runoff. Disturbed areas of the project that will not be compacted gravel road surface will be revegetated with native grasses. Conclusions As is demonstrated above, the proposed site improvements will increase the estimated peak runoff flowrate from 0.01 to 0.30 cfs for the 2-year event, and from 2.03 to 3.21 cfs for the 100- year event. This Drainage Narrative was prepared in accordance with the Fort Collins Stormwater Criteria Manual, and SEC believes that the increase in peak runoff flowrates will not impact adjacent properties. “I hereby attest that this report for the preliminary &/or final drainage design for the Gilmartin Subdivision was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others.” Please do not hesitate to contact me directly if you have any questions or concerns regarding this Drainage Narrative, or if you require any additional information. Respectfully, Paul C. Sorensen, PE Attachments CONTOUR INTERVAL: 10 FEET PROJECT DATE: FEBRUARY 2022 MAP SOURCE: USGS FORT COLLINS, COLO 2016 LARIMER COUNTY PARCEL NUMBER: 9709404005 341 S Taft Hill Rd Fort Collins, CO FIGURE 1 VICINITY MAP PROJECT SORENSEN ENGINEERING & CONSTRUCTION, INC CIVIL / ENVIRONMENTAL ENGINEERING 1901 BEAR COURT FORT COLLINS, CO 80525 PHONE:970 590-1579 paul@secengineering.net N Scale in Miles 0 11/2 PROPERTY LOCATION GILMARTIN SUBDIVISION A TRACT OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 9, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO N 89°35'30" W ANDERSON CECELIA M 15.00' REC. NO. 20100078322 --� S 89°35'30" E 444.1 O' • l)LO z 0 0 � wM o C:: N' LO ...... -� ..-0 ----01 - 0 t:: =�r--ro S 89 °35'30" E 79.00' z 0 00 0N...... 01 = OUTLOT 5,482.02 Sq. Ft. 0.13 Acres ,-._ 57.00' S 89'35'30" E 365.1 O' PENNSYLVANI A z STREET 00 57' RIGHT-OF-WAY 0 0 DEDICATED BY THIS PLAT N 3954.54 Sq. Fl. LOT 1 0) (0 l)g 11..I- N t1l :;E 0) ...... 0.09 ac. 25,330.19 Sq. Ft. 01 = (,.) 00 - -..... ::> 0 0 oz� (0 (,.) ex:! N 89 °35'30" W 79.00' :;E 0.58± Acres 0) (0 (,.) ---57.00' N 89'35'30" W 365.05' \--N 89'35'30" W 200.00' ----N 89 °35'30" W 444.05' N 89 °35'30" W 15.00' THE PENTECOSTALS OF FORT COLLINS REC. NO. 20060085357 20 0 ,n ( IN US FEET) 1 inch= CERTIFICATE OF DEDICATION: The Owner does hereby dedicate and convey to the City of Fort Collins, Colorado (hereafter "City"), for public use, forever, a permanent right-of-way for street purposes and the "Easements" as laid out and designated on this Plat; provided, however, that (1) acceptance by the City of this dedication of Easements does not impose upon the City a duty to maintain the Easements so dedicated, and (2) acceptance by the City of this dedication of streets does not impose upon the City a duty to maintain streets so dedicated until such time as the provisions of the Maintenance Guarantee have been fully satisfied. The streets dedicated on this Plat are the fee property of the City as provided in Section 31-23-107 C.R.S. The City's rights under the Easements include the right to install, operate, access, maintain, repair, reconstruct, remove and replace within the Easements public improvements consistent with the intended purpose of the Easements; the right to install, maintain and use gates in any fences that cross the Easements; the right to mark the location of the Easements with suitable markers; and the right to permit other public utilities to exercise these same rights. Owner reserves the right to use the Easements for purposes that do not interfere with the full enjoyment of the rights hereby granted. The City is responsible for maintenance of its own improvements and for repairing any damage caused by its activities in the Easements, but by acceptance of this dedication, the City does not accept the duty of maintenance of the Easements, or of improvements in the Easements that are not owned by the City. Owner will maintain the surface of the Easements in a sanitary condition in compliance with any applicable weed, nuisance or other legal requirements. 