Loading...
HomeMy WebLinkAboutReports - Drainage - 07/16/2025Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 1 of 27 PREPARED FOR: Hartford Homes, LLC 4801 Goodman St. Timnath, CO 80547 PREPARED BY: Galloway & Company, Inc. 5235 Ronald Reagan Blvd., Suite 200 Johnstown, CO 80534 Contact: James Prelog, PE DATE: July 16, 2025 BLOOM COMMERCIAL Fort Collins, CO PRELIMINARY DRAINAGE REPORT Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 2 of 27 ENGINEER’S STATEMENT “I hereby attest that this report for the final drainage design for the Bloom Commercial was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others.” Herman Feissner, P.E. 0038066 Date For and on behalf of Galloway & Company, Inc. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 3 of 27 I. Introduction ................................................................................................................................................ 4 General Location .............................................................................................................................. 4 Existing/Pre-Project Site Info ........................................................................................................... 4 II. Master Drainage Basin .............................................................................................................................. 5 Overall Basin Description ................................................................................................................. 5 Existing Drainage Facilities .............................................................................................................. 5 Floodplain ......................................................................................................................................... 6 III. Project Description ................................................................................................................................... 7 Existing Conditions ........................................................................................................................... 7 Proposed Conditions ........................................................................................................................ 7 IV. Proposed Drainage Facilities ................................................................................................................... 8 General Concept .............................................................................................................................. 8 Proposed Drainage Basins .............................................................................................................. 9 Detention Pond ................................................................................................................................ 9 Low Impact Development and Water Quality ................................................................................ 10 V. Drainage Design Criteria ........................................................................................................................ 11 Directly Connected Impervious Area (DCIA) ................................................................................. 11 Development Criteria Reference and Constraints ......................................................................... 12 Hydrological Criteria ....................................................................................................................... 12 Hydraulic Criteria ............................................................................................................................ 13 VI. EROSION AND SEDIMENT CONTROL MEASURES .................................................................... 14 Construction Material & Equipment ............................................................................................... 14 Maintenance ................................................................................................................................... 14 VII. Conclusions .......................................................................................................................................... 16 Compliance with Standards ........................................................................................................... 16 Variances ....................................................................................................................................... 16 Summary of Concepts .................................................................................................................... 16 VIII. References .......................................................................................................................................... 17 Appendices: A. Exhibits and Figures B. Excerpts from Reference Materials C. Hydrologic Computations D. Hydraulic Computations E. SWMM Model F. Drainage Maps TABLE OF CONTENTS Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 4 of 27 I. Introduction General Location The proposed Bloom Commercial project site (Site or commercial site) is in the southern region of Bloom. More specifically it is located directly south of Donella Drive and north of East Mulberry Street, just west of I-25, to the east of the Mosaic Subdivision in Fort Collins, Colorado. The overall Bloom development is bordered to the north by East Vine Drive; to the east by the Imu-Tek Animal Health Clinic and undeveloped land; to the south by East Mulberry Street; and to the west by East Ridge Second Filing (i.e., Mosaic Subdivision). The Bloom Commercial site is located in the Northwest Quarter of Section 9, Township 7 N., Range 66 W. of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. A vicinity map is included in Appendix A for reference. This report follows a previous report by Galloway & Company, Inc. (GAL), “Final Drainage Report Bloom Filing 1” dated November 2022. Two amendments to the November 2022 report have been filed: - June 2023: “Bloom Filing 1 Amendment – Drainage Modifications”; - January 2025: “Bloom Filing 1 Amendment – Drainage Modifications”. Existing/Pre-Project Site Info The commercial site consists of the area of the overall site that is south of Donella Drive. In the pre- project conditions the land was undeveloped and overlot graded. Pre-project grades across the site vary from 0.5 to 3.0 percent. The commercial site generally drains from north to south. The project site is located within the Cooper Slough/Boxelder Basin and the Cooper Slough channel is located just to the east of the project site. The Lake Canal also cuts across the southwest corner of the overall Bloom site. SWMM basin I from the November 2022 work is not a part of this current work. This basin is located southwest of the Lake Canal. According to the Natural Resources Conservation (NRCS) Web Soil Survey, the commercial site consists of a mix of soil types and Hydrologic Soil Groups (HSG) including: - Ascalon Sandy Loam (17), HSG ‘B’ - Garrett Loam (83%), HSG ‘B’ The soil map generated by the Web Soil Survey can be found in Appendix A. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 5 of 27 II. Master Drainage Basin Overall Basin Description The overall Bloom project site is located in the lower portion of the Cooper Slough Watershed. The master plan for this drainage basin was updated in May of 2021. This report is titled “City of Fort Collins Upper Cooper Slough Basin Selected Plan of Improvements” prepared by Icon Engineering, Inc. (Master Plan). The Cooper Slough drainage basin resides in northeast Fort Collins and unincorporated Larimer County, Colorado. The Master Plan describes it as a long and slender watershed, flowing from north to south, comprising 28 square miles which are tributary to Box Elder Creek and the Cache la Poudre River. The watershed begins at the confluence with Box Elder Creek, which is about one-half mile south of Mulberry Street and slightly west of I-25, and proceeds north for 20 miles to Larimer County Road 80 at a location northwest of the Town of Wellington. The basin has a maximum width of 3.9 miles at a location just south of Wellington. Predominant land uses are characterized by farmland and open space, with development occurring mainly in the southern portion of the watershed, near northeast Fort Collins. The Cooper Slough watershed has been divided into upper and lower portions by the Larimer & Weld Canal. The project site is located in the lower portion of the watershed. The Master Plan discusses improvements to the Cooper Slough and Lake Canals including culverts installed in Vine and Mulberry, but these improvements lie outside of the boundaries of this project and therefore are not a part of this project. There will be no changes to the Cooper Slough or Lake Canals as part of this project. The proposed development to the southeast of the project site, Peakview, has included a portion of a box culvert that will eventually divert water from the Lake Canal to the Cooper Slough. The box culvert will be designed, constructed, plugged, and buried until future Master Plan culvert improvements are constructed. Relevant excerpts from the Master Plan are included in Appendix B. Existing Drainage Facilities A historic/existing basin map was developed with the November 2022 report, reference Appendix B, for an excerpt from the report. A SWMM model was used to determine the existing runoff and the 2-year and 100-year runoff values from the models are included in the basin description below. According to the Master Plan, future development within the area of the site is to “Limit the release (both peak discharge and volume) associated with future development within the Upper Cooper Slough Basin to the 100-year existing condition release rates into the lower Cooper Slough area.” Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 6 of 27 The basin below was established in the November 2022 report and includes the Bloom Commercial site. Basin H-3 (±162 acres, Q2 = 8.7 cfs, Q100 = 52.0 cfs) is associated with the western portion of the site. Runoff currently sheet flows south into the Lake Canal. Floodplain The Cooper Slough runs along the eastern boundary of the overall Bloom project site. According to the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map Panels 982 (FIRM Number 08069C0982F) effective date December 19, 2006 and Panel 984 (FIRM Number 08069C0984H) effective date May 2, 2012 included in Appendix A, a portion of the site lies within Zone AE of the Cooper Slough, an area subject to inundation by the 1% annual chance 100-yr flood. In Zone AE, the base flood elevations (BFEs) have been determined. However, a LOMR (FEMA Case No.: 17-08-1354P) became effective February 21, 2019. The LOMR was submitted as a part of a restudy of the Boxelder and Cooper Slough prepared for the Boxelder Stormwater Authority by Ayres Associates. The effective 100-yr floodplain encroaches on a significant portion of the commercial site south of Donella Drive. No development activities are planned to encroach on the effective floodway. All elevations provided are in reference to the NAVD 1988, with Cooper Slough effective 100-yr floodplain water surface elevations ranging between 4930.5 ft and 4960.2 ft adjacent to the overall Bloom project site. The development shall follow floodplain regulations stated in Chapter 10 of the City Code. All structures shall have the elevation of the lowest floor be above regulatory flood protection elevations. It is anticipated that no work shall commence within the floodway. A floodplain use permit was submitted to the City of Fort Collins in conjunction with the November 2022 report. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 7 of 27 III. Project Description The Bloom Commercial development encompasses ±35.6 acres and will include the development of multi-family homes, commercial use, and associated streets, utilities, and open space. The project site is bordered to the east by Greenfields Court; to the west by existing industrial development; to the north by Donella Drive; and to the south by the Lake Canal and Frontage Road. This report summarizes the drainage facilities for the commercial site including proposed channel improvements, Low Impact Development (LID) Best Management Practices (BMPs), Water Quality (i.e., Extended Detention Basin (EDB), and stormwater quantity detention. Existing Conditions The existing project site is ±35.6 acres of undeveloped ground. Existing grades of the Site generally slope from 0.5 to 3.0 percent. Proposed Conditions The proposed Bloom Commercial site in the southern area of the larger Bloom development. It will include the development of town homes, commercial buildings, associated streets, utilities, and open space. The commercial site drains to the west, southwest, and southeast to three (3)-detention ponds at various grades. These three on-site detention ponds will eventually outfall into the Cooper Slough. The commercial site will also provide stormwater quantity detention for Bloom Filing 3. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 8 of 27 IV. Proposed Drainage Facilities General Concept Runoff from the developed site will generally be conveyed via overland flow and curb and gutter to a proposed storm drain system that will convey the minor and major event stormwater runoff to on-site detention ponds. There are three (3)-detention ponds proposed within the commercial site to provide water quality (e.g., associated with the remaining 25% of newly added impervious area) and quantity detention. Pond G1 (proposed) will outfall into proposed storm drain that ties into the existing Cooper Slough Outfall (designed and constructed w/Bloom Filing 1). Pond H (existing) ties into the existing Cooper Clough outfall. Pond J (proposed) will outfall into proposed storm drain that ties into the existing Cooper Slough Outfall. Existing detentions ponds E and G are also included in the commercial site SWMM because they contribute to the total release rate. Per GAL’s November 2022 FDR and subsequent June 2023 and January 2025 Bloom Filing 1 Amendment documents, the total allowable release into the Cooper Slough is 44.4 cfs (i.e., ±222 acres * 0.2 cfs/acre – per accepted variance). The total release from detention ponds A, B, C, and D is ±23.7 cfs; therefore, the allowable remaining release from ponds E (existing), G (existing), G1 (proposed with the commercial site), H (existing), and J (proposed with the commercial site) is ±20.7 cfs. Detention ponds E, G, G1, H, and J were analyzed herein using EPA SWMM 5.2. A summary of the pond volumes and release rates from the SWMM model is included in Appendix C. The commercial site has been divided into three (3) three larger SWMM basins G1, H, and J. These larger basins were further divided into twenty-nine (29) smaller basins for the purposes of Rational Method calculations. Water Quality will be provided on-site through Low Impact Development (LID) practices and Water Quality Capture (WQCV) within the detention ponds. The City of Fort Collins, per section 2.3.7 Low Impact Development (FCSCM), requires implementation of LID systems following one of the following options: 1) 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious; or 2) 75% of all newly added or modified impervious area must be treated by LID techniques. There are no off-site basins impacting the project site. There are no proposed improvements to the Cooper Slough associated with the development of the commercial site. A floodplain permit is to be submitted prior to any work being done within the floodplain. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 9 of 27 Proposed Drainage Basins Basin G1 Basin G1 encompasses areas of both Bloom Filing 3 and Bloom Commercial. The total area of G1 is approximately 32 acres (i.e., ±33.4 acres in Rational Method and ±32.0 acres in SWMM). We acknowledge there are minor discrepancies between the Rational Method and SWMM basin areas. Our intent is to resolve them as the project moves forward. Specific to the work herein, areas are relative to the SWMM areas. Approximately 21.0 acres of basin G1 are within the Filing 3 site, and approximately 11.0 acres are within the commercial site. This basin includes areas for commercial businesses, associated infrastructure, and open space. In a subsequent submittal, additional LID detail will be added to treat 75% of the newly added impervious area with an LID technique (i.e., ±0.15 ac-ft for a volume-based LID). In support of this, Appendix C includes preliminary Sand Filter (SF) sizing. The Water Quality Capture Volume (WQCV) associated with the remaining newly added impervious area within the total G1 area will be treated in an Extended Detention Basin (i.e., ±0.14 ac-ft) within Pond G1. This volume will be added to the estimated quantity volume. In this report, basin G1 will provide EDB and quantity detention for the area located within Filing 3. While the LID for the Filing 3 area will be provided within Filing 3. Basin H Basin H comprises approximately 10.7 acres. This area will be developed in the future as commercial. Our intent is for the future developer to meet the CoFC LID requirements locally. The remaining 25% of the newly added impervious area will be treated in an EDB within Pond H (existing). Basin J Basin J comprises approximately 6.9 acres. This area will be developed in the future as higher-density residential (e.g., townhomes). Our intent is for the future developer to meet the CoFC LID requirements locally. The remaining 25% of the newly added impervious area will be treated in an EDB within Pond J (proposed). Detention Pond Each pond will provide volume for quality (i.e., EDB) and quantity. The Final Drainage Report Bloom Filing 1 (November 2022, GAL) presented the release rate methodology for the overall Bloom development that was approved and subsequently applied herein. Two follow-up memorandums by GAL in June 2023 and January 2025, revised the layout of Pond G by splitting it into two detention ponds (i.e., Pond G and Pond G1) and revised the total release rate into the Cooper Slough from detention ponds A, Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 10 of 27 B, C, and D from ±21.9 cfs to ±23.7 cfs, respectively. Therefore, the allowable release rate from the commercial site when combined with flows from Basin G is ±20.7 cfs. Ponds G1, H, and J will provide water quality. In future filings, the water quality plate will be resized for the actual imperviousness that is tributary to those ponds. The table below shows release rates and volumes. Detention Pond (s) 100-year Volume Required (per SWMM) Allowable Release Rate Proposed Release Rate (From SWMM Model) E and G EXISTING ±20.7 cfs* ±13.5 cfs ±21.1** cfs G1 ±7.6 ac-ft / 329,053 ft3 ±6.5 cfs H ±3.2 ac-ft / 140,590 ft3 ±0.5 cfs J ±2.0 ac-ft / 86,290 ft3 ±0.6 cfs * Release rate presented in Bloom Filing 1 Amendment - Drainage Modifications (January 2025, GAL) **The estimated release rate per SWMM is ±2.0% higher than allowable. Low Impact Development and Water Quality The ODP has determined that water quality and detention will be required for the development of the Site. Required “Water Quality Capture Volume (“WQCV”) was calculated using equation 7-1 and Equation 7-2 from FCSCM. The following table is the anticipated amount of the newly added impervious area and a breakdown of the total area treated by an LID or an EDB feature. Basin SWMM Basin Area SWMM % IMP. Preliminary LID and WQCV Area Estimates ft2 acres Newly Added Imp. Area (NAIA), ft2 75% of NAIA for LID, ft2 25% of NAIA for WQCV, ft2 G 853520.4 19.6 90.0% 768168.4 576126.3 192042.1 G1 (total) 1395559.3 32.0 72.5% 1011780.5 758835.4 252945.1 G1 (local) 480048.2 11.0 80.0% 384038.6 288028.9 96009.6 H 464232.3 10.7 80.0% 371385.9 278539.4 92846.5 I 279160.8 6.4 80.0% 223328.6 167496.5 55832.2 J 300263.9 6.9 80.0% 240211.1 180158.3 60052.8 Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 11 of 27 V. Drainage Design Criteria Directly Connected Impervious Area (DCIA) At this preliminary stage of the design process, we’ve started working on our strategy for implementing ‘The Four-Step Process’ for stormwater quality management. Each step is listed below and includes a brief narrative describing the implementation strategy. Step 1 - Employ runoff reduction practices The newly added impervious area associated with developed runoff from the G1 (local), H, and J series of basins will drain to an LID facility such as a Sand Filter (SF) or ADS StormTech system prior to entering the local on-site detention facilities. Our intent is to provide quantity detention and additive Water Quality Capture Volume (WQCV) for each basin and its estimated future imperviousness. Basin specific LID facilities will be designed at the time of development. However, Appendix C includes sample calculations for a Sand Filter (SF) in G1 (local). The SF design encourages settling of sediments, filtering, and infiltration. The Mile High Flood District (MHFD) defines the facility as an “engineered, depressed landscape area designed to capture and filter or infiltrate the Water Quality Capture Volume (WQCV).” Step 2 - Implement BMPs that provide a Water Quality Capture Volume (WQCV) The developed runoff from the G1, H, and J basins will drain into an Extended Detention Basin (EDB) sized for 25% of the newly added imperviousness within the respective tributary area. The MHFD defines an EDB as “An engineered basin with an outlet structure designed to slowly release urban runoff over an extended time period to provide water quality benefits and control peak flows for frequently occurring storm events. The basins are sometimes called "dry ponds" because they are designed not to have a significant permanent pool of water remaining between storm runoff events. Outlet structures for extended detention basins are sized to control more frequently occurring storm events.” Step 3 - Stabilize drainageways Measures have be implemented to protect the Cooper Slough from the on-site detention pond outflows. Step 4 - Implement site specific and other source control BMPS Site specific considerations such as material storage and other site operations are addressed in the Stormwater Management Plan (SWMP). Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 12 of 27 Development Criteria Reference and Constraints The project must release at historic rates for each drainage basin, however due to the site being located on flat, farmland it has been determined that 0.2 cfs/acre would be a more appropriate release into the Cooper Slough. The overall Bloom Commercial site will release into the Cooper Slough at a rate of ±21.1 cfs Hydrological Criteria For urban catchments that are not complex and are generally 160 acres or less in size, it is acceptable that the design storm runoff be analyzed using the Rational Method. The Rational Method is often used when only the peak flow rate or total volume of runoff is needed (e.g., storm sewer sizing or simple detention basin sizing). The Rational Method was used to estimate the peak flow at each design point. For preliminary design, no routing (i.e., time attenuation) calculations were completed; this work will occur at Final Design. When a total flow is reported within this preliminary drainage report, assume it is simply a summation of all upstream flows. The Rational Method is based on the Rational Formula: Q = CiA Where: Q = the maximum rate of runoff, cfs C = a runoff coefficient that can be interpreted as ratio between the runoff volume from an area and the average rate of rainfall depth over a given duration for that area i = average intensity of rainfall in in/hr for a duration equal to the Time of Concentration (Tc) A = area, acres The one-hour rainfall Intensity-Duration-Frequency tables for use with the Rational Method of runoff analysis are provided in Table 3.4-1 and Figure 3.4-1 (refer to Appendix B). The 2-year and 100-year storm events are the basis for the preliminary drainage system design. The 2- year storm is considered the minor storm event. It has a fifty percent probability of exceedance during any given year. The 100-year storm is considered the major storm event. It has a one percent probability of exceedance during any given year. The 2-year drainage system, at a minimum, must be designed to transport runoff from the 2-year recurrence interval storm event with minimal disruption to the urban environment. The 100-year drainage system, as a minimum, must be designed to convey runoff from the 100-year recurrence interval flood to minimize life hazards and health, damage to structures, and interruption to traffic and services. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 13 of 27 The preliminary detention requirements were estimated with EPA SWMM 5.2. The SWMM input parameters for each basin reference Table 4.1-1 of the FCSDCM. Hydraulic Criteria The on-site excess developed runoff within each tributary area will begin as overland flow from the future commercial and townhome roof and parking areas. Runoff then flows from these areas to nearby curb and gutter in the parking area or nearby street section where it channelizes. The channelized flow is intercepted by curb or area inlets and discharged to the local storm drain system that outfalls to an LID facility and ultimately a local detention pond. Detailed hydraulic analyses for street capacity, inlet capacity, and storm drain capacity (i.e., HGL and EGL) will be provided in a future submittal. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 14 of 27 VI. EROSION AND SEDIMENT CONTROL MEASURES A General Permit for Stormwater Discharge Associated with Construction Activities issued by the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division (WQCD), will be acquired for the site. A Stormwater Management Plan (SWMP) should be prepared to identify the Stormwater Control Measures (SCMs) which, when implemented, will meet the requirements of said General Permit. Below is a summary of SWMP requirements which may be implemented on-site. The following temporary SCMs may be installed and maintained to control on-site erosion and prevent sediment from traveling off-site during construction: • Silt Fence (SF) – a woven synthetic fabric that filters runoff. The silt fence is a temporary barrier that is placed at the base of a disturbed area. • Vehicle Tracking Control (VTC) – a stabilized stone pad located at points of ingress and egress on a construction site. The stone pad is designed to reduce the amount of mud transported onto public roads by construction traffic. • Straw Wattles (SW) – wattles act as a sediment filter. They are a temporary BMP and require proper installation and maintenance to ensure their performance. • Inlet protection (IP) – Inlet protection will be used on all existing and proposed storm inlets to help prevent debris from entering the storm sewer system. Inlet protection generally consists of straw wattles or block and gravel filters. Construction Material & Equipment The contractor shall store all construction materials and equipment and shall provide maintenance and fueling of equipment in confined areas on-site from which runoff will be contained and filtered. Maintenance The temporary SCMs will be inspected by the contractor at a minimum of once every two weeks and after each significant storm event. The property owner will be responsible for routine and non-routine maintenance of the temporary BMPs. Routine maintenance includes: • Remove sediment from the bottom of the temporary sediment basin when accumulated sediment occupies about 20% of the design volume or when sediment accumulation results in poor drainage. • Lawn mowing-maintain height of grass depending on aesthetic requirements. • Debris and litter removal-remove debris and litter to minimize outlet clogging and improve aesthetics as necessary. • Inspection of the facility-inspect the facility annually to ensure that it functions as initially intended. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 15 of 27 • Cleaning and repair of BMP’s is required when sediment has built up or the BMP is not working properly. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 16 of 27 VII. Conclusions Compliance with Standards The design presented in this drainage report for Bloom Commercial development has been prepared in accordance with the design standards and guidelines presented in the Fort Collins Stormwater Criteria Manual. Variances There are no variances requests associated with the current work. Summary of Concepts The proposed storm drainage improvements should provide adequate protection for the developed site. The proposed drainage system for the site should not negatively impact the existing downstream storm drainage system. Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. Page 17 of 27 VIII. References 1. Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, January 2016 (with current revisions). 2. Fort Collins Stormwater Criteria Manual (Addendum to the Urban Drainage Storm Drainage Criteria Manuals Volumes 1, 2, and 3), prepared by City of Fort Collins, Revised December 2018 3. Soil Map – Larimer County Area, Colorado as available through the Natural Resources Conservation Service National Cooperative Soil Survey web site via Web Soil Survey 2.0. 4. Flood Insurance Rate Map – Larimer County, Colorado and Incorporated Areas Community Panel No. 08069C0982F, Effective December 19, 2006 and 08069C0984H, Effective May 2, 2012. 5. City of Fort Collins Upper Cooper Slough Basin Selected Plan of Improvements, Icon Engineering, Inc., May 2021. 6. Final Drainage Report for Peakview, United Civil Design Group, December 21, 2020. 7. Master Drainage Report for Mulberry, Galloway & Company, Inc., August 8, 2021 8. Preliminary Drainage and Erosion Control Report for Bloom Filing Three Fort Collins, Colorado, Aspen Engineering, June 14, 2023 9. Final Drainage and Erosion Control Report Bloom Multi Family Fort Collins, Colorado, CivilWorx, LLC, June 25, 2024 Bloom Commercial Preliminary Drainage Report Galloway & Company, Inc. APPENDIX A Exhibits and Figures 5235 Ronald Reagan Blvd., Suite 200 Johnstown, CO 80534 970.800.3300 • GallowayUS.com BLOOM COMMERCIAL VICINITY MAP NOT TO SCALE Hydrologic Soil Group—Larimer County Area, Colorado (HFH073 | Bloom Commercial) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/13/2025 Page 1 of 4 44 9 2 2 0 0 44 9 2 3 0 0 44 9 2 4 0 0 44 9 2 5 0 0 44 9 2 6 0 0 44 9 2 7 0 0 44 9 2 8 0 0 44 9 2 9 0 0 44 9 3 0 0 0 44 9 3 1 0 0 44 9 2 2 0 0 44 9 2 3 0 0 44 9 2 4 0 0 44 9 2 5 0 0 44 9 2 6 0 0 44 9 2 7 0 0 44 9 2 8 0 0 44 9 2 9 0 0 44 9 3 0 0 0 44 9 3 1 0 0 498200 498300 498400 498500 498600 498700 498800 498200 498300 498400 498500 498600 498700 498800 40° 35' 22'' N 10 5 ° 1 ' 1 9 ' ' W 40° 35' 22'' N 10 5 ° 0 ' 4 7 ' ' W 40° 34' 49'' N 10 5 ° 1 ' 1 9 ' ' W 40° 34' 49'' N 10 5 ° 0 ' 4 7 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 200 400 800 1200 Feet 0 50 100 200 300 Meters Map Scale: 1:4,880 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 19, Aug 29, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 2, 2021—Aug 25, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (HFH073 | Bloom Commercial) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/13/2025 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 7 Ascalon sandy loam, 0 to 3 percent slopes B 25.1 28.8% 35 Fort Collins loam, 0 to 3 percent slopes C 0.0 0.0% 40 Garrett loam, 0 to 1 percent slopes B 59.4 68.2% 73 Nunn clay loam, 0 to 1 percent slopes C 0.0 0.0% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 1.8 2.1% 94 Satanta loam, 0 to 1 percent slopes C 0.7 0.8% Totals for Area of Interest 87.1 100.0% Hydrologic Soil Group—Larimer County Area, Colorado HFH073 | Bloom Commercial Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/13/2025 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado HFH073 | Bloom Commercial Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/13/2025 Page 4 of 4 National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to Levee Zone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 7/13/2025 at 4:08 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 105°1'21"W 40°35'12"N 105°0'43"W 40°34'45"N Basemap Imagery Source: USGS National Map 2023 4,514 752.3 HFH073 | Bloom Commercial This map is a user generated static output from the City of Fort Collins FCMaps Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. City of Fort Collins - GIS 572.0 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Feet572.00286.00 Notes Legend 3,430 Street Names FEMA Floodplain FEMA High Risk - Floodway FEMA High Risk - 100 Year FEMA Moderate Risk - 100 / 500 Year City Floodplains City High Risk - Floodway City High Risk - 100 Year City Moderate Risk - 100 Year City Limits Bloom Commercial Preliminary Drainage Report APPENDIX B Excerpts from Reference Materials ANHEUSER BUSCH (AB) PLANT Sod Farm Diversion Q diverted = 752 cfs Proposed Sod Farm Pond S = 164 AF Max WSE = 5033.2 ft Berm along southern end at 5037.0 ft Sod Farm Pond Outlet Pipe into No. 8 Outlet Ditch 36" RCP with a 33.6" Orifice Q = 54 cfs Mountain Vista Diversion From No8 Outlet Ditch Q = 2 5 0 c f s Q = 8 9 c f s Assume Full Development of AB Lands with 100yr -> 2yr Detention (On-Site) Mountain Vista Diversion May Be Conveyed In Open Channel or Pipe through Montava Development Proposed C&S/ Crumb Detention Pond (426) S = 193 AF WSE = 4987.0 ft Qin = 903 cfs New AB Pond Outfall Overflow Flume Discharges into Cooper Slough Q = 304 cfs Existing AB 425 Pond Outlet Remains Connected to L&W Canal Q = 385 cfs Existing AB Pond 425 S = 47 AF Max WSE = 4983.5 Qin = 732 cfs Remove Existing Flow Spill At CSRR Provide Open Channel to Convey Flows on West Side of RR Combined Outlow From C&S/ Crumb and L&W Canal Spill Q = 639 cfs Proposed E. Vine Dr. Culverts (3) 8' x 4' RCBC Q = 678 cfs Proposed E. Mulberry St. Culverts (2) 6' x 11' RCBC Q = 1050 cfs COOPER SLOUGH Canal Spill to Dry Creek Q = 0 cfs Canal Spill Q = 421 cfs Q = 7 7 8 c f s Q = 3 5 7 c f s Q = 2 2 9 c f s Q = 3 3 9 c f s Q = 1 0 0 2 c f s Q = 3 7 4 c f s NO . 8 O U T L E T D I T C H LARIME R & W E L D C A N A L CO L O R A D O & S O U T H E R N R A I L R O A D BOXELDER WATERSHED DRY CREEK WATERSHED COOPER SLOUGH WATERSHED BLACK HOLLOW OUTFALL CHANNEL IMPROVEMENTS FROM 2006 MASTER PLAN NOT INCLUDED IN 2021 UPDATE Q = 2 5 0 c f s N. Poudre Reservoir No. 6 Add 8-inch Iron Sill Plate to Spillway Q = 547 cfs S = 679 AF Max WSE = 5163.2' Proposed (2) 6'x11' RCBC to Lake Canal SH-14 Proposed Channel to Box Elder Creek Channel and Bank Improvements along Cooper Slough Pond A S = 82 AF Max WSE = 5019.6 ft Qout = 778 cfs Montava Swale Q = 778 cfs Q = 1 4 9 c f s Overflow Pond S = 20.3 AF WSE = 4980.2 ft Qin = 112 cfs Proposed C&S/ Crumb Outfalls: 42" RCP to AB Pond = 102 cfs 3ft x 13.5ft RCBC to AB Pond (3ft above Pond inv) = 331 cfs Spill to Overflow Pond = 112cfs Overflow Pond Outfall into L&W Canal 48" RCP with a 44.4" Orifice Qout = 103 cfs Proposed (3) 3'x15' RCBC under Lake Canal Proposed Channel Proposed culverts for local drainage MONTAVA DEVELOPMENT MT VISTA AND TIMBERLINE ROAD MIXED-USED DEVELOPMENT WATER'S EDGE DEVELOPMENT COUNTRY CLUB RESERVE DEVELOPMENT Existing 24-in Culvert Capaity = 21cfs Culvert Crossing (3) 10'X3' RCBC Q = 888cfs Proposed Channel Formalize Spill from Lake Canal E VINE DR IN T E R S T A T E 2 5 S B E MULBERRY ST GI D D I N G S R D TU R N B E R R Y R D RICHARDS LAKE RD MOUNTAIN VISTA DR E LIN C O L N A V E S TIMB E R L I N E R D COUNTRY CLUB RD E COUNTY ROAD 48 §¨¦25 §¨¦25 Cooper Slough Selected Plan (2021) Figure 3: Selected Plan Projects $ 0 0.5 Miles Legend swale Overflow_Pond Pond_A C&S_Pond AB_Pond CRUMB_OUTLET Sod Farm Pond Proposed_Channel Proposed Culvert Montava Dev Boundary Waters Edge Dev Boundary Cooper Slough Basin Boundary MtVista ! ! ! ! !Anheuser Busch Property 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 GallowayUS.com Memorandum HFH22 - Memorandum F1 Amendment.docx Page 1 of 2 To:Wes Lamarque, PE City of Fort Collins From:Matthew Pepin, PE Galloway, Inc. Date:06/20/2023 Re:Bloom Filing 1 Amendment - Drainage Modifications To Mr. Lamarque, Bloom Filing 1 required revisions that would include a modified pond, an added pond, and modifications to associated storm infrastructure. This memorandum is to help provide information on the changes from the approved Bloom F1 Final Drainage Report for the stated Amendment. Pond Modification / Addition Pond G was initially approved to provide 9.5 ac-ft of volume and release at a rate of 17.6 cfs. This pond is being split into two separate ponds to allow for increased development within the piece of land where Pond G initially was planned. Pond G will now be reduced to a volume of 4.8 ac-ft and releasing at 13.5 cfs. A second pond, Pond G1, will be located on the western part of the site. Pond G1 will provide 5.1 ac-ft of volume and release at 4.4 cfs. This would increase the amount of total flow existing both ponds from the original by 0.2 cfs. In order to maintain a maximum of 22.3 cfs releasing into the southern part of the Cooper Slough outfall, Pond I’s flow will be restricted from 0.35 cfs to 0.15 cfs. Storm Infrastructure The associated basin that were tributary to the effected modification storm infrastructure are labeled as A-G1, A-G2,…A-G6. Inlet calculations were added for these basins as well. An updated StormCAD output for the effected storm lines has been included a part of this memo. Tailwater conditions were set based on the 100-year WSEL for the major storm event and a free outfall condition in the minor event. Note: there is HGL surcharging from SD Inlet L1.5 and SD Inlet L1. The HGL at this location is .27 higher than the RIM at the MH of SD MH L1.4. This equates to 3.24 inches and would remain within the ROW, not impacting the lots. Storm Infrastructure incorporating Bloom F2 In order to take into account LID’s within Bloom F2, there is another modification to the storm pipe infrastructure. A concern of too much flow entering the LID in the major storm events would cause damage needed to be mitigated. To prevent this from happening, a manhole would split flow from outfalling into the LID and by passing downstream to outfall into the EDB (Pond E). This flow split would have flow entering into the LID at a maximum of 15.5 cfs in the major storm event. The flow split is achieved by having the smaller 15” pipe sit lower than the larger pipe, restricting flow for the minor event to only pass through the 15” pipe. The flow rate allowing for all flow in the minor storm event to enter the LID at a flow rate of 12.02 cfs. Bloom Filing 1 06/20/2023 HFH22 - Memorandum F1 Amendment.docx Galloway & Company, Inc.Page 2 of 2 CONCLUSION The modifications to the site will not change the overall design intent that was originally approved with Bloom F1 Drainage Report. Sincerely, GALLOWAY Matthew Pepin, PE Civil Project Engineer MatthewPepin@Gallowayus.com 01/02/2024 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 • GallowayUS.com Memorandum HFH22 - Memorandum F1 Amendment v2.docx Page 1 of 1 To: Wes Lamarque, PE City of Fort Collins From: Matthew Pepin, PE Galloway, Inc. Date: 01/31/2025 Re: Bloom Filing 1 Amendment - Drainage Modifications To Mr. Lamarque, Bloom Filing 1 required revisions that would include modifying Pond D outlet structure design. This memorandum is to help provide information on the changes from the approved Bloom F1 Final Drainage Report for the stated Amendment. Pond D Outlet Structure Modification Pond D was initially approved to release at a rate of 0.76 cfs. Upon completing the pond certification for the pond, it was determined that the pond would not drain in 120-hours per Colorado State Statute. Pond D’s release rate was modified to increase to 2.55 cfs to allow it to fully drain within the 120-hours. This increase would provide a total increase of 1.78 cfs into the upper portion of Cooper Slough. The approved Cooper Slough release rate initially was 21.91 cfs and the revised release rate is 23.69 cfs. To compensate for the increase on the upper portion of the Cooper Slough, the existing interim Pond G1 (which will be modified in its future condition) and the future commercial site proposed pond located within Basin H will restrict its release to equalize the total site to a maximum of 0.2 cfs per acre as outlined in the approved Final Drainage Report and City of Fort Collins Storm Drainage Criteria. These design modifications will occur at a later date. To allow for the change of flow, the restrictor plate will be raised to be approximately 0.3’ above the structure bottom. CONCLUSION The modifications to Pond D will not change the overall design intent that was originally approved with Bloom F1 Drainage Report and will allow for the pond to fully drain the stormwater stored within the pond within 120 hours. Sincerely, GALLOWAY Matthew Pepin, PE Sr. Civil Project Engineer MatthewPepin@Gallowayus.com H1 H4 H3 H2 CooperSlough LakeCanal O1 CityofFortCollins Mulberry - Existing Conditions SWMM 5.1 Page 1 SHARED STORM 1 - PROFILE STA: 9+50 TO STA 18+50 4910 4915 4920 4925 4930 4935 4940 4945 4950 4910 4915 4920 4925 4930 4935 4940 4945 4950 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+50 MH D P 1 - 2 ST A : 1 3 + 1 9 . 