Loading...
HomeMy WebLinkAboutReports - Drainage - 06/26/2025FINAL DRAINAGE REPORT FOR COLLEGE & TRILBY MULTI-FAMILY COMMUNITY Prepared For: ZOCAL COMMUNITY DEVELOPMENT 455 SHERMAN STREET, SUITE 250 COLORADO, DENVER 80020 KOLBY O’HERRON (303) 820-8611 June 26th 2025 Project No. 39823.00 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 1A Fort Collins, CO 80525 College & Trilby Multi-Family Community Final Drainage Report ii TABLE OF CONTENTS TABLE OF CONTENTS ......................................................................................................................... ii APPENDIX ..................................................................................................................................... iii Engineer’s Certification Block ........................................................................................................... iv GENERAL DESCRIPTION AND LOCATION ............................................................................................ 1 LOCATION ..................................................................................................................................... 1 DESCRIPTION OF PROPERTY .......................................................................................................... 1 MASTER DRAINAGE BASIN DESCRIPTION ....................................................................................... 2 FLOODPLAIN SUBMITTAL REQUIREMENTS ..................................................................................... 3 DRAINAGE BASINS AND SUB-BASINS ................................................................................................. 3 MAJOR BASINS AND SUB-BASINS ................................................................................................... 3 EXISTING SUB-BASIN DESCRIPTION ................................................................................................ 4 EXISTING OFFSITE DRAINAGE BASINS ............................................................................................ 4 PROPOSED SUB-BASINS DESCRIPTIONS ......................................................................................... 5 ONSITE SWMM SUB-BASINS DESCRIPTIONS .................................................................................. 9 OFFSITE SWMM SUB-BASINS DESCRIPTIONS ................................................................................. 9 PROJECT DESCRIPTION .................................................................................................................... 14 PROJECT DESCRIPTION ................................................................................................................ 14 PROPOSED DRAINAGE FACILITIES .................................................................................................... 14 GENERAL CONCEPT ..................................................................................................................... 14 WATER QUALITY/ DETENTION FACILITIES .................................................................................... 15 LOW IMPACT DEVELOPMENT ...................................................................................................... 16 DRAINAGE DESIGN CRITERIA ........................................................................................................... 16 REGULATIONS ............................................................................................................................. 16 FOUR-STEP PROCESS TO PROTECT RECEIVING WATERS ............................................................... 16 DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS ........................................................... 18 HYDROLOGIC CRITERIA ................................................................................................................ 18 HYDRAULIC CRITERIA ................................................................................................................... 19 FLOODPLAIN REGULATIONS COMPLIANCE ................................................................................... 20 MODIFICATIONS OF CRITERIA ...................................................................................................... 20 EROSION CONTROL ..................................................................................................................... 20 CONCLUSIONS ................................................................................................................................. 20 COMPLIANCE WITH STANDARDS ................................................................................................. 20 DRAINAGE CONCEPT ................................................................................................................... 21 College & Trilby Multi-Family Community Final Drainage Report iii APPENDIX Appendix A – Figures Appendix B – Hydrologic Calculations Appendix C – Hydraulic Calculations Appendix D – Water Quality Calculations Appendix E – Reference Appendix F – Maps Appendix G – LID Exhibit College & Trilby Multi-Family Community Final Drainage Report iv Engineer’s Certification Block I hereby attest that this report for the final drainage design for the College & Trilby Multi-Family Community was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others. Joseph M. Frank, PE Registered Professional Engineer State of Colorado No. 53399 College & Trilby Multi-Family Community Final Drainage Report 1 GENERAL DESCRIPTION AND LOCATION LOCATION The site is located in The Southeast Quarter of Section 11, Township 6 North, Range 69 West of the 6th P.M. in the City of Fort Collins, Larimer County, Colorado. More specifically, the site is a 39.1803 acre property that is currently undeveloped. The site borders College Ave to the East, to the South, the Site Borders Trilby Road, South Gate Church, and a right in and right out with access to Ziggy's Coffee. To the west, the site borders a detention pond that controls runoff for the First Free Will Baptist Church, the Skyview South First Filing Subdivision, and a social services organization owned by Foothills Gateway Inc. To the north, the site borders Hazel Self Storage, two current vacant parcels of land, and a portion of Skyview Drive. DESCRIPTION OF PROPERTY The site generally drains west to east at a 10% to 4% slope. The majority of the site is undeveloped and has several existing farm buildings scattered throughout the site. There are two existing culverts crossings under College Avenue along the eastern boundary of the subject property. The Two existing culverts drain from the site east under College Avenue. The two crossings are identified as south and north. The north crossing is a 48" pipe that gets downsized to a 30" pipe downstream. The south crossing is a 24" pipe. College Avenue creates two inadvertent detention ponds on the subject property due to attenuation/ponding of storm runoff. The inverts of the culverts are such that standing water remains after rainfall events, creating wetland areas on the site. The site is located in the Fossil Creek Basin, specifically within the Stone Creek sub-Basin. The Stone Creek master drainage plans identify these two inadvertent detention areas and specify that these be preserved with the future development of the site. The North Loudon Ditch and Reservoir Company has a 30” gravity irrigation line that goes through the site adjacent and along the northern boundary of the site. The site currently has a small shed and gravel access road; the majority of the site is primarily vacant with native grass. The Natural Resources Conservation Service (NRCS) soil survey shows that the majority of the soils on site are composed of type B soils, which have a mild infiltration and runoff rate. The remaining site is made up of Type C and D soils, which are characterized by a lower infiltration rate and corresponding higher runoff rates. For additional information, refer to the NRCS soil map within Appendix A of this report. College & Trilby Multi-Family Community Final Drainage Report 2 MASTER DRAINAGE BASIN DESCRIPTION The site is located in the Fossil Creek Basin, specifically within the Stone Creek sub-Basin. The Stone Creek Basin - Selected Plan of Improvements", Icon, September 2018 calls out two areas for onsite water quality and detention. The Stone Creek master plan specifies that a smaller pond be built near the existing right in and right out by Ziggy's Coffee and College Ave. Currently, that site drains through a 24" RCP and outfalls across College Ave. The smaller pond will have a riprap-lined overflow channel that will outfall north into the larger pond. The City of Fort Collins has two options for detaining runoff on the site. Option A – construct an overflow channel between the two detention ponds and upsize the northern 30" pipe downstream of the 48" outfall to a 48" pipe. This option significantly increases the allowed release rate onsite and lowers the required detention volume.Option B –the onsite overflow channel is not built/ or built, and the existing 30" RCP storm pipe is not upsized. With each option, the proposed project will need to be in continuity with the City's Stone Creek SWMM model, and the peak release rate for either option is to not be exceeded. Wilson and Company is currently working on the capital improvements for the College and Trilby intersection, the City's Stone Creek SWMM model, and is working on modifying the design recommendations called out in the 2018 Stone Creek Master Plan by Icon Engineering to treat and detain storm water for the College and Trilby intersection improvements. JR Engineering has incorporated the drainage improvement from College and Trilby into the site by following the general recommendations from the Wilson and Company's design and the 2018 Stone Creek Master Plan. JR Engineering is proposing that the smaller pond (P366) will be a water quality pond, an overflow channel will be built, and the runoff will be detained in the larger pond (P363), but the 30" RCP will not be upsized to a 48" RCP. Currently, the site is zoned as general commercial, but the site will be re-purposed as a medium-density mixed-use neighborhood district. The North Loudon Ditch that goes along the northern portion of the site is not anticipated to influence the drainage on site since it is currently piped in a 30” RCP gravity line throughout the site. College & Trilby Multi-Family Community Final Drainage Report 3 FLOODPLAIN SUBMITTAL REQUIREMENTS The site is on FEMA FIRM panels 08069C1200F and 08069C1000F. The flood map for this location has a status of "not printed". This means that the entire area of the panel is in a single flood zone, so FEMA chose to economize and not create a printable image for this location. The site lies within FEMA Zone X, areas which are determined to be outside the 0.2% annual chance floodplain. The site is not located within a FEMA regulated floodplain, as shown in Appendix A in the FEMA attachments. The site is also not located in the City of Fort Collins Floodplain, as shown in Appendix A in the City of Fort Collins Flood map. DRAINAGE BASINS AND SUB-BASINS MAJOR BASINS AND SUB-BASINS The College and Trilby site is 39.1803 acres; the site will be developed into a multi-family residential community with a recreation facility and will include onsite and offsite detention. The site is located in the Fossil Creek basin. The Fossil Creek drainage basin extends along the south end of Fort Collins, from the foothills across Interstate 25 past CR 5. It encompasses 32 square miles in the City of Fort Collins and Larimer County. More specifically, the site is in the Stone Creek sub-basin of the Fossil Creek Tributary. College & Trilby Multi-Family Community Final Drainage Report 4 EXISTING SUB-BASIN DESCRIPTION The existing site’s hydrology was modeled within the 2018 Stone Creek basin master plan. EPA SWMM was used to model the hydrology of the site. Currently, the City has accepted an updated hydrologic model for the Stone Creek master plan after some inaccuracies were found when Wilson and Company modeled the College and Trilby Capital Improvements for the site. The site is anticipated to be constructed after capital improvements for the College and Trilby Intersection have been made. JR Engineering is currently referencing the SC_100Yearprop SWMM model as the existing conditions model. This model includes the proposed drainage and storm system improvements, basin modifications, and increased imperviousness due to the College and Trilby intersection improvements by Wilson and Company, which are anticipated to be in place while the College & Trilby Multi-Family Community is developed. EXISTING OFFSITE DRAINAGE BASINS Currently, the site collects offsite runoff from three locations: Runoff from the southern portion of West Trilby Road drains onto the site via a CMP FES that crosses Trilby Road and drains directly onto the site. Runoff from the Northern portion of Trilby Road drains onto the site via a grass swale in confluence with upstream runoff, as shown in the offsite SWMM Map by Wilson and Company within Appendix E. An existing drainage pan goes south to north in the backyards of Skyview South First Filing as shown in the Trilby College Ex-Drainage Exhibit in Appendix G. The runoff then goes offsite to an adjacent swale along Gateway Center Drive. In the 100-year event, it’s anticipated that the runoff will overflow within the back of the yards. The capacity of the existing drainage pan has been modeled in SWMM, and the capacity is shown in Appendix F of this report in the Drainage Report on typical cross section AA. College & Trilby Multi-Family Community Final Drainage Report 5 PROPOSED SUB-BASINS DESCRIPTIONS Basin A1, 1.90 acres and 16 % impervious, is composed of open space, a proposed walk, and a swale where runoff will be conveyed to design point 1a, where it will drain onto Rover Way via a chase drain. Basin A2, 1.79 acres and 51.9% impervious, is composed of multi-family residential units and an alley. The runoff from this basin will be conveyed to an inlet at design point 2a. Basin A3, 1.62 acres and 38% impervious, is composed of multi-family duplex residential units, paved walks and paved driveways, and a residential local street Rover Way. The runoff from this basin goes to design point 4a at an on-grade inlet. Basin A4, 0.42 acres and 59.3% impervious, is composed of a local residential street, paved walk, and paved driveways. The runoff from this basin goes to design point 5a at an on-grade inlet. Basin A5, 0.75 acres and 69.0% impervious. This basin is composed of a collector Street Mars, paved walk, and multi-family