20ft. Except as expressly permitted in an approved plan of development or other written agreement with the City, Owner will not install on the Easements, or permit the installation on the Easements, of any building, structure, improvement, fence, retaining wall, sidewalk, tree or other landscaping (other than usual and customary grasses and other ground cover). In the event such obstacles are installed in the Easements, the City has the right to require the Owner to remove such obstacles from the Easements. If Owner does not remove such obstacles, the City may remove such obstacles without any liability or obligation for repair and replacement thereof, and charge the Owner the City's costs for such removal. If the City chooses not to remove the obstacles, the City will not be liable for any damage to the obstacles or any other property to which they are attached. The rights granted to the City by this Plat inure to the benefit of the City's agents, licensees, permittees and assigns. MAINTENANCE GUARANTEE: The Owner hereby warrants and guarantees to the City, for a period of two (2) years from the date of completion and first acceptance by the City of the improvements warranted hereunder, the full and complete maintenance and repair of the improvements to be constructed in connection with the Development which is the subject of this Plat. This warranty and guarantee is made in accordance with the City Land Use Code and/or the Transitional Land Use Regulations, as applicable. This guarantee applies to the streets and all other appurtenant structures and amenities lying within the rights-of-way, Easements and other public properties, including, without limitation, all curbing, sidewalks, bike paths, drainage pipes, culverts, catch basins, drainage ditches and landscaping. Any maintenance and/or repair required on utilities shall be coordinated with the owning utility company or department. The Owner shall maintain said improvements in a manner that will assure compliance on a consistent basis with all construction standards, safety requirements and environmental protection requirements of the City. The Owner shall also correct and repair, or cause to be corrected and repaired, all damages to said improvements resulting from development-related or building-related activities. In the event the Owner fails to correct any damages within thirty (30) days after written notice thereof, then said damages may be corrected by the City and all costs and charges billed to and paid by the Owner. The City shall also have any other remedies available to it as authorized by law. Any damages which occurred prior to the end of said two (2) year period and which are unrepaired at the termination of said period shall remain the responsibility of the Owner. REPAIR GUARANTEE: In consideration of the approval of this final Plat and other valuable consideration, the Owner does hereby agree to hold the City harmless for a five (5) year period, commencing upon the date of