9 1 RI M 4 9 2 9 . 7 ± IN V . I N 4 9 2 4 . 0 3 ( N ) IN V . I N 4 9 2 2 . 0 1 ( W ) IN V . O U T 4 9 2 1 . 9 1 ( E ) FE S D P 1 - 1 ST A : 1 0 + 0 0 . 0 0 RI M 4 9 2 3 . 6 ± IN V . I N 4 9 2 1 . 2 7 ( W ) ST U B D P 1 - 3 ST A : 1 7 + 7 6 . 4 8 RI M 4 9 2 5 . 3 ± IN V . O U T 4 9 2 2 . 9 4 ( E ) PROPOSED GRADE EXISTING GROUND 456.6 LF 30" RCP @ 0.20% 319.9 LF 30" RCP @ 0.20% 5'(W) x 8'(L) TYPE L RIPRAP 100-YR HGL ST A R T B O X C U L V E R T ST A : 1 0 + 0 1 . 5 5 IN V . O U T 4 9 2 2 . 6 9 ( E ) IN V . O U T 4 9 2 2 . 6 9 ( W ) 137.3 LF 4'X12' BOX CULVERT @ 0.20% EN D B O X C U L V E R T ST A : 9 + 9 5 . 5 1 IN V . I N 4 9 2 2 . 4 1 ( W ) 9+7510+00 11+00 12+00 13+0014+0015+0016+0017+0018+00 FRON T A G E R O A D LOT 2 MULBERRY ST (CO HWY 14) FR O N T A G E R O A D GR E E N F I E L D S D R I V E STA: 9+75.00 N: 4440.56 E: 4688.12 START ALIGNMENT STUB DP 1-3 STA 9+99.20 N: 4469.56 E: 3887.42 FES DP 1-1 STA 9+84.18 N: 4442.19 E: 4663.17 319.9 LF 30" STORM 456.6 LF 30" STORM MH DP 1-2 STA 10+00.00 N: 4463.10 E: 4343.94 DP STORM 1 (SEE THIS SHEET) STA: 18+00.00 N: 4469.89 E: 3863.90 END ALIGNMENT GD STORM 1 (SEE SHEET C4.11) GD STORM 1-3 (SEE SHEET C4.11) FR STORM 1 (SEE SHEET C4.13) WQ STORM 1 (SEE SHEET C4.13) DP STORM 1 (SEE SHEET C4.13) 137.3 LF 4'X12' BOX CULVERT START BOX CULVERT STA 10+01.55 N: 4471.61 E: 3906.00 END BOX CULVERT STA 9+95.51 N: 4463.39 E: 4043.05 PROPOSED BOX CULVERT (SEE SHEET C7.10 FOR MORE INFO) 9+75 10+00 10+50 MH DP 1-2 STA 10+00.00 N: 4463.10 E: 4343.94 21.6 LF 12" STORM OUTLET DP 1-2.1 STA 10+21.62 N: 4484.71 E: 4344.28 FRO N T A G E R O A D STA: 9+75.00 N: 4438.10 E: 4343.55 START ALIGNMENT STA: 10+50.00 N: 4513.09 E: 4344.74 END ALIGNMENT MU L B E R R Y S T ( C O H W Y 1 4 ) DP STORM 1 - PROFILE STA: 9+50 TO STA 11+00 4910 4915 4920 4925 4930 4935 4940 4945 4950 4910 4915 4920 4925 4930 4935 4940 4945 4950 9+50 10+00 10+50 11+00 OU T L E T D P 1 - 2 . 1 ST A : 1 0 + 2 1 . 6 2 IN V . O U T 4 9 2 4 . 4 6 ( S ) MH D P 1 - 2 ST A : 1 0 + 0 0 . 0 0 IN V . I N 4 9 2 4 . 0 3 ( N ) IN V . I N 4 9 2 2 . 0 1 ( W ) IN V . O U T 4 9 2 1 . 9 1 ( E ) PROPOSED GRADE EXISTING GROUND 100-YR HGL 21.6 LF 12" RCP @ 2.00% VA L L E Y 1 4 L L C 12 / 2 1 / 2 0 2 0 U18024 1" = 50' 1" = 5' PE A K V I E W P L D NO R T H 12 / 2 3 / 2 0 2 0 11 : 0 6 : 5 3 A M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 1 8 0 2 4 - P E A K V I E W \ C A D D \ C P \ C 4 . 1 0 - S T O R M P L A N & P R O F I L E S . D W G C4 . 1 0 - S T O R M P L A N & P R O F I L E S SM E JR S C4.10 67 ST O R M P L A N & P R O F I L E 0 50'100' SCALE: 1" = 50' 25' PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PRE L I M I N A R Y PLA N S NOT F O R C O N S T R U C T I O N PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , u n a u t h o r i z e d ch a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d m u s t be a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com 19 CABLE TV LINE ELECTRIC LINE FIBER OPTIC LINE GAS LINE G GAS METER IRRIGATION LINE SANITARY MANHOLE SANITARY MAIN SANITARY SERVICE FLARED END SECTION STORM INLET STORM MANHOLE STORM OUTLET STRUCTURE STORM PIPE RIP RAP TELEPHONE LINE FIRE HYDRANT FIRELINE WATER FITTINGS WATER MAIN WATER SERVICE WATER METER THRUST BLOCK GATE VALVE FIBER, GAS, ELECTRIC, OR TELEPHONE PEDESTAL LEGEND N KEYMAP 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 3.THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 4.STORM SEWER SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY OF FORT COLLINS SPECIFICATIONS AND DETAILS. SEE ADDITIONAL NOTES ON SHEET C0.03. 5.STORM SEWER MAINS SHOWN ON THESE DRAWINGS AS HIGH DENSITY POLYETHYLENE (HDPE) SHALL BE WATERTIGHT ADS-N12 OR APPROVED EQUAL. 6.ALL PIPE LENGTHS ARE FROM CENTER TO CENTER OF ADJACENT STRUCTURES. DESIGN LENGTH OF THE PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. NOTES CHECKED BY: CHECKED BY: CHECKED BY: APPROVED: CITY OF GREELEY REVIEWED BY:___________________________________________ LARIMER COUNTY ENGINEERING DATE LARIMER COUNTY APPROVAL BLOCK NORTH G DE L O Z I E R R O A D LOT 10 LOT 7 LOT 9 LOT 8 LOT 7 LOT 10 LOT 9 LOT 8 BLOCK 28 BLOCK 30 E27 E6 E11 E24 E10 E7 E5 E22 E23 E9 E16 E14 E12 E12.1 E11.1 E24.1 E25.1 E15 E17 acres 0.68 0.85 0.63 acres E5 0.72 0.90 1.07 acres OS4 0.46 0.57 0.29 acres E7 0.74 0.92 1.03 acres E9 0.72 0.90 1.07 acres E10 0.74 0.93 1.03 acres E11 0.55 0.68 0.40 acres E12 0.79 0.99 0.44 acres E14 0.65 0.81 0.30 acres OS3 0.33 0.41 0.85 acres E15 0.82 1.00 0.57 acres OS6 0.60 0.75 0.43 acres E17 0.65 0.81 0.59 acres OS7 0.60 0.75 0.41 acres E22 0.76 0.96 0.99 acres E23 0.77 0.96 0.99 acres E24 0.54 0.67 0.73 acres E24.1 0.67 0.84 0.36 acres E27 0.69 0.86 0.33 acres FUT-G 0.90 1.00 40.3 acres OS5 0.79 0.99 0.15 acres E15.1 0.80 1.0 1.15 acres E26.1 0.80 1.00 0.72 acres E14.1 0.80 1.00 1.3 acres E12.1 0.94 1.00 0.21 acres E25.1 0.62 0.78 0.19 STAMP H: H a r t f o r d H o m e s C O F o r t C o l l i n s H F H 2 2 M u l b e r r y 0 C I V 3 C D F D P F 1 h f h 0 2 2 c 1 0 0 d r a i n a g e d w g Ma t t h e w P e p i n 7/ 1 2 2 0 2 2 Init.#Issue / DescriptionDate FI N A L D E V E L O P M E N T P L A N S BL O O M F I L I N G O N E FO R T C O L L I N S C O THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PR E LIM IN A R Y NO T FO R B ID D IN G NO T FO R C O N S T R U C TIO N Date: Drawn By: Project No: Checked By: 06.01.2022 HFH000022 MA T C H L I N E S E E S H E E T C1 0 4 MATCHLINE-SEE SHEET C10.1 MATCHLINE-SEE SHEET C10.8 DESIGN POINT DETENTION POND BASIN BOUNDARY i.e., MHFD-Detention_v4.03 and/or SWMM) SUB-BASIN BOUNDARY (i.e., Rational Method) OVERLAND FLOW DIRECTION I.E., LANDSCAPING) DIRECT FLOW DIRECTION I.E., PAVEMENT, CURB AND GUTTER) BASIN ID 2-YR RUNOFF COEFFICIENT BASIN AREA ACRES) acres A1 0.05 0.35 2.50 A APPROXIMATE DETENTION POND OVERFLOW PATH 100-YR RUNOFF COEFFICIENT FEMA CROSS SECTION IRRIGATION POND LIMITS KEYMAP Know what's before you dig.SCALE: 1"=50' 0 205010 JKD JEP DRAINAGE PLAN C10.2 NOTES: 1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. 3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES. 4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. 5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. E17 acres E17 0.65 0.81 0.59 acres 0.60 0.75 0.41 acres FUT-G 0.90 1.00 40.3 acres G1 0.79 0.99 1.15 acres G2 0.79 0.99 1.15 STAMP H: H a r t f o r d H o m e s C O F o r t C o l l i n s H F H 2 2 M u l b e r r y 0 C I V 3 C D F D P F 1 h f h 0 2 2 c 1 0 0 d r a i n a g e d w g Ma t t h e w P e p i n 7/ 1 2 2 0 2 2 Init.#Issue / DescriptionDate FI N A L D E V E L O P M E N T P L A N S BL O O M F I L I N G O N E FO R T C O L L I N S C O THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PR E LIM IN A R Y NO T FO R B ID D IN G NO T FO R C O N S T R U C TIO N Date: Drawn By: Project No: Checked By: 06.01.2022 HFH000022 MA T C H L I N E S E E S H E E T C1 0 9 MATCHLINE-SEE SHEET C10.2 MATCHLINE-SEE SHEET C10.10 DESIGN POINT DETENTION POND BASIN BOUNDARY i.e., MHFD-Detention_v4.03 and/or SWMM) SUB-BASIN BOUNDARY (i.e., Rational Method) OVERLAND FLOW DIRECTION I.E., LANDSCAPING) DIRECT FLOW DIRECTION I.E., PAVEMENT, CURB AND GUTTER) BASIN ID 2-YR RUNOFF COEFFICIENT BASIN AREA ACRES) acres A1 0.05 0.35 2.50 A APPROXIMATE DETENTION POND OVERFLOW PATH 100-YR RUNOFF COEFFICIENT FEMA CROSS SECTION IRRIGATION POND LIMITS KEYMAP Know what's before you dig.SCALE: 1"=50' 0 205010 JKD JEP DRAINAGE PLAN C10.8 NOTES: 1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. 3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES. 4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. 5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. G3 G4 G1 G2 acres FUT-H 0.80 1.00 33.3 acres G4 0.81 1.00 1.16 acres G3 0.81 1.00 1.18 acres FUT-G 0.90 1.00 40.3 STAMP H: H a r t f o r d H o m e s C O F o r t C o l l i n s H F H 2 2 M u l b e r r y 0 C I V 3 C D F D P F 1 h f h 0 2 2 c 1 0 0 d r a i n a g e d w g Ma t t h e w P e p i n 7/ 1 2 2 0 2 2 Init.#Issue / DescriptionDate FI N A L D E V E L O P M E N T P L A N S BL O O M F I L I N G O N E FO R T C O L L I N S C O THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PR E LIM IN A R Y NO T FO R B ID D IN G NO T FO R C O N S T R U C TIO N Date: Drawn By: Project No: Checked By: 06.01.2022 HFH000022 MA T C H L I N E S E E S H E E T C1 0 1 1 MATCHLINE-SEE SHEET C10.8 MATCHLINE-SEE SHEET C10.12 DESIGN POINT DETENTION POND BASIN BOUNDARY i.e., MHFD-Detention_v4.03 and/or SWMM) SUB-BASIN BOUNDARY (i.e., Rational Method) OVERLAND FLOW DIRECTION I.E., LANDSCAPING) DIRECT FLOW DIRECTION I.E., PAVEMENT, CURB AND GUTTER) BASIN ID 2-YR RUNOFF COEFFICIENT BASIN AREA ACRES) acres A1 0.05 0.35 2.50 A APPROXIMATE DETENTION POND OVERFLOW PATH 100-YR RUNOFF COEFFICIENT FEMA CROSS SECTION IRRIGATION POND LIMITS KEYMAP Know what's before you dig. SCALE: 1"=50' 0 205010 JKD JEP DRAINAGE PLAN C10.10 NOTES: 1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. 3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES. 4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. 5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. CITY OF GREELEY Preliminary Drainage and Erosion Control Report for Bloom Filing Three Fort Collins, Colorado June 14, 2023 4 1 42 39 3 5 3 6 3 7 38 39 40 40 40 40 3 7 3 8 3 8 39 39 39 39 41 41 42 42 40 40 39 40 39 39 39 40 40 40 41 40 4 0 41 41 42 42 4 1 41 42 40 40 39 3 9 4 1 4 1 41 41 40 37 3 8 39 39 40 37 38 39 41 38 3 9 39 3 9 38 3 8 39 3935 3 5 40 34 3 4 36 36 37 3 7 38 38 3 9 39 3 4 40 38 39 41 41 40 4 0 41 41 4 1 4 1 40 40 39 35 34 36 37 38 39 4 0 373839 3839 36373839373839 38 39 3938 37 40 4 0 4 1 4 1 41 40 4 1 40 38 39 40 40 40 41 41 4 1 41 40 40 40 4 0 41 41 42 41 42 42 40 40 40 41 4 1 41 42 42 42 42 4142 4 2 41 42 42 4 2 40 4 0 4 0 41 40 39 41 42 43 44 41 41 41 4142 42 41 41 40 40 41 41 42 42 42 42 40 41 42 43 44 42 42 42 43 43 44 44 42 42 42 41 4 2 41 4 1 4 2 43 45 45 42 43 43 44 44 42 43 44 44 44 4 444 45 4242 4243 4 3 43 43 44 46 45 45 43 44 46 4 6 46 46 45 4646 46 4 3 45 45 45 45 43 4 4 46 46 46 46 47 47 47 4 6 43 43 43 41 42 44 44 45 44 46 47 45 44 46 47 47 47 42 41 41 41 42 43 40 41 41 41 4 1 42 42 43 43 4 1 41 41 4141 4 1 44 44 42 42 42 42 41 46 40 40 37 37 38 38 39 39 41 42 43 44 45 35 32 33 34 3 6 30 35 29 31 32 33 34 36 30 29 31 36 36 40 44 37 38 39 41 42 43 45 40 36 37 38 39 373839 38 35 40 38 3 7 37 38 39 40 41 42 43 36 44 46 44 45 46 46 45 45 46 37 47 CO CO CO CO POOL UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP UP LOT 1/ PHASE 1 LOT 2/ PHASE 2 21 0.43 0.72 2 0.85 0.77 3 3 0.41 0.80 11 11 0.77 0.76 12 12 0.52 0.76 6 6 0.93 0.73 4 4 1.02 0.89 8 7 0.55 0.44 9 16 17 17 0.39 0.76 5 0.38 0.59 10 10 0.72 0.75 18 18 0.70 0.84 19 19 0.37 0.84 20 20 0.55 0.83 21 21 0.67 0.84 22 22 0.47 0.88 23 23 1.39 0.39 24 24 0.20 0.51 25 25 0.34 0.66 26 26 0.13 0.61 28 28 0.19 0.66 27 27 0.24 0.61 29 29 0.18 0.58 30 30 0.03 0.67 31 31 0.21 0.58 32 32 0.11 0.87 33 33 0.29 0.57 34 34 0.40 0.61 35 35 0.17 0.55 36 36 0.16 0.54 37 37 0.11 0.30 38 38 0.18 0.48 39 39 0.29 0.63 40 40 0.16 0.61 EX PROPERTY BOUNDARY/ ROW EX PROPERTY BOUNDARY/ ROW EX PROPERTY BOUNDARY/ ROW EX PROPERTY BOUNDARY/ ROW EX PROPERTY BOUNDARY/ ROW E.H.BARKER ET.AL. PARCEL NO. 8708400002) BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 BUILDING 6 BUILDING7BUILDING8 POOL BUILDING 9 COMMUNITY BUILDING BUILDING 10 BUILDING 11 BUILDING 12 BUILDING 13 BUILDING 14 BUILDING 15 PRIVATE DRIVE BARK PARK PROPOSED RAIN GARDEN BODE BOULEVARD ANGELA AVENUE INTERNATIONAL BLVD. DONELLA DRIVE AR I A W A Y AR I A W A Y DE L O Z I E R R D DE L O Z I E R R D EX PROPERTY BOUNDARY/ ROW EXISTING REGIONAL POND G BY OTHERS) EXISTING REGIONAL POND E BY OTHERS)(TO THE NORTH OF THIS MAP) 1 5 8 0.20 0.60 7 13 0.50 0.81 13 14 0.21 0.47 14 15 0.54 0.83 15 EXISTING REGIONAL POND G1 BY OTHERS)(TO THE SOUTH OF THIS MAP) 16 0.17 0.59 9 0.24 0.34 SHEET No: PR O J E C T L O C A T I O N DR A W I N G OF CHECKED BY: DESIGNED BY: DRAWN BY: DE S C R I P T I O N O F R E V I S I O N DA T E RE V I S E D B Y AP P R O V E D B Y RE V 1 2 3 4 5 6 7 PRE L I M I N A R Y NOT F O R C O N S T R U C T I O N project no: date: BL O O M F I L I N G T H R E E FO R T C O L L I N S C O L O R A D O DR A I N A G E E X H I B I T C-013 13 20 JULY 27, 2022 801-004 JRG JRG JRG ASPEN 0' SCALE: 1" = 60' 60'120' LEGEND EXISTING CONTOURS NEW INTERMEDIATECONTOURS39 40 NEW INDEX CONTOURS PROPOSED FLOWLINE EX RIGHT-OF-WAY/ PROPERTY BOUNDARY PROPOSED DRAINAGE BASIN BOUNDARY LINE PROPOSED STORM PIPE EXISTING STORM PIPE & MANHOLE RD PROPOSED ROOF DRAIN AND STORM PIPE 1.PROPOSED ELEVATIONS SHOWN ARE RELATIVE TO A DATUM OF 4900 FEET, AND ARE BASED ON THE BENCHMARKS DESCRIBED ON SHEET C-001. 2.THE DRAINAGE BASINS SHOWN ON THIS EXHIBIT WILL BE ULTIMATELY CONVEYED TO OFFSITE REGIONAL DETENTION PONDS, LOCATED NORTHEAST AND SOUTH OF THE BLOOM SITE, AND WITHIN THE MASTERPLAN DEVELOPMENT AREA. THE MASTERPLAN PONDS WILL PROVIDE WATER QUALITY AND DETENTION FOR THE DEVELOPED CONDITION OF THE BLOOM SITE. THE MAJORITY OF THE DEVELOPED SITE RUNOFF FROM THE ATTRIBUTING BASINS IS CONVEYED TO THE PROPOSED RAIN GARDEN, LOCATED NEAR THE SOUTHERN PROPERTY BOUNDARY, WHILE THE REMAINING SITE AREA RUNOFF IS CONVEYED TO STORM SYSTEMS, WHICH CONVEY RUNOFF DIRECTLY TO THE OFFSITE REGIONAL PONDS. 