residential units. The runoff from this basin goes to an on-grade inlet at design point 6a. Basin A6, 0.47 acres and 73.5% impervious, is composed of a collector street Mars, paved walk. The runoff from this basin goes to an on-grade inlet at design point 7a. Basin A7, 1.26 acres and 65.0% impervious, is composed of a collector street Mars, paved walk, and multi-family residential units. The runoff from this basin goes to an on-grade inlet at design point 8a. Basin A8, 0.30 acres and 65.6% impervious this basin is composed of a collector street Mars, paved walk, and paved driveways. The runoff from this basin goes to an on-grade inlet at design point 9a. College & Trilby Multi-Family Community Final Drainage Report 6 Basin A9, 0.18 acres and 65.7% impervious, is composed of a collector street Mars, paved walk. The runoff from this basin goes to an on-grade inlet at design point 10a. Basin B1, 0.63 acres and 76.3% impervious, comprises a residential alley, multi-family residential units, and paved driveways. The runoff from this basin drains to design point 1b at a sump inlet. Basin B2, 1.17 acres and 7.0% impervious, comprises open space and a side swale that runs adjacent to the property line. The runoff from this basin drain into a type D sump inlet at design point 2b in confluence with upstream runoff from the capital improvements of Trilby College. Basin C1.1, 3.82 acres and 4.5% impervious, comprised of residential duplex units, paved walks and paved driveways, and a local residential street – Rover Way. The runoff from this basin drains into an on-grade inlet at design point 1.1C. Basin C1.2, 0.72 acres and 38.1% impervious, comprised of residential multi-family units, paved walks and paved driveways, and a local residential street – Rover Way. The runoff from this basin drains into an on-grade inlet at design point 1.2C. Basin C1.3, 0.18 acres and 66.2% impervious, comprised of residential duplex units, paved walks and paved driveways, and a local residential street - Rover Way. The runoff from this basin drains into an on-grade inlet at design point 1.3C. Basin C2, 1.12 acres and 41.6% impervious, is composed of paved walk and paved and a local residential street - Rover Way. The runoff from this basin drains into an on-grade inlet at design point 2C. Basin C3, 2.22 acres and 70.2% impervious is composed of paved driveways, a paved local residential alley, onsite park spaces, and multi-family residential units. The runoff from this basin drains into an on-grade inlet at design point 3a. College & Trilby Multi-Family Community Final Drainage Report 7 Basin C4.1, 0.82 acres and 67.5% impervious, is composed of residential multi-family units, walks, and a local collector, Mars Drive. Runoff from this basin drains to a on-grade inlet at design point 4c. Basin C4.2, 1.76 acres and 52.1% impervious, is composed of residential multi-family units, walks, and a local collector, Mars Drive. Runoff from this basin drains to a sump inlet at design point 4c. Basin C5, 1.34 acres and 65.0% impervious, is composed of residential multi-family units, walk, and a local collector Mars Drive. Runoff from this basin drains to a sump inlet at design point 5c. Basin D1, 0.29 acres and 81.4% impervious, is composed of a local residential street – Stellar Drive and paved walk. The runoff from this basin drains to a sump inlet at design point d1. Basin D2, 0.50 acres and 67.5% impervious is comprised of a local residential street –Stellar Drive and paved walk. The runoff from this basin drains to a sump inlet at design point d2. Basin E1, 0.42 acres and 81.3% impervious is comprised of a local residential alley, and multi- family residential units. The runoff for this basin will be treated for water quality in pond P366. Basin E2, 0.73 acres and 78.1% impervious is comprised of a road (Lunar Court) and a residential Cul-de-Sac. Runoff from this basin will drain into a sump inlet and will be treated for water quality in Pond 366. Basin E3, 0.23 acres and 78.1% impervious is comprised of a private parking lot. The runoff from this basin drains to design point 3e. Basin E4, 0.17 acres and 62.6% impervious is comprised of a recreation facility. Runoff from this basin drains directly into the adjacent water quality pond P366. Basin E5, 0.38 acres and 37.4% impervious is comprised of a recreation facility. Runoff from this basin drains directly into the water quality pond P366. College & Trilby Multi-Family Community Final Drainage Report 8 Basin E6 0.86 acres and 6.3% impervious is comprised of the water quality detention pond P366. Basin F1, 1.20 acres and 31.9% impervious, is composed of the overflow channel between pond P366 and pond P363, as shown within section CC on the drainage maps Basin OF1, 0.53 acres and 12.2% impervious, is composed of an overflow swale that captures runoff from Skyview South, First Filing. Runoff in the overflow swale is routed to detention pond P363. Basin G1, 1.49 acres and 74.0% impervious, is composed of a residential alley, paved walk, paved driveways, and multi-family residential units. The runoff from this basin drains to an on-grade inlet within the alley at design point 1g. Basin G2, 0.62 acres and 83.1% impervious. This basin is composed of a residential alley, paved driveways, and multi-family residential units. The runoff from this basin drains to an on-grade inlet at design point 2g. Basin G3 has 1.06 acres, and 56.8% is impervious. This basin is composed of walks and residential units. The runoff from this basin drains to a series of inlets represented by design point 3g. Basin G4, 0.82 acres and 76.6% impervious is composed of residential alleys, paved driveways, and multi-family residential units. The runoff from this basin drains to a sump inlet at design point 4g. Basin H1 has 5.81 acres and is 7.3% impervious. This basin is composed of the detention facility P363 for the site. Runoff from this basin drains and is released to an outlet structure, where it goes directly east of the site under College Ave to the Prairie Dog Meadows Natural Area. College & Trilby Multi-Family Community Final Drainage Report 9 ONSITE SWMM SUB-BASINS DESCRIPTIONS Basin CT-1, 24.68 Acres and 53.4% impervious is composed the College & Trilby Multi-Family development. Runoff from this basin will be treated for water quality in the ADS isolator rows. Basin CT-2, 5.37 Acres and 45.7% impervious is composed the College & Trilby Multi-Family development, recreation center and onsite water quality pond P366. The conveyance between Pond P366 and Pond P363 is both channelized and piped in events greater than the 25 year and the channel will receive flow from the overflow weir. In events under the 25 year the runoff will be piped. Basin CT-3, 1.20 Acres and 31.7% impervious is composed of the overflow channel and adjacent lots. The water quality for this basin will be treated for water quality in the drainage channel as a grass buffer for water quality treatment. This is shown as basin F1 on the rational drainage maps F1. Basin CT-4 (H1), 5.81 Acres and 7.3% impervious is composed of pond P363. Runoff from the townhomes adjacent to the pond will be treated for water quality as they drain down into the pond via a grass buffer. This is shown as basin H1 on the rational drainage maps. Basin OF1, 0.53 Acres and 34.3% impervious is composed of the overflow channel and walk on the western boundary of the site. The conveyance between Pond P366 and Pond P363 is both channelized and piped in events greater than the 25 year. In events under the 25 year the runoff will be piped. OFFSITE SWMM SUB-BASINS DESCRIPTIONS The offsite basins delineated by Wilson and Company are shown in Appendix E. The comprehensive proposed drainage map and SWMM map are shown in Appendix F. The offsite basins are part of the Stone Creek master plan and have recently been updated to incorporate the College and Trilby Intersection improvements by Wilson and Company in February of 2024. College & Trilby Multi-Family Community Final Drainage Report 10 The existing onsite Basins B820 and B910 have been removed and replaced with additional sub basin to represent the site and the frontage for the site on W Trilby Road and South College Ave. These new basin are represent by basins CT-1 through CT04, OS1- OS6 and OF1. The offsite basins B930, B840, and B850 have been modified to conform to the proposed site grading and observed offsite drainage patterns. In addition, since B910B was part of the Trilby frontage and part of the existing site, this basin was modified, and basins OS1, OS2, OS3, and OS4 have been added to the frontage on Trilby Ave. Basins OS5 and OS6 were added to represent the frontage of South College Ave. The updated basins and delineations are shown in the proposed drainage map in Appendix F of this report. A comprehensive table - SWMM Model Comparison Table - shows the changes made to the basins as shown in Appendix B of this Report. The conveyance between Pond P366 and Pond P363 is both channelized and piped in events greater than the 25 year and the channel will receive flow from the overflow weir. In events under the 25 year the runoff will be piped. Basin OS1, 0.73 acres and 82.0% impervious is composed of the intersection of Mars Drive and West Trilby Road. Runoff from the intersection drains to an on-grade inlet, where it is piped and treated in a water-quality pond P366. From then on, the runoff is piped and drains via the overflow channel to the detention facility P363. Basin OS2, 2.03 acres, 48.3% impervious, is composed of the northern portion of West Trilby Road. The runoff from this basin drains into a roadside swale. The runoff drains to an inlet and is piped and treated in a water-quality pond P366. From then on, the runoff is piped and drains into a channel where it outfalls to the detention facility P363. Basin OS3, 0.32 acres and 71.5% impervious, is composed of the south portion of West Trilby Road and receives runoff. The runoff drains to a type D inlet from the CIP project and is piped and treated in a water quality pond P366. From then on, the runoff goes into a channel and outlet structure within a 30 “ RCP pipe where it outfalls to the detention facility P363. College & Trilby Multi-Family Community Final Drainage Report 11 Basin OS4, 0.40 acres and 90.8% impervious this basin is composed of the south side of West Trilby Road and includes the ROW improvements associated with the College and Trilby project. The runoff from this basin drains into an on grade inlet built in Ridgewood Hills PUP First Filing. Basin OS5, 1.69 acres and 76.3% impervious this basin drains undetained to an existing 10’ type R inlet on the western portion of South College Ave directly adjacent to the pond outfall for Pond P366. This inlet does not drain into the pond P363. The runoff from this basin drains to the outfall pipe via the 10’ existing type R inlet. Basin OS6, 0.88 acres and 78.3% impervious this basin drains undetained along the north western portion of the site along South College Ave (east of the site) to a sump Inlet downstream of the site adjacent to South College Ave and Skyway Drive. Basin B770A, 0.36 acres, and 100.0% impervious, is composed of the southern portion of East Trilby Road and the College and Trilby intersection. Runoff from this basin drains to an on-grade type R inlet. Runoff is then piped to the water quality pond P366, and from there on the runoff is routed in the overflow channel and outlet structure within a 30 “ RCP pipe to the detention pond P363. Basin B770B, 1.52 acres 89.0% impervious, composed of the eastern portion of South College Ave South of Trilby road. Runoff from this basin drains to an on-grade type R inlet and is piped to pond P363. Basin B900A, 0.48 acres and 95.0% impervious, is composed of east Trilby Road. Runoff from this basin drains to an on-grade type R-inlet; runoff is then piped to the water quality pond P366, and from there on, the runoff is routed in the overflow channel and outlet structure within a 30” RCP to the detention pond P363. Basin B900B, 0.56 acres and 100.0% Impervious. This basin is composed of the eastern portion of South College Ave north of the College and Trilby intersection. Runoff from this basin drains College & Trilby Multi-Family Community Final Drainage Report 12 to an on-grade type R-Inlet. The runoff is piped to the water quality pond P366, and from there on, the runoff is routed in the overflow channel and outlet structure with a 30” RCP to detention pond P363. Basin B910C, 1.30 acres and 90.0% impervious, this basin is composed of the northwestern quadrant of the College and Trilby intersection. Runoff from this basin drains to an on-grade type-R inlet. The runoff is piped to the water quality pond P366, and from there on the runoff is routed in the overflow channel and outlet structure with a 30” RCP to detention pond P363. Basin B920C, 1.71 acres and 66.0% impervious, is composed of commercial development, the College and Trilby intersection, and is situated on the southwest quadrant of the College and Trilby intersection. Runoff from this basin drains to an on-grade type R-Inlet; runoff is piped to the water quality pond P366, and from there on, the runoff is routed in the overflow channel and outlet structure with a 30” RCP to detention pond P363. Basin B910D, 0.46 acres and 100.0% impervious. This basin is composed of the right in and right for Ziggy's Coffee. Runoff from this basin drains to an on-grade type R inlet; runoff is then piped to the water quality pond P366, and from there on, the runoff is routed in the overflow channel and outlet structure with a 30” RCP to detention pond P363. Basin B920A, 3.82 acres and 20.0% impervious. This basin is composed of the southern portion of West Trilby Road. Runoff from this basin drains within a swale to a sump inlet; runoff is then piped to the water quality P366, and from there on, the runoff is routed in the overflow channel and outlet structure 30” RCP to detention pond P363. Basin B920B, 0.99 acres and 63.0% impervious. This basin is composed of the southern portion of West Trilby Rd. The runoff from this basin is conveyed within a swale to a sump inlet; runoff is then piped to the water quality pond P366, and from there on, the runoff is routed in the overflow channel and outlet structure with a 30” RCP to detention pond P363. College & Trilby Multi-Family Community Final Drainage Report 13 Basin B910A, 2.99 acres and 74% impervious, is composed of Southgate Church and Ziggy's Coffee. This basin drains to a detention pond situated near the northwest corner of the basin and ultimately passes through pond P366 and Pond P363. B830, 7.82 acres and 