Loading...
HomeMy WebLinkAboutReports - Drainage - 07/17/2025 Final Drainage Report For Willox Farms Dated: July 17, 2025 Engineer: EPS Group 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 Project No. 987-012 Date: July 2025 EPS Group Fort Collins | Greeley 970.221.4158 epsgroupinc.com WILLOX FARM TABLE OF CONTENTS Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 1 of 18 TABLE OF CONTENTS 1.0 Engineer Certification .....................................................................................................3 2.0 General Location and Description..................................................................................5 2.1 Location .......................................................................................................................................................................................... 5 2.2 Description of Property ............................................................................................................................................................ 5 2.3 FLOODPLAIN ................................................................................................................................................................................. 8 3.0 Drainage Basins and Sub-Basins ....................................................................................8 3.1 Major Basin Description............................................................................................................................................................ 8 3.2 Sub-Basin Description ............................................................................................................................................................... 8 4.0 Drainage Design Criteria .................................................................................................9 4.1 Optional Revisions ...................................................................................................................................................................... 9 4.2 Development Criteria, Reference, and Constraints ....................................................................................................... 9 4.3 Hydrological Criteria .................................................................................................................................................................. 9 4.4 Hydraulic Criteria ......................................................................................................................................................................... 9 4.5 Floodplain Regulations Compliance ................................................................................................................................... 9 4.6 Modifications of Criteria ........................................................................................................................................................... 9 4.7 Storm Management Strategy .............................................................................................................................................. 10 5.0 Drainage Facility Design .............................................................................................. 10 5.1 General Concept....................................................................................................................................................................... 10 5.2 Specific Details .......................................................................................................................................................................... 11 6.0 Conclusions ................................................................................................................... 12 6.1 Compliance with Standards ................................................................................................................................................. 12 7.0 References ..................................................................................................................... 12 APPENDICES APPENDIX A – Hydrologic Computations APPENDIX B – Detention Pond Computations APPENDIX C – Storm Sewers, Weirs, Inlets, and Swales APPENDIX D – LID Design Information APPENDIX E – Erosion Control Report APPENDIX F – USDA Soils Report MAP POCKET DR1 – Historic Drainage Exhibit DR2 – Drainage Exhibit DR3 – Drainage Exhibit WILLOX FARM FIGURES AND TABLES Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 2 of 18 TABLE OF FIGURES Figure 1: Vicinity Map ................................................................................................................................................................ 5 Figure 2: Aerial Photograph .................................................................................................................................................... 6 Figure 3: Proposed Site Plan ................................................................................................................................................... 7 Figure 4: Regulatory Floodplains .......................................................................................................................................... 8 WILLOX FARM ENGINEER CERTIFICATION Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 3 of 18 1.0 ENGINEER CERTIFICATION July 17, 2025 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: FINAL DRAINAGE REPORT FOR WILLOX FARM Dear Staff: EPS Group is pleased to submit this Final Drainage and Erosion Control Report for your review. This report accompanies the combined Final Development Plan (FDP) submittal for the proposed Willox Farm. This report has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM) and serves to document the stormwater impacts associated with the proposed Willox Farm. We understand review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the FCSCM. If you have any questions as you review this report, please feel free to contact us. Sincerely, EPS Group, Inc. Jacob O'Banion, EI Ben Ruch, PE Project Engineer Senior Project Engineer WILLOX FARM ENGINEER CERTIFICATION Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 4 of 18 I hereby certify that this report for the final drainage design of Willox Farm was prepared by me or under my direct supervision in accordance with the provisions of the City of Fort Collins Standards and Specifications and Construction of Public and Private Improvements for the Responsible Parties thereof. I understand that the City of Fort Collins does not and shall not assume liability for drainage facilities designed by others. Benjamin R. Ruch Registered Professional Engineer State of Colorado No. 54317 WILLOX FARM FINAL DRAINAGE REPORT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 5 of 18 2.0 GENERAL LOCATION AND DESCRIPTION 2.1 LOCATION 1. Vicinity Map 2. The Willox Farm site is located in the Northwest ¼ of Section 2, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site (refer to Figure 1) is bordered to the north by W Willox Ln., to the south by Soft Gold Park, to the east by Hickory Village and to the west by Garden Sweet and private property. 2.2 DESCRIPTION OF PROPERTY 1. The Willox Farm site is comprised of roughly ±19.01 acres. 2. The site currently exists as an undeveloped parcel with native ground cover. The existing ground slopes with a mild grade (i.e., 0.4 – 0.6±%) through the interior to the southeast across flat grades. The drainage continues through the South property boundary to Soft Gold Park. Project Location Figure 1: Vicinity Map WILLOX FARM FINAL DRAINAGE REPORT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 6 of 18 3. A subsurface exploration report was completed by Earth Engineering Consultants, LLC. on May 6, 2021 (EEC Project No. 1212027). At the time this report was written, the site was undeveloped with established vegetation. According to Earth Engineering Consultants, the site consists of Clayey sand, silty, clayey sand and/or sandy lean clay subsoils which were encountered beneath the surficial topsoil/vegetative layer extended to depths of approximately 3 to 5 feet below existing site grades. Silty sand with gravel and interbedded cobbles at increased depths, was encountered beneath the upper slightly cohesive zone and extended to the bedrock formation. Siltstone/sandstone/claystone bedrock was encountered at depths of approximately 16 to 18 feet below existing site grades. 4. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: (http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx), the site consists of Caruso Clay Loam (Hydrologic Soil Group D)and Table Mountain Loam (Hydrologic Soil Group B). The calculations assume a Hydrologic Soil Group of D. Hydrologic Soil Group D has a very slow rate of water absorption and infiltration 5. There are no major drainage ways on the site. However the Larimer - Weld Canal is located approximately 995’ north while the Cache La Poudre River is located approximately 2,220 feet south. Figure 2: Aerial Photograph WILLOX FARM FINAL DRAINAGE REPORT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 7 of 18 6. The proposed project site plan will consist of approximately 62 single Family residential lots. Other proposed improvements include asphalt driveways, sidewalks and landscape areas. Figure 3 shows the proposed site plan. Figure 3: Proposed Site Plan WILLOX FARM FINAL DRAINAGE REPORT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 8 of 18 2.3 FLOODPLAIN The subject property is not located in a FEMA regulatory floodplain (see Figure 4). 3.0 DRAINAGE BASINS AND SUB-BASINS 3.1 MAJOR BASIN DESCRIPTION 1. Willox Farm is located in the Cache la Poudre River Basin, it is a major tributary to the South Platte River. It is located in Larimer and Weld Counties, with a small portion of the drainage basin extending into southern Wyoming. Passing through Fort Collins, the Poudre River corridor provides for stormwater drainage from various contributing city drainage basins. Floodplain restrictions have limited the number of buildings in the floodplain, resulting in lower development density. This lower density, combined with sensitivity to the natural environment, has resulted in a high concentration of parks and open space along the river corridors. 3.2 SUB-BASIN DESCRIPTION 1. The subject property historically drains overland through the interior to the southeast across flat grades. Runoff from the site has historically overflow to the southeast property boundary and then to Soft Gold Park. Figure 4: Regulatory Floodplains WILLOX FARM FINAL DRAINAGE REPORT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 9 of 18 2. A more detailed description of the project drainage patterns is provided in sections below. 4.0 DRAINAGE DESIGN CRITERIA 4.1 OPTIONAL REVISIONS 1. There are no optional provisions outside of the Larimer County Stormwater Design Standards (LCSDS), City of Fort Collins Standards and Specifications (FCSCM), and the Mile High Flood District (MHFD) Urban Storm Drainage Criteria Manual (USDCM). 4.2 DEVELOPMENT CRITERIA, REFERENCE, AND CONSTRAINTS 1. In order to bring Willox Farm into compliance with current land use code and stormwater criteria, 75% of all newly added impervious areas will be treated by LID techniques, in this case two rain gardens were used and roughly 95.11% of all newly added impervious area is treated. The rain gardens will treat the tributary area for water quality while meeting the City’s LID requirements. The detention pond will provide the remaining necessary water quality treatment. 4.3 HYDROLOGICAL CRITERIA 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure 3.4-1 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table 3.4-1 was utilized for Rational Method runoff calculations. 2. The Rational Method was employed to compute localized stormwater runoff utilizing coefficients contained in Tables 3.2-1 and 3.2-2 of the FCSCM. 3. Two separate design storms were utilized to address distinct drainage scenarios. The first event analyzed is the "Minor" or "Initial" storm, which has a two-year recurrence interval. The second event considered is the "Major" storm, which has a 100-year recurrence interval. 4. No other assumptions or calculation methods were used for this development that are not referenced by the current City of Fort Collins criteria. 4.4 HYDRAULIC CRITERIA 1. As previously noted, the subject property maintains historical drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with the criteria outlined in the FCSCM and/or Mile High Flood Control District’s Urban Storm Drainage Criteria Manual. 3. As discussed above, the subject property is not located in the 100-year floodplain. The proposed project does not propose to modify any natural drainageways. 4.5 FLOODPLAIN REGULATIONS COMPLIANCE 1. As previously mentioned, this project is not subject to any floodplain regulations. 4.6 MODIFICATIONS OF CRITERIA 1. No formal modifications are requested at this time. WILLOX FARM FINAL DRAINAGE REPORT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 10 of 18 4.7 STORM MANAGEMENT STRATEGY 1. The overall stormwater management strategy employed with Willox Farm utilizes the "Four Step Process" to minimize adverse impacts of urbanization on receiving waters. The following describes how the proposed development has incorporated each step. a. Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to reduce the stormwater impacts of this development is the site selection itself and the selection of developable areas on the site. The Willox Farm aims to reduce runoff peaks, volumes, and pollutant loads from frequently occurring storm events (i.e., water quality (i.e., 80th percentile) and two-year storm events). Site constraints limit the possible Low Impact Development (LID) techniques; however, two rain gardens have been provided as LID technique for storm quality management. b. Step 2 – Implement Best Management Practices (BMPs) that provide a Water Quality Capture Volume (WQCV) with slow release. The efforts taken in Step 1 will help to minimize excess runoff from frequently occurring storm events; however, development still generates additional stormwater runoff beyond historical conditions. The primary water quality treatment and volume control will occur in the detention pond. c. Step 3 – Stabilize Drainageways. There are no major drainageways within the subject property. While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways, nonetheless. By providing water quality treatment, where none previously existed, sediment with erosion potential is removed from downstream drainageway systems. d. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments. 5.0 DRAINAGE FACILITY DESIGN 5.1 GENERAL CONCEPT 1. The main objectives of the project drainage design are to maintain existing drainage patterns and ensure no adverse impacts on any adjacent properties. 2. The site receives offsite surface runoff from the Garden Sweet property to the northwest of the site. There are also small amounts of offsite flows from W Willox Lane that will be captured and routed through the site. 3. Onsite detention and water quality treatment for the Willox Farm project will be provided by the two rain gardens, extended detention within the detention pond and the remainder within Detention Pond. 4. Irrigation flows owned by the City of Fort Collins will be passed through the pond and conveyed south to the drainage swale on the west side of Soft Gold Park, until such time as the City’s Parks department constructs a pipeline on the west side of the project site to convey these flows to the City owned irrigation pond in Soft Gold Park. 5. LID treatment will be provided using two rain gardens on the southeast and southwest side of the project, meeting the requirement that at least 75% of the new/improved impervious areas be treated. 