HomeMy WebLinkAboutSupporting Documentation - Response to Comments - 08/06/2025
Page 1 of 15
Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522
970.221.6689 970.224.6134 fax fcgov.com/developmentreview
April 18, 2025
Evan Gilmartin
2519 S Shields Street, Ste 1K 194 Response Letter: August 6, 2025
Fort Collins, CO 805261855
RE: Gilmartin Single Unit Dwelling with ADU, FDP250005, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal
of Gilmartin Single Unit Dwelling with ADU. If you have questions about any comments, you may contact the individual
commenter or direct your questions through your Development Review Coordinator, Todd Sullivan.
Comment Summary:
Department: Development Review Coordinator
Contact: Todd Sullivan tsullivan@fcgov.com 970 221 6695
Topic: General
Comment Number: 1
INFORMATION:
I will be your primary point of contact throughout the development review and permitting process. If
you have any questions, need additional meetings with the project reviewers, or need assistance
throughout the process, please let me know and I can assist you and your team. Please include me in
all email correspondence with other reviewers and keep me informed of any phone conversations.
Comment Number: 2
SUBMITTAL:
As part of your submittal, a response to the comments provided in this letter and a response to plan
markups is required. The final letter is provided to you in Microsoft Word format. Please use this letter
to insert responses to each comment for your submittal, using a different font color. Please use the
markups to insert responses to each comment on plans. Please do not flatten markup responses.
Page 2 of 15
Provide a detailed response for any comment asking a question or requiring an action. Any
comment requesting a response or requiring action by you with a response of noted, acknowledged
etc. will be considered not addressed. You will need to provide references to specific project plans,
pages, reports, or explanations of why comments have not been addressed [when applicable].
There are twenty-five (25) comments requiring action before this project can be deemed ready for hearing.
Comment Number: 3
SUBMITTAL:
Correct file naming is required as part of a complete submittal. Please follow
the Electronic Submittal Requirements and File Naming Standards found here:
https://www.fcgov.com/developmentreview/files/electronic submittal requirement
ts and file naming standards_v1_8 1 19.pdf?1703783275
File names should have the corresponding number, followed by the file type
prefix, project information, and round number.
For example: 1_SITE PLAN_Project Name_FDP_Rd1.
A list of numbers and prefixes for each file can be found at the link above.
Comment Number: 4
SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the PDF file.
The default setting is "1" ("on") in AutoCAD. To change the setting and remove
this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and
newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing text appears as Comments in a PDF created by AutoCAD.html
Comment Number: 5
SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut off for routing the same week. When you are preparing to resubmit your
plans, please notify me with an expected submittal date with as much advanced notice as possible.
Comment Number: 6
INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project.
Comment Number: 7
INFORMATION:
ANY project that requires four or more rounds of review would be subject to an additional fee of $3,000.00.
Page 3 of 15
Comment Number: 8
FOR RECORDING – PLAT AND PLANNING SET:
Could you please update the City signature blocks on the Plat and Planning
Set? Instead of using "this _______ day of ______A.D., 20____," could you opt
for "on this day, ____________" for the date? This alternative format facilitates
smoother date input with digital signatures.
Additionally, kindly ensure there is sufficient space between the signature line
and the title line to accommodate the digital signature.
Response: As requested, both the Plat and Planning Set have been updated to show the date as directed, and
the title blocks now provide sufficient space to accommodate digital signatures.
Comment Number: 9
FOR HEARING:
The proposed development project is subject to a Type 1 Review. The decision maker for your project
will be an Administrative Hearing Officer at a public hearing. For the hearing, we will formally notify
surrounding property owners within 800 feet (excluding public right of way and publicly owned open
space). As your Development Review Coordinator, I will assist with preparing the mailing and coordinating
the hearing date with your team.
Comment Number: 10
FOR HEARING:
All "For Hearing", "For Approval", "For Final Approval" comments need to be addressed and resolved prior
to moving forward with scheduling the Hearing. Staff will need to agree the project is ready for Hearing
approximately 4 to 8 weeks prior to the hearing.
Department: Planning Services
Contact: Arlo Schumann aschumann@fcgov.com 970 221 6599
Topic: General
Comment Number: 1
04/15/2025: For Hearing:
For Hearing: Please note on the plans that final building design shall meet the
zone district and building type standards as outlined in Section 2.2.1 and Division 3.1.