completion and first acceptance by the City of the improvements to be constructed in connection with the development which is the subject of this Plat, from any and all claims, damages, or demands arising on account of the design and construction of public improvements of the property shown herein; and the Owner furthermore commits to make necessary repairs to said public improvements, to include, without limitation, the roads, streets, fills, embankments, ditches, cross pans, sub-drains, culverts, walls and bridges within the right-of way, Easements and other public properties, resulting from failures caused by design and/or construction defects. This agreement to hold the City harmless includes defects in materials and workmanship, as well as defects caused by or consisting of settling trenches, fills or excavations. Further, the Owner warrants that he/she owns fee simple title to the property shown hereon and agrees that the City shall not be liable to the Owner or his/her successors in interest during the warranty period, for any claim of damages resulting from negligence in exercising engineering techniques and due caution in the construction of cross drains, drives, structures or buildings, the changing of courses of streams and rivers, flooding from natural creeks and rivers, and any other matter whatsoever on private property. Any and all monetary liability occurring under this paragraph shall be the liability of the Owner. I further warrant that I have the right to convey said land according to this Plat. NOTICE OF OTHER DOCUMENTS: All persons take notice that the Owner has executed certain documents pertaining to this Development which create certain rights and obligations of the Development, the Owner and/or subsequent Owners of all or portions of the Development site, many of which obligations constitute promises and covenants that, along with the obligations under this Plat, run with the land. The said documents may also be amended from time to time and may include, without limitation, the Development Agreement, Site And Landscape Covenants, Final Site Plan, Final Landscape Plan, and Architectural Elevations, which documents are on file in the office of the clerk of the City and should be closely examined by all persons interested in purchasing any portion of the Development site. N 89"35'30" W 256.0' LLOYD THOMAS C/CAROL YN F REC. NO. 20060032629 40 6.0 STATEMENT OF OWNERSHIP AND SUBDIVISION Know all persons by these presents, that the undersigned, being owners of the following described land: A tract of land located in Section 9, Township 7 North, Range 69 West of the 6th Principal Meridian more particularly describes as: Beginning at the Southeast comer of Section 9, Township 7 North, Range 69 West North 249.37 feet, Thence S 89°35'30" E 42.00 feet to the True Point of Beginning, thence N 89'35'30" W 444.05 feet, thence N 00 °02'15" W 69.38 feet, thence S 89°35'30" E 444.10 feet to the west line of the South Taft Hill Right--0f-Way, thence South 69.38 feet to the True Point of Beginning. which above described tract contains 30,809.08 Sq. Ft. being 0.71 acres, more or less have caused the above described land to be surveyed and subdivided into lots, tracts and streets as shown on this plat to be known as the Gilmartin Subdivision, subject to all easements and rights-of-way now of record or existing or indicated on this plat. The rights and obligations of the Plat shall run with the land. ATTORNEY'S CERTIFICATION: I hereby