94.16% of the new/improved impervious areas will be treated with the proposed design. WILLOX FARM FINAL DRAINAGE REPORT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 11 of 18 5.2 SPECIFIC DETAILS 1. The detention volume required for the Willox Farm site is 1.78 ac-ft. This volume was calculated using the FAA Method. 2. City Code requires LIS treatment for all projects. This project proposed meeting the requirement using two rain gardens as an LID technique. These rain gardens will capture majority of the water quality volume (WQCV) for the full site. This configuration will treat 95.11% of the new impervious area. 3. The Willox Farm site has been broken into 12 onsite sub-basins and 7 offsite sub-basins for design purposes. Anticipated drainage patterns for proposed drainage basins are described below: Basin A1 Basin A1 consists of the back side of lots on the south portion of Saint Therese Street. This runoff flows into proposed area inlets and then are routed south to Rain Garden A. Basin A2 Basin A2 is comprised of the intersection of Moller Street and Saint Therese Street as well as the front side of lots surrounding this intersection. Runoff travels via overland flow and curb and gutter to two inlets on the west side of Moller Street. These proposed inlets and storm drain route flows south to Rain Garden A. Basin A3 Basin A3 is made up of open space and the back side of lots on the north portion of Saint Therese Street. Flows travel via overland flow into a concrete channel that routes runoff to a storm drain and eventually to Rain Garden A. Rain Garden A overtops into the detention pond which then controls the release from the site. Basin B1 Basin B1 consists of the backside of the lots lining Saint Grace Street. The basin blows directly south into the Proposed Detention Pond. This basin will not be treated for LID in the rain gardens. Basin B2 Basin B2 consists of Saint Grace Street and the south portions of Saint Jerome Street and Saint Therese Street as well as the front side of the lots lining these streets. Flow from these basins travels via overland flow and curb and gutter into Rain Garden B. Rain Garden B overtops into the Detention Pond before being released from the site. Basin B3 Basin B3 consists of portions of Saint Joseph Street as well as the back side of lots along Saint Therese Street and Saint Jerome Street. Runoff travels via overland flow and curb and gutter before they are routed into Basin B4 and eventually to Rain Garden B. Basin B4 Basin B4 consists of back of lots and open space East of Saint Jerome Steet. Runoff travels via overland flow into a concrete pan. These are routed to Rain Garden B. Basin B5 Basin B5 consists of portions of Saint Joseph Street, Saint Therese Street, and Saint Jerome Street as well as the front side of lots along these streets. Runoff travels via overland flow and curb and gutter before they are routed into Basin B4 and eventually to Rain Garden B. WILLOX FARM FINAL DRAINAGE REPORT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 12 of 18 Basin B6 Basin B6 consists of the back side of lots along Saint Joseph Street as well as open space. Flows in this basin travel via overland flow into a concrete pan that routes flows into Basin B4. These flows continue in the concrete channel to Rain Garden B. Basin B7 Basin B7 is made up primarily of West Willox Lane and the north portion of Saint Therese Street. Flows travel via overland flow and curb and gutter to a sidewalk culvert that routes into Basin B5 before they continue into Basin B4 towards Rain Garden B. Basin OS1 & OS2 Basin OS1 and Basin OS2 both consist primarily of open space. Basin OS1 flows generally to the southeast and is captured in a swale on the west side of the site and routed through the Detention Pond. If the property to the west develops in the future, their outfall would be able to connect to the storm pipe that crosses Moller Street on the west side of the site. OS2 is routed through Basin A3 into a proposed storm drain and then through the detention pond. Basins OS3 & OS4 Basins OS3 and OS4 are comprised of portions of West Willox Lane and are collected by a proposed storm pipe and routed along the west side of the site to an existing swale. Basins OS5 & OS6 Basin OS5 is comprised of the east side of the site which is open space and will sheet flow east mimicking historic flows. Basin OS6 is comprised of the southwest and southern part of the site which is open space and will sheet flow southwest and south mimicking historic flows. Basins OS7 Basin OS7 is comprised of the northeast side of the site which is open space with residential structure and will sheet flow southeast to mimic historic flows. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. 6.0 CONCLUSIONS 6.1 COMPLIANCE WITH STANDARDS 1. The proposed drainage design for the Willox Farm site complies with Larimer County Storm Drainage Standards, the Urban Storm Drainage Criteria Manual Volumes 1, 2, and 3, and City of Fort Collins Stormwater Criteria Manual. 2. There are no FEMA regulatory floodplains associated with the Willox Farm development. 3. The drainage design proposed with this project complies with the Cache la Poudre River Basin requirements. 7.0 REFERENCES City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. WILLOX FARM FINAL DRAINAGE REPORT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 13 of 18 Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com HISTORIC COMPOSITE RUNOFF COEFFICIENT CALCULATIONS Project: 987-012 Calculations By: J. Obanion Date: 7/17/2025 Character of Surface Percent Impervious1 2-year Runoff Coefficient 10-year Runoff Coefficient 100-year Runoff Coefficient 100% 0.95 0.95 1.00 90% 0.95 0.95 1.00 40% 0.50 0.50 0.625 45% 2% 0.20 0.20 0.25 Basin ID Basin Area (sq.ft.) Basin Area (acres) Area of Asphalt (acres) Area of Driveways & Sidewalks (acres) Area of Gravel (acres) Area of Residential (acres) Lawns and Landscaping (acres) Percent Impervious 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient h1 828,264 19.014 0.000 0.000 0.000 0.000 19.014 2%0.20 0.20 0.25 h2 169,963 3.902 0.000 0.000 0.000 0.000 3.902 2%0.20 0.20 0.25 h3 58,774 1.349 0.092 0.000 0.000 0.000 1.258 9%0.25 0.25 0.30 h4 23,803 0.546 0.221 0.000 0.000 0.000 0.325 42%0.50 0.50 0.55 Total 1,080,804 24.812 0.313 0.000 0.000 0.000 24.499 3%0.21 0.21 0.26 Asphalt...................................................................................................................................................................................... Driveway & Sidewalks............................................................................................................................................................... Gravel....................................................................................................................................................................................... Residential................................................................................................................................................................................ USDA SOIL TYPE: D Unless noted, runoff coefficients are taken from Table 6-5 of the Urban Storm Drainage Criteria Manual (03/2017) Lawns and Landscaping........................................................................................................................................................... Page 1 of 3 Project: Calculations By: Date: C5 Length, L (ft) Slope, S (%) Ti (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Comp. Tc (min) Actual Tc (min) h1 h1 0.20 300 1.27 26.39 1166 1.20 2.19 8.87 N/A N/A N/A 35.26 18.14 18.14 h2 h2 0.20 300 0.50 36.01 300 0.50 1.41 3.54 N/A N/A N/A 39.54 13.33 13.33 h3 h3 0.25 300 1.79 22.24 N/A N/A N/A N/A N/A N/A 22.24 11.67 11.67 h4 h4 0.50 90 5.61 5.87 N/A N/A N/A 548 0.47 1.03 8.87 14.75 13.54 13.54 total Total 0.21 300 2.52 20.76 N/A N/A N/A 1320 0.41 0.96 22.91 43.67 19.00 19.00 Time of Concentration Gutter/Swale Flow, Time of Concentration: HISTORIC TIME OF CONCENTRATION COMPUTATIONS Overland Flow