3.DRAINAGE DESIGN FOR THE PROPOSED SITE IS IN ACCORDANCE WITH THE MATERPLAN DEVELOPMENT, BY OTHERS. 4.PLEASE REFER TO THE RATIONAL METHOD CALCULATIONS FOR PRELIMINARY BASIN FLOW CALCULATIONS. ROUTED FLOWS WILL BE PROVIDED IN FINAL DESIGN. 5.12" OF CDOT CLASS 'A' BEDDING MATERIAL SHALL BE PLACED UNDER ALL RIPRAP SHOWN. 6.ROOF DRAINS FROM THE PROPOSED BUILDINGS ARE ANTICIPATED TO DISCHARGE OVERLAND TO NEARBY SWALES, INLETS, OR CURB AND GUTTER. 7.RUNOFF FROM THE SITE WILL DRAIN TO LOW POINTS AND PASS THROUGH CURB CUTS, SIDEWALK CHASES, SWALES, AND STORM SEWER PIPES, WHICH ULTIMATELY DISCHARGE TO THE PROPOSED ONSITE RAIN GARDEN, AND OFFSITE REGIONAL DETENTION PONDS. PERMANENT GEOTEXTILE FABRIC AND GRASS LINED DRAINAGE CHANNELS WILL ENHANCE EROSION CONTROL WITHIN THE SITE LIMITS. SITE BMP'S WILL BE IMPLEMENTED TO REDUCE SEDIMENT TRANSPORT OFFSITE, AND WILL BE SHOWN IN THE FINAL EROSION CONTROL PLAN/EXHIBIT. 8.ALL PROPOSED STORM DRAINAGE PIPES AND STRUCTURES (OUTSIDE OF PLATTED ROW) WILL BE PRIVATELY OWNED AND MAINTAINED BY THE OWNER. ALL EXISTING STORM SEWER WITHIN PUBLIC ROW, WILL BE OWNED AND MAINTAINED BY THE CITY OF FORT COLLINS. NOTES: PROPOSED DRAINAGE BASIN SUMMARY TABLE: PROPOSED DRAINAGE BASIN ID ACRES / 'C' VALUE PROPOSED DRAINAGE DESIGN POINT DRAINAGE FLOW DIRECTION DRAINAGE SWALE 0.720.43 1 PROPOSED LID SUMMARY TABLE: 4025 Automation Way, Ste B2 | Fort Collins, CO 80525 | 970-698-6046 |www.civilworxeng.com Final Drainage and Erosion Control Report Bloom Multi Family Fort Collins, CO Prepared for: Hartford Acquisitions, LLC 4801 Goodman Road Timnath, CO 80547 June 25, 2024 City of Fort Collins Approved Plans Approved by: Date: Bloom Commercial Preliminary Drainage Report APPENDIX C Hydrologic Calculations Tributary Area tc | 2-Year tc | 100-Year Q2 Q100 Sub-basin (acres)(min)(min)(cfs)(cfs) G1 18.45 0.80 1.00 17.8 17.7 25.5 111.0 G1.1 1.56 0.95 1.00 16.5 16.5 2.7 9.7 G1.2 1.36 0.95 1.00 17.2 17.2 2.3 8.3 G1.3 2.29 0.95 1.00 17.8 17.8 3.7 13.7 G1.4 0.23 0.95 1.00 5.0 5.0 0.6 2.3 G1.5 0.25 0.95 1.00 5.0 5.0 0.7 2.5 G1.6 0.39 0.95 1.00 5.1 5.0 1.0 3.8 G1.7 0.56 0.63 0.79 11.9 8.9 0.7 3.6 G1.8 2.06 0.83 1.00 7.3 5.0 4.3 20.5 G1.9 2.44 0.46 0.58 5.7 5.0 3.1 14.0 G1.10 1.00 0.85 1.00 5.0 5.0 2.4 9.9 G1.11 0.61 0.87 1.00 5.0 5.0 1.5 6.1 G1.12 0.61 0.95 1.00 5.0 5.0 1.6 6.0 G1.13 0.69 0.94 1.00 5.0 5.0 1.8 6.8 G1.14 0.32 0.75 0.94 6.1 5.0 0.6 3.0 G1.15 0.38 0.73 0.91 8.4 6.0 0.7 3.3 G1.16 0.12 0.70 0.87 5.0 5.0 0.2 1.0 G1.17 0.12 0.71 0.89 5.0 5.0 0.2 1.0 H 6.16 0.91 1.00 9.3 7.5 12.9 54.4 H1 0.61 0.80 1.00 11.6 8.8 1.0 5.0 H2 0.55 0.81 1.00 5.6 5.0 1.2 5.5 H3 0.61 0.85 1.00 5.3 5.0 1.5 6.1 H4 1.01 0.83 1.00 6.1 5.0 2.3 10.1 H5 0.35 0.62 0.78 5.0 5.0 0.6 2.7 H6 0.36 0.63 0.78 7.1 5.9 0.6 2.7 H7 5.31 0.72 0.89 9.7 6.7 8.5 43.6 H8 3.09 0.39 0.49 12.7 12.7 2.5 10.7 J 6.85 0.82 1.00 11.8 9.3 11.7 55.0 J1 0.80 0.68 0.85 12.8 11.4 1.1 5.0 G1 BASINS (TO DETENTION)33.43 - -54.0 226.8 H BASINS (TO DETENTION)18.06 - -31.1 140.8 J BASINS (TO DETENTION)7.65 - -12.8 60.0 TO POND G1 LID 8.90 -- TO POND H LID 18.06 -- TO POND J LID 7.65 -- BASIN SUMMARY TABLE C2 C100 H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3. Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports- Info\Hydrology\Rational\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls Subdivision:Mulberry Project Name: Bloom Commerical Location:CO, Fort Collins Project No.: Calculated By: DSH Checked By: HF INPUT User Input Date: 7/14/25 OUTPUT Calculated Value Single-Family Alley-Loaded SF Duplex/AttachedMulti-Family 95%5%100% G1 18.45 95 8.15 42 15 3.41 3 95 6.89 35 0.80 G1.1 1.56 95 1.56 95 15 0.00 0 95 0.00 0 0.95 G1.2 1.36 95 1.36 95 15 0.00 0 95 0.00 0 0.95 G1.3 2.29 95 2.29 95 15 0.00 0 95 0.00 0 0.95 G1.4 0.23 95 0.23 95 15 0.00 0 95 0.00 0 0.95 G1.5 0.25 95 0.25 95 15 0.00 0 95 0.00 0 0.95 G1.6 0.39 95 0.39 95 15 0.00 0 95 0.00 0 0.95 G1.7 0.56 95 0.34 57 15 0.22 6 95 0.00 0 0.63 G1.8 2.06 95 1.35 62 15 0.31 2 95 0.40 18 0.83 G1.9 2.44 95 0.00 0 15 1.55 10 100 0.89 37 0.46 G1.10 1.00 95 0.80 76 15 0.13 2 95 0.07 7 0.85 G1.11 0.61 95 0.46 71 15 0.06 1 95 0.09 15 0.87 G1.12 0.61 95 0.33 52 15 0.00 0 95 0.27 43 0.95 G1.13 0.69 95 0.24 33 15 0.01 0 95 0.44 61 0.94 G1.14 0.32 95 0.24 71 15 0.08 4 95 0.00 0 0.75 G1.15 0.38 95 0.28 69 15 0.10 4 95 0.00 0 0.73 G1.16 0.12 95 0.08 65 15 0.04 5 95 0.00 0 0.70 G1.17 0.12 95 0.08 67 15 0.04 4 95 0.00 0 0.71 H 6.16 95 3.76 58 15 0.30 1 95 2.09 32 0.91 H1 0.61 95 0.49 77 15 0.12 3 95 0.00 0 0.80 H2 0.55 95 0.46 79 15 0.09 3 95 0.00 0 0.81 H3 0.61 95 0.54 83 15 0.08 2 95 0.00 0 0.85 H4 1.01 95 0.86 81 15 0.15 2 95 0.00 0 0.83 H5 0.35 95 0.21 56 15 0.14 6 95 0.00 0 0.62 H6 0.36 95 0.21 56 15 0.15 6 95 0.00 0 0.63 H7 5.31 95 3.75 67 15 1.56 4 95 0.00 0 0.72 H8 3.09 95 0.44 14 15 2.15 10 95 0.49 15 0.39 J 6.85 95 4.80 67 15 1.11 2 95 0.94 13 0.82 J1 0.80 95 0.53 63 15 0.27 5 95 0.00 0 0.68 %Imp G1 BASINS (Detention Tributary)33.43 80% G1 Basins Total 33.43 80% WQCV Pond D 8.90 71% Area Weighted C2Runoff Coefficient Area (ac) Roofs, Ponds Runoff Coefficient Area (ac)Area Weighted Asphalt + Concrete Walks Lawns, Sandy Soil Area Weighted HFH73 Area (ac)Basin ID Total Area (ac)Runoff Coefficient COMPOSITE RUNOFF COEFFICIENTS Page 1 of 2 7/14/2025 Subdivision:Mulberry Project Name: Bloom Commerical Location:CO, Fort Collins Project No.: Calculated By: DSH Checked By: HF Date: 8/3/21 1 2 3 4 5 6 7 8 9 10 13 15 16 17 18 19 20 21 22 23 24 BASIN D.A. Hydrologic C2 C5 C100 L S Ti | 2-Year Ti | 100-Year L S Cv VEL. Tt COMP. Tc | 2-Year COMP. Tc | 100-Year TOTAL Urbanized Tc Tc | 2-Year Tc | 100-Year ID (AC) Soils Group Cf=1.00 Cf=1.00 Cf=1.25 (FT) (%) (MIN) (MIN) (FT) (%) (FPS) (MIN) (MIN) (MIN)LENGTH(FT)(MIN) (MIN) (MIN) G1 18.45 B 0.80 0.80 1.00 200 1.00 7.9 2.6 1200 1.00 20 1.3 15.1 23.0 17.7 1400 17.8 17.8 17.7 G1.1 1.56 B 0.95 0.95 1.00 55 1.00 2.1 1.4 1110 1.00 20 1.2 16.0 18.1 17.4 1165 16.5 16.5 16.5 G1.2 1.36 B 0.95 0.95 1.00 200 1.00 4.0 2.6 1100 1.00 20 1.1 16.3 20.2 18.9 1300 17.2 17.2 17.2 G1.3 2.29 B 0.95 0.95 1.00 200 2.00 3.1 2.1 1200 0.75 20 1.1 18.5 21.7 20.6 1400 17.8 17.8 17.8 G1.4 0.23 B 0.95 0.95 1.00 50 2.00 1.6 1.0 120 2.00 20 2.9 0.7 2.3 1.7 170 10.9 5.0 5.0 G1.5 0.25 B 0.95 0.95 1.00 50 2.00 1.6 1.0 120 2.00 20 3.3 0.6 2.2 1.7 170 10.9 5.0 5.0 G1.6 0.39 B 0.95 0.95 1.00 130 1.30 2.9 2.0 320 0.20 20 2.5 2.2 5.1 4.1 450 12.5 5.1 5.0 G1.7 0.56 B 0.63 0.63 0.79 75 0.50 9.6 6.4 270 1.60 20 1.8 2.5 12.1 8.9 345 11.9 11.9 8.9 G1.8 2.06 B 0.83 0.83 1.00 170 3.90 4.2 1.5 360 2.60 20 1.9 3.1 7.3 4.7 530 12.9 7.3 5.0 G1.9 2.44 B 0.46 0.46 0.58 20 1.90 4.3 3.5 210 1.50 20 2.5 1.4 5.7 4.9 230 11.3 5.7 5.0 G1.10 1.00 B 0.85 0.85 1.00 50 4.20 2.1 0.8 165 4.00 20 4.0 0.7 2.8 1.5 215 11.2 5.0 5.0 G1.11 0.61 B 0.87 0.87 1.00 130 2.20 3.7 1.6 50 0.20 20 2.8 0.3 4.0 1.9 180 11.0 5.0 5.0 G1.12 0.61 B 0.95 0.95 1.00 80 1.20 2.4 1.6 40 5.50 20 3.5 0.2 2.5 1.8 120 10.7 5.0 5.0 G1.13 0.69 B 0.94 0.94 1.00 40 1.20 1.8 1.1 230 0.70 20 2.4 1.6 3.4 2.7 270 11.5 5.0 5.0 G1.14 0.32 B 0.75 0.75 0.94 40 1.20 3.9 1.8 230 0.70 20 1.7 2.2 6.1 4.0 270 11.5 6.1 5.0 G1.15 0.38 B 0.73 0.73 0.91 40 0.70 4.9 2.5 280 1.70 20 1.3 3.5 8.4 6.0 320 11.8 8.4 6.0 G1.16 0.12 B 0.70 0.70 0.87 20 1.70 2.8 1.6 60 0.20 20 6.8 0.1 3.0 1.7 80 10.4 5.0 5.0 G1.17 0.12 B 0.71 0.71 0.89 20 1.70 2.7 1.5 60 0.20 20 6.8 0.1 2.9 1.6 80 10.4 5.0 5.0 H 6.16 B 0.91 0.91 1.00 180 2.00 3.8 2.0 280 0.40 20 0.8 5.5 9.3 7.5 460 12.6 9.3 7.5 H1 0.61 B 0.80 0.80 1.00 100 2.40 4.2 1.4 340 1.60 20 0.8 7.4 11.6 8.8 440 12.4 11.6 8.8 H2 0.55 B 0.81 0.81 1.00 30 3.70 1.9 0.7 390 1.00 20 1.8 3.7 5.6 4.4 420 12.3 5.6 5.0 H3 0.61 B 0.85 0.85 1.00 40 1.00 3.0 1.2 350 1.00 20 2.5 2.3 5.3 3.5 390 12.2 5.3 5.0 H4 1.01 B 0.83 0.83 1.00 50 1.00 3.6 1.3 370 1.00 20 2.4 2.5 6.1 3.9 420 12.3 6.1 5.0 H5 0.35 B 0.62 0.62 0.78 25 2.00 3.6 2.4 210 0.40 20 3.4 1.0 4.6 3.4 235 11.3 5.0 5.0 H6 0.36 B 0.63 0.63 0.78 25 2.00 3.5 2.4 210 0.40 20 1.0 3.6 7.1 5.9 235 11.3 7.1 5.9 H7 5.31 B 0.72 0.72 0.89 150 2.50 6.5 3.5 340 0.50 20 1.7 3.2 9.7 6.7 490 12.7 9.7 6.7 H8 3.09 B 0.39 0.39 0.49 110 0.70 15.6 13.5 370 0.40 20 1.0 6.2 21.8 19.7 480 12.7 12.7 12.7 J 6.85 B 0.82 0.82 1.00 50 0.90 3.8 1.4 450 1.20 20 0.9 8.0 11.8 9.3 500 12.8 11.8 9.3 J1 0.80 B 0.68 0.68 0.85 50 0.90 5.8 3.5 450 1.20 20 0.9 8.0 13.7 11.4 500 12.8 12.8 11.4 NOTES: Ti = (1.87*(1.1 - CCf)*(L)^0.5)/((S)^0.33), S in %Cv Tt=L/60V 2.5 Velocity V=Cv*S^0.5, S in ft/ft 5 Tc Check = 10+L/180 7 For urbanized basins a minimum Tc of 5.0 minutes is required.10 For non-urbanized basins a minimum Tc of 10.0 minutes is required 15 20 STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN Tc CHECK HFH73 FINALINITIAL/OVERLAND (Ti) TRAVEL TIME (URBANIZED BASINS)(Tt) Paved Areas and Shallow Paved Swales DATA Type of Land Surface Heavy Meadow Tillage/Field Short Pasture and Lawns Nearly Bare Ground Grassed Waterway Page 1 of 1 7/14/2025 Project Name: Bloom Commerical Subdivision:Mulberry Project No.:HFH73 Location:CO, Fort Collins Calculated By: DSH Design Storm:Checked By: HF Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( A c ) Ru n o f f C o e f f . | C 2 Tc | 2 - Y e a r ( m i n ) C* A ( A c ) I ( i n / h r ) Q ( c f s ) Tc ( m i n ) C* A ( A c ) I ( i n / h r ) Q ( c f s ) Sl o p e ( % ) St r e e t F l o w ( c f s ) De s i g n F l o w ( c f s ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) Tt ( m i n ) REMARKS G1 G1 18.45 0.80 17.8 14.80 1.73 25.5 G1.1 G1.1 1.56 0.95 16.5 1.48 1.79 2.7 G1.2 G1.2 1.36 0.95 17.2 1.29 1.75 2.3 G1.3 G1.3 2.29 0.95 17.8 2.17 1.73 3.7 G1.4 G1.4 0.23 0.95 5.0 0.22 2.85 0.6 17.8 2.40 1.73 4.1 G1.5 G1.5 0.25 0.95 5.0 0.23 2.85 0.7 17.8 18.17 1.73 31.4 G1.6 G1.6 0.39 0.95 5.1 0.37 2.84 1.0 G1.7 G1.7 0.56 0.63 11.9 0.35 2.08 0.7 G1.8 G1.8 2.06 0.83 7.3 1.70 2.55 4.3 G1.9 G1.9 2.44 0.46 5.7 1.13 2.76 3.1 17.8 27.04 1.73 46.7 G1.10 G1.10 1.00 0.85 5.0 0.85 2.85 2.4 7.3 2.55 2.55 6.5 G1.11 G1.11 0.61 0.87 5.0 0.54 2.85 1.5 11.9 2.79 2.08 5.8 G1.12 G1.12 0.61 0.95 5.0 0.58 2.85 1.6 G1.13 G1.13 0.69 0.94 5.0 0.65 2.85 1.8 G1.14 G1.14 0.32 0.75 6.1 0.24 2.71 0.6 G1.15 G1.15 0.38 0.73 8.4 0.28 2.41 0.7 G1.16 G1.16 0.12 0.70 5.0 0.08 2.85 0.2 G1.17 G1.17 0.12 0.71 5.0 0.08 2.85 0.2 H H 6.16 0.91 9.3 5.61 2.30 12.9 H1 H1 0.61 0.80 11.6 0.49 2.10 1.0 H2 H2 0.55 0.81 5.6 0.45 2.77 1.2 H3 H3 0.61 0.85 5.3 0.52 2.81 1.5 H4 H4 1.01 0.83 6.1 0.84 2.71 2.3 H5 H5 0.35 0.62 5.0 0.22 2.85 0.6 H6 H6 0.36 0.63 7.1 0.22 2.58 0.6 H7 H7 5.31 0.72 9.7 3.80 2.24 8.5 H8 H8 3.09 0.39 12.7 1.21 2.03 2.5 6.2 13.36 2.70 36.1 J J 6.85 0.82 11.8 5.62 2.09 11.7 J1 J1 0.80 0.68 12.8 0.54 2.02 1.1 12.8 6.17 2.02 12.5 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 2-Year 8/3/21 Page 1 of 1 7/14/2025 STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: Bloom Commerical Subdivision:Mulberry Project No.:HFH73 Location:CO, Fort Collins Calculated By: DSH Design Storm: Checked By: HF Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( A c ) Ru n o f f C o e f f . | C 10 0 Tc | 1 0 0 - Y e a r ( m i n ) C* A ( A c ) I ( i n / h r ) Q ( c f s ) Tc ( m i n ) C* A ( A c ) I ( i n / h r ) Q ( c f s ) Sl o p e ( % ) St r e e t F l o w ( c f s ) De s i g n F l o w ( c f s ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) Tt ( m i n ) REMARKS G1 G1 18.45 1.00 17.7 18.45 6.02 111.0 G1.1 G1.1 1.56 1.00 16.5 1.56 6.25 9.7 G1.2 G1.2 1.36 1.00 17.2 1.36 6.11 8.3 G1.3 G1.3 2.29 1.00 17.8 2.29 6.01 13.7 G1.4 G1.4 0.23 1.00 5.0 0.23 9.95 2.3 17.8 2.52 6.01 15.2 G1.5 G1.5 0.25 1.00 5.0 0.25 9.95 2.5 17.7 22.00 6.02 132.4 G1.6 G1.6 0.39 1.00 5.0 0.39 9.95 3.8 G1.7 G1.7 0.56 0.79 8.9 0.44 8.22 3.6 G1.8 G1.8 2.06 1.00 5.0 2.06 9.95 20.5 G1.9 G1.9 2.44 0.58 5.0 1.41 9.95 14.0 17.8 32.19 6.01 193.4 G1.10 G1.10 1.00 1.00 5.0 1.00 9.95 9.9 5.0 3.06 9.95 30.4 G1.11 G1.11 0.61 1.00 5.0 0.61 9.95 6.1 8.9 3.20 8.22 26.3 G1.12 G1.12 0.61 1.00 5.0 0.61 9.95 6.0 G1.13 G1.13 0.69 1.00 5.0 0.69 9.95 6.8 G1.14 G1.14 0.32 0.94 5.0 0.30 9.95 3.0 G1.15 G1.15 0.38 0.91 6.0 0.35 9.51 3.3 G1.16 G1.16 0.12 0.87 5.0 0.10 9.95 1.0 G1.17 G1.17 0.12 0.89 5.0 0.11 9.95 1.0 H H 6.16 1.00 7.5 6.16 8.83 54.4 H1 H1 0.61 1.00 8.8 0.61 8.24 5.0 H2 H2 0.55 1.00 5.0 0.55 9.95 5.5 H3 H3 0.61 1.00 5.0 0.61 9.95 6.1 H4 H4 1.01 1.00 5.0 1.01 9.95 10.1 H5 H5 0.35 0.78 5.0 0.27 9.95 2.7 H6 H6 0.36 0.78 5.9 0.28 9.54 2.7 H7 H7 5.31 0.89 6.7 4.75 9.18 43.6 H8 H8 3.09 0.49 12.7 1.52 7.08 10.7 6.2 15.76 9.43 148.7 J J 6.85 1.00 9.3 6.85 8.02 55.0 J1 J1 0.80 0.85 11.4 0.68 7.38 5.0 11.4 7.53 7.38 55.6 PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF STREET 6/2/21 Page 1 of 1 7/14/2025 Bloom Commercial Preliminary Drainage Report APPENDIX D Hydraulic Calculations Bloom Commercial Preliminary Drainage Report Detention Project Number:HFH73 | Bloom Commercial Project Location:Fort Collins, Colorado Date: 7/14/2025 Calculations By:H. Feissner Pond Description:Pond G (Existing) User Input Cell:Blue Text Design Point:N/A Design Storm:100-year Required Volume:86290 ft3 4933.15 ft Design Storm:N/A Required Volume:0 ft3 N/A ft Design Storm:N/A Required Volume:0 ft3 N/A ft Contour Elevation Contour Area Depth Incremental Volume Cummulative Volume Incremental Volume Cummulative Volume Cummulative Volume ft ft2 ft ft3 ft3 ft3 ft3 ac-ft 4928.00 0 0 0 0 0 0 0.0 4928.50 1225 0.50 306 306 204 204 0.0 4929.00 2781 0.50 1002 1308 975 1179 0.0 4930.00 11995 1.00 7388 8696 6851 8030 0.2 4931.00 21178 1.00 16587 25282 16370 24400 0.6 4932.00 28923 