certify that this Subdivision Plat has been duly executed as required pursuant to Section 2.2.3(C)(3)(a) through (e) inclusive of the Land Use Code of the City of Fort Collins and that all persons signing this Subdivision Plat on behalf of a corporation or other entity are duly authorized signatories under the laws of the State of Colorado. This Certification is based upon the records of the Clerk and Recorder of Larimer County, Colorado as of the date of execution of the plat and other information discovered by me through reasonable inquiry and is limited as authorized by Section 2.2.3(C)(3)(f) of the Land Use Code. Attorney: Address: Registration No.: SURVEYOR'S STATEMENT: I I ------ en ...... 01 0 -0 Cc, -o -I --o 'O =<!� mm ►coen �� m z -I -----� I 12.00' o�m"'10 )>-□ �o -;-m :::loO<z-)>)> r -; ;u I-- G) en I "CJ -; ·6� 71 ! 12.00' -:::Lll S -H 30.0' FOUND 3/4" REBAR AND 2.5" ALUMINUM CAP P.L.S. 29407 STAMPED PER MONUMENT RECORD FILED AUGUST 31, 2008 LEGEND S 89 °35'30" E 30.00' N 89 °35'30" W 30.00' 30.0' T7N R69W ··+·"S16 S15 2012 �s 34�1,. ----C" Ill C/l cii' 0 -C" CD Ill :::,, :::, C/l �- z 000 0 0 0 :;E N (0 (,.) ...... - ® = FOUND 5/8" REBAR 0 = FOUND 1/2" REBAR FOUND 5/8" REBAR AND RED •= PLASTIC CAP P.L.S. 20676 A= FOUND 2.5" ALUMINUM CAP P.L.S. 14823 STAMPED 1.0 FT W.C. la\= SET 5/8" REBAR AND GREEN � PLASTIC CAP P.L.S. 38547 � FOUND SECTION MONUMENT V-AS DESCRIBED LOT LINE EASEMENT LINE FOUND 3/4" REBAR AND 2.5" ALUMINUM CAP P.L.S. 34174 STAMPED PER MONUMENT RECORD FILED FEBRUARY 28,2013 ,� �� --"11 11111 fli"'�.,_l:::JII �'Wl!lll ,. ''' f/�a"'-, M---irll I I 111 I Ill<! VICINITY MAP 1" = 600' I, Steven D Wood, a Colorado Registered Professional Land Surveyor, do hereby state that this Subdivision Plat was ,----; NOTICE1------------------------------, ALL RESPONSIBILITIES AND COSTS OF OPERATION, MAINTENANCE AND RECONSTRUCTION OF THE PRIVATE STREETS AND/OR DRIVES LOCATED ON THE PRIVATE PROPERTY THAT IS THE SUBJECT OF THIS PLAT SHALL BE BORNE BY THE OWNERS OF SAID PROPERTY, prepared from an actual survey under my personal supervision, that the monumentation as indicated hereon were found or set as shown, and that the forgoing plat is an accurate representation thereof, all this to the best of my knowledge, information and belief. STEVEN D WOOD Colorado Registered Professional Land Surveyor# APPROVED AS TO FORM, CITY ENGINEER: By the City Engineer of the City of Fort Collins, Colorado on this day, City Engineer PLANNING APPROVAL: By the Director of Planning the City of Fort Collins, Colorado this day, Director of Plannin of of A.O., A.O., EITHER INDIVIDUALLY, OR COLLECTIVELY, THROUGH A PROPERTY OWNERS' ASSOCIATION, IF APPLICABLE. THE CITY OF FORT COLLINS SHALL HAVE NO OBLIGATION OF OPERATION, MAINTENANCE OR RECONSTRUCTION OF SUCH PRIVATE STREETS AND/OR DRIVES NOR SHALL THE CITY HAVE ANY OBLIGATION TO ACCEPT SUCH STREETS AND/OR DRIVES AS PUBLIC STREETS OR DRIVES. 1.Basis of bearings assuming the East line of the Southeast Quarter of Section 9 as bearing North 00°00'00" West, from a 2.5" aluminum cap at the Southeast corner of Section 9 stamped P.L.S. 34174 2012, to a 2½" aluminum cap stamped P.L.S. 29407 2008 at the East Quarter of Section 9 with all bearings contained herein relative thereto: 2.Lineal units used in the preparation of this plat are based upon the U.S. Survey Foot. 3.Total area in square feet of easements dedicated to the public or the city by this plat. = 3954.54 Square Feet. Total area in square feet of easements dedicated to the public or city that is being vacated by this plat. = 0.00 Square Feet. 4.At the request of the client no Tille Commitment was obtained for this plat. 5.Project Bemchmark Fort Collins 25-97 located at the Southwest corner Mulberry St. and Taft Hill Rd., on a concrete Traffic Signal Base NAVD88 = 5071.25 (NGVD = 5068.08) 0 z Ole -� 0I...