Response: The primary structure will be a single family dwelling and will be a “detached urban house” and
the accessory dwelling unit will comply with these standards of these two sections. A note with these Code
citations has been added to the Site Plan as requested.
Page 4 of 15
Comment Number: 2
04/15/2025: For Hearing:
Pedestrian paths from the units to the street and public spaces are required.
Please indicate and note these paths on the site plan.
Response: A four-foot-wide walkway is shown that connects both units to the public sidewalk on S. Taft Hill
Road.
Comment Number: 3
04/18/2025: For Hearing:
See markups on General Notes sheet C101
Response: These markups have been addressed.
Department: Engineering Development Review
Contact: Tim Dinger tdinger@fcgov.com
Topic: General
Comment Number: 1
03/31/2025: FOR APPROVAL:
Please address all redlines on the plans.
Comment Number: 2
04/02/2025: FOR APPROVAL:
There needs to be a better legend on the plans. All linetypes need to be shown
in a legend or otherwise labeled on the plans.
Comment Number: 3
04/02/2025: FOR APPROVAL:
Please add 9 ft width utility easements adjacent to the ROW of Pennsylvania
Street, per LCUASS figure 7 9F.
Response: The easements have been added to the Plat.
Comment Number: 4
04/02/2025: INFORMATION:
At the time that Pennsylvania Street is constructed and able to provide access
to this property, this property's current access onto Taft Hill Road must be
closed down, and access must be established from Pennsylvania Street. The
previous driveway at Taft Hill will need to be reconstructed to a sidewalk that
meets ADA and LCUASS standards.
Response: A note has been added to the Site Plan addressing this issue.
Page 5 of 15
Comment Number: 5
04/02/2025: INFORMATION:
I am confused by your submittal of the site plan vs. the utility plan. It seems like
the exact same plan was submitted twice, once for utility plans and once for the
site plan. Was that your intent, or should it be one plan that is used as both the
utility plan and the site plans? There are different items, such as
approval/signature blocks, that apply to each type of plan. The Utility plan must
adhere to LCUASS standards and the utility plan checklist found in LCUASS
appendix E.
Response: These plans have been separated.
Comment Number: 6
04/15/2025: FOR APPROVAL:
There should be a hard surface walkway for emergency services to use either from the front of the
residences to the driveway or from the front of the residences to Taft Hill Road. If the buildings will
have sprinkler systems installed, then this comment can be ignored.
Response: A four-foot-wide concrete walk now connects both entrances to the sidewalk on Taft Hill Road.
In addition, both dwellings will be equipped with an automatic fire extinguishing system.
Comment Number: 7
04/15/2025: FOR APPROVAL:
Please provide an existing conditions sheet in the utility plan sheet set.
Response: The site is currently vacant and undeveloped. Please see sheet U102 for details.
Department: Traffic Operation
Contact: Steve Gilchrist sgilchrist@fcgov.com 970 224 6175
Topic: General
Comment Number: 1
04/13/2025: INFORMATION: Based on the narrative provided and the
anticipated increase in trips/traffic being less than the required 20 peak/200
daily trips, the requirement of a formal transportation impact study will be
waived at this time. The access details included in the narrative are also
accepted by the City with the expected long term future construction of
Pennsylvania allowing for the primary access to this property to be taken off that
street and theTaft Hill access being closed.
Response: A note has been added to the Site Plan regarding the closing of the driveway on Taft Hill Road
when access becomes available via Pennsylvania St.
Page 6 of 15
Comment Number: 2
04/13/2025: FOR APPROVAL: ADA accessible pedestrian facilities and
connectivity will need to be detailed within the Utility plans to demonstrate how
access will be taken to the units for emergency services. The new driveway will
also need to be detailed within the plans to show compliance with all
Engineering standards, along with the reconstruction of the old driveway that will
no longer provide access.
Response: A private four-foot-wide concrete walkway now connects both entrances to the public sidewalk
on Taft Hill Road. As required, the LCUASS Drawing 706.2 that details the standard driveway approach with
Attached walk (Type II) and the new driveway detail LCUASS Figure 7 -11F, Alley Option (A) (Drainage to
Center) are now both provided on the Construction Detail, Sheet U105 of the Utility Set. Additionally, a 4’
sidewalk is now shown in both the Planning set (Sheet P102) and the Utility Set (Sheets U103 and U104) to
connect with the attached walk on the south side of the driveway providing direct access to each dwelling
unit from the attached sidewalk.