45% impervious; this basin is composed of Skyview South First Filing. The runoff from this basin drains into a pan along side the eastern portion of the back of lots within the subdivision. The runoff from this pan will overtop and go into an adjacent swale in the 100- year event where the runoff will be detained in pond P363. B840 11.79 acres and 45 % impervious; this basin is composed of Skyview South First Filing. The runoff from this basin drains into a pan along site the eastern portion of the back of lots within the subdivision. The runoff from this pan will overtop and go into an adjacent swale, where the runoff will be detained in detention pond P363. B930 4.71 acres and 31.2 % impervious; this basin is composed of the First Free Will Baptist Church at 320 W Trilby Road. Runoff from this basin is detained in detention pond P930. Runoff from this basin is released and ultimately is treated for water quality within pond P366 and is detained within pond 363. This basin’s southern boundary was slightly modified to account for the Frontage on W. Trilby Ave. B876 16.97 acres and 60% impervious; this basin is made up of a social services organization owned by Foothills Gateway Inc. that is composed of buildings and parking lots. This basin was slightly modified to account for an inlet to accept runoff from basin B830 and B840, which drains via a pan. The Stone Creek master plan specifies that B830 and B840 drain into pond P363. The runoff from this basin drains to an existing swale on the western boundary of the College and Trilby site and does not drain onto the College and Trilby Multi-Family site. B850 17.24 acres and 10% impervious; this basin borders the northern boundary of the site and is composed of Mars Collector Roadway and a self-storage facility. This basin’s southern boundary was slightly modified to tie into the northern boundary of the College and Trilby Multi-Family site. College & Trilby Multi-Family Community Final Drainage Report 14 For additional information on offsite drainage basins and ponds in series, refer to the Wilson and Company Stone Creek Proposed Conditions SWMM Schematic area of College and Trilby Intersection Enhancements Storm System dated February of 2024 within Appendix E and the Proposed SWMM map located in Appendix F. PROJECT DESCRIPTION PROJECT DESCRIPTION College & Trilby is a residential multi-family development that will consist of a recreation center, alleys, and local and collector roadways. The College & Trilby site will hold detention and water quality improvements for the College and Trilby in continuity with the Stone Creek Master Plan. PROPOSED DRAINAGE FACILITIES GENERAL CONCEPT The proposed improvements to the College and Trilby site will result in the developed condition being treated for water quality and detained. Low-impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows. Specifically, ADS isolator rows are proposed near the central portion of the site to treat and provide water quality for the majority of the development. The remaining portion of the development will be treated for water quality in the smaller water quality pond (P366) along with the tributary area and which also treats runoff from the capital improvements to the Trilby and College intersection. The majority of the runoff is treated for WQ/LID via ADS isolator row and extended detention in P366. A small portion of the site’s impervious area is left untreated. Specifically, this impervious area consists of residential lots facing Pond P363 and the channel in-between pond P363 and P366, where runoff from water quality events will discharge across an extensive vegetated buffer. This buffer provides significant infiltration and filtering, effectively reducing pollutants and minimizing runoff before reaching Pond P366. No runoff from streets or alleys crosses this buffer, resulting in fewer pollutants such as hydrocarbons typically associated with vehicular surfaces. College & Trilby Multi-Family Community Final Drainage Report 15 Given the reduced pollutant load and effective natural infiltration, this approach aligns with the City of Fort Collins' intent and standards for stormwater quality management. Runoff from the site is captured in inlets located in the alleys and on grade and sump inlets along the curb and gutter. Runoff is conveyed in storm sewers, along the curb and gutter, and via surface flow to the detention facility. Secondly, surface overflow paths will be provided such that the 100- year storm flows remain at least one foot below the finished floor elevation at the time of the final drainage report. WATER QUALITY/ DETENTION FACILITIES The majority of the water quality is treated within the onsite ADS isolator rows directly adjacent to pond P363 and via Grass Buffers – that make up a small portion of the site’s treated impervious area. The majority of the site is treated by LID methods via the ADS isolator row. The remaining water quality within the site will be treated in tangent with water quality pond P366, which also treats the College and Trilby Capital improvements. The portion of the site that drains to the detention facility will drain over a grass buffer which will provide water quality treatment when the runoff drains over and infiltrates the soil and vegetation in a water quality event. The runoff that drains into the channel between pond 363 and 366 will act as a grass buffer, since the channel only receives overflow in events above the 25 year event. While the grass buffers located within the overflow channel and adjacent to the detention pond do not independently meet the City’s criteria for formal water quality or LID BMPs, they provide supplemental treatment for the limited portion of impervious area that is not routed to dedicated BMPs. This untreated impervious area is primarily composed of rooftop surfaces from townhomes, which generate low pollutant loads and no vehicular runoff. As these areas discharge to vegetated surfaces prior to entering the detention system, incidental infiltration and filtering of runoff is expected to occur. Combined with the fact that over 90% of the site’s impervious area is treated through engineered BMPs (e.g., ADS Isolator Rows and Pond P366), the design College & Trilby Multi-Family Community Final Drainage Report 16 exceeds the City’s minimum 75% LID treatment requirement and meets the overall intent of the Stormwater Criteria Manual. LOW IMPACT DEVELOPMENT A minimum of 75 percent of the new impervious surface area is treated by a Low-Impact Development (LID) best management practice (BMP) in accordance with City criteria. An illustrative LID/ Surface Map is provided in Appendix G, and the sizing calculations of the LID method is provided in Appendix D. DRAINAGE DESIGN CRITERIA REGULATIONS This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Stormwater Criteria Manual (dated 2018)(FCSCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. FOUR-STEP PROCESS TO PROTECT RECEIVING WATERS The City of Fort Collins requires the Four Step Process to protect receiving waters. The four- step process incorporates reducing runoff volume, treating water quality capture volume, stabilizing streams, and implementing long-term source controls. Volume reduction is an important part of the four-step process and is fundamental to effective stormwater management. Per City criteria, a minimum of 75 percent of the new impervious surface area must be treated by a Low-Impact Development (LID) best management practice (BMP). The site incorporates underground ADS isolator rows, and a water quality pond designed to capture and treat at least 75% of the site’s water quality capture volume. The isolator rows need to be properly cleaned and maintained to allow for long-term protection of the receiving waters. The proposed LID BMPs will have the effect of slowing runoff through the site and increase infiltration and rainfall interception by encouraging infiltration via the careful selection of vegetative cover. The dog park will have a waste station, crusher fines and an underdrain system to provide infiltration so that in a water quality event, a media of crusher fines with the underdrain system will effectively improve water quality. The water quality for the dog park will ultimately be treated in the ADS isolator College & Trilby Multi-Family Community Final Drainage Report 17 rows. Some portions of the site do not drain directly to the ADS isolator rows or directly to the water quality treatment pond. These portions of the site do not include roadways or alleys, and there is a large degree of separation of land, generating a buffer to infiltrate and improve water quality. These areas the P363 and the overflow channel between Pond P363 and P366 are considered to be treated by a grass buffer bmp, the runoff is released out of Pond 363. The improvements will decrease the runoff coefficient from the site and are expected to have no adverse impact on the timing, quantity, or quality of stormwater runoff. The majority of the new impervious area is treated by the proposed isolator rows in the mid-eastern portion of the site. The remainder of the site is treated within water quality pond P366, as illustrated in the LID/Surface Map provided in Appendix G. Step 1 – Employ Runoff Reduction Practices All of the developed runoff through the site will be routed through the onsite detention pond at pond P363. The detention pond will restrict the flow rate of stormwater leaving the site and reduce the impact on downstream drainage areas. Additionally, the design will allow for greater than 75% of the project’s added impervious area to be routed through an approved LID water quality treatment train. The onsite water quality BMPs includes a water quality pond, underground ADS StormTech isolator rows, and grass buffers for water quality. Step 2 – Implement BMPS that Provide a Water Quality Capture Volume The site incorporates underground ADS isolator rows, and a water quality pond designed to capture and treat at over 90% of the site’s water quality capture volume. The isolator rows need to be properly cleaned and maintained to allow for long-term protection of the receiving waters. The proposed LID BMPs will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative cover. Step 3 –Stabilize Drainageways The stormwater improvements at College and Trilby improves the existing condition by eliminating flows overtopping College Ave at Pond P363 and at Pond P366. Step 4 – Implement site-specific and other source-control BMPs The dog park will have a waste station, crusher fines, and an underdrain system to provide infiltration so that in a water quality event, a media of crusher fines with the underdrain system will effectively improve College & Trilby Multi-Family Community Final Drainage Report 18 water quality before it is ultimately treated in the underground ADS StormTech isolator rows. An erosion control plan and Stormwater Management Plan will be implemented to prevent erosion and control sediment on the project site and downstream drainage ways during and after construction. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS The master drainage report for the Stone Creek Drainage Basin was prepared by ICON Engineering, Inc. City of Fort Collins Stone Creek Basin Selected Plan of Improvements; Icon Engineering, Inc., October 2018. JR Engineering is following the general recommendations. The City of Fort Collins College and Trilby intersection improvements plans are directly tributary to the site. The College and Trilby, intersection improvement plan is being developed, and the Stone Creek basin master plan has been modified in a memorandum from Wilson and Company dated 12/2023 that has been approved by the City of Fort Collins. Wilson and Company has designed the College and Trilby intersection improvements and provided an updated corrected effective SWMM and proposed SWMM model for the site. JR Engineering is updating and building off the Proposed SWMM model for the College and Trilby-Multi Family Development. JR Engineering has incorporated the drainage improvement from College and Trilby into the site by incorporating the site into the Wilson and Company’s design and the 2018 Stone Creek Master Plan (the SC_100Yearprop SWMM model). The Wilson and Company modeled pond P366 as a water quality pond with detention and improved overtopping onto College Ave. JR Engineering is proposing that the smaller pond P366 be utilized as a water quality pond with some detention, where an overflow channel will be built, and the majority of the runoff will be detained in the larger pond - P363. The 30” RCP under College Avenue directly adjacent to pond P363 will not be upsized to a 48” RCP per option B of the Stone Creek basin master plan. The capacity of the existing 30” pipe is 60 cfs. Wilson and Company modeled the large pond with new LiDAR topo and reduced the overtopping onto College Ave from the corrected effective condition to the proposed condition. JR Engineering has eliminated overtopping onto College Ave. The stormwater improvements at College and Trilby improve the existing condition by eliminating flows overtopping College Ave at Pond P363 by adding additional volume to the detention pond. Overflow onto College Avenue from Pond P366 is no longer present. Pond 366 will serve as a water quality pond with additional attenuation provided up to the overflow weir (approximately 2ft). The overflow channel College & Trilby Multi-Family Community Final Drainage Report 19 between pond 366 and pond 363 element P366_OVERFLOW_CHANNEL, as shown within section CC in the Drainage Map within Appendix F - receives flow overtopping from the weir in an event between the 25-year and 50-year. The water quality Pond 366 was sized for onsite and offsite tributary area. To develop a rating curve in SWMM, the volume used to calculate the WQCV in P366 was done in an MHFD spreadsheet; the area in the spreadsheet override was multiplied by 1.2 to account for sediment accumulation in accordance with the City of Fort Collins Criteria. Table 1, as shown below, shows the 100-year volume and 100-year WSELV. Table 2 shows the maximum release rate(s) for the detention for the facilities on site. Table 3 shows the approximate onsite pond drain times modeled within SWMM. Table 1: Pond Volumes (Acre-Ft)WSELV RELEASE (CFS) P363 9.78 5006.04 55.00 P366 1.41 5024.52 108.73 The water quality volume for P366 is 0.444 Acre-ft. – in a water quality event. Table 2: 100 YR Release Rates Rate (CFS) Total overflow from pond P366 and runoff from channel basin. unrestricted 30” outlet pipe. 48” RCP at 60 cfs capacity. Not being upsized to 48” downstream. Capacity is