·-(]) ca(I) I...cO·-a.0)I...co WO " <,! Wo �� � w a ct0: N"-- w_ -' 0 13� "' ;- � C z"' in w C Sheet FIGURE 2 PLAT ;; "'C w ., !!! ., �c 0: "' ;; "'z ., �� C 00 1 Of 1 Sheets XS # : 1 0 1 1 5 0 6 8 . 7 2 f t N A V D 8 8 XS # : 1 0 4 6 5 0 7 0 . 4 4 f t N A V D 8 8 XS # : 1 0 7 9 5 0 7 0 . 7 2 f t N A V D 8 8 XS # : 1 1 9 5 5 0 7 1 . 5 9 f t N A V D 8 8 XS # : 1 4 7 7 5 0 7 5 . 9 4 f t N A V D 8 8 S T A F T H I L L R D W MULBERRY ST Printed: 02/02/2022. All floodplain boundaries are approximate. This information is based on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) and the City of Fort Collins Master Drainageway Plans. This letter does not imply that the referenced property will or will not be free from flooding or damage. A property not in the Special Flood Hazard Area or in a City Designated Floodplain may be damaged by a flood greater than that predicted on the map or from a local drainage problem not shown on the map. This map does not create liability on the part of the City, or any officer or employee thereof, for any damage that results from reliance on this information. City Flood Risk Map Moderate Risk May include:- Areas of FEMA 500-year floodplain (FEMA Zone X-shaded).- Areas of FEMA or City 100-year floodplain (sheet flow) withaverage depths of less than 1 foot.- Areas protected by levees from the 100-year flood.Low Risk Areas outside of FEMA and City mapped 100-year and 500-year floodplains. Local drainage problems may still exist. City Flood Fringe - May Include:- Areas of FEMA 100-year floodplain (FEMA Zones A, AE, AO, and AH)- Areas of City 100-year floodplain including ponding areas and sheetflow areas with average depths of 1-3 feet.There is a 1% annual chance that these areas will be flooded. High Risk City Floodway - Area of 100-year floodplain with greatest depths and fastest velocities. 0 40 80 120 16020Feet FIGURE 3 SUBJECT PROPERTY FIGURE 3 50 7 5 50 7 6 50 7 4 50 7 3 507 2 5071 50 7 0 50 7 1 50 7 0 507650 7 6 5077 adjacent house adjacent garageadj shedadjacent building SO U T H T A F T H I L L R O A D XS # . 1 0 7 9 5 0 7 0 . 7 2 f t N A V D 8 8 XS # . 1 0 4 6 5 0 7 0 . 4 4 f t N A V D 8 8 XS # . 1 0 1 1 5 0 6 8 . 7 2 f t N A V D 8 8 XS # . 1 4 7 7 5 0 7 5 . 9 4 f t N A V D 8 8 XS # . 1 1 9 5 5 0 7 1 . 5 9 f t N A V D 8 8 LOT 1 26162.75 Sq. Ft. 0.60 Acres 5068' 5070' 5072' 5074' 5076' 5078' 5072' 0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 DUCT WORK DUCT WORK PRINCIPAL RESIDENCE ADU - DEDATCHED BFE 5070.72 FF 5075.4FF 5076 BFE 5072.9 MIN DUCT 5074.4BFE 5073.5 MIN DUCT 5075 100-YR BASE FLOOD ELEVATIONEXISTING GRADE 5075' 5074' 5073' 5071' 5071.6'5070.4'5071.0' 5071.9' SPREAD FOOTING W/ FOUNDATION WALL (TOP OF FOOTER MIN 30" BELOW EXIST GRADE) BFE 5075.94 6" VERTICAL CURB SECTION A - A' SCALE: HORIZONTAL 1" = 20' VERTICAL 1" = 4' (5:1 EXAGGERATION) EL E V A T I O N 1 " = 4 ' OUTLOT (EXIST GRADES/VEGETATION TO REMAIN UNDISTURBED) A' A SF SF SF SF BFE 5071.59' QU I T C L A I M - R E C . NO . 