Department: PFA
Contact: Marcus Glasgow marcus.glasgow@poudre fire.org 970 416 2869
Topic: General
Comment Number: 1
04/11/2025: FOR APPROVAL
Civil site plan note 10 should be corrected to show "must provide an approved
13D automatic fire sprinkler system"
Response: The following statement is now included in the Utility Set General Notes, Note 49, Sheet U101: “All
buildings must provide an approved 13D automatic fire sprinkler system.”
Comment Number: 2
04/15/2025: FOR APPROVAL
ACCESS TO BUILDING OPENINGS – IFC 504.1
An approved access walkway leading from fire apparatus access roads to the
main egress door of the building shall be provided on this site. The walkway
shall be capable of providing access for emergency personnel and equipment.
Comment response indicates a gravel drive way to provide access however
this does not provide adequate access to the main front door of the dwellings.
The access walkway also needs to be a surface (hard surface) capable of
moving personnel and medical equipment from emergency/fire apparatus to the
front doors. Please provide details on the site plan for the access walkway.
Response: A four-foot-wide concrete walkway will connect the entrances of both dwellings to the sidewalk
on Tatt Hill Road.
Page 7 of 15
Department: Stormwater Engineering
Contact: Derek Lutz dlutz@fcgov.com 970 221 6339
Topic: General
Comment Number: 1
04/14/2025: FOR FINAL APPROVAL:
Please see markups on the Utility Plans and the Drainage Report. Address all
markups and provide comment responses with the next submittal.
Comment Number: 2
04/14/2025: FOR FINAL APPROVAL:
Provide more detailed grading on the next submittal to ensure all developed
runoff remains onsite until Taft Hill Road right of way.
Response: In response to this comment, the existing grades and contours will remain unchanged to the
extent possible. Minor grading will occur around each structure in order to promote flood water flow to
the flood vents that are proposed in each structure. As requested, this minor grading is now shown on
the Grading and Drainage Plan, Sheet U103.
Comment Number: 3
04/14/2025: FOR FINAL APPROVAL:
Drainage Report: Please review the PDP/FDP Drainage Report Checklist in
the For Collins Stormwater Criteria Manual (FCSCM). Follow the checklist
format, include all necessary items, and utilize FCSCM calculation methods.
Please eliminate information that is not relevant to the drainage design.
Response: Thank you for this comment. The Fort Collins Stormwater Criteria Manual (FCSCM) was used to
generate composite runoff coefficients and precipitation numbers, the values of which were incorporated into
the MHFD Rational Method spreadsheet to calculate the design storm runoff rates.
Department: Water Wastewater Engineering
Contact: Derek Lutz dlutz@fcgov.com 970 221 6339
Topic: General
Comment Number: 1
04/14/2025: INFORMATION:
The water and wastewater services can be extended directly from the principal
residence to the ADU. There does not need be common service lines in the driveway.
Response: As suggested, the water and wastewater services for the ADU are now shown to extend from the
principal residence.
Page 8 of 15
Comment Number: 2
04/14/2025: FOR FINAL APPROVAL:
When an ADU is served by the same water/wastewater service lines as a
principal residence, we require a covenant agreement stating that the ADU
cannot be sold separately from the principal residence without the addition of
separate service lines. I will follow up with our standard agreement.
Response: The Applicant understands the requirement for a covenant agreement stating that the ADU
cannot be sold separately from the principal residence without the addition of separate service lines. We
look forward to receiving the standard agreement.
Department: Floodplain
Contact: Taryn Tigges ttigges@fcgov.com
Topic: Floodplain
Comment Number: 1
04/14/2025: FOR INFORMATION: A portion of this property is currently located
in the city regulated, 100 year Canal Importation flood fringe and must comply
with the safety regulations of Chapter 10 of City Municipal Code.
Response: As is presented in the Drainage Narrative (SEC, March 19,2025) and as shown on the City Flood
Risk Map, with the exception of the extreme northeast corner of the property, the entire lot, including all of
the proposed lot improvements, lies within the City-Regulated 100-year Canal Importation Flood Fringe.
Accordingly, safety regulations of Chapter 10 of City Municipal Code are incorporated into the design.