Channelized Flow Swale Flow Design Point Basin(s) Tt = L / 60V (Equation 6-4) Tc = Ti + Tt (Equation 6-2) Intensity, i From Figures 3.3.1-2 (Area II) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ Rational Equation: Q = CiA (Equation 6-1) Overland Flow, Time of Concentration: July 17, 2025 J. Obanion 987-012 (Equation 6-4) (Equation 6-3) }  31 51.1395.0 S LCTi  10180L Page 2 of 3 Overland Flow, Time of Concentration: Gutter/Swale Flow, Time of Concentration: Intensity, I from Fig. RA-2 Velocity (Gutter Flow), V = 20·S½Project:987-012 Velocity (Swale Flow), V = 15·S½Calculations By:J. Obanion Rational Equation: Q = CiA (Equation 6-1)Date: h1 h1 19.014 18.14 0.20 0.20 0.25 1.70 2.90 5.92 6.5 11.0 28.1 h2 h2 3.902 13.33 0.20 0.20 0.25 1.98 3.39 6.92 1.5 2.6 6.8 h3 h3 1.349 11.67 0.25 0.25 0.30 2.09 3.57 7.29 0.7 1.2 3.0 h4 h4 0.546 13.54 0.50 0.50 0.55 1.95 3.34 6.82 0.5 0.9 2.0 total Total 24.812 19 0.21 0.21 0.26 1.65 2.82 5.75 8.6 14.7 37.1 C2 Flow, Q100 (cfs) HISTORIC DIRECT RUNOFF COMPUTATIONS C10 C100 Design Point Flow, Q10 (cfs) Flow, Q2 (cfs)Basin(s) Area, A (acres) Intensity, I100 (in/hr) July 17, 2025 Tc (min) Tt = L / 60V (Equation 6-4) Tc = Ti + Tt (Equation 6-2) Intensity, I2 (in/hr) Intensity, I10 (in/hr) (Equation 6-4) (Equation 6-3) }  31 51.1395.0 S LCTi  Page 3 of 3 Runoff Coefficient1 Percent Impervious1 Project: Location: 0.95 100%Calc. By: 0.95 90%Date: 0.50 40% 0.55 50% 0.20 2% Basin ID Basin Area (sq.ft.) Basin Area (acres) Asphalt, Concrete (acres)Rooftop (acres) Gravel (acres)Residential: Low Density (acres) Lawns, Clayey Soil, Flat Slope < 2% (acres) Percent Impervious C2*Cf Cf = 1.00 C5*Cf Cf = 1.00 C10*Cf Cf = 1.00 C100*Cf Cf = 1.25 A1 33,711 0.77 0.00 0.00 0.00 0.53 0.24 35% 0.44 0.44 0.44 0.55 A2 56,029 1.29 0.52 0.00 0.00 0.53 0.23 62% 0.65 0.65 0.65 0.81 A3 104,532 2.40 0.07 0.00 0.00 0.53 1.80 15% 0.30 0.30 0.30 0.37 B1 30,861 0.71 0.00 0.00 0.00 0.71 0.00 50% 0.55 0.55 0.55 0.69 B2 122,579 2.81 0.76 0.00 0.00 1.61 0.44 56% 0.60 0.60 0.60 0.75 B3 50,754 1.17 0.02 0.00 0.00 0.65 0.50 30% 0.41 0.41 0.41 0.51 B4 75,858 1.74 0.34 0.00 0.00 0.75 0.65 42% 0.50 0.50 0.50 0.62 B5 159,140 3.65 1.31 0.00 0.00 1.77 0.57 60% 0.64 0.64 0.64 0.80 B6 37,612 0.86 0.08 0.00 0.00 0.20 0.58 22% 0.35 0.35 0.35 0.44 B7 24,334 0.56 0.39 0.00 0.00 0.00 0.17 71% 0.73 0.73 0.73 0.91 Total 695,409 15.96 3.50 0.00 0.00 7.28 5.18 45% 0.52 0.52 0.52 0.65 OS1 170,794 3.92 0.00 0.00 0.00 0.00 3.92 2% 0.20 0.20 0.20 0.25 OS2 23,162 0.53 0.24 0.00 0.00 0.00 0.29 46% 0.54 0.54 0.54 0.67 OS3 3,156 0.07 0.06 0.00 0.00 0.00 0.02 78% 0.78 0.78 0.78 0.97 OS4 7,250 0.17 0.08 0.00 0.00 0.00 0.08 51% 0.58 0.58 0.58 0.72 OS5 14,343 0.33 0.00 0.00 0.00 0.00 0.33 2% 0.20 0.20 0.20 0.25 OS6 8,307 0.19 0.01 0.00 0.00 0.00 0.18 6% 0.23 0.23 0.23 0.29 OS7 58,559 1.34 0.00 0.01 0.00 0.00 1.34 2% 0.20 0.20 0.20 0.25 Total 285,571 6.56 0.39 0.00 0.00 0.00 6.16 8%0.24 0.24 0.24 0.31 DEVELOPED RUNOFF COEFFICIENT CALCULATIONS Asphalt, Concrete Rooftop Gravel Streets, Parking Lots, Roofs, Alleys, and Drives: Character of Surface:Willox Fort Collins J. Obanion July 18, 2025 Lawns and Landscaping: Offsite Basins 2) Composite Runoff Coefficient adjusted per Table 3.2-3 of the Fort Collins Stormwater Manual (FCSM). Lawns, Clayey Soil, Flat Slope < 2% USDA SOIL TYPE: C Residential: Low Density Composite Runoff Coefficient2 1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM. Onsite Basins 5/18/2022 Where: Length (ft) Slope (%) Ti 2-Yr (min) Ti 10-Yr (min) Ti 100-Yr (min) Length (ft) Slope (%)Surface n Flow Area3 (sq.ft.) WP3 (ft)R (ft)V (ft/s) Tt (min) Max. Tc (min) Comp. Tc 2-Yr (min) Tc 2-Yr (min) Comp. Tc 100- Yr (min) Tc 100-Yr (min) a1 A1 115 3.07%9.09 9.09 7.56 513 0.50% Valley Pan 0.012 6.00 10.25 0.59 6.16 1.39 13.49 10.47 10.47 8.95 8.95 a2 A2 56 3.05%4.35 4.35 2.79 261 0.61% Gutter 0.012 3.61 19.18 0.19 3.17 1.37 11.76 5.72 5.72 4.16 5.00 a3 A3 94 8.27%7.19 7.19 6.52 308 0.54% Swale (4:1)0.035 4.00 8.25 0.48 1.93 2.66 12.23 9.85 9.85 9.18 9.18 b1 B1 67 6.25%4.57 4.57 3.43 N/A Gutter 0.012 3.61 19.18 N/A N/A 0.00 10.37 4.57 5.00 3.43 5.00 b2 B2 62 4.19%4.54 4.54 3.16 409 0.70%Gutter 0.012 3.61 19.18 0.19 3.41 2.00 12.62 6.54 6.54 5.16 5.16 b3 B3 86 1.83%9.83 9.83 8.39 370 0.50%Valley Pan 0.012 6.00 10.25 0.59 6.14 1.00 12.53 10.83 10.83 9.39 9.39 b4 B4 71 1.25%8.78 8.78 6.96 789 0.50%Valley Pan 0.012 6.00 10.25 0.59 6.12 2.15 14.78 10.93 10.93 9.11 9.11 b5 B5 85 2.28%6.04 6.04 3.95 700 0.50%Gutter 0.012 3.61 19.18 0.19 2.88 4.04 14.36 10.08 10.08 7.99 7.99 b6 B6 36 3.64%5.48 5.48 4.84 373 0.50%Valley Pan 0.012 6.00 10.25 0.59 6.15 1.01 12.27 6.49 6.49 5.85 5.85 b7 B7 25 1.80%2.86 2.86 1.47 230 0.12%Gutter 0.012 3.61 19.18 0.19 1.40 2.73 11.42 5.60 5.60 4.20 5.00 os1 OS1 200 1.00%23.80 23.80 23.80 350 0.42% Swale (8:1)0.035 8.00 16.12 0.50 1.73 3.37 13.06 27.17 13.06 27.17 13.06 os2 OS2 42 17.29%2.64 2.64 2.64 550 0.13% Swale (8:1)0.035 8.00 16.12 0.50 0.95 9.63 13.29 12.27 12.27 12.27 12.27 os3 OS3 23 2.39%2.15 2.15 2.15 22 0.91% Swale (8:1)0.035 8.00 16.12 0.50 2.54 0.14 10.25 2.29 5.00 2.29 5.00 os4 OS4 40 6.70%3.28 3.28 3.28 N/A Swale (8:1)0.035 8.00 16.12 N/A N/A 0.00 10.22 3.28 5.00 3.28 5.00 os5 OS5 40 3.73%6.87 6.87 6.87 N/A Swale (8:1)0.035 8.00 16.12 N/A N/A 0.00 10.22 6.87 6.87 6.87 6.87 os6 OS6 25 3.60%5.28 5.28 5.28 N/A Swale (8:1)0.035 8.00 16.12 N/A N/A 0.00 10.14 5.28 5.28 5.28 5.28 Offsite Basins Notes S = Longitudinal Slope, feet/feet R = Hydraulic Radius (feet) n = Roughness Coefficient V = Velocity (ft/sec) WP = Wetted Perimeter (ft) Design Point Basin ID Overland Flow Channelized Flow Time of Concentration DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Location: Maximum Tc:Overland Flow, Time of Concentration: Channelized Flow, Velocity: Channelized Flow, Time of Concentration: Willox Fort Collins J. Obanion July 18, 2025 Project: Calculations By: Date: (Equation 3.3-2 per Fort Collins Stormwater Manual)𝑇=1.87 1.1 − 𝐶 ∗ 𝐶𝑓𝐿 𝑆 𝑉 =1.49 𝑛∗ 𝑅/∗𝑆(Equation 5-4 per Fort Collins Stormwater Manual) 𝑇𝑐 =𝐿 180 + 10 (Equation 3.3-5 per Fort Collins Stormwater Manual) 𝑇𝑡 =𝐿 𝑉 ∗ 60 (Equation 5-5 per Fort Collins 1) Add 4900 to all elevations. 2) Per Fort Collins Stormwater Manual, minimum Tc = 5 min. Tc2 Tc10 Tc100 C2 C10 C100 I2 I10 I100 WQ Q2 Q10 Q100 a1 A1 0.77 10.5 10.5 9.0 0.4 0.4 0.6 2.2 3.8 8.2 0.4 0.8 1.3 3.5 a2 A2 1.29 5.7 5.7 5.0 0.6 0.6 0.8 2.8 4.7 10.0 1.2 2.3 3.9 10.4 a3 A3 2.40 9.8 9.8 9.2 0.3 0.3 0.4 2.3 3.9 8.0 0.8 1.6 2.8 7.2 b1 B1 0.71 5.0 5.0 5.0 0.6 0.6 0.7 2.9 4.9 10.0 0.6 1.1 1.9 4.8 b2 B2 2.81 6.5 6.5 5.2 0.6 0.6 0.8 2.6 4.4 10.0 2.2 4.4 7.5 21.1 b3 B3 1.17 10.8 10.8 9.4 0.4 0.4 0.5 2.2 3.7 8.0 0.5 1.0 1.8 4.8 b4 B4 1.74 10.9 10.9 9.1 0.5 0.5 0.6 2.2 3.7 8.0 0.9 1.9 3.2 8.7 b5 B5 3.65 10.1 10.1 8.0 0.6 0.6 0.8 2.2 3.8 8.6 2.6 5.2 8.8 25.1 b6 B6 0.86 6.5 6.5 5.9 0.3 0.3 0.4 2.7 4.6 9.6 0.4 0.8 1.4 3.6 b7 B7 0.56 5.6 5.6 5.0 0.7 0.7 0.9 2.8 4.7 10.0 0.6 1.1 1.9 5.1 os1 OS1 3.92 13.1 13.1 13.1 0.2 0.2 0.2 2.0 3.4 6.9 0.8 1.6 2.7 5.4 os2 OS2 0.53 12.3 12.3 12.3 0.5 0.5 0.5 2.1 3.5 7.2 0.3 0.6 1.0 2.0 os3 OS3 0.07 5.0 5.0 5.0 0.8 0.8 0.8 2.9 4.9 10.0 0.1 0.2 0.3 0.6 os4 OS4 0.17 5.0 5.0 5.0 0.6 0.6 0.6 2.9 4.9 10.0 0.1 0.3 0.5 1.0 os5 OS5 0.33 6.9 6.9 6.9 0.2 0.2 0.2 2.6 4.4 9.1 0.1 0.2 0.3 0.6 os6 OS6 0.19 5.3 5.3 5.3 0.2 0.2 0.2 2.9 4.9 10.0 0.1 0.1 0.2 0.4 Offsite Basins Fort Collins Project: Location: Calc. By: Intensity, I from Fig. 3.4.1 Fort Collins Stormwater Manual Rational Equation: Q = CiA (Equation 6-1 per MHFD) FLOW (CFS) DEVELOPED DIRECT RUNOFF COMPUTATIONS Intensity (in/hr) Willox J. Obanion July 18, 2025 Design Point Basin Area (acres) Runoff CTc (Min) Date: Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com Pond No : A 100-yr 0.65 13.50 min 15.96 acres Storage 77363 ft3 Max Release Rate =8.60 cfs 1.78 ac-ft Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 30966 1.00 8.60 2580 28386 10 7.720 48052 1.00 8.60 5160 42892 15 6.520 60875 1.00 8.60 7740 53135 20 5.600 69713 1.00 8.60 10320 59393 25 4.980 77494 1.00 8.60 12900 