limited to a 30” pipe. College & Trilby Multi-Family Community Final Drainage Report 18 Table 3: Approx. Drain Times P366 68 82 P363 67 85 CTL Thompson conducted groundwater monitoring for the site - the groundwater borings and locations are shown in Appendix E of this report. The detention outfall elevation for Pond P363 will have a dedicated outlet Structure. The proposed Storm-Tech isolator rows are situated approximately - 2’ above the high ground water elevation as shown in the ground water measurements from Aloterra in Appendix E of this report. The water quality facility at Pond P366 is anticipated to be built before construction starts on the College and Trilby Multi-Family Community is developed. Pond P366 will be constructed by the City of Fort Collins for the College and Trilby Intersection improvements. Pond P366 will have its outlet structure replaced entirely to accommodate the College and Trilby development, and the grading of the pond will be modified to have an access road from Stellar Drive. HYDROLOGIC CRITERIA Weighted percent imperviousness was calculated for each basin using the Fort Collins Stormwater Criteria Manual Table 3.2-2 for each basin. EPA SWMM version 5.2 (Build 5.2.2) was used to model the runoff for the site since the corresponding tributary area of the site is over 20 acres, and there are multiple detention basins upstream of the site that are in series with one another. The City of Fort Collins area has rainfall depths associated with the table below, as shown in Chapter 5 of the Fort Collins Stormwater Criteria Manual. The corresponding site and tributary area were modeled in SWMM for the 2-year storm and the 100-year storm and are shown in Table 4.1-4 below. College & Trilby Multi-Family Community Final Drainage Report 19 HYDRAULIC CRITERIA StormCAD was utilized to determine the hydraulic capacity of the storm sewer system on site. Headloss coefficients were input as recommended by AMEC. "Modeling Hydraulic and Energy Sewer Gradients in Storm Sewers: A Comparison of Computational Methods." UDFCD, 6 Oct. 2009. The stormCAD V8i input/results are shown in Appendix C.Additionally, hydraulic calculations for items such as street capacity, inlet capacity, swales, channels, and the emergency spillway are provided within the Final Drainage Report. The emergency spillway for pond P363 will not see flows overtopping College Avenue unless the outlet structure is clogged in the 100 year event. Pond 363 has been graded to attenuate and detain runoff and release into the 48" pipe, which is reduced downstream to a 30” pipe and has the capacity of a 30” pipe. College & Trilby Multi-Family Community Final Drainage Report 20 FLOODPLAIN REGULATIONS COMPLIANCE As previously stated, the site lies within FEMA Zone X, areas which are determined to be outside the 0.2% annual chance floodplain. The site is not located within a FEMA regulated floodplain, as shown in Appendix A in the FEMA attachments. The site is also not located in the City of Fort Collins Floodplain, as shown in Appendix A in the City of Fort Collins Flood map. MODIFICATIONS OF CRITERIA The site does not treat 100% of modified/ added impervious areas with traditional BMPs. 98.89% of modified added onsite impervious area is treated for water quality. The small portion of runoff that is untreated is from the overflow-swale on the western portion of the site composed of Basin OF1. This basin is not directly tributary to any streets, alleys or roofs and will not negatively impact the water quality of the site. While the grass buffers located within the overflow channel and adjacent to the detention pond do not independently meet the City’s criteria for formal water quality or LID BMPs, they provide supplemental treatment for the limited portion of impervious area that is not routed to dedicated BMPs. This untreated impervious area is primarily composed of rooftop surfaces from townhomes, which generate low pollutant loads and no vehicular runoff. As these areas discharge to vegetated surfaces prior to entering the detention system, incidental infiltration and filtering of runoff is expected to occur. EROSION CONTROL This Final Drainage Report has been prepared in accordance with applicable drainage, erosion control, and stormwater management criteria and standards of the City of Fort Collins. The design and analysis provided herein comply with local jurisdictional requirements and demonstrate adherence to the City of Fort Collins Storm Drainage Criteria Manual. All erosion control measures and materials specified in the Storm Water Management Plan and Grading, Erosion and Sediment control plan meet or exceed the City of Fort Collins criteria. CONCLUSIONS COMPLIANCE WITH STANDARDS The hydrologic and water quality calculations were performed using the required methods as outlined in the City of Fort Collins Stormwater Criteria Manual. The proposed drainage improvements meet or exceed the City’s requirements. This large detention pond (P363) is not held to the typical City of Fort College & Trilby Multi-Family Community Final Drainage Report 21 Collins detention release rates of the 2-year pre-developed event but the Stone Creek master plan release rate of 60 cfs. This drainage report is in compliance with the detention requirement and recommendations set forth within the Stone Creek drainage master plan. Pond P363 has been graded in and designed to attenuate the runoff from the College and Trilby Multi-Family site. The large detention facility (P363) does not exceed the existing maximum 60 cfs release rate, and there is an overflow channel with water quality and additional attenuation provided within pond P366. DRAINAGE CONCEPT The proposed concept for the development of the Trilby College site involves surface flows and piping of developed condition and offsite flow to the water quality pond, an onsite water quality facility with ADS isolator rows, and the runoff for the site will be treated at detention facility P363 onsite. All the offsite flows will be conveyed through the site and directly released at a rate under 60 cfs in compliance with the Stone Creek Master plan. The existing conditions drainage patterns are maintained in the proposed. The proposed improvements will have no adverse impacts on the flow rate, character, or quality of runoff leaving the site. The proposed improvements will have no adverse impacts on adjacent properties. College & Trilby Multi-Family Community Final Drainage Report 22 REFERENCES Fort Collins Stormwater Criteria Manual; City of Fort Collins, Colorado, December 2018. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3); Urban Drainage and Flood Control District, June 2001. City of Fort Collins Stone Creek Basin Selected Plan of Improvements; Icon Engineering, Inc., October 2018 Stone Creek SWMM Modeling for the College and Trilby Intersection Enhancements Project; Wilson and Company, April 2022 College & Trilby Multi-Family Community Final Drainage Report APPENDIX A – FIGURES A Westrian Company Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/30/2020 Page 1 of 4 44 8 2 7 0 0 44 8 2 8 0 0 44 8 2 9 0 0 44 8 3 0 0 0 44 8 3 1 0 0 44 8 3 2 0 0 44 8 3 3 0 0 44 8 3 4 0 0 44 8 3 5 0 0 44 8 2 7 0 0 44 8 2 8 0 0 44 8 2 9 0 0 44 8 3 0 0 0 44 8 3 1 0 0 44 8 3 2 0 0 44 8 3 3 0 0 44 8 3 4 0 0 44 8 3 5 0 0 493000 493100 493200 493300 493400 493500 493600 493000 493100 493200 493300 493400 493500 493600 40° 30' 9'' N 10 5 ° 5 ' 0 ' ' W 40° 30' 9'' N 10 5 ° 4 ' 3 0 ' ' W 40° 29' 38'' N 10 5 ° 5 ' 0 ' ' W 40° 29' 38'' N 10 5 ° 4 ' 3 0 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 200 400 800 1200 Feet 0 50 100 200 300 Meters Map Scale: 1:4,640 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 15, Jun 9, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/30/2020 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 35 Fort Collins loam, 0 to 3 percent slopes C 1.6 4.2% 36 Fort Collins loam, 3 to 5 percent slopes C 0.7 1.7% 54 Kim loam, 3 to 5 percent slopes B 11.2 28.8% 56 Kim-Thedalund loams, 3 to 15 percent slopes B 20.1 51.5% 63 Longmont clay, 0 to 3 percent slopes D 4.1 10.6% 65 Midway clay loam, 5 to 25 percent slopes D 1.2 3.0% 119 Wiley silt loam, 3 to 5 percent slopes B 0.1 0.1% Totals for Area of Interest 39.0 100.0% Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/30/2020 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/30/2020 Page 4 of 4 SITE SITE 9,028 1,504.7 FCMaps This map is a user generated static output from the City of Fort Collins FCMaps Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable.City of Fort Collins - GIS 1,143.0 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Feet1,143.00571.50 Notes Legend 6,859 SITE College & Trilby Multi-Family Community Final Drainage Report APPENDIX B – HYDROLOGIC CALCULATIONS Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:12/5/24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1 1.90 100%0.15 7.8%40%0.00 0.0%90%0.14 6.4%2%1.62 1.7%16.0% A2 1.79 100%0.48 27.0%40%0.00 0.0%90%0.48 24.0%2%0.83 0.9%51.9% A3 1.62 100%0.42 26.1%40%0.09 2.1%90%0.15 8.4%2%1.05 1.3%38.0% A4 0.42 100%0.25 58.4%40%0.00 0.0%90%0.00 0.0%2%0.18 0.8%59.3% A5 0.75 100%0.36 47.9%40%0.00 0.0%90%0.17 20.5%2%0.22 0.6%69.0% A6 0.47 100%0.35 72.9%40%0.00 0.0%90%0.00 0.0%2%0.13 0.5%73.5% A7 1.26 100%0.45 35.7%40%0.00 0.0%90%0.40 28.6%2%0.41 0.7%65.0% A8 0.30 100%0.20 64.9%40%0.00 0.0%90%0.00 0.0%2%0.11 0.7%65.6% A9 0.18 100%0.11 65.0%40%0.00 0.0%90%0.00 0.0%2%0.06 0.7%65.7% B1 0.63 100%0.28 43.7%40%0.00 0.0%90%0.23 32.1%2%0.13 0.4%76.3% B2 1.17 100%0.06 5.1%40%0.00 0.0%90%0.00 0.0%2%1.11 1.9%7.0% C1.1 3.82 100%1.16 30.3%40%0.00 0.0%90%0.55 13.1%2%2.11 1.1%44.5% C1.2 0.72 100%0.16 22.9%40%0.00 0.0%90%0.11 13.9%2%0.44 1.2%38.1% C1.3 0.18 100%0.07 38.8%40%0.00 0.0%90%0.05 26.7%2%0.06 0.6%66.2% C2 1.12 100%0.45 40.4%40%0.00 0.0%90%0.00 0.0%2%0.67 1.2%41.6% C3 2.22 100%0.88 39.7%40%0.00 0.0%90%0.74 29.9%2%0.60 0.5%70.2% C4.1 0.82 100%0.47 57.1%40%0.00 0.0%90%0.09 9.7%2%0.26 0.6%67.5% C4.2 1.76 100%0.51 29.2%40%0.00 0.0%90%0.43 21.9%2%0.81 0.9%52.1% C5 1.34 100%0.86 64.3%40%0.00 0.0%90%0.00 0.0%2%0.48 0.7%65.0% D1 0.29 100%0.22 75.6%40%0.00 0.0%90%0.00 0.0%2%0.07 0.5%76.1% D2 0.50 100%0.26 53.0%40%0.00 0.0%90%0.08 13.9%2%0.16 0.6%67.5% E1 0.42 100%0.20 47.0%40%0.00 0.0%90%0.16 34.1%2%0.06 0.3%81.3% E2 0.73 100%0.57 77.7%40%0.00 0.0%90%0.00 0.0%2%0.16 0.4%78.1% E3 0.23 100%0.18 77.6%40%0.00 0.0%90%0.00 0.0%2%0.05 0.4%78.1% E4 0.17 100%0.08 46.6%40%0.00 0.0%90%0.03 15.2%2%0.06 0.7%62.6% E5 0.38 100%0.11 28.0%40%0.00 0.0%90%0.03 8.1%2%0.24 1.3%37.4% E6 0.86 100%0.04 4.4%40%0.00 0.0%90%0.00 0.0%2%0.82 1.9%6.3% OF1 0.53 100%0.06 10.4%40%0.00 0.0%90%0.00 0.0%2%0.47 1.8%12.2% F1 1.20 100%0.07 6.0%40%0.00 0.0%90%0.32 24.3%2%0.81 1.3%31.7% G1 1.49 100%0.73 49.1%40%0.00 0.0%90%0.41 24.5%2%0.35 0.5%74.0% G2 0.62 100%0.29 46.3%40%0.00 0.0%90%0.25 36.5%2%0.08 0.3%83.1% G3 1.06 100%0.16 15.5%40%0.00 0.0%90%0.48 40.5%2%0.42 0.8%56.8% G4 0.82 100%0.50 60.6%40%0.00 0.0%90%0.14 15.5%2%0.18 0.4%76.6% H1 5.81 100%0.20 3.5%40%0.00 0.0%90%0.12 1.9%2%5.48 1.9%7.3% TOTAL 39.59 42.4% OS1 0.74 100%0.60 81.6%40%0.00 0.0%90%0.00 0.0%2%0.14 0.4%82.0% OS2 2.03 100%0.66 32.3%40%0.00 0.0%90%0.33 14.7%2%1.38 1.4%48.3% OS3 0.32 100%0.23 70.9%40%0.00 0.0%90%0.00 0.0%2%0.09 0.6%71.5% OS4 0.40 100%0.36 90.6%40%0.00 0.0%90%0.00 0.0%2%0.04 0.2%90.8% OS5 1.69 100%1.28 75.8%40%0.00 0.0%90%0.00 0.0%2%0.41 0.5%76.3% OS6 0.88 100%0.63 71.7%40%0.00 0.0%90%0.00 0.0%2%0.25 0.6%72.2% B920A 4.36 20.0% B830 7.82 45.0% B840 11.79 45.0% B850 17.24 10.0% B930 4.71 100%1.02 21.7%40%0.00 0.0%90%0.42 8.0%2%3.69 1.6%31.2% B910A 2.99 74.0% B910C 1.30 90.0% B910D 0.46 90.0% COMPOSITE % IMPERVIOUS CALCULATIONS % Imp. Area (ac)% Imp.Area (ac)Weighted % Imp. 39823.00 Weighted % Imp. Basins Total Weighted % Imp.Basin ID Total Area (ac) % Imp. Area (ac)% Imp. Area (ac)Weighted % Imp. Weighted % Imp. X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 12/5/2024 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:12/5/24 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 Hydrologic Soils Group A1 1.90 B 0.95 0.15 0.07 0.09 0.95 0.14 0.07 0.08 0.50 0.00 0.00 0.00 0.15 1.62 0.13 0.16 0.27 0.34 A2 1.79 B/D 0.95 0.48 0.26 0.32 0.95 0.48 0.25 0.32 0.50 0.00 0.00 0.00 0.20 0.83 0.09 0.12 0.60 0.75 A3 1.62 B 0.95 0.42 0.25 0.31 0.95 0.15 0.09 0.11 0.50 0.09 0.03 0.03 0.25 1.05 0.16 0.20 0.50 0.62 A4 0.42 B 0.95 0.25 0.56 0.69 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.18 0.08 0.10 0.64 0.80 A5 0.75 B/D 0.95 0.36 0.46 0.57 0.95 0.17 0.22 0.27 0.50 0.00 0.00 0.00 0.20 0.22 0.06 0.07 0.73 0.91 A6 0.47 D 0.95 0.35 0.69 0.87 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.25 0.13 0.07 0.08 0.76 0.95 A7 1.26 B 0.95 0.45 0.34 0.42 0.95 0.40 0.30 0.38 0.50 0.00 0.00 0.00 0.25 0.41 0.08 0.10 0.72 0.90 A8 0.30 A 0.95 0.20 0.62 0.77 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.11 0.07 0.09 0.69 0.86 A9 0.18 A 0.95 0.11 0.62 0.77 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.06 0.07 0.09 0.69 0.86 B1 0.63 D 0.95 0.28 0.42 0.52 0.95 0.23 0.34 0.42 0.50 0.00 0.00 0.00 0.20 0.13 0.04 0.05 0.80 0.99 B2 1.17 D 0.95 0.06 0.05 0.06 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.25 1.11 0.24 0.30 0.29 0.36 D1 0.29 D 0.95 0.22 0.72 0.90 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.07 0.05 0.06 0.77 0.96 D2 0.50 D 0.95 0.26 0.50 0.63 0.95 0.08 0.15 0.18 0.50 0.00 0.00 0.00 0.20 0.16 0.06 0.08 0.71 0.89 C1.1 3.82 B 0.95 1.16 0.29 0.36 0.95 0.55 0.14 0.17 0.50 0.00 0.00 0.00 0.25 2.11 0.14 0.17 0.56 0.70 C1.2 0.72 B/C 0.95 0.16 0.22 0.27 0.95 0.11 0.15 0.18 0.50 0.00 0.00 0.00 0.20 0.44 0.12 0.15 0.49 0.61 C1.3 0.18 B/C 0.95 0.07 0.37 0.46 0.95 0.05 0.28 0.35 0.50 0.00 0.00 0.00 0.20 0.06 0.06 0.08 0.71 0.89 C2 1.12 B 0.95 0.45 0.38 0.48 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.67 0.12 0.15 0.50 0.63 C3 2.22 B 0.95 0.88 0.38 0.47 0.95 0.74 0.32 0.39 0.50 0.00 0.00 0.00 0.25 0.60 0.07 0.08 0.76 0.95 C4.1 0.82 B 0.95 0.47 0.54 0.68 0.95 0.09 0.10 0.13 0.50 0.00 0.00 0.00 0.20 0.26 0.06 0.08 0.71 0.89 C4.2 1.76 B 1.95 0.51 0.57 0.71 1.95 0.43 0.48 0.59 1.50 0.00 0.00 0.00 1.20 0.81 0.56 0.70 1.00 1.00 C5 1.34 B 0.95 0.86 0.61 0.76 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.48 0.07 0.09 0.68 0.85 E1 0.42 B/D 0.95 0.20 0.45 0.56 0.95 0.16 0.36 0.45 0.50 0.00 0.00 0.00 0.20 0.06 0.03 0.04 0.84 1.00 E2 0.73 B 0.95 0.57 0.74 0.92 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.15 0.16 0.03 0.04 0.77 0.96 E3 0.23 B 0.95 0.18 0.74 0.92 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.15 0.05 0.03 0.04 0.77 0.96 E4 0.17 B/D 0.95 0.08 0.44 0.55 0.95 0.03 0.16 0.20 0.50 0.00 0.00 0.00 0.20 0.06 0.07 0.09 0.68 0.85 E5 0.38 D 0.95 0.11 