Comment Number: 2
04/14/2025: FOR APPROVAL: Any construction activities in the Canal
Importation 100 yr flood fringe (e.g. grading, structures, sidewalk or curb &
gutter installation/replacement, roads, utility work, landscaping, etc.) must be
preceded by an approved floodplain use permit, the appropriate permit
application fees, and approved plans. Please acknowledge that a floodplain
use permit will be acquired prior to any construction activities.
Response: The Applicant acknowledges this requirement and will obtain an approved Floodplain Use Permit
prior to conducting any construction activities on -site.
Comment Number: 3
04/14/2025: FOR INFORMATION: Please utilize the development review
checklist for floodplain requirements when preparing your plans for submittal.
https://www.fcgov.com/utilities/img/site_specific/uploads/fp checklist100 2018 update.pdf?1522697905
Response: We revised the Drainage Report by following the cited development review checklist
Page 9 of 15
Comment Number: 4
04/14/2025: FOR APPROVAL: Please show, on plan view, the boundaries of
the Canal Importation flood fringe on site drawings as applicable, including plat,
utility plan, site plan, and drainage plan. Contact floodplains@fcgov.com for floodplain CAD line work.
Response: We have provided this information. The Drainage Narrative includes the City Flood Risk Map
on which it is clearly shown that the entire lot lies within the City -regulated 100-year Flood Fringe area.
Accordingly, there are no city-regulated 100-year flood fringe boundaries to show on any of the site
maps, so none are given.
Comment Number: 5
04/14/2025: FOR APPROVAL: Construction of a residential structure is
allowed in a city regulated 100 year flood fringe, as long as the lowest finished
floor of the building, and all duct work, heating, ventilation, electrical systems,
etc. are elevated 18 inches above the highest Base Flood Elevation (BFE)
within the footprint of the structure. This elevation is known as the Regulatory
Flood Protection Elevation (RFPE). RFPE = BFE + 18 inches
Response: The Grading and Drainage Plan and the Erosion Control and Floodproofing Plan are
included in the Utility Set, Sheets U103 and U104, respectively. The 100-yr base flood elevations
(BFE) are clearly shown on both drawings in accordance with the City Flood Risk Map, cross
Sections XS#1477 and XS#1195 (both in NAVD88 vertical datum). As shown on Sheet U103,
Grading and Drainage Plan in the Utilities Set, the minimum duct work elevations or both of the
proposed structures are18-inches above the BFE, i.e., the Regulatory Flood Protection
Elevation,(RFPE).
The Principal Residence and the ADU are structurally independent, and Unit 1 has a lower BFE than
Unit 2.
Comment Number: 6
04/14/2025: FOR CERTIFICATE OF OCCUPANCY: An approved FEMA
Elevation Certificate, completed by a licensed surveyor or civil engineer and
showing that the structure is constructed to the required elevation, is required
post construction prior to a Certificate of Occupancy (CO) being issued.
Response: We are aware of this requirement as a condition of final issuance of a Certificate of
Occupancy. Even though this property does not lie within a FEMA regulated Flood Plain, the Applicant
acknowledges this requirement and will provide an approved FEMA Elevation Certificate post -
construction and prior to the issuance of any Certificate of Occupancy.
Comment Number: 7
04/14/2025: FOR BUILDING PERMIT: Crawl spaces must meet the
requirements of sections 10 39 and 10 40 of Municipal Code. These
requirements include flood venting of 1 square inch per square foot of enclosed
space. The structure must include at least 2 flood vents located on different
sides of the structure, preferably on the upstream and downstream sides of the
Page 10 of 15
structure. Vents must be within 1 foot of finished grade and below the RFPE.
Additionally, the distance between the lowest interior grade of the crawl space
and the top foundation wall cannot exceed 4 feet at any location. The crawl
space must have an adequate drainage system that includes a totally
immersible pump that allows floodwaters to drain from the interior of the crawl
space following a flood.
Response: We are in compliance with these sections of Chapter 10 of City Code. Three (3) flood vents
are provided at each end of both structures, as shown on Sheet U104, Grading, Drainage, and Erosion
Control Plan and Floodproofing Plan of the Utility Set. It is also shown on Sheet U104 that the design
criteria summarized in this comment are all met. The units are structurally independent, and flood vents
are provided in both the upstream and downstream sides of both structures (all are exterior vents).