1.00 25051 50333 24950 49351 1.1 4933.00 34193 1.00 31558 81891 31521 80872 1.9 4934.00 39657 1.00 36925 118816 36891 117763 2.7 4935.00 45391 1.00 42524 161340 42492 160255 3.7 4936.00 51481 1.00 48436 209776 48404 208659 4.8 Detention Pond Stage-Storage Calculations Required Volume Water Surface Elevation Average End Area Method: Conic Volume Method: 4928 4929 4930 4931 4932 4933 4934 4935 4936 0 50000 100000 150000 200000 250000 Co n t o u r E l e v a t i o n , f t Cummulative Volume, ft3 Stage - Storage | Pond G (existing) Project Number:HFH73 | Bloom Commerical Project Location:Fort Collins, Colorado Date: 7/14/2025 Calculations By:H. Feissner Pond Description:Pond G1 User Input Cell:Blue Text Design Point:N/A Design Storm:100-year Required Volume:329053 ft3 4935.46 ft Design Storm:N/A Required Volume:0 ft3 N/A ft Design Storm:N/A Required Volume:0 ft3 N/A ft Contour Elevation Contour Area Depth Incremental Volume Cummulative Volume Incremental Volume Cummulative Volume Cummulative Volume ft ft2 ft ft3 ft3 ft3 ft3 ac-ft 4927.00 464 0 0 0 0 0 0.0 4928.00 15262 1.00 7863 7863 6129 6129 0.1 4929.00 26346 1.00 20804 28667 20553 26682 0.6 4930.00 35529 1.00 30938 59605 30823 57506 1.3 4931.00 40617 1.00 38073 97678 38045 95550 2.2 4932.00 45815 1.00 43216 140894 43190 138740 3.2 4933.00 52392 1.00 49104 189997 49067 187807 4.3 4934.00 56856 1.00 54624 244621 54609 242416 5.6 4935.00 60000 1.00 58428 303049 58421 300837 6.9 4936.00 64000 1.00 62000 365049 61989 362826 8.3 Detention Pond Stage-Storage Calculations Average End Area Method: Required Volume Water Surface Elevation Conic Volume Method: 4927 4928 4929 4930 4931 4932 4933 4934 4935 4936 0 50000 100000 150000 200000 250000 300000 350000 400000 Co n t o u r E l e v a t i o n , f t Cummulative Volume, ft3 Stage - Storage | Pond G1 Project Number:HFH73 | Bloom Commercial Project Location:Fort Collins, Colorado Date: 7/14/2025 Calculations By:H. Feissner Pond Description:Pond H (Existing) User Input Cell:Blue Text Design Point:N/A Design Storm:100-year Required Volume:142435 ft3 4930.05 ft Design Storm:N/A Required Volume:0 ft3 N/A ft Design Storm:N/A Required Volume:0 ft3 N/A ft Contour Elevation Contour Area Depth Incremental Volume Cummulative Volume Incremental Volume Cummulative Volume Cummulative Volume ft ft2 ft ft3 ft3 ft3 ft3 ac-ft 4923.00 0 0 0 0 0 0 0.0 4923.50 7500 0.50 1875 1875 1250 1250 0.0 4924.00 13790 0.50 5323 7198 5243 6493 0.1 4925.00 16538 1.00 15164 22362 15143 21637 0.5 4926.00 19374 1.00 17956 40318 17937 39574 0.9 4927.00 22335 1.00 20855 61172 20837 60411 1.4 4928.00 25254 1.00 23795 84967 23780 84190 1.9 4929.00 28226 1.00 26740 111707 26726 110917 2.5 4930.00 31335 1.00 29781 141487 29767 140684 3.2 4931.00 34469 1.00 32902 174389 32890 173573 4.0 4932.00 35000 1.00 34735 209124 34734 208307 4.8 Detention Pond Stage-Storage Calculations Required Volume Water Surface Elevation Average End Area Method: Conic Volume Method: 4923 4924 4925 4926 4927 4928 4929 4930 4931 4932 0 50000 100000 150000 200000 250000 Co n t o u r E l e v a t i o n , f t Cummulative Volume, ft3 Stage - Storage | Pond H (existing) Project Number:HFH73 | Bloom Commercial Project Location:Fort Collins, Colorado Date: 7/14/2025 Calculations By:H. Feissner Pond Description:Pond J User Input Cell:Blue Text Design Point:N/A Design Storm:100-year Required Volume:5000 ft3 4925.20 ft Design Storm:N/A Required Volume:0 ft3 N/A ft Design Storm:N/A Required Volume:0 ft3 N/A ft Contour Elevation Contour Area Depth Incremental Volume Cummulative Volume Incremental Volume Cummulative Volume Cummulative Volume ft ft2 ft ft3 ft3 ft3 ft3 ac-ft 4924.50 0 0 0 0 0 0 0.0 4925.00 12972 0.50 3243 3243 2162 2162 0.0 4926.00 15030 1.00 14001 17244 13988 16150 0.4 4927.00 17188 1.00 16109 33353 16097 32247 0.7 4928.00 19447 1.00 18318 51671 18306 50553 1.2 4929.00 21806 1.00 20627 72297 20615 71168 1.6 4930.00 24266 1.00 23036 95333 23025 94193 2.2 Detention Pond Stage-Storage Calculations Required Volume Water Surface Elevation Average End Area Method: Conic Volume Method: 4925 4926 4927 4928 4929 4930 0 10000 20000 30000 40000 50000 60000 70000 80000 Co n t o u r E l e v a t i o n , f t Cummulative Volume, ft3 Stage - Storage | Pond J Bloom Commercial Preliminary Drainage Report LID and WQCV (i.e., EDB) Calculations Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =80.0 % (100% if all paved and roofed areas upstream of sand filter) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.800 C) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 0.26 watershed inches WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including sand filter area) Area = 288,029 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =6,304 cu ft VWQCV = WQCV / 12 * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth DWQCV =2.0 ft B) Sand Filter Side Slopes (Horizontal distance per unit vertical, Z = 4.00 ft / ft 4:1 or flatter preferred). Use "0" if sand filter has vertical walls. C) Minimum Filter Area (Flat Surface Area)AMin =2880 sq ft D) Actual Filter Area AActual =3000 sq ft E) Volume Provided VT =8479 cu ft 3. Filter Material 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in HFH073 | Bloom Commercial Basin G1 | LID Design Procedure Form: Sand Filter (SF) Herman Feissner Galloway & Company, Inc. July 14, 2025 UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" CDOT Class B or C Filter Material Other (Explain): YES NO HFH073_UD-BMP_v3.07-BasinG1_LID.xlsm, SF 7/14/2025, 9:41 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Works A) Describe the type of energy dissipation at inlet points and means of conveying flows in excess of the WQCV through the outlet Notes: Design Procedure Form: Sand Filter (SF) Herman Feissner Galloway & Company, Inc. July 14, 2025 HFH073 | Bloom Commercial Basin G1 | LID Choose One YES NO HFH073_UD-BMP_v3.07-BasinG1_LID.xlsm, SF 7/14/2025, 9:41 AM Sheet 1 of 3 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =90 % B) Tributary Area's Imperviousness Ratio (i = Ia / 100 )i = 0.90 C) Contributing Watershed Area Area = 4.4 ac D) For Watersheds Outside of the Denver Region, Depth of Average d6 = in Runoff Producing Storm E) Design Concept (Select EURV when also designing for flood control)1 F) Design Volume (WQCV) Based on 40-hour Drain Time VDESIGN=0.148 ac-ft (VDESIGN = (1.0 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12 * Area ) G) For Watersheds Outside of the Denver Region, VDESIGN OTHER= ac-ft Water Quality Capture Volume (WQCV) Design Volume (VWQCV OTHER = (d6*(VDESIGN/0.43)) H) User Input of Water Quality Capture Volume (WQCV) Design Volume VDESIGN USER= ac-ft (Only if a different WQCV Design Volume is desired) I) NRCS Hydrologic Soil Groups of Tributary Watershed i) Percentage of Watershed consisting of Type A Soils HSG A =% ii) Percentage of Watershed consisting of Type B Soils HSG B =% iii) Percentage of Watershed consisting of Type C/D Soils HSG C/D =% J) Excess Urban Runoff Volume (EURV) Design Volume For HSG A: EURVA = 1.68 * i1.28 EURVDESIGN = ac-f t For HSG B: EURVB = 1.36 * i1.08 For HSG C/D: EURVC/D = 1.20 * i1.08 K) User Input of Excess Urban Runoff Volume (EURV) Design Volume EURVDESIGN USER= ac-f t (Only if a different EURV Design Volume is desired) 2. Basin Shape: Length to Width Ratio L : W = : 1 (A basin length to width ratio of at least 2:1 will improve TSS reduction.) 3. Basin Side Slopes A) Basin Maximum Side Slopes Z = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 4. Inlet A) Describe means of providing energy dissipation at concentrated inflow locations: 0.148 5. Forebay A) Minimum Forebay Volume VFMIN =0.003 ac-ft (VFMIN = 2% of the WQCV) B) Actual Forebay Volume VF = ac-ft C) Forebay Depth (DF = 18 inch maximum)DF = in D) Forebay Discharge i) Undetained 100-year Peak Discharge Q100 = cfs ii) Forebay Discharge Design Flow QF = cfs (QF = 0.02 * Q100) E) Forebay Discharge Design F) Discharge Pipe Size (minimum 8-inches)Calculated DP =in G) Rectangular Notch Width Calculated WN = in Design Procedure Form: Extended Detention Basin (EDB) HFH073 | Bloom Commercial Galloway & Company, Inc. July 14, 2025 Basin G Herman Feissner UD-BMP (Version 3.07, March 2018) Flow too small for berm w/ pipe Choose One Excess Urban Runoff Volume (EURV) Choose One Wall with Rect. Notch Berm With Pipe Water Quality Capture Volume (WQCV) Wall with V-Notch Weir HFH073_UD-BMP_v3.07-BasinG.xlsm, EDB 7/14/2025, 1:03 PM Sheet 2 of 3 Designer: Company: Date: Project: Location: 6. Trickle Channel A) Type of Trickle Channel F) Slope of Trickle Channel S = ft / ft 7. Micropool and Outlet Structure A) Depth of Micropool (2.5-feet minimum)DM = ft B) Surface Area of Micropool (10 ft2 minimum)AM = sq ft C) Outlet Type D) Smallest Dimension of Orifice Opening Based on Hydrograph Routing (Use UD-Detention)Dorifice =inches E) Total Outlet Area Aot =square inches 8. Initial Surcharge Volume A) Depth of Initial Surcharge Volume DIS = in (Minimum recommended depth is 4 inches) B) Minimum Initial Surcharge Volume VIS = cu ft (Minimum volume of 0.3% of the WQCV) C) Initial Surcharge Provided Above Micropool Vs=cu ft 9. Trash Rack A) Water Quality Screen Open Area: At = Aot * 38.5*(e-0.095D)At =square inches Y Other (Y/N): N N C) Ratio of Total Open Area to Total Area (only for type 'Other') User Ratio = D) Total Water Quality Screen Area (based on screen type)Atotal =sq. in. E) Depth of Design Volume (EURV or WQCV) H= feet (Based on design concept chosen under 1E) F) Height of Water Quality Screen (HTR) HTR= inches G) Width of Water Quality Screen Opening (Wopening) Wopening = inches (Minimum of 12 inches is recommended) B) Type of Screen (If specifying an alternative to the materials recommended in the USDCM, indicate "other" and enter the ratio of the total open are to the total screen are for the material specified.) HFH073 | Bloom Commercial July 14, 2025 Galloway & Company, Inc. Design Procedure Form: Extended Detention Basin (EDB) Herman Feissner Basin G Choose One Orifice Plate Other (Describe): Choose One Concrete Soft Bottom HFH073_UD-BMP_v3.07-BasinG.xlsm, EDB 7/14/2025, 1:03 PM Sheet 3 of 3 Designer: Company: Date: Project: Location: 10. Overflow Embankment A) Describe embankment protection for 100-year and greater overtopping: B) Slope of Overflow Embankment Ze = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 11. Vegetation 12. Access A) Describe Sediment Removal Procedures Notes: Basin G HFH073 | Bloom Commercial July 14, 2025 Galloway & Company, Inc. Herman Feissner Design Procedure Form: Extended Detention Basin (EDB) Choose One Irrigated Not Irrigated HFH073_UD-BMP_v3.07-BasinG.xlsm, EDB 7/14/2025, 1:03 PM Sheet 1 of 3 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =72.5 % B) Tributary Area's Imperviousness Ratio (i = Ia / 100 )i = 0.725 C) Contributing Watershed Area Area = 5.8 ac D) For Watersheds Outside of the Denver Region, Depth of Average d6 = in Runoff Producing Storm E) Design Concept (Select EURV when also designing for flood control)1 F) Design Volume (WQCV) Based on 40-hour Drain Time VDESIGN=0.139 ac-ft (VDESIGN = (1.0 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12 * Area ) G) For Watersheds Outside of the Denver Region, VDESIGN OTHER= ac-ft Water Quality Capture Volume (WQCV) Design Volume (VWQCV OTHER = (d6*(VDESIGN/0.43)) H) User Input of Water Quality Capture Volume (WQCV) Design Volume VDESIGN USER= ac-ft (Only if a different WQCV Design Volume is desired) I) NRCS Hydrologic Soil Groups of Tributary Watershed i) Percentage of Watershed consisting of Type A Soils HSG A =% ii) Percentage of Watershed consisting of Type B Soils HSG B =% iii) Percentage of Watershed consisting of Type C/D Soils HSG C/D =% J) Excess Urban Runoff Volume (EURV) Design Volume For HSG A: EURVA = 1.68 * i1.28 EURVDESIGN = ac-f t For HSG B: EURVB = 1.36 * i1.08 For HSG C/D: EURVC/D = 1.20 * i1.08 K) User Input of Excess Urban Runoff Volume (EURV) Design Volume EURVDESIGN USER= ac-f t (Only if a different EURV Design Volume is desired) 2. Basin Shape: Length to Width Ratio L : W = : 1 (A basin length to width ratio of at least 2:1 will improve TSS reduction.) 