0.27 0.33 0.95 0.03 0.09 0.11 0.50 0.00 0.00 0.00 0.25 0.24 0.16 0.20 0.51 0.64 E6 0.86 B/D 0.95 0.04 0.04 0.05 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.25 0.82 0.24 0.30 0.28 0.35 F1 1.20 B/D 0.95 0.07 0.06 0.07 0.95 0.32 0.26 0.32 0.50 0.00 0.00 0.00 0.20 0.81 0.13 0.17 0.45 0.56 G1 1.49 B 0.95 0.73 0.47 0.58 0.95 0.41 0.26 0.32 0.50 0.00 0.00 0.00 0.15 0.35 0.04 0.04 0.76 0.95 G2 0.62 B 0.95 0.29 0.44 0.55 0.95 0.25 0.39 0.48 0.50 0.00 0.00 0.00 0.15 0.08 0.02 0.02 0.84 1.00 G3 1.06 B 0.95 0.16 0.15 0.18 0.95 0.48 0.43 0.53 0.50 0.00 0.00 0.00 0.15 0.42 0.06 0.07 0.63 0.79 G4 0.82 B 0.95 0.50 0.58 0.72 0.95 0.14 0.16 0.20 0.50 0.00 0.00 0.00 0.15 0.18 0.03 0.04 0.77 0.97 H1 5.81 B 0.95 0.20 0.03 0.04 0.95 0.12 0.02 0.03 0.50 0.00 0.00 0.00 0.20 5.48 0.19 0.24 0.24 0.30 OF1 0.53 B 0.95 0.06 0.10 0.12 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.47 0.18 0.22 0.28 0.35 COMP.37.06 0.56 0.69 39823.00 Total Area (ac)Runoff Coefficient COMPOSITE RUNOFF COEFFICIENT CALCULATIONS Basin ID Area (ac) 2 - YEAR C 100 - YEAR C Runoff Coefficient Area (ac)2 - YEAR C 100 - YEAR C Gravel Runoff Coefficient Area (ac)2 - YEAR C Basins Total Weighted 100 YEAR CRunoff Coefficient Area (ac)2 - YEAR C 100 - YEAR C Paved Roads/Ashphalt/Concrete Roofs Lawns Basins Total Weighted 2 YEAR C100 - YEAR C X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 12/5/2024 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:12/5/24 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 BASIN D.A. Hydrologic Impervious C2 C100 L S o t i - 2Year t i - 100 Year L t S t K VEL.t t COMP.t c-2 Year COMP.t c 100 - Year TOTAL Urbanized t c t c-2 Year t c-100 Year ID (ac)Soils Group (%)(ft)(%)(min)(min)(ft)(%)(ft/s)(min)(min)(min)LENGTH (ft)(min)(min)(min) A1 1.90 B 16%0.27 0.34 200 2.0%79.8 73.4 403 2.0%15.0 2.1 3.2 83.0 76.6 603.0 13.4 13.4 13.4 A2 1.79 B/D 52%0.60 0.75 40 2.0%21.4 14.9 424 1.1%20.0 2.1 3.4 24.8 18.3 464.0 12.6 12.6 12.6 A3 1.62 B 38%0.50 0.62 41.5 2.0%26.4 20.9 420 2.3%20.0 3.0 2.3 28.7 23.2 461.5 12.6 12.6 12.6 A4 0.42 B 59%0.64 0.80 32.5 2.0%17.9 11.7 404 2.8%20.0 3.3 2.0 19.9 13.7 436.5 12.4 12.4 12.4 A5 0.75 B/D 69%0.73 0.91 13 2.0%9.1 4.6 374 1.7%20.0 2.6 2.4 11.4 6.9 387.4 12.2 11.4 6.9 A6 0.47 D 73%0.76 0.95 13 2.0%8.3 3.7 354 1.9%20.0 2.7 2.2 10.5 5.8 367.0 12.0 10.5 5.8 A7 1.26 B 65%0.72 0.90 32 2.0%14.5 7.6 393 1.9%20.0 2.8 2.4 16.9 9.9 425.2 12.4 12.4 9.9 A8 0.30 A 66%0.69 0.86 32 2.0%15.9 9.3 183 2.2%20.0 3.0 1.0 16.9 10.3 215.0 11.2 11.2 10.3 A9 0.18 A 66%0.69 0.86 32 2.0%15.9 9.3 110 1.3%20.0 2.3 0.8 16.7 10.1 141.8 10.8 10.8 10.1 B1 0.63 D 76%0.80 0.99 21 8.0%6.0 2.1 189 2.8%20.0 3.4 0.9 6.9 3.0 210.0 11.2 6.9 5.0 B2 1.17 D 7%0.29 0.36 35 25.0%14.2 13.0 364 1.2%20.0 2.2 2.7 17.0 15.7 399.0 12.2 12.2 12.2 D1 0.29 D 76%0.77 0.96 13 2.0%8.2 3.5 243 2.4%20.0 3.1 1.3 9.5 4.8 256.0 11.4 9.5 5.0 D2 0.50 D 68%0.71 0.89 13 2.0%9.5 5.1 251 2.5%20.0 3.2 1.3 10.8 6.4 264.0 11.5 10.8 6.4 C1.1 3.82 B 44%0.56 0.70 32 2.0%20.6 15.2 1018 1.0%20.0 2.0 8.5 29.1 23.7 1050.0 15.8 15.8 15.8 C1.2 0.72 B/C 38%0.49 0.61 44 2.0%27.6 22.1 82 3.2%20.0 3.6 0.4 28.0 22.5 125.6 10.7 10.7 10.7 C1.3 0.18 B/C 66%0.71 0.89 46 2.0%17.8 9.6 53 3.0%20.0 3.5 0.3 18.1 9.8 99.0 10.6 10.6 9.8 C2 1.12 B 42%0.50 0.63 32 2.0%23.0 18.1 977 1.1%20.0 2.1 7.7 30.6 25.8 1008.7 15.6 15.6 15.6 C3 2.22 B 70%0.76 0.95 8 2.0%6.5 2.9 866 0.9%20.0 1.9 7.8 14.3 10.6 874.5 14.9 14.3 10.6 C4.1 0.82 B 67%0.71 0.89 13 2.0%9.6 5.2 360 1.9%20.0 2.8 2.2 11.8 7.4 373.0 12.1 11.8 7.4 C4.2 1.76 B 52%1.00 1.00 13 2.0%2.5 2.5 237 1.6%20.0 2.5 1.6 4.0 4.0 250.0 11.4 5.0 5.0 C5 1.34 B 65%0.68 0.85 13 2.0%10.2 6.1 745 1.4%20.0 2.4 5.2 15.5 11.3 758.1 14.2 14.2 11.3 E1 0.42 B/D 81%0.84 1.00 55 3.0%11.6 4.4 208 1.5%20.0 2.5 1.4 13.0 5.8 263.0 11.5 11.5 5.8 E2 0.73 B 78%0.77 0.96 13 2.0%8.1 3.3 313 1.8%20.0 2.7 1.9 10.0 5.3 326.0 11.8 10.0 5.3 E3 0.23 B 78%0.77 0.96 41 2.0%14.3 5.9 88 0.6%20.0 1.5 0.9 15.3 6.9 129.2 10.7 10.7 6.9 E4 0.17 B/D 63%0.68 0.85 10 2.0%9.1 5.5 64 6.3%20.0 5.0 0.2 9.3 5.7 74.0 10.4 9.3 5.7 E5 0.38 D 37%0.51 0.64 5 25.0%3.9 3.1 194 2.1%20.0 2.9 1.1 5.0 4.2 199.0 11.1 5.0 5.0 E6 0.86 B/D 6%0.28 0.35 34 25.0%14.1 12.9 114 2.0%20.0 2.8 0.7 14.8 13.6 148.0 10.8 10.8 10.8 F1 1.20 B/D 32%0.45 0.56 30 25.0%10.6 8.7 411 2.6%20.0 3.2 2.1 12.7 10.9 441.0 12.5 12.5 10.9 G1 1.49 B 74%0.76 0.95 20 3.0%9.0 4.0 573 1.7%20.0 2.6 3.7 12.7 7.7 593.0 13.3 12.7 7.7 G2 0.62 B 83%0.84 1.00 20 3.0%6.8 2.7 336 2.8%20.0 3.4 1.7 8.5 4.3 356.3 12.0 8.5 5.0 G3 1.06 B 57%0.63 0.79 50 1.5%24.6 16.2 295 2.7%20.0 3.3 1.5 26.1 17.7 345.0 11.9 11.9 11.9 G4 0.82 B 77%0.77 0.97 21 3.0%8.9 3.7 428 2.2%20.0 2.9 2.4 11.3 6.1 449.4 12.5 11.3 6.1 H1 5.81 B 7%0.24 0.30 115 25.0%27.2 25.3 434 0.5%20.0 1.4 5.1 32.3 30.4 549.0 13.1 13.1 13.1 OF1 0.53 B 12%0.28 0.35 5 2.0%12.5 11.4 435 0.5%20.0 1.4 5.1 17.6 16.6 440.0 12.4 12.4 12.4 NOTES: STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN Time of Concentration -Check 39823.00 FINAL(Tc)DATA INITIAL/OVERLAND (Ti) TRAVEL TIME (Tt) X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 12/5/2024 Project Name:College and Trilby Subdivision:College and Trilby Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( A c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( A c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS Runoff into chase goes onto Street 1a A1 1.90 0.27 13.4 0.51 1.96 1.0 Runoff from Alley goes to on-grade inlet 2a A2 1.79 0.60 12.6 1.08 2.01 2.2 0.0 0.00 3 80 3.5 0.4 Runoff Captured by On-grade inlet 2ai 12.6 1.08 2.01 2.2 On-grade inlet 3a A3 1.62 0.50 12.6 0.81 2.01 1.6 13.4 1.32 1.96 2.6 0.0 0.01 1.7 477 2.6 3.0 Tributary Runoff from from Basins A4 and A1 and bypass flow from basin 2a Runoff Captured by On-grade inlet 3ai 13.4 1.31 1.96 2.6 Piped runoff 1.2 15.6 2.39 1.83 4.4 4.4 2.4 1.0 18 22 5.6 0.1 Tributary basins A4 and A1 Captured by on grade inlet 4a A4 0.42 0.64 12.4 0.27 2.02 0.5 12.4 0.27 2.02 0.5 0.0 0.00 2 430 2.8 2.5 Tributary Basin A5. Bypass to DP 8a Runoff Captured by On-grade inlet 4ai 12.4 0.27 2.02 0.5 Piped runoff 1.3 15.7 2.66 1.83 4.9 4.9 2.7 2.0 18 51 7.5 0.1 Tributary basins A2,A3 and A4 Captured by on grade inlet 5a A5 0.75 0.73 11.4 0.55 2.10 1.2 0.0 0.00 1.7 472 2.6 3.0 Tributary Basin A6 5ai 11.4 0.55 2.10 1.2 Captured by on grade inlet 6a A6 0.47 0.76 10.5 0.36 2.17 0.8 0.0 0.00 2.9 300 3.4 1.5 Tributary Basin A7. Bypass to DP d2 Runoff Captured by On-grade inlet 6ai 10.5 0.36 2.17 0.8 Piped runoff from basins A5 and A6 1.1 11.4 0.91 2.10 1.9 1.9 0.9 1.0 18 52 2.0 0.4 Piped runoff basin A1-A6 1.4 15.6 3.57 1.83 6.5 6.5 3.6 1.0 24 244 6.2 0.7 Captured by on grade inlet Basin A8 8a A8 0.30 0.69 11.2 0.21 2.11 0.4 0.0 0.01 1.7 334 2.6 2.1 by-pass to DP 2d 8ai 11.2 0.20 2.11 0.4 Piped runoff basin A1-A7 and Basin A8 1.5 16.3 3.77 1.79 6.8 6.8 3.8 0.5 24 193 4.9 0.7 Bypass Flow to dp 4c 7a A7 1.26 0.72 12.4 0.91 2.02 1.8 15.6 0.92 1.83 1.7 0.0 0.00 0.6 305 1.5 3.3 Runoff captured in inlet 7ai 15.6 0.92 1.83 1.7 Bypass Flow to dp 5c 9a A9 0.18 0.69 10.8 0.12 2.15 0.3 0.0 0.00 0.6 305 1.5 3.3 Runoff Captured in Inlet 9ai 10.8 0.12 2.15 0.3 Piped runoff basin A1-A10 1.6 16.9 4.81 1.75 8.4 8.4 4.8 0.5 36 250 5.0 0.8 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 3 12/9/2024 Project Name:College and Trilby Subdivision:College and Trilby Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( A c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( A c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS DIRECT RUNOFF TOTAL RUNOFF STREET PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 1.2c C1.2 0.72 0.49 10.7 0.35 2.15 0.8 0.0 0.00 5 108 4.5 0.4 1.2ci 10.7 0.35 2.15 0.8 1.3c C1.3 0.18 0.71 10.6 0.13 2.17 0.3 0.0 0.00 5 80 4.5 0.3 By Passflow to inlet 4c 1.3ci 10.6 0.13 2.17 0.3 Runoff from basin C1.1 onto on grade inlet 1.1c C1.1 3.82 0.56 15.8 2.15 1.82 3.9 15.8 2.15 1.82 3.9 0.6 0.31 1.7 330 2.6 2.1 Runoff Captured by inlet 1.1ci 15.8 1.84 1.82 3.4 Piped Runoff 2.0 10.7 0.48 2.15 1.0 1.0 2.2 0.5 18 60 2.9 0.3 Tributary Basin C1.2 and C1.3 Piped Runoff 2.1 15.8 2.32 1.82 4.2 Tributary Basin C1.2 and C1.3 and Basin C1.1 On grade runoff from basin C2 2c C2 1.12 0.50 15.6 0.56 1.83 1.0 0.2 0.08 1.8 345 2.7 2.1 2ci 15.6 0.48 1.83 0.9 ByPass to DP 4C Piped runoff 2.2 15.8 2.80 1.82 5.1 5.1 2.8 1.0 18 290 5.9 0.8 Basin C1.1 -C1.3 and Basin C2 3c C3 2.22 0.76 14.3 1.69 1.91 3.2 0.0 0.00 1.8 125 2.7 0.8 Bypass to DP 4c 3ci 14.3 1.69 1.91 3.2 Piped runoff basins C1.1-C1.3, C2 and C3 2.3 15.8 4.49 1.82 8.2 8.2 4.5 1.0 24 100 6.6 0.3 4.1c C4.1 0.82 0.71 11.8 0.58 2.07 1.2 17.9 0.97 1.70 1.7 0.0 0.00 1.2 300 2.2 2.3 4.1ci 17.9 0.97 1.70 1.7 Piped runoff basins C1.1-C1.3, C2, C3, C4.1 2.4 17.9 5.46 1.70 9.3 Sump Inlet - bypass flows from 4.1c and 8a 4.2c C4.2 1.76 1.00 5.0 1.76 2.85 5.0 20.2 1.76 1.60 2.8 Piped runoff Basins A1-A10 and basin C1.1-C1.3, C2, C3 and C4.1 2.5 20.2 12.03 1.60 19.2 Sump Inlet -by pass flow from 10a 5c C5 1.34 0.68 14.2 0.92 1.91 1.8 14.2 0.92 1.91 1.8 Piped runoff Basins A1-A10 and basin C1.1-C1.3, C2, C3 and C4 2.6 20.2 12.95 1.60 20.7 20.7 12.9 1.5 42 80 9.5 0.1 and Basin C5 Runoff Captured by on grade Alley inlet 1g G1 1.49 0.76 12.7 1.14 2.00 2.3 0.0 0.00 1.5 171 2.4 1.2 Tributary Basin G1 1gi 12.7 1.14 2.00 2.3 Piped Runoff 2.7 20.4 14.09 1.59 22.4 22.4 14.1 2.0 48 150 10.6 0.2 Tributary Basins A1-10 Basin C1.1-C1.3, C4, C5 and G1 Runoff from Alley 2g G2 0.62 0.84 8.5 0.53 2.35 1.2 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 2 of 3 12/9/2024 Project Name:College and Trilby Subdivision:College and Trilby Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( A c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( A c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS DIRECT RUNOFF TOTAL RUNOFF STREET PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Runoff Captured by a series of inlets 3g G3 1.06 0.63 11.9 0.67 2.06 1.4 Runoff to inlet in alley at Dp 4g - sump 4g G4 0.82 0.77 11.3 0.63 2.10 1.3 13.9 1.16 1.93 2.2 Piped Runoff 3.1 13.9 1.79 1.93 3.5 3.5 1.8 1.0 36 150 4.9 0.5 Tributary basins G2-G4 3.2 20.6 15.88 1.58 25.1 Outfall into Forebay Runoff from Alley Drains into Chase 1e E1 0.42 0.84 11.5 0.35 2.09 0.7 Runoff from Cu-de-Sac and Runoff from chase 2e E2 0.73 0.77 10.0 0.56 2.21 1.2 13.3 0.91 1.96 1.8 1.8 0.9 1.0 24 30 4.3 0.1 Tributary Runoff basin E1 and E2 Runoff from sump inlet 3e E3 0.23 0.77 10.7 0.18 2.15 0.4 0.4 0.2 1.0 12 65 2.8 0.1 Tributary runoff from basin E1-E3 4.1 11.5 1.68 2.09 3.5 3.5 1.7 1.0 18 39 5.3 0.1 J910B OFFSITE Runoff from Trilby Road - picked up by 15 ft PR and 10 ft type r inlets 5.1 14.88 Runoff entered in from SWMM MODEL from J910B 1b B1 0.63 0.80 6.9 0.50 2.53 1.3 Offsite Runoff 5.2 16.1 Offsite runoff + basin B1 2b B2 1.17 0.29 12.2 0.33 2.03 0.7 5.3 16.8 Offsite runoff + basin B1 and B2 L367_Orifice P367 Outfall 0.12 Runoff entered in from SWMM MODEL Sump inlet, Recives by pass flow from basin A7 2d D2 0.50 0.71 10.8 0.35 2.15 0.8 12.0 0.35 2.05 0.7 Offsite runoff from pond P367, Offsite runoff from Trilby Road 6.1 17.7 Onsite basins B1 and B2 and D2 1d D1 0.29 0.77 9.5 0.22 2.26 0.5 Offsite runoff from pond P367, Offsite runoff from Trilby Road 6.2 18.2 Onsite basins B1 and B2 and D2 and D1 Notes: Street and Pipe C*A values are determined by Q/i using the catchment's intensity value. X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 3 of 3 12/9/2024 Project Name:College and Trilby Subdivision:College and Trilby Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( a c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS Runoff into chase goes onto Street 1a A1 1.90 0.34 13.4 0.64 6.85 4.4 Runoff from Alley goes to on-grade inlet 2a A2 1.79 0.75 12.6 1.35 7.02 9.5 6.5 0.93 3 80 3.5 0.4 Runoff Captured by On-grade inlet 2ai 12.6 0.42 7.02 3.0 On-grade inlet 3a A3 1.62 0.62 12.6 1.01 7.02 7.1 13.4 2.58 6.85 17.6 5.5 0.81 1.7 477 2.6 3.0 Tributary Runoff from from Basins A4 and A1 and bypass flow from basin 2a Runoff Captured by On-grade inlet 3ai 13.4 1.77 6.85 12.1 Piped runoff 1.2 15.6 2.19 6.39 14.0 14.0 2.2 1.0 18 22 7.9 0.0 Tributary basins A4 and A1 Captured by on grade inlet 4a A4 0.42 0.80 12.4 0.34 7.06 2.4 12.4 0.34 7.06 2.4 0.4 0.05 2 430 2.8 2.5 Tributary Basin A5. Bypass to DP 8a Runoff Captured by On-grade inlet 4ai 12.4 0.29 7.06 2.0 Piped runoff 1.3 15.7 2.48 6.38 15.8 15.8 2.5 2.0 18 51 9.5 0.1 Tributary basins A2,A3 and A4 Captured by on grade inlet 5a A5 0.75 0.91 6.9 0.69 8.83 6.1 1.5 0.17 1.7 472 2.6 3.0 Tributary Basin A6 5ai 6.9 0.52 8.83 4.6 Captured by on grade inlet 6a A6 0.47 0.95 5.8 0.45 9.42 4.2 0.6 0.07 2.9 300 3.4 1.5 Tributary Basin A7. Bypass to DP d2 Runoff Captured by On-grade inlet 6ai 5.8 0.38 9.42 3.6 Piped runoff from basins A5 and A6 1.1 6.9 0.90 8.83 8.0 8.0 0.9 1.0 18 52 2.0 0.4 Piped runoff basin A1-A6 1.4 15.6 3.39 6.39 21.6 21.6 3.4 1.0 24 244 8.2 0.5 STORM DRAINAGE SYSTEM DESIGN STANDARD FORM SF-3 (RATIONAL METHOD PROCEDURE) PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF 12/5/24 STREET X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 4 12/9/2024 Project Name:College and Trilby Subdivision:College and Trilby Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( a c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS STORM DRAINAGE SYSTEM DESIGN STANDARD FORM SF-3 (RATIONAL METHOD PROCEDURE) PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF 12/5/24 STREET Captured by on grade inlet Basin A8 8a A8 0.30 0.86 10.3 0.26 7.62 2.0 0.7 0.09 1.7 334 2.6 2.1 by-pass to DP 2d 8ai 10.3 0.17 7.62 1.3 Piped runoff basin A1-A7 and Basin A8 1.5 16.1 3.56 6.28 22.4 22.4 3.6 0.5 24 193 7.1 0.5 Bypass Flow to dp 4c 7a A7 1.26 0.90 9.9 1.14 7.74 8.8 15.6 2.17 6.39 13.8 2.1 0.33 0.6 305 1.5 3.3 Runoff captured in inlet 7ai 15.6 1.83 6.39 11.7 Bypass Flow to dp 5c 9a A9 0.18 0.86 10.1 0.15 7.70 1.2 0.2 0.03 0.6 305 1.5 3.3 Runoff Captured in Inlet 9ai 10.1 0.12 7.70 0.9 Piped runoff basin A1-A10 1.6 16.6 5.52 6.19 34.1 34.1 5.5 0.5 36 250 7.3 0.6 1.2c C1.2 0.72 0.61 10.7 0.44 7.51 3.3 2.1 0.28 5 108 4.5 0.4 1.2ci 10.7 0.16 7.51 1.2 1.3c C1.3 0.18 0.89 9.8 0.16 7.77 1.2 0.1 0.01 5 80 4.5 0.3 By Passflow to inlet 4c 1.3ci 9.8 0.15 7.77 1.2 Runoff from basin C1.1 onto on grade inlet 1.1c C1.1 3.82 0.70 15.8 2.69 6.34 17.0 15.8 2.98 6.34 18.9 8.9 1.40 1.7 330 2.6 2.1 Runoff Captured by inlet 1.1ci 15.8 1.58 6.34 10.0 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 2 of 4 12/9/2024 Project Name:College and Trilby Subdivision:College and Trilby Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( a c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS STORM DRAINAGE SYSTEM DESIGN STANDARD FORM SF-3 (RATIONAL METHOD PROCEDURE) PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF 12/5/24 STREET Piped