Comment Number: 8
04/14/2025: FOR APPROVAL: Please include the following text on Plans, Site
Plan, Utility Plan, Plat, and Drainage Report:
1) A portion of this property is currently located in the city regulated, 100 year
Canal Importation flood fringe and must comply with the safety regulations of
Chapter 10 of City Municipal Code.
2) Any construction activities in the flood fringe (e.g. structures, sidewalk or curb & gutter
installation/replacement, utility work, landscaping, etc.) must be preceded by an approved
floodplain use permit, the appropriate permit application fees, and approved plans.
3) The lowest finished floor elevation of a new residential structure, and all duct
work, heating, ventilation, electrical systems, etc. must be elevated 18 inches
above the highest Base Flood Elevation (BFE) within the footprint of the structure.
4) Any new crawl space must comply with venting and crawl space requirements from Sections 10 39 and
10 40 of City Municipal Code.
Response: The notes cited in this comment are now incorporated into the Floodplain and Floodway
Notes, Sheet P101, General Landscaping Notes in the Planning Set on the referenced sheets in the
Utility Plan set and are included in the Drainage Report.
Comment Number: 9
04/14/2025: FOR APPROVAL: Please see markups on the sheet labeled "Grading, Drainage,
and Erosion Control Plan." Apply comments wherever this cross section is shown.
Response: As requested, markups on the Grading, Drainage and Erosion Control Plan, Sheet U103 are
addressed and corresponding revisions are provided.
Department: Light And Power
Contact: Luke Unruh lunruh@fcgov.com 970 416 2724
Topic: General
Comment Number: 1
04/14/2025: INFORMATION:
Page 11 of 15
Light and Power has an existing underground secondary box at the Northeast
corner of the lot where new service wires can be landed. A transformer upgrade
may be necessary to accommodate the additional ADU and primary resident dwelling.
Response: Thank you for this information. At the time of building permit review, issuance of a building
permit and construction, we expect the general contractor and electrical contractor to have finalized design
of the electrical system in compliance with the requirements of Light and Power.
Comment Number: 2
04/14/2025: INFORMATION:
Since the ADU and primary resident will have a 2 gang electric meter, the
electric service will need to be installed owned and maintained by the owner.
Response: We understand this comment. Thank you.
Comment Number: 3
04/14/2025: INFORMATION:
Electric capacity fees, development fees, building site charges and any system
modification charges necessary to feed the site will apply to this development.
Please contact me to discuss development fees or visit the following website for
an estimate of charges and fees related to this project:
http://www.fcgov.com/utilities/business/builders and developers/plant investment t development fees
Comment Number: 4
04/14/2025: INFORMATION:
The proposed ADU is not attached to the existing home, which qualifies the
project as a single family detached residence. The ADU would be required to
be individually metered and will require its own service. Electric capacity fees,
development fees, building site charges and any system modification charges
necessary to feed the site will apply to this development.
Response: We understand this comment. Thank you.
Comment Number: 5
04/14/2025: INFORMATION:
You may contact Luke Unruh with project engineering if you have questions.
lunruh@fcgov.com. You may reference Light & Power’s Electric Service Standards at:
https://www.fcgov.com/utilities/img/site_specific/uploads/electricservicestandards.pdf?1645038437
You may reference our policies, development charge processes, and use our
fee estimator at http://www.fcgov.com/utilities/business/builders and developers
Page 12 of 15
Department: Park Planning
Contact: Missy Nelson mnelson@fcgov.com
Topic: General
Comment Number: 1
04/15/2025: INFORMATION: Both Park Planning & Development (PPD) and
Parks Operations and Maintenance (Parks O&M) comments will be provided by
Missy Nelson | mnelson@fcgov.com | 970.416.8077
Comment Number: 2
04/15/2025: FOR FINAL APPROVAL: Please add note to landscape plan:
"The Developer, or its successor(s) in interest, shall be responsible for the
ongoing irrigation and maintenance of the landscaping located within the public
right of way along the portion of S. Taft Hill Road that abuts the development."
Response: This note has been added to the Landscape Plan.
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970 221 6588
Topic: Construction Drawings
Comment Number: 2
04/15/2025: Please provide the following information for the Benchmark
Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM X.XX’.
Page 13 of 15
Response: As requested, the required benchmark information in the EXACT format is now provided in the
Utility Set, General Notes, Note 40, Sheet U101.