2 0 0 7 0 0 1 5 2 3 5 GRADE FOR NE FLOW PATTERN PENNSYLVANIA STREET 57' RIGHT OF WAY 30.00' SETBACK 42.00' 15.00' UTILITY EASEMENT PR O P E R T Y B O U N D A R Y Parking Spaces (10'x20') Recycled Asphalt / Road Base NEW ACCESS TO S TAFT HILL ROAD (SEE DETAIL SHEET C105) NEW ACCESS TO S TAFT HILL ROAD (SEE DETAIL SHEET CXXX) BUILDING ENVELOPE PRINCIPAL RESIDENCE 60' 35 '2100 sf GRAVEL OR RECYCLED ASPHALT ADU - DETACHED 25 ' 40'10' 1000 sf VTC FLOOD VENTS (1 SQ INCH VENT/1 SQ FOOT BUILDING): RECOMMEND FLOOD VENTS BY SMART VENT OR EQUAL - ALL 2X2 MULTI-VENT CONFIGURATION RS CWA CWA CONCRETE WASHOUT AREA - EXACT LOCATION TBD BY CONTRACTOR 12.00' STRUCTURE MODEL # FLOOR COVERAGE (SQ FT) AIR VENTILATION (SQ IN) # VENTS EACH END PRINCIPAL RESIDENCE ADU 1540- 150202 800 204 3 1540- 510 200 51 1 1540- 511 400 102 2 FLOOD VENT (3 EACH END, BOTH STRUCTURES) (TYP) 5071.7' X GRADE CRAWL SPACE TO PROMOTE FLOW TO VENTS (BOTH STRUCTURES) 5071.2' 50 7 0 . 9 ' 5070.4' X X X5070.9' 0 40 20 N o r t h - S c a l e 1 " = 2 0 ' SEAL LEGEND DRAWN BY: PS PAS CHECKED BY: SHEET NUMBER: SCALE: DATE: 03/06/2025 SHEET INDEX: JOB NUMBER: RE V I S I O N S PR O J E C T NO . D A T E D E S C R I P T I O N FO R T C O L L I N S , C O L O R A D O SH E E T T I T L E SO R E N S E N E N G I N E E R I N G & C O N S T R U C T I O N , I N C CI V I L / E N V I R O N M E N T A L E N G I N E E R I N G 19 0 1 B E A R C O U R T FO R T C O L L I N S , C O 8 0 5 2 5 PH O N E : 9 7 0 5 9 0 - 1 5 7 9 pa u l @ s e c e n g i n e e r i n g . n e t 34 1 S O U T H T A F T H I L L R O A D GR A D I N G , D R A I N A G E , A N D E R O S I O N C O N T R O L P L A N AS NOTED NEW CONTOUR SILT FENCESF FIGURE 4 ELEVATION TABLE UNIT EXISTING GRADE BFE FF (UPSTREAM SIDE) PRIMARY RES 5071 5072.9 5075.4 ADU 5072.4 5073.5 5076 EXISTING GRADE @ UPSTREAM SIDE OF UNIT ESTIMATED ELEVATIONS - INTERPOLATED @UNIT N-S ℄ XS#.1477 AND XS#.1195 - BASE FLOOD ELEVATIONS CROSS-SECTION GILMARTIN MINOR SUBDIVISION VTC VEHICLE TRACKING CONTROL NOTES: 1. AT THE TIME PENNSYLVANIA STREET IS FULLY CONSTRUCTED, ACCESS TO THIS PROPERTY MUST BE TAKEN FROM PENNSYLVANIA STREET AND THE ACCESS TAKEN FROM S TAFT HILL ROAD MUST BE CLOSED. 2. THE TOP OF FOUNDATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRE FOR PROTECTION FROM THE 100-YEAR STORM. RS ROCK SOCK PROPOSED RUNOFF FLOW DIRECTION CWA CONCRETE WASHOUT AREA 6 Attachment A NRCS Custom Soil Resources Report 7 Attachment B Mile High Flood District Hydrologic Calculations GILMARTIN SUBDIVISION HISTORICAL AND PROPOSED % IMPERVIOUS CALCULATIONS Total Drainage Area - 0.71 Acres =30,809 sf Surface Cover/Use Defined %i1 Historical Proposed Historical Flow Analsis 0.02 30809 0 Driveway (gravel_0.55 0 0 Parking lot and drive area (gravel)0.80 0 4,900 Rooftop 0.95 0 3,100 Undisturbed or Decompacted soil (native grasses and open space)0.05 0 15,000 Landscape/grasses2 0.20 0 7,809 Historical %i 0.020 Proposed %i 0.298 1. Reference: Mile High Flood District Stormwater Criteria Manual; Volume 3, Chapter 6, Table 6-3. 2. Assume landscaped area around buildings Area (sf) Purpose:This workbook applies the Rational Method to estimate stormwater runoff and peak flows from small urban catchments (typically less than 90 acres) Function:1. To calculate the runoff coefficient, C for a catchment 2. To calculate the time of concentration, and then compare with the regional time of concentration limit used for the Denver region. The smaller one is recommended as the rainfall duration for use with the Rational Method. 