Runoff 2.0 10.7 0.31 7.51 2.3 2.3 7.5 0.5 18 60 3.7 0.3 Tributary Basin C1.2 and C1.3 Piped Runoff 2.1 15.8 1.89 6.34 12.0 Tributary Basin C1.2 and C1.3 and Basin C1.1 On grade runoff from basin C2 2c C2 1.12 0.63 15.6 0.71 6.39 4.5 1.5 0.24 1.8 345 2.7 2.1 2ci 15.6 0.47 6.39 3.0 ByPass to DP 4C Piped runoff 2.2 15.8 2.36 6.34 14.9 14.9 2.4 1.0 18 290 8.5 0.6 Basin C1.1 -C1.3 and Basin C2 3c C3 2.22 0.95 10.6 2.11 7.53 15.9 11.9 1.58 1.8 125 2.7 0.8 Bypass to DP 4c 3ci 10.6 0.53 7.53 4.0 Piped runoff basins C1.1-C1.3, C2 and C3 2.3 15.8 2.88 6.34 18.3 18.3 2.9 1.0 24 100 8.0 0.2 4.1c C4.1 0.82 0.89 7.4 0.73 8.63 6.3 17.9 3.96 5.93 23.5 8.9 1.50 1.2 300 2.2 2.3 4.1ci 17.9 2.45 5.93 14.5 Piped runoff basins C1.1-C1.3, C2, C3, C4.1 2.4 17.9 5.34 5.93 31.7 Sump Inlet - bypass flows from 4.1c and 8a 4.2c C4.2 1.76 1.00 5.0 1.76 9.95 17.5 20.2 3.60 5.57 20.0 Piped runoff Basins A1-A10 and basin C1.1-C1.3, C2, C3 and C4.1 2.5 20.2 14.45 5.57 80.5 Sump Inlet -by pass flow from 10a 5c C5 1.34 0.85 11.3 1.15 7.34 8.4 13.3 1.18 6.85 8.1 Piped runoff Basins A1-A10 and basin C1.1-C1.3, C2, C3 and C4 2.6 20.2 15.63 5.57 87.0 87.0 15.6 1.5 42 80 13.9 0.1 and Basin C5 Runoff Captured by on grade Alley inlet 1g G1 1.49 0.95 7.7 1.42 8.52 12.1 4.6 0.54 1.5 171 2.4 1.2 Tributary Basin G1 1gi 7.7 0.88 8.52 7.5 Piped Runoff 2.7 20.3 16.51 5.56 91.7 91.7 16.5 2.0 48 150 15.7 0.2 Tributary Basins A1-10 Basin C1.1-C1.3, C4, C5 and G1 Runoff from Alley 2g G2 0.62 1.00 5.0 0.62 9.95 6.2 Runoff Captured by a series of nyloplastic inlets 3g G3 1.06 0.79 11.9 0.84 7.18 6.0 Runoff to inlet in alley at Dp 4g - sump 4g G4 0.82 0.97 6.1 0.79 9.27 7.3 8.8 1.95 8.09 15.8 Piped Runoff 3.1 8.8 2.74 8.09 22.2 22.2 2.7 1.0 36 150 8.5 0.3 Tributary basins G2-G4 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 3 of 4 12/9/2024 Project Name:College and Trilby Subdivision:College and Trilby Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( a c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS STORM DRAINAGE SYSTEM DESIGN STANDARD FORM SF-3 (RATIONAL METHOD PROCEDURE) PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF 12/5/24 STREET Runoff from Alley Drains into Chase 1e E1 0.42 1.00 5.8 0.42 9.43 4.0 Runoff from Cu-de-Sac and Runoff from chase 2e E2 0.73 0.96 5.3 0.70 9.79 6.8 12.5 1.12 7.05 7.9 7.9 1.1 1.0 24 30 6.5 0.1 Tributary Runoff basin E1 and E2 Runoff from sump inlet 3e E3 0.23 0.96 6.9 0.22 8.86 1.9 1.9 0.2 1.0 12 65 4.6 0.1 Tributary runoff from basin E1-E3 4.1 6.9 2.08 8.86 18.5 18.5 2.1 1.0 18 39 10.5 0.1 J910B OFFSITE Runoff from Trilby Road - picked up by 15 ft PR and 10 ft type r inlets 5.1 60.49 Runoff entered in from SWMM MODEL from J910B 1b B1 0.63 0.99 5.0 0.63 9.95 6.3 Offsite Runoff 5.2 66.8 Offsite runoff + basin B1 2b B2 1.17 0.36 12.2 0.42 7.11 3.0 5.3 69.7 Offsite runoff + basin B1 and B2 L367_Orifice P367 Outfall 0.17 Runoff entered in from SWMM MODEL Sump inlet, Recives by pass flow from basin A7 2d D2 0.50 0.89 6.4 0.44 9.09 4.0 7.3 0.51 8.67 4.4 Offsite runoff from pond P367, Offsite runoff from Trilby Road 6.1 74.3 Onsite basins B1 and B2 and D2 1d D1 0.29 0.96 5.0 0.28 9.95 2.8 Offsite runoff from pond P367, Offsite runoff from Trilby Road 6.2 77.1 Onsite basins B1 and B2 and D2 and D1 Notes: Street and Pipe C*A values are determined by Q/i using the catchment's intensity value. X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 4 of 4 12/9/2024 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:12/5/24 Tributary Area Length Width Slope % Imperv N-Imperv N-Perv Store Imperv. Dstore perv. Zero % imperv. Storage (max)Storage (min)Decay Rate Sub-basin B820 26.52 500.09 2310.00 3.90%5.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B910 15.78 339.28 2026.00 3.00%20.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B830 7.04 473.45 648.00 3.90%45.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B910A 3.06 533.17 250.00 2.00%74.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B876 17.03 420.06 1766.00 4.10%60.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:12/5/24 A1 1.90 100%0.15 7.8%40%0.00 0.0%90%0.14 6.4%2%1.62 1.7%14.3% A2 1.79 100%0.48 27.0%40%0.00 0.0%90%0.48 24.0%2%0.83 0.9%51.0% A3 1.62 100%0.42 26.1%40%0.09 2.1%90%0.15 8.4%2%1.05 1.3%36.7% A4 0.42 100%0.25 58.4%40%0.00 0.0%90%0.00 0.0%2%0.18 0.8%58.4% A5 0.75 100%0.36 47.9%40%0.00 0.0%90%0.17 20.5%2%0.22 0.6%68.4% A6 0.47 100%0.35 72.9%40%0.00 0.0%90%0.00 0.0%2%0.13 0.5%72.9% A7 1.26 100%0.45 35.7%40%0.00 0.0%90%0.40 28.6%2%0.41 0.7%64.3% A8 0.30 100%0.20 64.9%40%0.00 0.0%90%0.00 0.0%2%0.11 0.7%64.9% A9 0.18 100%0.11 65.0%40%0.00 0.0%90%0.00 0.0%2%0.06 0.7%65.0% C1.1 3.82 100%1.16 30.3%40%0.00 0.0%90%0.55 13.1%2%2.11 1.1%43.4% C1.2 0.72 100%0.16 22.9%40%0.00 0.0%90%0.11 13.9%2%0.44 1.2%36.8% C1.3 0.18 100%0.07 38.8%40%0.00 0.0%90%0.05 26.7%2%0.06 0.6%65.6% C2 1.12 100%0.45 40.4%40%0.00 0.0%90%0.00 0.0%2%0.67 1.2%40.4% C3 2.22 100%0.88 39.7%40%0.00 0.0%90%0.74 29.9%2%0.60 0.5%69.6% C4.1 0.82 100%0.47 57.1%40%0.00 0.0%90%0.09 9.7%2%0.26 0.6%66.8% C4.2 1.76 100%0.51 29.2%40%0.00 0.0%90%0.43 21.9%2%0.81 0.9%51.2% C5 1.34 100%0.86 64.3%40%0.00 0.0%90%0.00 0.0%2%0.48 0.7%64.3% G1 1.49 100%0.73 49.1%40%0.00 0.0%90%0.41 24.5%2%0.35 0.5%73.5% G2 0.62 100%0.29 46.3%40%0.00 0.0%90%0.25 36.5%2%0.08 0.3%82.8% G3 1.06 100%0.16 15.5%40%0.00 0.0%90%0.48 40.5%2%0.42 0.8%56.0% G4 0.82 100%0.50 60.6%40%0.00 0.0%90%0.14 15.5%2%0.18 0.4%76.1% SWMM Basin CT-1 24.68 100%9.03 36.6%40%0.09 0.1%90%4.59 16.7%2%11.07 0.9%53.4% B1 0.63 100%0.28 43.7%40%0.00 0.0%90%0.23 32.1%2%0.13 0.4%75.9% B2 1.17 100%0.06 5.1%40%0.00 0.0%90%0.00 0.0%2%1.11 1.9%5.1% D1 0.29 100%0.22 75.6%40%0.00 0.0%90%0.00 0.0%2%0.07 0.5%75.6% D2 0.50 100%0.26 53.0%40%0.00 0.0%90%0.08 13.9%2%0.16 0.6%66.9% E1 0.42 100%0.20 47.0%40%0.00 0.0%90%0.16 34.1%2%0.06 0.3%81.0% E2 0.73 100%0.57 77.7%40%0.00 0.0%90%0.00 0.0%2%0.16 0.4%77.7% E3 0.23 100%0.18 77.6%40%0.00 0.0%90%0.00 0.0%2%0.05 0.4%77.6% E4 0.17 100%0.08 46.6%40%0.00 0.0%90%0.03 15.2%2%0.06 0.7%61.8% E5 0.38 100%0.11 28.0%40%0.00 0.0%90%0.03 8.1%2%0.24 1.3%36.1% E6 0.86 100%0.04 4.4%40%0.00 0.0%90%0.00 0.0%2%0.82 1.9%4.4% SWMM Basin CT-2 5.37 100%1.99 37.0%40%0.00 0.0%90%0.52 8.8%2%2.86 1.1%45.7% Sub-Basin F1 1.20 100%0.07 6.0%40%0.00 0.0%90%0.32 24.3%2%0.81 1.3%31.7% SWMM Basin CT-3 1.20 100%0.07 6.0%90%0.00 0.0%90%0.32 24.3%2%0.81 1.3%31.7% Sub-Basin H1 5.81 100%0.20 3.5%40%0.00 0.0%90%0.12 1.9%90%5.48 1.9%7.3% SWMM Basin CT-4 5.81 100%0.20 3.5%40%0.00 0.0%90%0.12 1.9%90%5.48 1.9%7.3% Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:12/5/24 Tributary Area Length Width Slope % Imperv N-Imperv N-Perv Store Imperv. Dstore perv. Zero % imperv. Storage (max)Storage (min) Decay Rate Sub-basin CT-1 24.68 587.76 1829.09 1.53%53.4%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 CT-2 5.37 307.40 761.18 0.75%45.7%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 CT-3 1.20 338.70 154.85 2.40%31.7%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 CT-4 5.81 353.30 715.82 0.50%7.3%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 OF1 0.53 156.40 147.25 0.50%12.2%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 OS1 0.74 186.30 172.44 0.50%2.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 OS2 2.03 403.00 219.72 3.97%2.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 OS3 0.32 115.00 121.16 3.94%2.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 OS4 0.40 129.00 134.97 3.73%2.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 OS5 1.69 484.00 152.40 2.09%2.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 OS6 0.88 231.00 165.42 3.73%78.3%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B840 11.79 300.17 1710.37 3.00%45.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B830 7.82 473.45 719.26 3.90%45.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B930 4.71 399.91 512.81 3.00%31.2%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B910A 2.99 533.17 244.35 2.00%74.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B910C 1.30 83.39 681.60 2.30%90.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B910D 0.46 160.30 126.16 1.50%90.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B850 17.24 419.98 1787.65 4.10%10.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 B876 16.97 420.06 1759.42 4.10%60.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48 Basins Total Weighted % Imp.Basin ID Total Area (ac) % Imp. Area (ac)Weighted % Imp.Area (ac) SWMM INPUTS 39823.00 PROPOSED - SWMM INPUTS Basin inputs City of Fort Collins Default Inputs City of Fort Collins Horton inputs INTERIM - SWMM INPUTS Paved Roads and Walks Gravel Roofs PROPOSED ONSITE COMPOSITE SWMM IMPERVIOUS VALUES 39823.00 PROPOSED SWMM INPUTS 39823.00 Weighted % Imp. Sub-Basins Sub-Basins % Imp.Area (ac)Weighted % Imp.% Imp. * Updated Offsite Basins - kepth Lengths the same and updated area Lawns % Imp.Area (ac)Weighted % Imp. X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 12/9/2024 Project Name:College and Trilby Subdivision:College and Trilby Project No. Location:Fort Collins By:ARJ Design Storm:0 Date:12/5/24 WILSON - Interim SC_100YearPROP JR - Proposed College and Trilby SC_100YearPROP Name Basin Area (ac)Outlet Name Basin Area (ac)Diff Outlet Notes: B100 1.88 J100 B100 1.88 0 J100 --- B110 8.65 J100 B110 8.65 0 J100 --- B300 1.2 J300 B300 1.2 0 J300 --- B310 20.25 J316 B310 20.25 0 J316 --- B320 11.31 J320 B320 11.31 0 J320 --- B330 39.65 J330 B330 39.65 0 J330 --- B340 31.27 J346 B340 31.27 0 J346 --- B350 21.96 J350 B350 21.96 0 J350 --- B360 2.34 J360 B360 2.34 0 J360 --- B370 30.18 J360 B370 30.18 0 J360 --- B380 4.9 J360 B380 4.9 0 J360 --- B390 10.32 J390 B390 10.32 0 J390 --- B400 22.57 J390 B400 22.57 0 J390 --- B410 8.18 J410 B410 8.18 0 J410 --- B420 5.85 P324 B420 5.85 0 P324 --- B430 6.23 P324 B430 6.23 0 P324 --- B440 9.56 P324 B440 9.56 0 P324 --- B445 0.52 J452-TypeR B445 0.52 0 J452-TypeR --- B450 3.2 J450 B450 3.2 0 J450 --- B455 2.45 J508 B455 2.45 0 J508 --- B460 2.55 J456 B460 2.55 0 J456 --- B465 2.3 J456-TypeR B465 2.3 0 J456-TypeR --- B470 3.93 J470 B470 3.93 0 J470 --- B480 4.53 P343 B480 4.53 0 P343 --- B490 2.12 P343 B490 2.12 0 P343 --- B500 1.92 J500 B500 1.92 0 J500 --- B510 0.92 J510 B510 0.92 0 J510 --- B520 8.43 J520 B520 8.43 0 J520 --- B530 1.95 J525 B530 1.95 0 J525 --- B540 3.05 J540 B540 3.05 0 J540 --- B600 12.46 J600 B600 12.46 0 J600 --- B610 8.39 J600 B610 8.39 0 J600 --- B620 5.29 J620 B620 5.29 0 J620 --- B630 8.65 J630 B630 8.65 0 J630 --- B640 6.92 J640 B640 6.92 0 J640 --- B650 9.58 J650 B650 9.58 0 J650 --- B660 1.75 P385 B660 1.75 0 P385 --- B670 0.82 P384 B670 0.82 0 P384 --- B680 2.02 P383 B680 2.02 0 P383 --- B690 20 P382 B690 20 0 P382 --- B700 42.95 P386 B700 42.95 0 P386 --- B710 12.5 J710 B710 12.5 0 J710 --- B720 26.49 J710 B720 26.49 0 J710 --- B730 4.19 J730 B730 4.19 0 J730 --- B740 1.75 J740 B740 1.75 0 J740 --- B750 5.39 J740 B750 5.39 0 J740 --- B760 1.2 J760 B760 1.2 0 J760 --- B770 2.97 J770 B770 2.97 0 J770 --- B770A 0.36 J770A B770A 0.36 0 J770A --- B770B 1.52 J770B B770B 1.52 0 J770B --- B780 2.27 J770 B780 2.27 0 J770 --- B790 14.69 P790 B790 14.69 0 P790 --- B800 25.72 J804 B800 25.72 0 J804 --- B805 38.42 P400 B805 38.42 0 P400 --- B810 22.95 J810 B810 22.95 0 J810 --- B820 26.52 P363 Basin Removed B830 7.43 J830 B830 7.82 -0.39 J830 Updated per site W. Site Boundary B840 11.06 J840 B840 11.79 -0.73 J840 Updated per site W. Site Boundary B850 16.94 P375 B850 17.24 -0.3 P375 Updated per site N. Site Boundary B870 2.69 J870 B870 2.69 0 J870 --- B874 5.38 P874 B874 5.38 0 P874 --- B876 17.03 P876 B876 16.97 0.06 P876 Updated per site W. Site Boundary B880 15.67 J880 B880 15.67 0 J880 --- B900 2.17 J900 B900 2.17 0 J900 --- B900A 0.48 J900A B900A 0.48 0 J900A --- B900B 0.56 J900B B900B 0.56 0 J900B --- B910 15.74 P366 B910 Basin Removed B910A 3.06 P367 B910A 2.99 0.07 P367 Updated per SE Site Boundary B910B 0.28 J910B B910B Basin Removed B910C 1.34 J910C B910C 1.3 0.04 J910C Updated per E Site Boundary B910D 0.46 J910D B910D 0.46 0 J910D --- B920A 3.82 J920A B920A 3.82 0 J920A --- B920B 0.99 J920B B920B 0.99 0 J920B --- B920C 1.71 J920C B920C 1.71 0 J920C --- B930 7.06 P930 B930 4.71 2.35 P930 --- B940 15.47 P940 B940 15.47 0 P940 --- B950 2.56 P950 B950 2.56 0 P950 --- B970 8.66 P970 B970 8.66 0 P970 --- CT-1 24.68 P363 On-site treated in Isolator Rows CT-2 5.37 P366 Onsite treated in WQ Pond CT-3 1.2 J910 Channel between P366 and P363 CT-4 5.81 P363 Open space/ P363 OF1 0.53 J829 W. Overflow channel OS1 0.74 J931 W. Trilby RD OS2 2.03 J931 W. Trilby RD OS3 0.32 J932 W. Trilby RD OS4 0.4 P940 W. Trilby RD OS5 1.69 J363 S. College Ave. OS6 0.88 J374 S. College Ave. Total (ac).720.5 720.5 SWMM Model Comparison Table (SWMM MODEL COMP. Interim SC_100YearPROP Vs. Proposed College and Trilby SC_100YearPROP ) 100-Year 39823.00 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 2 12/9/2024 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 2 of 2 12/9/2024 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.:39823.00 By:ARJ Volume=1/3 x Depth x (A+B+(A*B)^0.5)Checked By:0 A - Upper Surface Date:12/5/24 B - Lower Surface Stage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume (square feet)(cubic feet)(cubic feet)(acre feet) 0.00 4998.87 0 0 0 0.00 0.13 4999.00 207 9 9 0.00 1.13 5000.00 20,791 7,691 7,700 0.18 2.13 5001.00 54,621 36,370 44,070 1.01 3.13 5002.00 69,423 61,874 105,944 2.43 4.13 5003.00 77,422 73,386 179,330 4.12 5.13 5004.00 84,528 80,949 260,279 5.98 6.13 5005.00 91,786 88,132 348,411 8.00 7.13 5006.00 99,265 95,501 443,912 10.19 8.13 5007.00 107,023 103,119 547,031 12.56 9.13 5008.00 115,553 111,261 658,292 15.11 10.13 5009.00 122,656 119,087 777,379 17.85 Volume (acre feet)Volume Water Surface Elevation Stage 100-Year Detention 9.78 5006.04 7.17 *Volume modeled in SWMM POND VOLUME CALCULATIONS POND P363 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 2 12/11/2024 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.39823.00 By:ARJ Checked By:0 Date:12/5/24 POND VOLUME CALCULATIONS 4998.00 5000.00 5002.00 5004.00 5006.00 5008.00 5010.