64594 30 4.520 84403 1.00 8.60 15480 68923 35 4.080 88884 1.00 8.60 18060 70824 40 3.740 93117 1.00 8.60 20640 72477 45 3.460 96914 1.00 8.60 23220 73694 50 3.230 100524 1.00 8.60 25800 74724 55 3.030 103730 1.00 8.60 28380 75350 60 2.860 106811 1.00 8.60 30960 75851 65 2.720 110047 1.00 8.60 33540 76507 70 2.590 112848 1.00 8.60 36120 76728 75 2.480 115774 1.00 8.60 38700 77074 80 2.380 118513 1.00 8.60 41280 77233 85 2.290 121158 1.00 8.60 43860 77298 90 2.210 123803 1.00 8.60 46440 77363 95 2.130 125951 1.00 8.60 49020 76931 100 2.060 128223 1.00 8.60 51600 76623 105 2.000 130712 1.00 8.60 54180 76532 110 1.940 132829 1.00 8.60 56760 76069 115 1.890 135287 1.00 8.60 59340 75947 120 1.840 137435 1.00 8.60 61920 75515 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 987-012 Willox Farm Project Number : Project Name : Detention Pond A = Tc = Project Location : Design Point C = Design Storm Page 1 of 1 987-012_Pond_FAA_Fort Collins_Pond A Pond Stage-Storage Curve Detention Pond 987-012 Willox Farm By: J. Obanion Date: 04/09/2024 Stage (FT) Contour Area (SF) Volume (CU.FT.) Volume (AC-FT) 4,983.00 28.22 0.00 0.00 4,983.20 484.26 51.25 0.00 4,983.40 2,121.90 311.86 0.01 4,983.60 4,302.37 954.29 0.02 4,983.80 6,643.77 2048.90 0.05 4,984.00 9,455.39 3658.82 0.08 4,984.20 12,798.94 5884.25 0.14 4,984.40 16,695.20 8833.67 0.20 4,984.60 21,130.71 12616.26 0.29 4,984.80 31,797.69 17338.86 0.40 4,985.00 37,419.61 23120.11 0.53 4,985.20 44,734.51 31176.17 0.72 4,985.40 49,509.05 40600.52 0.93 4,985.60 53,584.85 50909.91 1.17 4,985.80 57,615.44 62029.94 1.42 4,986.00 61,941.89 73182.66 1.68 4,986.07 63,262.55 77363.00 1.78 100-YR DETENTION 4,986.20 65,893.69 85691.41 1.97 Willox Farm ORIFICE RATING CURVE Detention Pond 100-yr Orifice Project:Willox Farm Date:7/17/2025 By:J. Obanion 100-yr WSEL=4986.07 Orifice Plate Outflow Q 8.6 cfs Orifice Coefficient Cd 0.65 Gravity Constant g 32.2 ft/s^2 100-year head H 3.09 ft Orifice Area Ao 0.94 ft^2 Orifice Area Ao 135.06 in^2 Radius r 6.0 in Diameter d 12.0 in Orifice Curve Stage (ft)H (ft)Q (cfs)Stage (ft)Note 4983.00 0.02 0.69 0.00 Pond Invert 4983.20 0.22 2.29 0.20 4983.40 0.42 3.17 0.40 4983.60 0.62 3.85 0.60 4983.80 0.82 4.43 0.80 4984.00 1.02 4.94 1.00 4984.20 1.22 5.40 1.20 4984.40 1.42 5.83 1.40 4984.60 1.62 6.23 1.60 4984.80 1.82 6.60 1.80 4985.00 2.02 6.95 2.00 4985.20 2.22 7.29 2.20 4985.40 2.42 7.61 2.40 4985.60 2.62 7.92 2.60 4985.80 2.82 8.22 2.80 4986.00 3.02 8.50 3.00 4986.07 3.09 8.60 3.07 100-Yr WSEL 7/17/2025 10:45 AM P:\987-012\Drainage\Detention\987-012_Circular Orifice Rating\Orifice Size Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Jul 18 2025 Pond Emergency Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 75.00 Total Depth (ft) = 1.00 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 94.30 Highlighted Depth (ft) = 0.54 Q (cfs) = 94.30 Area (sqft) = 41.67 Velocity (ft/s) = 2.26 Top Width (ft) = 79.32 0 10 20 30 40 50 60 70 80 90 100 110 Depth (ft) Depth (ft)Pond Emergency Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 1.50 1.50 2.00 2.00 Length (ft)Weir W.S. Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com Structure ID WQ Model HGL (ft) Flow Depth Above Weir (ft) Upstream Storm Sewer Model HGL (ft) Downstream Storm Sewer Model HGL (ft) Controlling HGL (ft) STMH A2 w Weir 4986.65 1.43 4988.08 4986.84 4988.08 1. HGL at STMH A2 - WQ Storm Event (Sets the Weir Height in STMH A2 to 4986.65) 2. From Hydraflow Express Weir Model using 100-Yr Storm Event 3. Weir Height Plus Flow Depth Above Weir (Used as starting HGL for Upstream Storm Sewer Model) 4. HGL Produced in STMH A2 from 100-YR Storm Event Storm Sewer Model (For Comparison to Upstream HGL) 5. The highest HGL in STMH A2 of all Storm A Storm Sewer Models Water Quality Weir Modeling Summary Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com Project:987-012 Calculations By:Jacob Obanion Date: Design Point Design Inlet Label Q2 Q100 Q100 Total Q100 Intercepted Q100 Unintercepted Inlet Type Inlet Size Notes A1 INLET A4-1 0.38 1.75 1.75 1.75 0.00 Nyloplast Basin Dome Grate 12"- A1 INLET A5-1 0.38 1.75 1.75 1.75 0.00 Nyloplast Basin Dome Grate 12"- A2 INLET A6 1.15 5.19 5.19 5.19 0.00 Type 13 Combo Single - A2 INLET A7 1.15 5.19 5.19 5.19 0.00 Type 13 Combo Single - INLET CAPACITY SUMMARY July 17, 2025 P:\987-012\Drainage\Inlets\Inlet Summary Table\Inlet summary Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =0.0 ftSide Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =ft/ftManning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.012 Height of Curb at Gutter Flow Line HCURB =4.74 inchesDistance from Curb Face to Street Crown TCROWN =15.0 ft Gutter Width W =2.58 ftStreet Transverse Slope SX =0.002 ft/ftGutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ftManning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =4.7 12.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.03 (August 2023)ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)Willox Farm Inlet A6 987-012_MHFD-Inlet_v5.03, Inlet A6 7/17/2025, 10:49 AM Design Information (Input)MINOR MAJORType of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =4.7 12.0 inches Grate Information MINOR MAJORLength of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =0.43 0.43Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60Curb Opening Information MINOR MAJORLength of a Unit Curb Opening Lo (C) =3.00 3.00 feet Warning 1 Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.58 2.58 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJORDepth for Grate Midwidth dGrate =0.43 1.04 ft Depth for Curb Opening Weir Equation dCurb =0.18 0.79 ftGrated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.73 1.00 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =N/A N/A Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.73 1.00 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =2.3 9.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =1.2 5.2 cfs Warning 1: Dimension entered is not a typical dimension for inlet type specified. CDOT/Denver 13 Combination INLET IN A SUMP OR SAG LOCATIONMHFD-Inlet, Version 5.03 (August 2023) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT/Denver 13 Combination Override 987-012_MHFD-Inlet_v5.03, Inlet A6 7/17/2025, 10:49 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =0.0 ftSide Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =ft/ftManning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.012 Height of Curb at Gutter Flow Line HCURB =4.74 inchesDistance from Curb Face to Street Crown TCROWN =15.0 ft Gutter Width W =2.58 ftStreet Transverse Slope SX =0.000 ft/ftGutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ftManning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =4.7 12.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.03 (August 2023)ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)Willox Farm Inlet A7 987-012_MHFD-Inlet_v5.03, Inlet A7 7/17/2025, 10:49 AM Design Information (Input)MINOR MAJORType of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =4.7 12.0 inches Grate Information MINOR MAJORLength of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =0.43 0.43Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60Curb Opening Information MINOR MAJORLength of a Unit Curb Opening Lo (C) =3.00 3.00 feet Warning 1 Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.58 2.58 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJORDepth for Grate Midwidth dGrate =0.43 1.04 ft Depth for Curb Opening Weir Equation dCurb =0.18 0.79 ftGrated Inlet Performance Reduction Factor for Long Inlets RFGrate =0.73 1.00 Curb Opening Performance Reduction Factor for Long Inlets RFCurb =N/A N/A Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =0.73 1.00 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =2.3 9.