3. To calculate the design rainfall intensity and resulting peak flow rate. Content:The workbook consists of the following five sheets: Intro Describes the purpose of each sheet in the workbook. Rational Calcs Performs Rational Method calculations, Q = CIA Weighted C Supporting tool to calculate area-weighted runoff coefficients from sub-areas. Weighted Slope Supporting tool to calculate length-weighted slope from multiple flow reaches. Weighted Tc Supporting tool to calculate reach-weighted time of concentration from multiple flow reaches. Design Info Provides background information from the USDCM Acknowledgements:Spreadsheet Development Team: Derek N. Rapp, P.E. Peak Stormwater Engineering, LLC Holly Piza, P.E. and Ken MacKenzie, P.E. Urban Drainage and Flood Control District Comments?Direct all comments regarding this spreadsheet workbook to:UDFCD email Revisions?Check for revised versions of this or any other workbook at:Downloads PEAK RUNOFF PREDICTION BY THE RATIONAL METHOD Denver, Colorado Urban Drainage and Flood Control District Version 2.00 released May 2017 , Intro , Designer: Company:2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr Date:1-hour rainfall depth, P1 (in) =0.98 1.09 1.33 1.69 1.99 3.67 4.50 Project:a b c Location:Rainfall Intensity Equation Coefficients =28.50 10.00 0.786 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr Overland Flow Length Li (ft) U/S Elevation (ft) (Optional) D/S Elevation (ft) (Optional) Overland Flow Slope Si (ft/ft) Overland Flow Time ti (min) Channelized Flow Length Lt (ft) U/S Elevation (ft) (Optional) D/S Elevation (ft) (Optional) Channelized Flow Slope St (ft/ft) NRCS Conveyance Factor K Channelized Flow Velocity Vt (ft/sec) Channelized Flow Time tt (min) Computed tc (min) Regional tc (min) Selected tc (min)2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr 0.01 0.05 0.15 0.33 0.40 0.49 0.59 28.69 32.29 29.55 1.55 1.73 2.11 2.68 3.15 5.81 7.12 0.01 0.06 0.22 0.63 0.90 2.03 3.01 0.21 0.28 0.35 0.49 0.54 0.61 0.68 15.90 18.73 18.73 1.99 2.22 2.71 3.44 4.05 7.47 9.16 0.30 0.44 0.67 1.19 1.55 3.21 4.4325.22 Cells of this color are for calculated results based on overrides Paul Sorensen Sorensen Engineering & Construction, Inc. 3/14/25 Taft Hill Subdivision: EXISTING & PROPOSED 341 South Taft Hill Road, Fort Collins, CO Version 2.00 released May 2017 PROPOSED 0.71 C 29.8 150.00 0.015 415.00 0.015 20 2.45 2.82 0.015300.00 Rainfall Intensity, I (in/hr) 1.22 3.61 29.55100.015265.00 Peak Flow, Q (cfs) Calculation of Peak Runoff using Rational Method Overland (Initial) Flow Time Channelized (Travel) Flow Time Time of ConcentrationRunoff Coefficient, C Subcatchment Name Area (ac) NRCS Hydrologic Soil Group Percent Imperviousnes s EXISTING 0.71 C 2.0 Select UDFCD location for NOAA Atlas 14 Rainfall Depths from the pulldown list OR enter your own depths obtained from the NOAA website (click this link) Cells of this color are for required user-input Cells of this color are for optional override values I 𝑖𝑛/ℎ𝑟=a ∗P1 b +tc c ti =0.395 1.1 −C5 Li Si0.33 tt =Lt 60K St =Lt 60Vt Computed tc =ti +tt Regional tc =26 −17i +Lt 60 14i +9 St Selected tc =max tminimum ,min Computed tc ,Regional tc tminimum=5 (urban) tminimum=10 (non-urban) Q 𝑐𝑓𝑠=CIA Supplementary Design Information for UD-Rational Workbook Urban Storm Drainage Criteria Manual (USDCM) Volume 1, Chapter 6 - Runoff (March 2017) Version 2.00 released May 2017 Page 6 Supplementary Design Information for UD-Rational Workbook Urban Storm Drainage Criteria Manual (USDCM) Volume 1, Chapter 6 - Runoff (March 2017) Version 2.00 released May 2017 Page 7