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 El e v a t i o n ( f t ) Pond Volume (ac-ft) Pond Stage-Storage X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 2 of 2 12/11/2024 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.:39823.00 By:ARJ Volume=1/3 x Depth x (A+B+(A*B)^0.5)Checked By:0 A - Upper Surface Date:12/5/24 B - Lower Surface Stage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume (square feet)(cubic feet)(cubic feet)(acre feet) 0.00 5019.25 0 0 0 0.00 0.75 5020.00 3,204 801 801 0.02 1.75 5021.00 9,840 6,220 7,021 0.16 2.75 5022.00 13,392 11,570 18,591 0.43 3.75 5023.00 15,949 14,652 33,243 0.76 4.75 5024.00 18,716 17,314 50,557 1.16 5.75 5025.00 22,031 20,351 70,908 1.63 6.75 5026.00 25,665 23,825 94,733 2.17 Volume (acre feet)Volume Water Surface Elevation Stage Water Quality 0.444 5022.01 2.76 100-Year 1.41 5024.52 5.27 * Volume Modeled in SWMM POND VOLUME CALCULATIONS POND P366 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 2 12/9/2024 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.39823.00 By:ARJ Checked By:0 Date:12/5/24 POND VOLUME CALCULATIONS 5018.00 5019.00 5020.00 5021.00 5022.00 5023.00 5024.00 5025.00 5026.00 5027.00 0.00 0.50 1.00 1.50 2.00 2.50 El e v a t i o n ( f t ) Pond Volume (ac-ft) Pond Stage-Storage X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 2 of 2 12/9/2024 5 Year Drain Time - SWMM Pond 366 Drain Time 5 Year Drain Time - SWMM Pond P363 Drain Time 100 Year Drain Time - SWMM Pond 366 Drain Time 100 Year Drain Time - SWMM Pond P363 Drain Time College & Trilby Multi-Family Community Final Drainage Report APPENDIX C – HYDRAULIC CALCULATIONS Analysis of Trapezoidal Channel (Grass-Lined uses SCS Method) NRCS Vegetal Retardance (A, B, C, D, or E)A, B, C, D, or E = Manning's n (Leave cell D16 blank to manually enter an n value)n =0.013 O 0.0115 Bottom Width B =1.875 ft Left Side Slope Z1 =33.33 ft/ft Right Side Sloe Z2 =33.33 ft/ft Check one of the following soil types: MAX MAX Non-Cohesive 5.0 fps 0.60 Cohesive 7.0 fps 0.80 Paved N/A N/A Minor Storm Major Storm TMAX =12.00 24.00 ft dMAX =0.18 0.36 ft Allowable Channel Capacity Based On Channel Geometry Minor Storm Major Storm Qallow =2.6 16.8 cfs dallow =0.15 0.33 ft Water Depth in Channel Based On Design Peak Flow Qo =2.3 12.1 cfs Water Depth d =0.14 0.29 ft MHFD-Inlet, Version 5.03 (August 2023) AREA INLET IN A SWALE This worksheet uses the NRCS vegetal retardance method to determine Manning's n for grass-lined channels. An override Manning's n can be entered for other channel materials. Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Choose One: Non-Cohesive Cohesive Paved 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 1g 12/5/2024, 10:13 AM MHFD-Inlet, Version 5.03 (August 2023) AREA INLET IN A SWALE College and Trilby Inlet DP 1g Inlet Design Information (Input) Type of Inlet Inlet Type = Angle of Inclined Grate (must be <= 30 degrees)θ =0.00 degrees Width of Grate W =1.88 ft Length of Grate L =12.00 ft RATIO 0.70 B 0.00 f 0.50 d N/A o 0.64 w 2.05 MINOR MAJOR Water Depth at Inlet (for depressed inlets, 1 foot is added for depression)d =0.14 0.29 Total Inlet Interception Capacity (assumes clogged condition)Qa =2.6 7.5 cfs Bypassed Flow Qb =0.0 4.6 cfs Capture Percentage = Qa/Qo C% =100 62 % User-DefinedUser-Defined 4 - On grade CDOT type 13 Inlet 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 1g 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.031 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 8.2 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Qallow =8.3 22.0 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 0.55 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 4a 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =3 3 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =0.5 2.0 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.4 cfs Capture Percentage = Qa/Qo C% =100 85 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 4a 12/5/2024, 10:17 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.023 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 8.2 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Qallow =7.1 19.0 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 2.59 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 3a 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =4 4 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =2.6 12.1 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 5.5 cfs Capture Percentage = Qa/Qo C% =99 69 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 3a 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =27.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.017 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 27.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.2 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Qallow =6.1 47.8 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 1.15 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 5a 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =3 3 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =1.2 4.6 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 1.5 cfs Capture Percentage = Qa/Qo C% =100 75 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 5a 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =27.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.017 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 27.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.2 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Qallow =6.1 47.8 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 0.78 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 6a 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =3 3 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =0.8 3.6 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.6 cfs Capture Percentage = Qa/Qo C% =100 85 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 6a 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =27.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.020 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 27.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.2 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Qallow =6.7 51.8 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 0.44 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 8a 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =0.4 1.3 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.7 cfs Capture Percentage = Qa/Qo C% =95 67 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 8a 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =27.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.010 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 27.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.2 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Qallow =4.7 36.6 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 1.69 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 7a 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =4 4 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =1.7 12.0 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 1.8 cfs Capture Percentage = Qa/Qo C% =100 87 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 7a 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =27.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.010 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 27.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.2 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Qallow =4.7 36.6 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 0.26 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 9a 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =0.3 0.9 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 0.2 cfs Capture Percentage = Qa/Qo C% =100 81 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 9a 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.079 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =6.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 7.2 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =3.3 19.5 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 1.03 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 2c 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =4 4 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =0.9 3.0 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.2 1.5 cfs Capture Percentage = Qa/Qo C% =85 66 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 2c 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.016 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.025 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 8.0 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =9.1 42.5 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 4.56 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 1.1c 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =4 4 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =4.0 13.2 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.6 8.9 cfs Capture Percentage = Qa/Qo C% =88 60 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 1.1c 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =27.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.020 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 27.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 12.0 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Qallow =6.7 51.8 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 1.58 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 4.1c 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =4 4 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =3.00 3.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =1.73 1.73 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =1.6 15.0 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 7.2 cfs Capture Percentage = Qa/Qo C% =100 68 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) User-Defined CombinationUser-Defined Combination 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 4.1c 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =27.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 27.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 4.2c 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =3 3 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 8.1 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth d =N/A N/A ft Depth for Curb Opening Weir Equation d =0.33 0.51 ft Grated Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RF =0.79 0.90 Combination Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =9.7 20.9 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =2.8 20.0 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 4.2c 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =27.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =12.0 27.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 9.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 5c 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =4.4 8.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =15.00 15.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth d =N/A N/A ft Depth for Curb Opening Weir Equation d =0.20 0.50 ft Grated Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RF =0.67 0.89 Combination Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =3.8 20.2 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =1.8 8.1 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 5c 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =9.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.0 6.1 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 1d 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =3.7 5.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth d =N/A N/A ft Depth for Curb Opening Weir Equation d =0.14 0.32 ft Grated Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RF =0.76 0.92 Combination Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =1.8 7.7 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =0.5 2.8 cfs INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 1d 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =9.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.0 6.1 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 2d 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =3.7 5.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth d =N/A N/A ft Depth for Curb Opening Weir Equation d =0.14 0.32 ft Grated Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RF =1.00 1.00 Combination Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =1.5 5.0 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =0.7 4.4 cfs INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 2d 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =11.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =87.9 ft Gutter Width W =1.73 ft Street Transverse Slope SX =0.006 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =20.0 87.9 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =4.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 3e 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =3.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =3.00 3.00 feet Width of a Unit Grate Wo =1.73 1.73 feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert =6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat =5.25 5.25 inches Angle of Throat Theta =0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =1.73 1.73 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.66 0.66 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth d =0.26 0.51 ft Depth for Curb Opening Weir Equation d =0.11 0.36 ft Grated Inlet Performance Reduction Factor for Long Inlets RF =0.47 0.94 Curb Opening Performance Reduction Factor for Long Inlets RF =N/A N/A Combination Inlet Performance Reduction Factor for Long Inlets RF =0.47 0.94 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =0.8 6.2 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =0.4 1.9 cfs INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) User-Defined Combination H-VertH-Curb W Lo (C) Lo (G) Wo WP User-Defined Combination Override Depths 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 3e 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =13.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =9.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =4.0 7.2 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 2e 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =3.7 5.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth d =N/A N/A ft Depth for Curb Opening Weir Equation d =0.14 0.32 ft Grated Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RF =1.00 1.00 Combination Inlet Performance Reduction Factor for Long Inlets RF =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =1.5 5.0 cfs WARNING: Inlet Capacity < Q Peak for Minor and Major Storms Q PEAK REQUIRED =1.8 7.9 cfs INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP 2e 12/5/2024, 10:13 AM Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =12.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.012 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =32.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.014 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 25.