3. Basin Side Slopes A) Basin Maximum Side Slopes Z = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 4. Inlet A) Describe means of providing energy dissipation at concentrated inflow locations: 0.139 5. Forebay A) Minimum Forebay Volume VFMIN =0.003 ac-ft (VFMIN = 2% of the WQCV) B) Actual Forebay Volume VF = ac-ft C) Forebay Depth (DF = 18 inch maximum)DF = in D) Forebay Discharge i) Undetained 100-year Peak Discharge Q100 = cfs ii) Forebay Discharge Design Flow QF = cfs (QF = 0.02 * Q100) E) Forebay Discharge Design F) Discharge Pipe Size (minimum 8-inches)Calculated DP =in G) Rectangular Notch Width Calculated WN = in Flow too small for berm w/ pipe Design Procedure Form: Extended Detention Basin (EDB) HFH073 | Bloom Commercial Galloway & Company, Inc. July 16, 2025 Basin G1 (Total) Herman Feissner UD-BMP (Version 3.07, March 2018) Choose One Excess Urban Runoff Volume (EURV) Choose One Wall with Rect. Notch Berm With Pipe Water Quality Capture Volume (WQCV) Wall with V-Notch Weir HFH073_UD-BMP_v3.07-BasinG1_Total.xlsm, EDB 7/16/2025, 9:29 AM Sheet 2 of 3 Designer: Company: Date: Project: Location: 6. Trickle Channel A) Type of Trickle Channel F) Slope of Trickle Channel S = ft / ft 7. Micropool and Outlet Structure A) Depth of Micropool (2.5-feet minimum)DM = ft B) Surface Area of Micropool (10 ft2 minimum)AM = sq ft C) Outlet Type D) Smallest Dimension of Orifice Opening Based on Hydrograph Routing (Use UD-Detention)Dorifice =inches E) Total Outlet Area Aot =square inches 8. Initial Surcharge Volume A) Depth of Initial Surcharge Volume DIS = in (Minimum recommended depth is 4 inches) B) Minimum Initial Surcharge Volume VIS = cu ft (Minimum volume of 0.3% of the WQCV) C) Initial Surcharge Provided Above Micropool Vs=cu ft 9. Trash Rack A) Water Quality Screen Open Area: At = Aot * 38.5*(e-0.095D)At =square inches Y Other (Y/N): N N C) Ratio of Total Open Area to Total Area (only for type 'Other') User Ratio = D) Total Water Quality Screen Area (based on screen type)Atotal =sq. in. E) Depth of Design Volume (EURV or WQCV) H= feet (Based on design concept chosen under 1E) F) Height of Water Quality Screen (HTR) HTR= inches G) Width of Water Quality Screen Opening (Wopening) Wopening = inches (Minimum of 12 inches is recommended) Basin G1 (Total) HFH073 | Bloom Commercial July 16, 2025 Galloway & Company, Inc. Design Procedure Form: Extended Detention Basin (EDB) Herman Feissner B) Type of Screen (If specifying an alternative to the materials recommended in the USDCM, indicate "other" and enter the ratio of the total open are to the total screen are for the material specified.) Choose One Orifice Plate Other (Describe): Choose One Concrete Soft Bottom HFH073_UD-BMP_v3.07-BasinG1_Total.xlsm, EDB 7/16/2025, 9:29 AM Sheet 3 of 3 Designer: Company: Date: Project: Location: 10. Overflow Embankment A) Describe embankment protection for 100-year and greater overtopping: B) Slope of Overflow Embankment Ze = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 11. Vegetation 12. Access A) Describe Sediment Removal Procedures Notes: Basin G1 (Total) HFH073 | Bloom Commercial July 16, 2025 Galloway & Company, Inc. Herman Feissner Design Procedure Form: Extended Detention Basin (EDB) Choose One Irrigated Not Irrigated HFH073_UD-BMP_v3.07-BasinG1_Total.xlsm, EDB 7/16/2025, 9:29 AM Sheet 1 of 3 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =80 % B) Tributary Area's Imperviousness Ratio (i = Ia / 100 )i = 0.800 C) Contributing Watershed Area Area = 2.1 ac D) For Watersheds Outside of the Denver Region, Depth of Average d6 = in Runoff Producing Storm E) Design Concept (Select EURV when also designing for flood control)1 F) Design Volume (WQCV) Based on 40-hour Drain Time VDESIGN=0.058 ac-ft (VDESIGN = (1.0 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12 * Area ) G) For Watersheds Outside of the Denver Region, VDESIGN OTHER= ac-ft Water Quality Capture Volume (WQCV) Design Volume (VWQCV OTHER = (d6*(VDESIGN/0.43)) H) User Input of Water Quality Capture Volume (WQCV) Design Volume VDESIGN USER= ac-ft (Only if a different WQCV Design Volume is desired) I) NRCS Hydrologic Soil Groups of Tributary Watershed i) Percentage of Watershed consisting of Type A Soils HSG A =% ii) Percentage of Watershed consisting of Type B Soils HSG B =% iii) Percentage of Watershed consisting of Type C/D Soils HSG C/D =% J) Excess Urban Runoff Volume (EURV) Design Volume For HSG A: EURVA = 1.68 * i1.28 EURVDESIGN = ac-f t For HSG B: EURVB = 1.36 * i1.08 For HSG C/D: EURVC/D = 1.20 * i1.08 K) User Input of Excess Urban Runoff Volume (EURV) Design Volume EURVDESIGN USER= ac-f t (Only if a different EURV Design Volume is desired) 2. Basin Shape: Length to Width Ratio L : W = : 1 (A basin length to width ratio of at least 2:1 will improve TSS reduction.) 3. Basin Side Slopes A) Basin Maximum Side Slopes Z = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 4. Inlet A) Describe means of providing energy dissipation at concentrated inflow locations: 0.058 5. Forebay A) Minimum Forebay Volume VFMIN =0.001 ac-ft (VFMIN = 1% of the WQCV) B) Actual Forebay Volume VF = ac-ft C) Forebay Depth (DF = 12 inch maximum)DF = in D) Forebay Discharge i) Undetained 100-year Peak Discharge Q100 = cfs ii) Forebay Discharge Design Flow QF = cfs (QF = 0.02 * Q100) E) Forebay Discharge Design F) Discharge Pipe Size (minimum 8-inches)Calculated DP =in G) Rectangular Notch Width Calculated WN = in Flow too small for berm w/ pipe Design Procedure Form: Extended Detention Basin (EDB) HFH073 | Bloom Commercial Galloway & Company, Inc. July 14, 2025 Basin H Herman Feissner UD-BMP (Version 3.07, March 2018) Choose One Excess Urban Runoff Volume (EURV) Choose One Wall with Rect. Notch Berm With Pipe Water Quality Capture Volume (WQCV) Wall with V-Notch Weir HFH073_UD-BMP_v3.07-BasinH.xlsm, EDB 7/14/2025, 1:10 PM Sheet 2 of 3 Designer: Company: Date: Project: Location: 6. Trickle Channel A) Type of Trickle Channel F) Slope of Trickle Channel S = ft / ft 7. Micropool and Outlet Structure A) Depth of Micropool (2.5-feet minimum)DM = ft B) Surface Area of Micropool (10 ft2 minimum)AM = sq ft C) Outlet Type D) Smallest Dimension of Orifice Opening Based on Hydrograph Routing (Use UD-Detention)Dorifice =inches E) Total Outlet Area Aot =square inches 8. Initial Surcharge Volume A) Depth of Initial Surcharge Volume DIS = in (Minimum recommended depth is 4 inches) B) Minimum Initial Surcharge Volume VIS = cu ft (Minimum volume of 0.3% of the WQCV) C) Initial Surcharge Provided Above Micropool Vs=cu ft 9. Trash Rack A) Water Quality Screen Open Area: At = Aot * 38.5*(e-0.095D)At =square inches Y Other (Y/N): N N C) Ratio of Total Open Area to Total Area (only for type 'Other') User Ratio = D) Total Water Quality Screen Area (based on screen type)Atotal =sq. in. E) Depth of Design Volume (EURV or WQCV) H= feet (Based on design concept chosen under 1E) F) Height of Water Quality Screen (HTR) HTR= inches G) Width of Water Quality Screen Opening (Wopening) Wopening = inches (Minimum of 12 inches is recommended) Basin H HFH073 | Bloom Commercial July 14, 2025 Galloway & Company, Inc. Design Procedure Form: Extended Detention Basin (EDB) Herman Feissner B) Type of Screen (If specifying an alternative to the materials recommended in the USDCM, indicate "other" and enter the ratio of the total open are to the total screen are for the material specified.) Choose One Orifice Plate Other (Describe): Choose One Concrete Soft Bottom HFH073_UD-BMP_v3.07-BasinH.xlsm, EDB 7/14/2025, 1:10 PM Sheet 3 of 3 Designer: Company: Date: Project: Location: 10. Overflow Embankment A) Describe embankment protection for 100-year and greater overtopping: B) Slope of Overflow Embankment Ze = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 11. Vegetation 12. Access A) Describe Sediment Removal Procedures Notes: Basin H HFH073 | Bloom Commercial July 14, 2025 Galloway & Company, Inc. Herman Feissner Design Procedure Form: Extended Detention Basin (EDB) Choose One Irrigated Not Irrigated HFH073_UD-BMP_v3.07-BasinH.xlsm, EDB 7/14/2025, 1:10 PM Sheet 1 of 3 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =80 % B) Tributary Area's Imperviousness Ratio (i = Ia / 100 )i = 0.800 C) Contributing Watershed Area Area = 1.3 ac D) For Watersheds Outside of the Denver Region, Depth of Average d6 = in Runoff Producing Storm E) Design Concept (Select EURV when also designing for flood control)1 F) Design Volume (WQCV) Based on 40-hour Drain Time VDESIGN=0.035 ac-ft (VDESIGN = (1.0 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12 * Area ) G) For Watersheds Outside of the Denver Region, VDESIGN OTHER= ac-ft Water Quality Capture Volume (WQCV) Design Volume (VWQCV OTHER = (d6*(VDESIGN/0.43)) H) User Input of Water Quality Capture Volume (WQCV) Design Volume VDESIGN USER= ac-ft (Only if a different WQCV Design Volume is desired) I) NRCS Hydrologic Soil Groups of Tributary Watershed i) Percentage of Watershed consisting of Type A Soils HSG A =% ii) Percentage of Watershed consisting of Type B Soils HSG B =% iii) Percentage of Watershed consisting of Type C/D Soils HSG C/D =% J) Excess Urban Runoff Volume (EURV) Design Volume For HSG A: EURVA = 1.68 * i1.28 EURVDESIGN = ac-f t For HSG B: EURVB = 1.36 * i1.08 For HSG C/D: EURVC/D = 1.20 * i1.08 K) User Input of Excess Urban Runoff Volume (EURV) Design Volume EURVDESIGN USER= ac-f t (Only if a different EURV Design Volume is desired) 2. Basin Shape: Length to Width Ratio L : W = : 1 (A basin length to width ratio of at least 2:1 will improve TSS reduction.) 3. Basin Side Slopes A) Basin Maximum Side Slopes Z = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 4. Inlet A) Describe means of providing energy dissipation at concentrated inflow locations: 0.035 5. Forebay A) Minimum Forebay Volume VFMIN =0.000 ac-ft (VFMIN = 1% of the WQCV) B) Actual Forebay Volume VF = ac-ft C) Forebay Depth (DF = 12 inch maximum)DF = in D) Forebay Discharge i) Undetained 100-year Peak Discharge Q100 = cfs ii) Forebay Discharge Design Flow QF = cfs (QF = 0.02 * Q100) E) Forebay Discharge Design F) Discharge Pipe Size (minimum 8-inches)Calculated DP =in G) Rectangular Notch Width Calculated WN = in Flow too small for berm w/ pipe Design Procedure Form: Extended Detention Basin (EDB) HFH073 | Bloom Commercial Galloway & Company, Inc. July 14, 2025 Basin I Herman Feissner UD-BMP (Version 3.07, March 2018) Choose One Excess Urban Runoff Volume (EURV) Choose One Wall with Rect. Notch Berm With Pipe Water Quality Capture Volume (WQCV) Wall with V-Notch Weir HFH073_UD-BMP_v3.07-BasinI.xlsm, EDB 7/14/2025, 1:11 PM Sheet 2 of 3 Designer: Company: Date: Project: Location: 6. Trickle Channel A) Type of Trickle Channel F) Slope of Trickle Channel S = ft / ft 7. Micropool and Outlet Structure A) Depth of Micropool (2.5-feet minimum)DM = ft B) Surface Area of Micropool (10 ft2 minimum)AM = sq ft C) Outlet Type D) Smallest Dimension of Orifice Opening Based on Hydrograph Routing (Use UD-Detention)Dorifice =inches E) Total Outlet Area Aot =square inches 8. Initial Surcharge Volume A) Depth of Initial Surcharge Volume DIS = in (Minimum recommended depth is 4 inches) B) Minimum Initial Surcharge Volume VIS = cu ft (Minimum volume of 0.3% of the WQCV) C) Initial Surcharge Provided Above Micropool Vs=cu ft 9. Trash Rack A) Water Quality Screen Open Area: At = Aot * 38.5*(e-0.095D)At =square inches Y Other (Y/N): N N C) Ratio of Total Open Area to Total Area (only for type 'Other') User Ratio = D) Total Water Quality Screen Area (based on screen type)Atotal =sq. in. E) Depth of Design Volume (EURV or WQCV) H= feet (Based on design concept chosen under 1E) F) Height of Water Quality Screen (HTR) HTR= inches G) Width of Water Quality Screen Opening (Wopening) Wopening = inches (Minimum of 12 inches is recommended) Basin I HFH073 | Bloom Commercial July 14, 2025 Galloway & Company, Inc. Design Procedure Form: Extended Detention Basin (EDB) Herman Feissner B) Type of Screen (If specifying an alternative to the materials recommended in the USDCM, indicate "other" and enter the ratio of the total open are to the total screen are for the material specified.) Choose One Orifice Plate Other (Describe): Choose One Concrete Soft Bottom HFH073_UD-BMP_v3.07-BasinI.xlsm, EDB 7/14/2025, 1:11 PM Sheet 3 of 3 Designer: Company: Date: Project: Location: 10. Overflow Embankment A) Describe embankment protection for 100-year and greater overtopping: B) Slope of Overflow Embankment Ze = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 11. Vegetation 12. Access A) Describe Sediment Removal Procedures Notes: Basin I HFH073 | Bloom Commercial July 14, 2025 Galloway & Company, Inc. Herman Feissner Design Procedure Form: Extended Detention Basin (EDB) Choose One Irrigated Not Irrigated HFH073_UD-BMP_v3.07-BasinI.xlsm, EDB 7/14/2025, 1:11 PM Bloom Commercial Preliminary Drainage Report APPENDIX E SWMM Models Bloom Commercial Preliminary Drainage Report Proposed SWMM Model EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.4) ------------------------------------------------------------ WARNING 09: time series interval greater than recording interval for Rain Gage CoFC_2yr **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ 03/19/2021 00:00:00 Ending Date .............. 03/26/2021 00:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 19.501 0.978 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 5.713 0.287 Surface Runoff ........... 12.563 0.630 Final Storage ............ 1.401 0.070 Continuity Error (%) ..... -0.902 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 12.563 4.094 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 12.484 4.068 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.061 0.020 Continuity Error (%) ..... 