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =1.2 5.2 cfs Warning 1: Dimension entered is not a typical dimension for inlet type specified. CDOT/Denver 13 Combination INLET IN A SUMP OR SAG LOCATIONMHFD-Inlet, Version 5.03 (August 2023) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT/Denver 13 Combination Override 987-012_MHFD-Inlet_v5.03, Inlet A7 7/17/2025, 10:49 AM Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Jul 18 2025 A1 - A1 User-defined Invert Elev (ft) = 89.57 Slope (%) = 0.50 N-Value = 0.034 Calculations Compute by: Known Q Known Q (cfs) = 11.54 (Sta, El, n)-(Sta, El, n)... ( 0.00, 90.30)-(11.08, 89.65, 0.035)-(12.08, 89.57, 0.012)-(13.08, 89.65, 0.012)-(23.07, 90.14, 0.035)-(40.97, 90.30, 0.035) Highlighted Depth (ft) = 0.71 Q (cfs) = 11.54 Area (sqft) = 9.67 Velocity (ft/s) = 1.19 Wetted Perim (ft) = 38.43 Crit Depth, Yc (ft) = 0.50 Top Width (ft) = 38.39 EGL (ft) = 0.73 -5 0 5 10 15 20 25 30 35 40 45 50 Elev (ft) Depth (ft)Section 89.00 -0.57 89.50 -0.07 90.00 0.43 90.50 0.93 91.00 1.43 Sta (ft) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Jul 18 2025 A2 - A2 User-defined Invert Elev (ft) = 85.15 Slope (%) = 0.50 N-Value = 0.033 Calculations Compute by: Known Q Known Q (cfs) = 62.78 (Sta, El, n)-(Sta, El, n)... ( 0.00, 87.05)-(6.96, 85.65, 0.035)-(7.46, 85.15, 0.012)-(11.49, 85.15, 0.012)-(12.06, 85.65, 0.012)-(19.54, 86.03, 0.035)-(32.71, 86.30, 0.035) -(52.89, 87.05, 0.035) Highlighted Depth (ft) = 1.57 Q (cfs) = 62.78 Area (sqft) = 26.95 Velocity (ft/s) = 2.33 Wetted Perim (ft) = 42.98 Crit Depth, Yc (ft) = 1.29 Top Width (ft) = 42.46 EGL (ft) = 1.65 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 Elev (ft) Depth (ft)Section 84.50 -0.65 85.00 -0.15 85.50 0.35 86.00 0.85 86.50 1.35 87.00 1.85 87.50 2.35 88.00 2.85 Sta (ft) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, Jul 18 2025 A3 - A3 User-defined Invert Elev (ft) = 87.01 Slope (%) = 0.50 N-Value = 0.034 Calculations Compute by: Known Q Known Q (cfs) = 19.50 (Sta, El, n)-(Sta, El, n)... ( 0.00, 87.96)-(1.83, 87.74, 0.035)-(116.62, 87.51, 0.035)-(117.12, 87.01, 0.012)-(121.12, 87.01, 0.012)-(121.62, 87.51, 0.012)-(124.90, 87.96, 0.035) Highlighted Depth (ft) = 0.77 Q (cfs) = 19.50 Area (sqft) = 21.66 Velocity (ft/s) = 0.90 Wetted Perim (ft) = 122.53 Crit Depth, Yc (ft) = 0.67 Top Width (ft) = 122.09 EGL (ft) = 0.78 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Elev (ft) Depth (ft)Section 86.75 -0.26 87.00 -0.01 87.25 0.24 87.50 0.49 87.75 0.74 88.00 0.99 Sta (ft) Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =32.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.320 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.13 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 194,271 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =2,041 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =1243 sq ft D) Actual Flat Surface Area AActual =1406 sq ft E) Area at Design Depth (Top Surface Area)ATop =2885 sq ft F) Rain Garden Total Volume VT=2,145 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =50.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =2,041 cu ft iii) Orifice Diameter, 3/8" Minimum DO =9/16 in Design Procedure Form: Rain Garden (RG) J. Obanion Northern Engineering July 17, 2025 Willox - Rain Garden A Fort Collins, CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.07_RAIN GARDEN_A, RG 7/17/2025, 11:08 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) J. Obanion Northern Engineering July 17, 2025 Willox - Rain Garden A Fort Collins, CO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose OneYES NO YES NO UD-BMP_v3.07_RAIN GARDEN_A, RG 7/17/2025, 11:08 AM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =51.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.510 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.17 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 470,276 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =6,552 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =4797 sq ft D) Actual Flat Surface Area AActual =5207 sq ft E) Area at Design Depth (Top Surface Area)ATop =8030 sq ft F) Rain Garden Total Volume VT=6,619 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =50.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =6,552 cu ft iii) Orifice Diameter, 3/8" Minimum DO =15/16 in Design Procedure Form: Rain Garden (RG) J. Obanion Northern Engineering July 17, 2025 Willox - Rain Garden A Fort Collins, CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.07_RAIN GARDEN_B, RG 7/17/2025, 11:08 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) J. Obanion Northern Engineering July 17, 2025 Willox - Rain Garden A Fort Collins, CO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose OneYES NO YES NO UD-BMP_v3.07_RAIN GARDEN_B, RG 7/17/2025, 11:08 AM Project Number:Project:Willox Farm Project Location: Calculations By:Date:7/17/2025 Sq. Ft. Acres A1 33,711 0.77 35%Rain Garden A Rain Garden 11,841 A2 56,029 1.29 62%Rain Garden A Rain Garden 34,513 A3 104,532 2.40 15% Rain Garden A Rain Garden 16,072 B1 30,861 0.71 50% n/a n/a 15,430 B2 122,579 2.81 56% Rain Garden B Rain Garden 68,576 B3 50,754 1.17 30% Rain Garden B Rain Garden 15,396 B4 75,858 1.74 42% Rain Garden B Rain Garden 31,888 B5 159,140 3.65 60% Rain Garden B Rain Garden 96,188 B6 37,612 0.86 22% Rain Garden B Rain Garden 8,281 B7 24,334 0.56 71% Rain Garden B Rain Garden 17,259 OS1 170,794 3.92 2% n/a n/a 3,416 OS2 23,162 0.53 46% n/a n/a 10,668 OS3 3,156 0.07 78% n/a n/a 2,453 OS4 7,250 0.17 51% n/a n/a 3,718 OS5 14,343 0.33 2% n/a n/a 287 OS6 8,307 0.19 6% n/a n/a 539 OS7 58,559 1.34 2% n/a n/a 1,435 Total 980,980 22.52 337,960 Project Number: Project: Project Location: Calculations By: Date: Sq. Ft. Acres Rain Garden A 194,271 4.46 32%A1,A2,A3 Rain Garden 3,588 62,426 Rain Garden B 470,276 10.80 51% B2,B3,B4,B5,B6, B7 Rain Garden 6,875 237,588 Total 664,548 15.26 300,014 Total Area of Current Development 695,409 ft2 Total Impervious Area 315,444 ft2 Total Impervious Area without LID Treatment 15,430 ft2 B1 75% Requried Minimum Area to be Treated 236,583 ft2 Total Treated Area 300,014 ft2 Percent Impervious Treated by LID 95.11% LID Site Summary - New Impervious Area LID Summary per LID Structure LID Summary Willox Farm 7/17/2025 Weighted % Impervious Impervious Area (ft2) Volume per UD-BMP (ft3)LID ID Area 987-012 Fort Collins, Colorado J. Obanion Subbasin ID Treatment Type LID Summary AreaBasin ID Treatment TypePercent Impervious LID ID 987-012 Fort Collins, Colorado J. Obanion Total Impervious Area (ft2) LID Summary per Basin UD IR E E E E E E E E E E E E E E E E E T S S T T T T E E E W W W W W W W W W W W W SOFT GOLD PARK DETENTION POND WILLOX LN RAIN GARDEN A REQUIRED VOLUME: 2,041 CU. FT. MINIMUM FLAT AREA: 1,243 SF PROVIDED VOLUME: 2,145 CU. FT. PROVIDED FLAT AREA: 1,406 SF IMPERVIOUS AREA TREATED: 62,426 SF RAIN GARDEN B REQUIRED VOLUME: 6,552 CU. FT. MINIMUM FLAT AREA: 4,797 SF PROVIDED VOLUME: 6,619 CU. FT. PROVIDED FLAT AREA: 5,207 SF IMPERVIOUS AREA TREATED: 237,558 SF 0.07 ac. OS3 1.17 ac. B3 0.71 ac. B1 1.74 ac. B4 0.86 ac. B6 3.90 ac. OS1 0.56 ac. B7 2.40 ac. A3 0.55 ac. OS2 0.77 ac. A1 0.19 ac. OS6 2.32 ac. A 1.34 ac. OS7 0.17 ac. OS4 0.32 ac. OS5 2.81 ac. B2 1.29 ac. A2 3.65 ac. B5 WILLOX FARM SHEET NO: P:\9 8 7 - 0 1 2 \ D W G \ D R N G \ 9 8 7 - 0 1 2 _ L I D . D W G 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 PHONE: 970.221.4158 www.epsgroupinc.com DRAWING REFERENCE: LID TREATMENT EXHIBIT J. OBANION 1"=150' APRIL 2025 LID-1 DRAWN BY: SCALE: ISSUED: NOTES 1.FOR LID RAIN GARDEN CALCULATIONS PLEASE REFER TO THE FINAL DRAINAGE REPORT DATED APRIL 25, 2025. 2.REFER TO UTILITY PLANS FOR WILLOX FARM FOR ADDITIONAL GRADING AND UTILITY INFORMATION. 