Topic: Plat
Comment Number: 1
04/15/2025: FOR FINAL APPROVAL:
Please make changes as marked in the Technical Services (TS) markup PDF.
If changes are not made or you disagree with comments, please provide written
response of why corrections were not made. Please provide any responses on
redlined sheets and/or in response letter. If you have any specific questions
about the markups, please contact John Von Nieda at 970 221 6565 or
jvonnieda@fcgov.com
Department: Outside Agencies
Contact: Larimer County Assessor, Meagan deRoin, GIS Specialist,
deroinmr@co.larimer.co.us, 970.498.7078
Topic: Plat
Comment Number: 1
Larimer County Assessor
Please contact me to address an outstanding item related to this parcel. This
item will need to be resolved prior to finalization (recordation) of the plat. Thank you.
Response: We are aware of this issue and intend to have it resolved prior to recording.
Contact: Xcel Energy, Donna George, Donna.L. George@xcelenergy.com,
303.581.3306
Topic: General
Comment Number: 2
Xcel Energy
Please see letter provided as a separate attachment.
Response: We have been in contact with Donna George at Xcel. Utilities Locates inspected the site on July
25, 2025. This independent utility locating firm has marked the Xcel pipeline – it is in the street, not within
the boundaries of the Gilmartin Subdivision. The markings indicate that this pipeline is located under the
gutter at the face of the curb. This information has been passed on to Donna George. The Xcel natural gas
pipeline is now shown on the Utility Plan, Sheet U105 in the Utility Set .
Department: Environmental Planning
Contact: Kristie Raymond kraymond@fcgov.com
Topic: General
Comment Number: 1
03/24/2025: No comments.
Page 14 of 15
Department: Forestry
Contact: Freddie Haberecht fhaberecht@fcgov.com
Topic: General
Comment Number: 1
04/15/2025: No comments at this time.
Department: Historic Preservation
Contact: Jim Bertolini jbertolini@fcgov.com 970 416 4250
Topic: General
Comment Number: 1
04/07/2025: NO HISTORIC REVIEW REQUIRED:
This proposal does not require historic review because there are no designated
historic resources on the site and the nature of the project does not impact any
historic resources that may lie on the development site or within 200 feet of the site.
Department: Internal Services
Contact: Russell Hovland rhovland@fcgov.com 970 416 2341
Topic: Building Insp Plan Review
Comment Number: 1
A permit is required for single family house construction and shall comply with
adopted codes as amended. Current adopted codes are:
• 2021 International Residential Code (IRC) with local amendments
• Colorado Plumbing Code (currently 2021 IPC) with local amendments
• 2023 National Electrical Code (NEC) as amended by the State of Colorado
• Projects shall comply with the current adopted building codes, local
amendments and structural design criteria can be found here: https://www.fcgov.com/building/codes
• New 2024 buildings codes will be adopted in early 2026 .
• Please read the residential permit application submittal checklist for complete requirements.
• Snow Live Load: Ground Snow Load 35 PSF.
• Frost Depth: 30 inches.
• Wind Loads: Risk Category II (most structures):
• 140mph (Ultimate) exposure B or Front Range Gust Map published by The
Structural Engineer's Association of Colorado
• Seismic Design: Category B.
• Climate Zone: Zone 5
• Energy Code: 2021 IECC residential chapter
Page 15 of 15
INFORMATIONAL ITEMS:
• 5ft setback required from property line or provide fire rated walls & openings
for non fire sprinkled houses per chap 3 of the IRC. 3ft setback is required for fire sprinkled houses.
• Fire separation of 10ft between dwellings is required.
• Bedroom egress windows (emergency escape openings) required in all bedrooms.
• For buildings using electric heat, heat pump equipment is required.
• A passing building air tightness (blower door) test is required for certificate of occupancy.
• For projects located in Metro Districts, there are special additional code requirements for
new buildings. Please contact the plan review team to obtain the requirements for each district.
• New IRC code amendment R320 requires dwellings with habitable space on
the 1st floor must provide a visitable bathroom and path to such.
• The roof must be provided with solar ready zones at outlined in IRC appendix RB.
• Energy code requires short hot water supply lines by showing plumbing compactness.
Response: Thank you for this comprehensive list of requirements necessary for Applications for Building Permits for (1.) a single
family detached house and (2.) one detached accessory dwelling unit.