0.138 ******************************** Highest Flow Instability Indexes ******************************** Link Pond_C_Outlet (18) ************************* Routing Time Step Summary ************************* Minimum Time Step : 30.00 sec Average Time Step : 30.00 sec Maximum Time Step : 30.00 sec % of Time in Steady State : 0.00 Average Iterations per Step : 1.00 % of Steps Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ A 0.98 0.00 0.00 0.29 0.62 0.00 0.62 0.94 13.38 0.633 D 0.98 0.00 0.00 0.51 0.43 0.00 0.43 0.43 10.47 0.437 E 0.98 0.00 0.00 0.38 0.54 0.00 0.54 0.39 6.67 0.553 C 0.98 0.00 0.00 0.10 0.80 0.00 0.80 0.48 9.11 0.817 G 0.98 0.00 0.00 0.10 0.80 0.00 0.80 0.43 8.00 0.817 H 0.98 0.00 0.00 0.20 0.72 0.00 0.72 0.24 10.29 0.740 B 0.98 0.00 0.00 0.29 0.62 0.00 0.62 0.26 6.18 0.638 I 0.98 0.00 0.00 0.20 0.72 0.00 0.72 0.13 4.86 0.738 S4 0.98 0.00 0.00 0.22 0.76 0.00 0.76 0.02 1.98 0.774 S5 0.98 0.00 0.00 0.10 0.87 0.00 0.87 0.05 5.44 0.890 G1 0.98 0.00 0.00 0.27 0.65 0.00 0.65 0.59 15.39 0.662 J 0.98 0.00 0.00 0.20 0.72 0.00 0.72 0.15 4.66 0.733 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- J2 JUNCTION 0.00 0.00 4935.00 0 00:00 0.00 J1 JUNCTION 0.00 0.00 4942.50 0 00:00 0.00 J3 JUNCTION 0.00 0.00 4927.00 0 00:00 0.00 J4 JUNCTION 0.09 0.46 4923.46 1 11:50 0.46 J5 JUNCTION 0.10 0.58 4927.58 1 11:44 0.58 J6 JUNCTION 1.07 1.27 4940.27 1 12:06 1.27 J7 JUNCTION 0.10 0.58 4924.93 1 11:48 0.58 Peakview_Storm_Stub OUTFALL 0.00 0.00 4922.94 0 00:00 0.00 CooperSlough OUTFALL 0.00 0.00 4938.00 0 00:00 0.00 Lake_Canal OUTFALL 0.00 0.00 0.00 0 00:00 0.00 CooperSloughNorth OUTFALL 0.00 0.00 4940.00 0 00:00 0.00 Pond_A STORAGE 0.12 1.14 4946.64 1 11:47 1.14 Pond_B STORAGE 0.17 1.48 4943.98 1 12:37 1.48 Pond_C STORAGE 0.07 1.41 4939.91 1 11:16 1.41 Pond_D STORAGE 0.13 0.39 4942.89 1 17:14 0.39 Pond_E STORAGE 0.08 0.48 4939.98 1 12:06 0.48 Pond_G STORAGE 0.12 1.40 4929.90 1 11:20 1.37 Pond_H STORAGE 0.28 1.25 4924.25 1 17:01 1.25 Pond_I STORAGE 0.52 1.89 4924.39 1 17:14 1.89 Fut_CommercialPond STORAGE 0.11 0.33 4924.33 1 16:18 0.33 Pond_G1 STORAGE 0.11 1.23 4928.23 1 11:44 1.23 Pond_J STORAGE 0.12 0.65 4925.15 1 12:13 0.65 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- J2 JUNCTION 0.00 0.40 1 17:14 0 0.415 0.000 J1 JUNCTION 0.00 0.40 1 17:14 0 0.415 0.000 J3 JUNCTION 0.00 4.56 1 11:20 0 0.832 0.000 J4 JUNCTION 0.00 6.83 1 11:29 0 1.85 0.000 J5 JUNCTION 0.00 2.13 1 11:44 0 0.587 0.000 J6 JUNCTION 0.00 0.98 1 12:06 0 0.39 0.000 J7 JUNCTION 0.00 2.31 1 11:49 0 0.735 0.000 Peakview_Storm_Stub OUTFALL 0.00 6.83 1 11:29 0 1.85 0.000 CooperSlough OUTFALL 0.00 8.33 1 11:22 0 2.09 0.000 Lake_Canal OUTFALL 0.00 0.08 1 17:14 0 0.125 0.000 CooperSloughNorth OUTFALL 0.00 0.00 0 00:00 0 0 0.000 gal Pond_A STORAGE 13.38 13.38 1 11:05 0.942 0.942 0.064 Pond_B STORAGE 6.18 7.32 1 11:05 0.259 1.2 0.064 Pond_C STORAGE 9.11 9.11 1 11:05 0.477 0.477 0.368 Pond_D STORAGE 10.47 10.47 1 11:05 0.432 0.432 -0.000 Pond_E STORAGE 6.67 6.67 1 11:05 0.391 0.391 -0.000 Pond_G STORAGE 9.98 10.20 1 11:05 0.443 0.833 0.141 Pond_H STORAGE 10.29 10.29 1 11:05 0.237 0.237 0.006 Pond_I STORAGE 4.86 4.86 1 11:05 0.125 0.125 0.006 Fut_CommercialPond STORAGE 5.44 5.44 1 11:05 0.0499 0.0499 0.002 Pond_G1 STORAGE 15.39 15.39 1 11:05 0.587 0.587 0.079 Pond_J STORAGE 4.66 4.66 1 11:05 0.149 0.149 0.004 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** ------------------------------------------------------------------------------------------------ Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft³ Full Loss Loss 1000 ft³ Full days hr:min CFS ------------------------------------------------------------------------------------------------ Pond_A 0.452 0.1 0.0 0.0 12.411 2.2 1 11:47 3.80 Pond_B 0.227 0.1 0.0 0.0 10.231 3.0 1 12:37 3.37 Pond_C 0.008 0.0 0.0 0.0 1.906 1.1 1 11:16 5.31 Pond_D 7.890 1.8 0.0 0.0 24.416 5.6 1 17:14 0.40 Pond_E 1.893 0.6 0.0 0.0 12.185 4.0 1 12:06 0.98 Pond_G 0.046 0.0 0.0 0.0 3.125 1.5 1 11:20 4.56 Pond_H 1.557 0.7 0.0 0.0 10.689 5.1 1 17:01 0.19 Pond_I 1.178 1.1 0.0 0.0 6.343 6.0 1 17:14 0.08 Fut_CommercialPond 1.058 3.5 0.0 0.0 3.281 10.9 1 16:18 0.03 Pond_G1 0.366 0.1 0.0 0.0 11.650 3.2 1 11:44 2.13 Pond_J 0.473 0.5 0.0 0.0 5.163 5.4 1 12:13 0.18 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- Peakview_Storm_Stub 96.69 0.42 6.83 1.852 CooperSlough 96.87 0.48 8.33 2.090 Lake_Canal 64.85 0.04 0.08 0.125 CooperSloughNorth 0.00 0.00 0.00 0.000 ----------------------------------------------------------- System 64.60 0.94 15.18 4.068 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- C1 DUMMY 0.40 1 17:14 C2 DUMMY 0.40 1 17:14 C3 DUMMY 4.56 1 11:20 C4 DUMMY 6.83 1 11:29 C7 CONDUIT 0.97 1 12:11 3.14 0.02 0.09 C8 CONDUIT 2.31 1 11:50 2.90 0.03 0.11 C9 CONDUIT 2.13 1 11:48 2.81 0.18 0.29 Pond_H_Outlet ORIFICE 0.19 1 17:01 0.00 Pond_D_Outlet ORIFICE 0.40 1 17:14 0.00 Pond_E_Outlet ORIFICE 0.98 1 12:06 0.00 Pond_B_Outlet ORIFICE 3.37 1 12:37 0.00 Pond_C_Outlet ORIFICE 5.31 1 11:16 0.00 Pond_A_Outlet ORIFICE 3.80 1 11:47 0.00 PondG_Outlet ORIFICE 4.56 1 11:20 0.00 Pond_I_Outlet ORIFICE 0.08 1 17:14 0.00 C5 ORIFICE 0.03 1 16:18 0.00 PondG1_Outlet ORIFICE 2.13 1 11:44 0.00 Pond_J_Outlet ORIFICE 0.18 1 12:13 0.00 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon Jul 14 12:15:10 2025 Analysis ended on: Mon Jul 14 12:15:10 2025 Total elapsed time: < 1 sec EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.4) ------------------------------------------------------------ **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ 03/19/2021 00:00:00 Ending Date .............. 03/26/2021 00:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 73.136 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 11.525 0.578 Surface Runoff ........... 60.532 3.037 Final Storage ............ 1.396 0.070 Continuity Error (%) ..... -0.434 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 60.532 19.725 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 60.329 19.659 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.183 0.060 Continuity Error (%) ..... 0.034 ******************************** Highest Flow Instability Indexes ******************************** Link Pond_C_Outlet (14) ************************* Routing Time Step Summary ************************* Minimum Time Step : 30.00 sec Average Time Step : 30.00 sec Maximum Time Step : 30.00 sec % of Time in Steady State : 0.00 Average Iterations per Step : 1.00 % of Steps Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ A 3.67 0.00 0.00 0.62 2.51 0.48 2.99 4.55 233.48 0.815 D 3.67 0.00 0.00 1.14 1.72 0.77 2.49 2.52 144.67 0.679 E 3.67 0.00 0.00 0.84 2.19 0.59 2.78 2.01 108.80 0.758 C 3.67 0.00 0.00 0.15 3.23 0.22 3.45 2.06 138.82 0.939 G 3.67 0.00 0.00 0.15 3.23 0.22 3.45 1.83 122.69 0.939 H 3.67 0.00 0.00 0.30 2.88 0.44 3.32 1.09 96.26 0.904 B 3.67 0.00 0.00 0.54 2.51 0.56 3.08 1.28 85.59 0.838 I 3.67 0.00 0.00 0.30 2.88 0.44 3.31 0.58 49.26 0.903 S4 3.67 0.00 0.00 0.29 2.80 0.52 3.32 0.08 8.81 0.906 S5 3.67 0.00 0.00 0.13 3.23 0.24 3.47 0.20 21.06 0.946 G1 3.67 0.00 0.00 0.47 2.60 0.54 3.14 2.85 201.90 0.856 J 3.67 0.00 0.00 0.31 2.88 0.43 3.30 0.69 54.51 0.900 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- J2 JUNCTION 0.00 0.00 4935.00 0 00:00 0.00 J1 JUNCTION 0.00 0.00 4942.50 0 00:00 0.00 J3 JUNCTION 0.00 0.00 4927.00 0 00:00 0.00 J4 JUNCTION 0.14 0.79 4923.79 0 02:30 0.79 J5 JUNCTION 0.12 1.08 4928.08 0 02:25 1.08 J6 JUNCTION 1.07 1.79 4940.79 0 02:22 1.79 J7 JUNCTION 0.17 1.08 4925.43 0 02:28 1.08 Peakview_Storm_Stub OUTFALL 0.00 0.00 4922.94 0 00:00 0.00 CooperSlough OUTFALL 0.00 0.00 4938.00 0 00:00 0.00 Lake_Canal OUTFALL 0.00 0.00 0.00 0 00:00 0.00 CooperSloughNorth OUTFALL 0.00 0.00 4940.00 0 00:00 0.00 Pond_A STORAGE 0.46 6.54 4952.04 0 02:36 6.53 Pond_B STORAGE 0.97 7.11 4949.61 0 11:54 7.11 Pond_C STORAGE 0.18 5.94 4944.44 0 02:07 5.93 Pond_D STORAGE 0.68 3.82 4946.32 0 03:08 3.82 Pond_E STORAGE 0.23 5.17 4944.67 0 02:22 5.16 Pond_G STORAGE 0.46 7.94 4936.44 0 02:25 7.94 Pond_H STORAGE 2.70 6.97 4929.97 0 02:44 6.97 Pond_I STORAGE 4.06 5.60 4928.10 0 03:05 5.60 Fut_CommercialPond STORAGE 0.84 2.60 4926.60 0 02:12 2.60 Pond_G1 STORAGE 0.66 8.43 4935.43 0 02:25 8.42 Pond_J STORAGE 1.02 5.12 4929.62 0 02:39 5.12 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- J2 JUNCTION 0.00 2.55 0 03:08 0 2.51 0.000 J1 JUNCTION 0.00 2.55 0 03:08 0 2.51 0.000 J3 JUNCTION 0.00 13.48 0 02:25 0 3.92 0.000 J4 JUNCTION 0.00 21.16 0 02:27 0 8.74 0.000 J5 JUNCTION 0.00 6.54 0 02:25 0 2.85 0.000 J6 JUNCTION 0.00 8.85 0 02:22 0 2.01 0.000 J7 JUNCTION 0.00 7.11 0 02:29 0 3.54 -0.000 Peakview_Storm_Stub OUTFALL 0.00 21.16 0 02:27 0 8.74 0.000 CooperSlough OUTFALL 0.00 23.69 0 02:22 0 10.4 0.000 Lake_Canal OUTFALL 0.00 0.14 0 03:05 0 0.528 0.000 CooperSloughNorth OUTFALL 0.00 0.00 0 00:00 0 0 0.000 gal Pond_A STORAGE 233.48 233.48 0 00:40 4.55 4.55 0.029 Pond_B STORAGE 85.59 92.51 0 00:40 1.28 5.83 0.010 Pond_C STORAGE 138.82 138.82 0 00:40 2.06 2.06 0.033 Pond_D STORAGE 144.67 144.67 0 00:40 2.52 2.52 0.010 Pond_E STORAGE 108.80 108.80 0 00:40 2.01 2.01 0.046 Pond_G STORAGE 131.50 133.55 0 00:40 1.91 3.92 0.020 Pond_H STORAGE 96.26 96.26 0 00:40 1.09 1.09 0.005 Pond_I STORAGE 49.26 49.26 0 00:40 0.576 0.576 0.001 Fut_CommercialPond STORAGE 21.06 21.06 0 00:40 0.199 0.199 0.003 Pond_G1 STORAGE 201.90 201.90 0 00:40 2.85 2.85 0.025 Pond_J STORAGE 54.51 54.51 0 00:40 0.686 0.686 0.009 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** ------------------------------------------------------------------------------------------------ Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft³ Full Loss Loss 1000 ft³ Full days hr:min CFS ------------------------------------------------------------------------------------------------ Pond_A 26.488 4.8 0.0 0.0 495.551 89.8 0 02:36 12.13 Pond_B 33.071 9.9 0.0 0.0 274.945 81.9 0 11:54 8.57 Pond_C 3.892 2.1 0.0 0.0 177.236 97.9 0 02:07 13.64 Pond_D 49.189 11.3 0.0 0.0 311.016 71.6 0 03:08 2.55 Pond_E 7.717 2.5 0.0 0.0 201.128 66.2 0 02:22 8.85 Pond_G 8.939 4.3 0.0 0.0 206.849 98.6 0 02:25 13.48 Pond_H 43.662 20.9 0.0 0.0 140.590 67.2 0 02:44 0.47 Pond_I 38.571 36.6 0.0 0.0 75.236 71.5 0 03:05 0.14 Fut_CommercialPond 8.378 27.9 0.0 0.0 26.032 86.8 0 02:12 0.09 Pond_G1 20.065 5.5 0.0 0.0 329.053 90.1 0 02:25 6.54 Pond_J 14.562 15.3 0.0 0.0 86.290 90.5 0 02:39 0.57 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- Peakview_Storm_Stub 99.95 1.93 21.16 8.739 CooperSlough 99.94 2.30 23.69 10.390 Lake_Canal 99.92 0.12 0.14 0.528 CooperSloughNorth 0.00 0.00 0.00 0.000 ----------------------------------------------------------- System 74.95 4.35 44.98 19.658 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- C1 DUMMY 2.55 0 03:08 C2 DUMMY 2.55 0 03:08 C3 DUMMY 13.48 0 02:25 C4 DUMMY 21.16 0 02:27 C7 CONDUIT 8.85 0 02:25 6.00 0.15 0.26 C8 CONDUIT 7.11 0 02:30 4.05 0.09 0.20 C9 CONDUIT 6.54 0 02:28 3.80 0.56 0.54 Pond_H_Outlet ORIFICE 0.47 0 02:44 0.00 Pond_D_Outlet ORIFICE 2.55 0 03:08 0.00 Pond_E_Outlet ORIFICE 8.85 0 02:22 0.00 Pond_B_Outlet ORIFICE 8.57 0 11:54 0.00 Pond_C_Outlet ORIFICE 13.64 0 02:07 0.00 Pond_A_Outlet ORIFICE 12.13 0 02:36 0.00 PondG_Outlet ORIFICE 13.48 0 02:25 0.00 Pond_I_Outlet ORIFICE 0.14 0 03:05 0.00 C5 ORIFICE 0.09 0 02:12 0.00 PondG1_Outlet ORIFICE 6.54 0 02:25 0.00 Pond_J_Outlet ORIFICE 0.57 0 02:39 0.00 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon Jul 14 12:06:58 2025 Analysis ended on: Mon Jul 14 12:06:58 2025 Total elapsed time: < 1 sec Bloom Commercial Preliminary Drainage Report APPENDIX F Drainage Maps acres H1 0.80 1.00 0.61 acres H2 0.81 1.00 0.55 acres H 0.91 1.00 6.16 acres G1.2 0.95 1.00 1.36acres G1.3 0.95 1.00 2.29 acres G1.9 0.46 0.58 2.44 acres G1.10 0.85 1.00 1.00 acres G1.8 0.83 1.00 2.06 acres G1.7 0.63 0.79 0.56 acres G1.12 0.95 1.00 0.61 acres G1.13 0.94 1.00 0.69 acres G1.11 0.87 1.00 0.61 acres G1.4 0.95 1.00 0.23 acres G1.5 0.95 1.00 0.25 acres G1.6 0.95 1.00 0.39 acres G1.16 0.70 0.87 0.12 acres H5 0.62 0.78 0.35 acres G1.1 0.95 1.00 1.56 acres G1.15 0.73 0.91 0.38 acres G1 % IMP. 72.5 32.0 acres G % IMP. 90.0 19.6 G1.3 G1.4 G-OS G1.1 G1.2 G1.15G1.7 G1.16 G1.17 H1 H2 G1.5 G1.12 H5 H6 G1.13 G1.14 G1.11 G1.8 G1.9 - - - - - - - - - - - - - - H: \ H \ H a r t f o r d H o m e s \ C O F o r t C o l l i n s H F H 7 3 - B l o o m C o m m e r c i a l \ 0 C I V \ 3 - C D \ H F H 0 7 3 _ C 1 0 . 1 D r a i n a g e P l a n . d w g - He r m a n F e i s s n e r - 7/ 1 6 / 2 0 2 5 BL O O M F I L I N G N I N E PR E L I M I N A R Y D E V E L O P M E N T P L A N FO R T C O L L I N S , C O THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT 5235 Ronald Reagan Blvd., Suite 200 Johnstown, CO 80534 970.800.3300 GallowayUS.com PRE L I M I N A R Y NOT F O R B I D D I N G NOT F O R C O N S T R U C T I O N #Date Issue / Description Init. Project No: Drawn By: Checked By: Date: HFH000073.20 07/15/2025 Sheet of 47 DESIGN POINT OVERLAND FLOW DIRECTION (I.E., LANDSCAPING) DIRECT FLOW DIRECTION (I.E., PAVEMENT, CURB AND GUTTER) BASIN ID 2-YR RUNOFF COEFFICIENT BASIN AREA (ACRES) acres A1 0.05 0.35 2.50 A APPROXIMATE DETENTION POND OVERFLOW PATH 100-YR RUNOFF COEFFICIENT BASIN BOUNDARY (i.e., SWMM) A BASIN BOUNDARY (i.e., Rational Method) SWMM BASIN ID SWMM BASIN AREA (ACRES) acres A1 0.05 0.35 2.50 SWMM BASIN IMPERVIOUS (%) RATIONAL METHOD BASIN IDENTIFIER SWMM BASIN IDENTIFIER Know what's before you dig. PGS JEP DRAINAGE PLAN 46 C10.1 acres H7 0.72 0.89 5.31 acres H3 0.85 1.00 0.61 acres J1 0.68 0.85 0.80 acres H8 0.39 0.49 3.09 acres G1.14 0.75 0.94 0.32 acres J 0.82 1.00 6.85 acres0.87 acres G1.17 0.71 0.89 0.12 acres H6 0.63 0.78 0.36 acres H % IMP. 80.0 10.7 acres J % IMP. 80.0 6.9 J1 LP G1.16 G1.17 H3 H8 H5 H6 G1.13 G1.14 - - - - - - - - - - - - - - H: \ H \ H a r t f o r d H o m e s \ C O F o r t C o l l i n s H F H 7 3 - B l o o m C o m m e r c i a l \ 0 C I V \ 3 - C D \ H F H 0 7 3 _ C 1 0 . 1 D r a i n a g e P l a n . d w g - He r m a n F e i s s n e r - 7/ 1 6 / 2 0 2 5 BL O O M F I L I N G N I N E PR E L I M I N A R Y D E V E L O P M E N T P L A N FO R T C O L L I N S , C O THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT 5235 Ronald Reagan Blvd., Suite 200 Johnstown, CO 80534 970.800.3300 GallowayUS.com PRE L I M I N A R Y NOT F O R B I D D I N G NOT F O R C O N S T R U C T I O N #Date Issue / Description Init. Project No: Drawn By: Checked By: Date: HFH000073.20 07/15/2025 Sheet of 47 DESIGN POINT OVERLAND FLOW DIRECTION (I.E., LANDSCAPING) DIRECT FLOW DIRECTION (I.E., PAVEMENT, CURB AND GUTTER) BASIN ID 2-YR RUNOFF COEFFICIENT BASIN AREA (ACRES) acres A1 0.05 0.35 2.50 A APPROXIMATE DETENTION POND OVERFLOW PATH 100-YR RUNOFF COEFFICIENT BASIN BOUNDARY (i.e., SWMM) A BASIN BOUNDARY (i.e., Rational Method) SWMM BASIN ID SWMM BASIN AREA (ACRES) acres A1 0.05 0.35 2.50 SWMM BASIN IMPERVIOUS (%) RATIONAL METHOD BASIN IDENTIFIER SWMM BASIN IDENTIFIER Know what's before you dig. PGS JEP DRAINAGE PLAN 47 C10.2