3.REFER TO LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON HARDSCAPES. LEGEND PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET AREA TREATED BY RAIN GARDEN B AREA TREATED BY RAIN GARDEN A NORTH ( IN FEET ) 0 1 INCH = 150 FEET 150 150 LID Site Summary - New Impervious Area Total Area of Current Development 695,409 ft2 Total Impervious Area 315,444 ft2 Total Impervious Area without LID Treatment: Basin A1 15,430 ft2 75% Requried Minimum Area to be Treated 236,583 ft2 Total Treated Area 300,014 ft2 Percent Impervious Treated by LID 95.11%ft2 Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com WILLOX FARM APPENDIX Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) has been included with the final construction drawings. It should be noted; however, any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed, or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing and/or wattles along the disturbed perimeter, gutter protection in the adjacent roadways, and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Final Utility Plans will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project may be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive Storm Water Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Larimer County Area, ColoradoNatural Resources Conservation Service March 9, 2022 9 Custom Soil Resource Report Soil Map 44 9 5 1 5 0 44 9 5 2 0 0 44 9 5 2 5 0 44 9 5 3 0 0 44 9 5 3 5 0 44 9 5 4 0 0 44 9 5 4 5 0 44 9 5 5 0 0 44 9 5 5 5 0 44 9 5 1 5 0 44 9 5 2 0 0 44 9 5 2 5 0 44 9 5 3 0 0 44 9 5 3 5 0 44 9 5 4 0 0 44 9 5 4 5 0 44 9 5 5 0 0 44 9 5 5 5 0 492450 492500 492550 492600 492650 492700 492750 492450 492500 492550 492600 492650 492700 492750 40° 36' 39'' N 10 5 ° 5 ' 2 1 ' ' W 40° 36' 39'' N 10 5 ° 5 ' 7 ' ' W 40° 36' 24'' N 10 5 ° 5 ' 2 1 ' ' W 40° 36' 24'' N 10 5 ° 5 ' 7 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600Feet 0 30 60 120 180Meters Map Scale: 1:2,200 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 16, Sep 2, 2021 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 22 Caruso clay loam, 0 to 1 percent slope 14.2 78.9% 105 Table Mountain loam, 0 to 1 percent slopes 3.8 21.1% Totals for Area of Interest 17.9 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, Custom Soil Resource Report 11 onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 12 Larimer County Area, Colorado 22—Caruso clay loam, 0 to 1 percent slope Map Unit Setting National map unit symbol: jpvt Elevation: 4,800 to 5,500 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Caruso and similar soils:85 percent Minor components:15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Caruso Setting Landform:Flood-plain steps, stream terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Parent material:Mixed alluvium Typical profile H1 - 0 to 35 inches: clay loam H2 - 35 to 44 inches: fine sandy loam H3 - 44 to 60 inches: gravelly sand Properties and qualities Slope:0 to 1 percent Depth to restrictive feature:More than 80 inches Drainage class:Somewhat poorly drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat):Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table:About 24 to 48 inches Frequency of flooding:NoneOccasional Frequency of ponding:None Calcium carbonate, maximum content:5 percent Maximum salinity:Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water supply, 0 to 60 inches: Moderate (about 8.4 inches) Interpretive groups Land capability classification (irrigated): 3w Land capability classification (nonirrigated): 5w Hydrologic Soil Group: D Ecological site: R067BY036CO - Overflow Hydric soil rating: No Minor Components Loveland Percent of map unit:9 percent Custom Soil Resource Report 13 Landform:Terraces Ecological site:R067BY036CO - Overflow Hydric soil rating: Yes Fluvaquents Percent of map unit:6 percent Landform:Terraces Hydric soil rating: Yes 105—Table Mountain loam, 0 to 1 percent slopes Map Unit Setting National map unit symbol: jpty Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Table mountain and similar soils:85 percent Minor components:15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Table Mountain Setting Landform:Stream terraces, flood plains Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Parent material:Alluvium Typical profile H1 - 0 to 36 inches: loam H2 - 36 to 60 inches: clay loam Properties and qualities Slope:0 to 1 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat):Moderately high to high (0.60 to 2.00 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:15 percent Maximum salinity:Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Sodium adsorption ratio, maximum:5.0 Available water supply, 0 to 60 inches: High (about 9.8 inches) Custom Soil Resource Report 14 Interpretive groups Land capability classification (irrigated): 1 Land capability classification (nonirrigated): 3c Hydrologic Soil Group: B Ecological site: R049XY036CO - Overflow Hydric soil rating: No Minor Components Caruso Percent of map unit:7 percent Hydric soil rating: No Fluvaquentic haplustolls Percent of map unit:4 percent Landform:Terraces Hydric soil rating: Yes Paoli Percent of map unit:4 percent Hydric soil rating: No Custom Soil Resource Report 15 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 16 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 17 Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com W W W W W W W WWW W W W T W S S W T ELECS S T MS W W WM W W T S MM W HYD OH U OH U FO FO FO FO FO FO FO FO FO FO G G G G G G G G G G OHU OHU OHU OHU OHU FO FO FO FO FO FO FO FO FO FO FO XXXXXXXXXXX FO FO X G G FO FOGG G X X X X FO FO FO OHU OH U OHU W FO W X X X X X X X X X X X X X X X X XXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X FO FO FO FO FO FO FO FO FOGGGGGGGGG FO FO FO FO FO FO FO FOFO E E E E E E E W W W W X X X OHU OH U OH U OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU X X X X XX X W W W W W W W W W W W W W W W W W W W W W W W W W 19.01 ac. h1 h1 WEST WILLOW LANE EXISTING 20' SANITARY SEWER EASEMENT TO BE VACATED WITH PLAT (ENCROACHES ON PROPERTY. SEE PLAT FOR NOTES) EXISTING 10' UTILITY EASEMENT EXISTING 6' CITY OF FORT COLLINS EASEMENT EXISTING 10' MOUNTAIN STATES UTILITY EASEMENT EXISTING 30' NCWA EASEMENT EXISTING 6' CITY OF FORT COLLINS EASEMENT 100' UNION PACIFIC RAILROAD ROW PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY EXISTING 20' PUBLIC DRAINAGE EASEMENT ACKELSON CONNIE A. 603 W WILLOX LANE, KAFKA, AMY 709 W WILLOX LANE, PITT, JEAN 1522 WOOD LANE, GBP LLC 1434 WOOD LANE, PEREZ DANIEL A. 400 HICKORY STREET 149 PEREZ DANIEL A. 400 HICKORY STREET 149 3.90 ac. h2 1.35 ac. h3 0.55 ac. h4 KEYMAP T WEST WILLOX LANE HICKORY STREET SOFT GOLD PARK Sheet WI L L O X F A R M Th e s e d r a w i n g s a r e i n s t r u m e n t s of s e r v i c e p r o v i d e d b y E P S Gr o u p , I n c . / N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . a n d ar e n o t t o b e u s e d f o r a n y t y p e of c o n s t r u c t i o n u n l e s s s i g n e d an d s e a l e d b y a P r o f e s s i o n a l En g i n e e r i n t h e e m p l o y o f E P S Gr o u p , I n c . / N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . NO T F O R C O N S T R U C T I O N RE V I E W S E T of 60 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 NORTH ( IN FEET ) 0 1 INCH = 60 FEET 60 60 120 180 DR1 HI S T O R I C D R A I N A G E E X H I B I T 58 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 NOTES: A LEGEND: 1.REFER TO THE FINAL DRAINAGE REPORT DATED APRIL 25, 2025 BY EPS GROUP FOR ADDITIONAL INFORMATION. DR1 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call RHistoric Drainage Summary Design Point Basin(s)Area, A (acres) Tc (min)C2 C10 C100 Intensity, I2 (in/hr) Intensity, I10 (in/hr) Intensity, I100 (in/hr) Flow, Q2 (cfs) Flow, Q10 (cfs) Flow, Q100 (cfs) h1 h1 19.01 18.14 0.20 0.20 0.25 1.70 2.90 5.92 6.46 11.03 28.14 h2 h2 3.90 13.33 0.20 0.20 0.25 1.98 3.39 6.92 1.55 2.65 6.75 h3 h3 1.35 11.67 0.25 0.25 0.30 2.09 3.57 7.29 0.70 1.20 2.95 h4 h4 0.55 13.54 0.50 0.50 0.55 1.95 3.34 6.82 0.53 0.91 2.05 total Total 24.81 19.00 0.21 0.21 0.26 1.65 2.82 5.75 8.60 14.69 37.09 / / / / / / / // / / / / / / / / / / / / / / / W WWW W S W T ELECS S T MS W W WM W W T S MM W XXXXXXXXXXXX XOHUOHUOHU OHU OHU OHU OHU X XXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX X X X X X X X X X X X X X X X E E E E E E E E E E E OHU OH U OH U OH U OH U OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU WWWWWWWWWWWWWWW W W W W W W W W W W W T A3A3 A1A1 SA I N T T H E R E S E S T R E E T SAINT JOSEPH STREET WILLOX LN ACKELSON CONNIE A. KAFKA, AMY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY SA I N T J E R O M E S T R E E T PROPOSED 2-2' SIDEWALK CHASES PROPOSED 4' SIDEWALK CULVERT PROPOSED 4' CONCRETE PAN w/ CURB PROPOSED 2' SIDEWALK CHASE PROPOSED 2' CONCRETE PAN PROPOSED 4' SIDEWALK CULVERT PROPOSED 2' CONCRETE PAN WILLOX STORM DRAIN SEE SHEET ST3 WILLOX EAST STORM DRAIN SEE SHEET ST4 1.17 ac. B3 1.74 ac. B4 0.86 ac. B6 0.07 ac. OS3 3.90 ac. OS1 0.56 ac. B7 2.40 ac. A3 0.55 ac. OS2 1.34 ac. OS7 0.17 ac. OS4 0.32 ac. OS5 3.65 ac. B5 PROPOSED FOREBAY KEYMAP T WEST WILLOX LANE HICKORY STREET SOFT GOLD PARK Sheet WI L L O X F A R M Th e s e d r a w i n g s a r e i n s t r u m e n t s of s e r v i c e p r o v i d e d b y E P S Gr o u p , I n c . / N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . a n d ar e n o t t o b e u s e d f o r a n y t y p e of c o n s t r u c t i o n u n l e s s s i g n e d an d s e a l e d b y a P r o f e s s i o n a l En g i n e e r i n t h e e m p l o y o f E P S Gr o u p , I n c . / N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . NO T F O R C O N S T R U C T I O N RE V I E W S E T of 60 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 DR2 DE V E L O P E D D R A I N A G E E X H I B I T 59 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 1.REFER TO THE "FINAL DRAINAGE REPORT DATED APRIL 25, 2025" BY EPS GROUP FOR ADDITIONAL INFORMATION. 2.THE WILLOX FARM PROJECT WILL BE DETAINING THE DIFFERENCE BETWEEN THE HISTORIC 2-YEAR EVENT AND THE DEVELOPED 100-YEAR EVENT. 3.LID MEASURES IS PROVIDED VIA RAIN GARDEN. 4.ALL PROPOSED STORM SEWER ARE TO BE PRIVATELY OWNED AND MAINTAINED. SWALE SECTIONS PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 NOTES: A LEGEND: MATCH LINE - SEE SHEET DR3 DR2 DR3 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R DEVELOPED DRAINAGE SUMMARY Design Point Basin ID Total Area (acres) C2 C100 2-Yr Tc (min) 100-Yr Tc (min)WQ Q2 (cfs) Q100 (cfs) a1 A1 0.77 0.44 0.55 10.47 10.47 0.38 0.76 3.50 a2 A2 1.29 0.65 0.81 5.72 5.72 1.15 2.30 10.38 a3 A3 2.40 0.30 0.37 9.85 9.85 0.81 1.62 7.19 b1 B1 0.71 0.55 0.69 5.00 5.00 0.56 1.11 4.85 b2 B2 2.81 0.60 0.75 6.54 6.54 2.20 4.40 21.10 b3 B3 1.17 0.41 0.51 10.83 10.83 0.51 1.03 4.76 b4 B4 1.74 0.50 0.62 10.93 10.93 0.94 1.89 8.72 b5 B5 3.65 0.64 0.80 10.08 10.08 2.58 5.16 25.06 b6 B6 0.86 0.35 0.44 6.49 6.49 0.40 0.80 3.63 b7 B7 0.56 0.73 0.91 5.60 5.60 0.56 1.12 5.05 Offsite Basins os1 OS1 3.92 0.20 0.20 13.06 13.06 0.78 1.55 5.43 os2 OS2 0.53 0.54 0.54 12.27 12.27 0.29 0.59 2.05 os3 OS3 0.07 0.78 0.78 5.00 5.00 0.08 0.16 0.56 os4 OS4 0.17 0.58 0.58 5.00 5.00 0.14 0.27 0.96 os5 OS5 0.33 0.20 0.20 6.87 6.87 0.09 0.17 0.60 os6 OS6 0.19 0.23 0.23 5.28 5.28 0.06 0.13 0.44 os7 OS7 1.34 0.20 0.20 11.39 11.39 0.29 0.58 2.03 POND SUMMARY TABLE Pond ID Tributary Area (ac) Avg. Percent Imperviousness (%) 100-Yr Detention Vol. (ac-ft) 100-Yr Detention WSEL (ft) Peak Release (cfs) Detention Pond 15.96 45 1.78 4,986.07 8.60 INLET CAPACITY SUMMARY Design Point Design Inlet Label Q2 Q100 Q100 Total Q100 Intercepted Q100 Unintercepted Inlet Type Inlet Size A1 INLET A4-1 0.38 1.75 1.75 1.75 0.00 Nyloplast Basin Dome Grate 12" A1 INLET A5-1 0.38 1.75 1.75 1.75 0.00 Nyloplast Basin Dome Grate 12" A2 INLET A6 1.15 5.19 5.19 5.19 0.00 Type 13 Combo Single A2 INLET A7 1.15 5.19 5.19 5.19 0.00 Type 13 Combo Single Rain Garden Summay Min. Flat Area (sf)Req. Vol. (cf) Prov. Flat Area (sf)Prov. Vol. (cf) Imp. Area Treated (sf) RAIN GARDEN A 1,243 2,041 1,406 2,145 62,426 RAIN GARDEN B 4,797 6,552 5,207 6,619 237,558 SWALE SUMMARY TABLE SWALE ID MIN D MIN TW S1 (n:1)BW S2 (n:1)Q Q*1.33 A1 - A1 0.71 38.39 25.0 n/a 13.0 8.68 11.54 A2 - A2 1.57 42.46 18.0 4.0 5.0 47.20 62.78 A3 - A3 0.77 122.09 7.0 4.0 200.0 14.66 19.50 W W T W X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXX X UD UD UD UD UD 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 8" SS 8" SS 8" SS 8" SS 8" SS 8" S S 8" S S 8" S S UD UD A2 A2 A3A3 SA I N T J E R O M E S T R E E T MOLLER STREET SAINT GRACE STREET PITT, JEAN GBP LLC PEREZ DANIEL A. PEREZ DANIEL A. SOFT GOLD PARK PROPOSED DETENTION POND 100-YR DETENTION VOLUME = 1.91 AC-FT 100-YR WSEL= 4989.11 PROPERTY BOUNDARY PROPERTY BOUNDARY PROPOSED POND OUTLET STRUCTURE PROPOSED 2' CONCRETE PAN PROPOSED 2' CONCRETE PAN PROPOSED 4' SIDEWALK CULVERT PROPOSED 2' CONCRETE PAN RAIN GARDEN A BIOMEDIA AREA RAIN GARDEN B BIOMEDIA AREA STORM DRAIN A SEE SHEET ST1 STORM DRAIN C SEE SHEET ST2 STORM DRAIN B SEE SHEET ST2 RG A UNDERDRAIN RG B UNDERDRAIN 0.71 ac. B1 0.77 ac. A1 0.19 ac. OS6 2.32 ac. A 2.81 ac. B2 1.29 ac. A2 INLET A7 INLET A6 STMH A2 w/ WEIR INLET A4-1 INLET A3-1 KEYMAP T WEST WILLOX LANE HICKORY STREET SOFT GOLD PARK Sheet WI L L O X F A R M Th e s e d r a w i n g s a r e i n s t r u m e n t s of s e r v i c e p r o v i d e d b y E P S Gr o u p , I n c . / N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . a n d ar e n o t t o b e u s e d f o r a n y t y p e of c o n s t r u c t i o n u n l e s s s i g n e d an d s e a l e d b y a P r o f e s s i o n a l En g i n e e r i n t h e e m p l o y o f E P S Gr o u p , I n c . / N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . NO T F O R C O N S T R U C T I O N RE V I E W S E T of 60 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 DR3 DE V E L O P E D D R A I N A G E E X H I B I T 60 NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 1.REFER TO THE "FINAL DRAINAGE REPORT DATED APRIL 25, 2025" BY EPS GROUP FOR ADDITIONAL INFORMATION. 2.THE WILLOX FARM PROJECT WILL BE DETAINING THE DIFFERENCE BETWEEN THE HISTORIC 2-YEAR EVENT AND THE DEVELOPED 100-YEAR EVENT. 3.LID MEASURES IS PROVIDED VIA RAIN GARDEN. 4.ALL PROPOSED STORM SEWER ARE TO BE PRIVATELY OWNED AND MAINTAINED. PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 NOTES: A LEGEND: MATCH LINE - SEE SHEET DR2 DR3 DR2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SWALE SECTIONS DEVELOPED DRAINAGE SUMMARY Design Point Basin ID Total Area (acres) C2 C100 2-Yr Tc (min) 100-Yr Tc (min)WQ Q2 (cfs) Q100 (cfs) a1 A1 0.77 0.44 0.55 10.47 10.47 0.38 0.76 3.50 a2 A2 1.29 0.65 0.81 5.72 5.72 1.15 2.30 10.38 a3 A3 2.40 0.30 0.37 9.85 9.85 0.81 1.62 7.19 b1 B1 0.71 0.55 0.69 5.00 5.00 0.56 1.11 4.85 b2 B2 2.81 0.60 0.75 6.54 6.54 2.20 4.40 21.10 b3 B3 1.17 0.41 0.51 10.83 10.83 0.51 1.03 4.76 b4 B4 1.74 0.50 0.62 10.93 10.93 0.94 1.89 8.72 b5 B5 3.65 0.64 0.80 10.08 10.08 2.58 5.16 25.06 b6 B6 0.86 0.35 0.44 6.49 6.49 0.40 0.80 3.63 b7 B7 0.56 0.73 0.91 5.60 5.60 0.56 1.12 5.05 Offsite Basins os1 OS1 3.92 0.20 0.20 13.06 13.06 0.78 1.55 5.43 os2 OS2 0.53 0.54 0.54 12.27 12.27 0.29 0.59 2.05 os3 OS3 0.07 0.78 0.78 5.00 5.00 0.08 0.16 0.56 os4 OS4 0.17 0.58 0.58 5.00 5.00 0.14 0.27 0.96 os5 OS5 0.33 0.20 0.20 6.87 6.87 0.09 0.17 0.60 os6 OS6 0.19 0.23 0.23 5.28 5.28 0.06 0.13 0.44 os7 OS7 1.34 0.20 0.20 11.39 11.39 0.29 0.58 2.03 POND SUMMARY TABLE Pond ID Tributary Area (ac) Avg. Percent Imperviousness (%) 100-Yr Detention Vol. (ac-ft) 100-Yr Detention WSEL (ft) Peak Release (cfs) Detention Pond 15.96 45 1.78 4,986.07 8.60 INLET CAPACITY SUMMARY Design Point Design Inlet Label Q2 Q100 Q100 Total Q100 Intercepted Q100 Unintercepted Inlet Type Inlet Size A1 INLET A4-1 0.38 1.75 1.75 1.75 0.00 Nyloplast Basin Dome Grate 12" A1 INLET A5-1 0.38 1.75 1.75 1.75 0.00 Nyloplast Basin Dome Grate 12" A2 INLET A6 1.15 5.19 5.19 5.19 0.00 Type 13 Combo Single A2 INLET A7 1.15 5.19 5.19 5.19 0.00 Type 13 Combo Single Rain Garden Summay Min. Flat Area (sf)Req. Vol. (cf) Prov. Flat Area (sf)Prov. Vol. (cf) Imp. Area Treated (sf) RAIN GARDEN A 1,243 2,041 1,406 2,145 62,426 RAIN GARDEN B 4,797 6,552 5,207 6,619 237,558 SWALE SUMMARY TABLE SWALE ID MIN D MIN TW S1 (n:1)BW S2 (n:1)Q Q*1.33 A1 - A1 0.71 38.39 25.0 n/a 13.0 8.68 11.54 A2 - A2 1.57 42.46 18.0 4.0 5.0 47.20 62.78 A3 - A3 0.77 122.09 7.0 4.0 200.0 14.66 19.50