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =4.0 6.8 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =4.0 24.9 cfs Minor storm max. allowable capacity GOOD - greater than the design peak flow of 3.00 cfs on sheet 'Inlet Management' MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP J910B 12/5/2024, 10:13 AM Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening)No =5 5 Modeled as 10' ex typ R and a 15' Length of a Single Unit Inlet (Grate or Curb Opening)Lo =5.00 5.00 ft Proposed Type R inlet Width of a Unit Grate (cannot be greater than W, Gutter Width)Wo =N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q =3.0 20.2 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 1.8 cfs Capture Percentage = Qa/Qo C% =100 92 % INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb OpeningCDOT Type R Curb Opening One type ex 10' type R and one 15' type R 3979303 MHFD-Inlet_v5.03.xlsm, Inlet DP J910B 12/5/2024, 10:13 AM Flow Rate (Q)Ponding Depth 4" (y)Ponding Depth 6" (y)Ponding Depth 9" (y)Ponding Depth 12" (y)Ponding Depth 18" (y) 0.0 0.00 0.00 0.00 0.00 0.00 1.0 0.79 0.16 0.11 0.13 0.13 2.0 2.22 0.45 0.24 0.24 0.23 3.0 4.06 0.81 0.37 0.35 0.33 4.0 6.23 1.24 0.51 0.45 0.42 5.0 8.69 1.73 0.65 0.55 0.51 6.0 11.40 2.27 0.79 0.65 0.60 7.0 14.35 2.85 0.94 0.75 0.68 8.0 17.51 3.47 1.08 0.84 0.76 9.0 20.87 4.13 1.23 0.94 0.84 9.2 21.56 4.27 1.26 0.96 0.86 10.0 24.41 4.83 1.38 1.03 0.92 11.0 28.14 5.56 1.54 1.13 1.00 12.0 32.03 6.33 1.69 1.22 1.07 13.0 36.09 7.12 1.85 1.31 1.15 14.0 40.30 7.95 2.01 1.40 1.23 y = Number of inlets DP 2 Year Flow -cfs 100 Year Flow - cfs 4g Inches Ponding Depth 9 Inches No. Inlet 100 Year Req to capture 100%3.0 No. of Inlets Provided 5.0 No Bypass Flow 0 cfs Number of CDOT Type 13 Inlets required for given Capacity at a Sump Flow Rate (Q)Ponding Depth 4" (y)Ponding Depth 6" (y)Ponding Depth 9" (y)Ponding Depth 12" (y)Ponding Depth 18" (y) 0.0 0.00 0.00 0.00 0.00 0.00 1.0 0.79 0.16 0.11 0.13 0.13 2.0 2.22 0.45 0.24 0.24 0.23 3.0 4.06 0.81 0.37 0.35 0.33 4.0 6.23 1.24 0.51 0.45 0.42 5.0 8.69 1.73 0.65 0.55 0.51 6.0 11.40 2.27 0.79 0.65 0.60 7.0 14.35 2.85 0.94 0.75 0.68 8.0 17.51 3.47 1.08 0.84 0.76 9.0 20.87 4.13 1.23 0.94 0.84 9.2 21.56 4.27 1.26 0.96 0.86 10.0 24.41 4.83 1.38 1.03 0.92 11.0 28.14 5.56 1.54 1.13 1.00 12.0 32.03 6.33 1.69 1.22 1.07 13.0 36.09 7.12 1.85 1.31 1.15 14.0 40.30 7.95 2.01 1.40 1.23 15.0 44.67 8.81 2.16 1.49 1.30 y = Number of inlets DP 2 Year Flow -cfs 100 Year Flow - cfs 1b 1.26 6.27 Ponding Depth 6 Inches No. Inlet 100 Year Req to capture 100%3.0 Inlets Provided 3.0 Number of CDOT Type 13 Inlets required for given Capacity at a Sump Flow Rate (Q)Ponding Depth 4" (y)Ponding Depth 6" (y)Ponding Depth 9" (y)Ponding Depth 12" (y)Ponding Depth 18" (y) 0.0 0.00 0.00 0.00 0.00 0.00 1.0 0.79 0.16 0.11 0.13 0.13 2.0 2.22 0.45 0.24 0.24 0.23 3.0 4.06 0.81 0.37 0.35 0.33 4.0 6.23 1.24 0.51 0.45 0.42 5.0 8.69 1.73 0.65 0.55 0.51 6.0 11.40 2.27 0.79 0.65 0.60 7.0 14.35 2.85 0.94 0.75 0.68 8.0 17.51 3.47 1.08 0.84 0.76 9.0 20.87 4.13 1.23 0.94 0.84 9.2 21.56 4.27 1.26 0.96 0.86 10.0 24.41 4.83 1.38 1.03 0.92 11.0 28.14 5.56 1.54 1.13 1.00 12.0 32.03 6.33 1.69 1.22 1.07 13.0 36.09 7.12 1.85 1.31 1.15 14.0 40.30 7.95 2.01 1.40 1.23 15.0 44.67 8.81 2.16 1.49 1.30 y = Number of inlets DP 2 Year Flow -cfs 100 Year Flow - cfs 1g 2.28 12.10 Ponding Depth 4 Inches No. Inlet 100 Year Req to capture 100%33.0 No. of Inlets Provided 3 2 Year Bypass Flow 0 cfs 100 Year Bypass Flow 9.65 cfs Number of CDOT Type 13 Inlets required for given Capacity at a Sump Flow Rate (Q)Ponding Depth 4" (y)Ponding Depth 6" (y)Ponding Depth 9" (y)Ponding Depth 12" (y)Ponding Depth 18" (y) 0.0 0.00 0.00 0.00 0.00 0.00 1.0 0.79 0.16 0.11 0.13 0.13 2.0 2.22 0.45 0.24 0.24 0.23 3.0 4.06 0.81 0.37 0.35 0.33 4.0 6.23 1.24 0.51 0.45 0.42 5.0 8.69 1.73 0.65 0.55 0.51 6.0 11.40 2.27 0.79 0.65 0.60 7.0 14.35 2.85 0.94 0.75 0.68 8.0 17.51 3.47 1.08 0.84 0.76 9.0 20.87 4.13 1.23 0.94 0.84 9.2 21.56 4.27 1.26 0.96 0.86 10.0 24.41 4.83 1.38 1.03 0.92 11.0 28.14 5.56 1.54 1.13 1.00 12.0 32.03 6.33 1.69 1.22 1.07 13.0 36.09 7.12 1.85 1.31 1.15 14.0 40.30 7.95 2.01 1.40 1.23 15.0 44.67 8.81 2.16 1.49 1.30 y = Number of inlets DP 2 Year Flow -cfs 100 Year Flow - cfs 3c 3.14 15.38 Ponding Depth 4 Inches No. Inlet 100 Year Req to capture 100%47.0 No. of Inlets Provided 5 2 Year Bypass Flow 0 cfs 100 Year Bypass Flow 11.93 cfs Number of CDOT Type 13 Inlets required for given Capacity at a Sump Flow Rate (Q)Ponding Depth 4" (y)Ponding Depth 6" (y)Ponding Depth 9" (y)Ponding Depth 12" (y)Ponding Depth 18" (y) 0.0 0.00 0.00 0.00 0.00 0.00 1.0 0.79 0.16 0.11 0.13 0.13 2.0 2.22 0.45 0.24 0.24 0.23 3.0 4.06 0.81 0.37 0.35 0.33 4.0 6.23 1.24 0.51 0.45 0.42 5.0 8.69 1.73 0.65 0.55 0.51 6.0 11.40 2.27 0.79 0.65 0.60 7.0 14.35 2.85 0.94 0.75 0.68 8.0 17.51 3.47 1.08 0.84 0.76 9.0 20.87 4.13 1.23 0.94 0.84 9.2 21.56 4.27 1.26 0.96 0.86 10.0 24.41 4.83 1.38 1.03 0.92 11.0 28.14 5.56 1.54 1.13 1.00 12.0 32.03 6.33 1.69 1.22 1.07 13.0 36.09 7.12 1.85 1.31 1.15 14.0 40.30 7.95 2.01 1.40 1.23 15.0 44.67 8.81 2.16 1.49 1.30 y = Number of inlets DP 2 Year Flow -cfs 100 Year Flow - cfs 2a 2.17 9.48 Ponding Depth 4 Inches No. Inlet 100 Year Req to capture 100%23.0 No. of Inlets Provided 4 2 Year Bypass Flow 0 cfs 100 Year Bypass Flow 6.51 cfs Number of CDOT Type 13 Inlets required for given Capacity at a Sump Flow Rate (Q)Ponding Depth 4" (y)Ponding Depth 6" (y)Ponding Depth 9" (y)Ponding Depth 12" (y)Ponding Depth 18" (y) 0.0 0.00 0.00 0.00 0.00 0.00 1.0 0.79 0.16 0.11 0.13 0.13 2.0 2.22 0.45 0.24 0.24 0.23 3.0 4.06 0.81 0.37 0.35 0.33 4.0 6.23 1.24 0.51 0.45 0.42 5.0 8.69 1.73 0.65 0.55 0.51 6.0 11.40 2.27 0.79 0.65 0.60 7.0 14.35 2.85 0.94 0.75 0.68 8.0 17.51 3.47 1.08 0.84 0.76 9.0 20.87 4.13 1.23 0.94 0.84 9.2 21.56 4.27 1.26 0.96 0.86 10.0 24.41 4.83 1.38 1.03 0.92 11.0 28.14 5.56 1.54 1.13 1.00 12.0 32.03 6.33 1.69 1.22 1.07 13.0 36.09 7.12 1.85 1.31 1.15 14.0 40.30 7.95 2.01 1.40 1.23 y = Number of inlets DP 2 Year Flow -cfs 100 Year Flow - cfs 1.2c Ponding Depth 4 Inches No. Inlet 100 Year Req to capture 100%5.0 No. of Inlets Provided 1 2 Year Bypass Flow 0 cfs 100 Year Bypass Flow 2.13 cfs Number of CDOT Type 13 Inlets required for given Capacity at a Sump Flow Rate (Q)Ponding Depth 4" (y)Ponding Depth 6" (y)Ponding Depth 9" (y)Ponding Depth 12" (y)Ponding Depth 18" (y) 0.0 0.00 0.00 0.00 0.00 0.00 1.0 0.79 0.16 0.11 0.13 0.13 2.0 2.22 0.45 0.24 0.24 0.23 3.0 4.06 0.81 0.37 0.35 0.33 4.0 6.23 1.24 0.51 0.45 0.42 5.0 8.69 1.73 0.65 0.55 0.51 6.0 11.40 2.27 0.79 0.65 0.60 7.0 14.35 2.85 0.94 0.75 0.68 8.0 17.51 3.47 1.08 0.84 0.76 9.0 20.87 4.13 1.23 0.94 0.84 9.2 21.56 4.27 1.26 0.96 0.86 10.0 24.41 4.83 1.38 1.03 0.92 11.0 28.14 5.56 1.54 1.13 1.00 12.0 32.03 6.33 1.69 1.22 1.07 13.0 36.09 7.12 1.85 1.31 1.15 14.0 40.30 7.95 2.01 1.40 1.23 15.0 44.67 8.81 2.16 1.49 1.30 y = Number of inlets DP 2 Year Flow -cfs 100 Year Flow - cfs 1.3c 0.28 1.24 Ponding Depth 4 Inches No. Inlet 100 Year Req to capture 100%2.0 No. of Inlets Provided 1 2 Year Bypass Flow 0 cfs 100 Year Bypass Flow 0.07 cfs Number of CDOT Type 13 Inlets required for given Capacity at a Sump 6'- 0 9 16/"Ø 1 2/ 1' - 1 1 1' - 1 1 1 2/ 1'-95 8/3'-01 2/1'-95 8/ 6'-713 16/ 72'' ROUND TOP-MOUNT TRASH RACK LDR-72 0 1 1 101 IRONWOOD ROAD MIDDLESBORO, KY 40965 PH: (606) 248-5560 FAX: (606) 248-6308 JRHOE.COM MADE IN THE U.S.A. AVAILABLE MATERIALS: MILD STEEL (NO FINISH) - WGT: MILD STEEL (GALVANIZED) - WGT: STAINLESS STEEL - WGT: ALUMINUM - WGT: CUSTOM SIZES AVAILABLE AVAILABLE UPON REQUEST WITH: 496.7 lbs. 496.7 lbs. 496.7 lbs. 167.8 lbs. ACCESS PORT ANTI-VORTEX PLATE TITLE: SIZE DWG. NO.REV. SHEET /A 118839 Trash Overflow for J829 and J828 NW Corner of the Site Subdivision:College and Trilby Location:West Trilby and South College Project Name:College and Trilby Project Number:39793.03 Calculated By:ARJ Checked By: Date:4/10/2025 Design Point - J829 and J828 (6 ft. And 8ft. Dia Manhole w/ Trash Rack) Design flow 102.63 and 20.74 cfs Orifice Flow Calculation Q = C*A* square root (2gH) 6' mh C = 0.6 A = 28.274 sq ft g = 32.2 Head (ft)CA (2GH)Sqrt (2GH)Capacity -CFS 0.57 16.9644 36.60 6.050 102.6 1 16.9644 64.40 8.025 136.1 2 16.9644 128.80 11.349 192.5 3 16.9644 193.20 13.900 235.8 4 16.9644 257.60 16.050 272.3 5 16.9644 322.00 17.944 304.4 6 16.9644 386.40 19.657 333.5 8' mh C = 0.6 A = 50.27 sq ft g = 32.2 Head (ft)CA (2GH)Sqrt (2GH)Capacity -CFS 0.007341949 30.162 0.47 0.688 20.7 1 30.162 64.40 8.025 242.0 2 30.162 128.80 11.349 342.3 3 30.162 193.20 13.900 419.2 4 30.162 257.60 16.050 484.1 5 30.162 322.00 17.944 541.2 6 30.162 386.40 19.657 592.9 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:12/19/23 Value Units Va 4.59 ft/s Gs 2.5 Gs 32.2 (ft/s ^2 ) C 0.86 D(50)0.29 feet D(50)4 inches *using type M riprap - 12" OVERFLOW CHANNEL CC - RIPRAP CALCULATIONS 39823.00 RIP-RAP METHOD - ISBASH Method D50 = stone size (ft) V a = average channel velocity (ft/s) G s = specific gravity of stone G = gravitational constant (ft/s ^2 ) C = 0.86 for high turbulence zones 1.20 for low turbulence zones FORT COLLINS STORMWATER CRITERIA MANUAL Grading (Ch. 8) 3.0 Detention Basin Grading Design 3.5 Spillway Page 13 Figure 3.5-1. Spillway Detail and Rock Sizing Chart EMERCENCY OVERFLOW SPILLWAY POND P363. TOTAL INFOW AT POND 363 = 336 CFS WEIR EQUATION Q=CLH^(3/2) C=WEIR COEFFICIENT L=LENGTH H=HEIGHT C=3.0 L=320.5 FT H=0.496 FT - UNDER 0.5 FT DESIGN FLOW = 336 CFS USING TYPE M RIP RAP W/ TOE WALL Scenario: 100 Year C-4.8 (STORM) C-4.9 (STORM) C-1.11 (STORM) C-1.12 (STORM) C-8.1 (STORM) C-363.3 (STORM) C-363.2 (STORM) C-363.1 (STORM) C-12.1 (STORM) C-1.1 (STORM) C-4.1 (STORM) C-11.2 (STORM) C-1.4 (STORM) C-1.2 (STORM) C-12.4 (STORM)C-9.1 (STORM) C-10.1 (STORM) C-9.2 (STORM) C-1.5 (STORM)C-13.1 (STORM) C-1.6 (STORM) C-19.1 (STORM)C-19.2 (STORM) C-4.2 (STORM) C-20.1 (STORM) C-3.1 (STORM) C-3.2 (STORM) C-15.1 (STORM) C-6.1 (STORM) C-3.3 (STORM) C -14.1 (STORM) C-1.8 (STORM) C-7.1 (STORM) C-8.2 (STORM) C-5.1 (STORM) C-1.9 (STORM) C-1.10 (STORM) C-18.1 (STORM) C-2.6 (STORM) C-4.3 (STORM) C-8.3 (STORM) C-1.13 (STORM) C-1.14 (STORM) C-3.8 (STORM) C-4.4 (STORM) C-4.5 (STORM) O-9 O-12 O-1 O-4 P363 O-3 P363.1 FES (STORM)P363.3 - MH (STORM) 12.4 - MH (STORM) 8.1 - MH (STORM) 1.2 - MH (STORM) 12.3 - MH (STORM) 11.3 - INLET (STORM) 11.4 - INLET (STORM) 11.2 - MH (STORM) 4.2 - MH (STORM) 11.1 - MH (STORM) 1.5 - INLET (STORM) 11.5 - INLET (STORM) 1.4 - MH (STORM) 1.3 - MH (STORM) 12.1 - OULET STRUCTURE (STORM) 12.2 - MH (STORM)9.2 - MH (STORM) 10.1 - INLET (STORM) 11.6 - INLET (STORM) 9.3 - INLET (STORM) 13.1 - INLET (STORM)1.6 - INLET (STORM) 1.7 - MH (STORM) 3.5 - INLET (STORM) 19.2 - INLET (STORM) 19.1 - INLET (STORM) 3.6 - MH (STORM) 2.1 - MH (STORM) 4.3 - MH (STORM) 20.1 - INLET (STORM) 3.3 - MH (STORM) 3.2 - INLET (STORM) 15.1 - INLET (STORM) 1.8 - MH (STORM) 6.1 - INLET (STORM) 2.3 - MH (STORM) 2.4 - MH (STORM) 14.1 - VALLEY INLET (STORM) 3.4 - MH (STORM) 1.9- MH (STORM) 8.2 - INLET (STORM) 7.1 - INLET (STORM) 2.5 - MH (STORM) 22.1 - INLET (STORM) 16.1 - INLET (STORM) 5.1 - MH (STORM) 1.10 - MH (STORM) 5.2 - INLET (STORM) 2.7 - INLET (STORM) 18.1 - INLET (STORM) 1.11 - MH (STORM) 2.6 - MH (STORM) 4.4 - MH (STORM) 17.1 - VALLEY INLET (STORM) 3.7 - MH (STORM) 1.13 - MH (STORM) 8.3 - INLET (STORM) 1.15 - INLET (STORM) 1.14 - MH (STORM) 3.8 - EX INLET (STORM) 3.9 - INLET (STORM) 4.5 - MH (STORM) 4.6 - MH (STORM) 4.7 - MH (STORM) 4.8 - MH (STORM) 4.9 - MH (STORM) 4.10 - MH (STORM) 1.12 - MH (STORM) P363.2 - MH (STORM) Page 1 of 176 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-16666/25/2025 StormCAD [10.03.04.53]Bentley Systems, Inc. Haestad Methods Solution Center3979303 StormCAD.stsw Urban Drainage and Flood Control District Modeling Hydraulic and Energy Gradients in Storm Sewers: October 6, 2009 Page 19 6.3 Combined Junction Loss Equation g Vkg Vkg Vkg V g VkHH ofi bL fi m fofT bTsj 22222 22222 Equation (13) where,Hj = UD Sewer junction loss Hs = Standard method junction loss kbT = Bend loss coefficient at truckling kbL = Bend loss coefficient at lateral VfT = Full flow velocity of trunk line at manhole Vfi = Full flow velocity of incoming lateral at manhole Vo = Full flow velocity of trunk line at manhole k =Head Loss Coefficient g =Acceleration due to Gravity Table 2 StormCAD Standard Method Conversions StormCAD Conversion Table Be n d L o s s Bend Angle K coefficient Conversion 0 0.05 22.5 0.1 45 0.4 60 0.64 90 1.32 La t e r a l L o s s 1 Lateral K coefficient Conversion Bend Angle Non Surcharged Surcharged 45 0.27 0.47 60 0.52 0.9 90 1.02 1.77 2 Laterals K coefficient Conversion 45 0.96 60 1.16 90 1.52 The engineering guidelines from this study provide the methodology needed to reach an HGL analysis result using StormCAD which replicates that of UD-Sewer. However, the following limitations apply: The full pipe velocity should not exceed 18 fps The conversion only applies for the storm sewer pipe sizes 42” or less A regional storm sewer system should use UD-Sewer only Scenario: 2 Year Current Time Step: 0.000 h FlexTable: Conduit Table X:\3970000.all\3979303\StormCAD\Model\3979303 StormCAD.stsw Upstream Structure Label Diameter (in) Slope (Calculated) (ft/ft) Length (User Defined) (ft) Manning's n Flow (cfs) Capacity (Full Flow) (cfs) Invert (Start) (ft) Invert (Stop) (ft) Elevation Ground (Start) (ft) Elevation Ground (Stop) (ft) Hydraulic Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Energy Grade Line (In) (ft) Energy Grade Line (Out) (ft) Upstream Structure Headloss Coefficient Velocity (ft/s) 1.2 - MH (STORM)C-1.1 (STORM)42.0 0.025 70.8 0.013 25.10 158.20 5,001.75 5,000.00 5,015.37 5,003.97 5,003.29 5,001.00 5,003.88 5,002.90 0.050 12.02 1.13 - MH (STORM)C-1.12 (STORM)18.0 0.023 28.8 0.013 1.03 16.03 5,035.90 5,035.23 5,040.48 5,039.65 5,036.28 5,036.24 5,036.41 5,036.25 1.020 5.10 1.15 - INLET (STORM)C-1.14 (STORM)18.0 0.012 47.4 0.013 0.75 11.72 5,037.59 5,037.00 5,041.36 5,041.43 5,037.91 5,037.26 5,038.03 5,037.47 0.100 3.73 1.5 - INLET (STORM)C-1.4 (STORM)42.0 0.019 29.1 0.013 22.43 138.38 5,015.40 5,014.85 5,021.65 5,021.94 5,016.85 5,015.93 5,017.40 5,017.15 0.100 10.58 1.8 - MH (STORM)C-1.7 (STORM)30.0 0.015 251.9 0.013 9.30 50.31 5,026.29 5,022.50 5,032.74 5,028.74 5,027.31 5,023.60 5,027.69 5,023.91 1.020 7.82 1.10 - MH (STORM)C-1.9 (STORM)24.0 0.017 230.2 0.013 5.10 29.45 5,032.90 5,029.00 5,038.47 5,034.54 5,033.70 5,030.43 5,033.99 5,030.50 1.320 7.02 2.4 - MH (STORM)C-2.3 (STORM)30.0 0.019 32.5 0.013 6.54 56.63 5,028.47 5,027.85 5,034.09 5,033.42 5,029.32 5,029.09 5,029.63 5,029.20 0.050 7.69 2.7 - INLET (STORM)C-2.6 (STORM)18.0 0.010 26.3 0.013 1.15 10.45 5,034.23 5,033.97 5,038.68 5,039.34 5,034.63 5,034.67 5,034.77 5,034.70 0.050 3.89 3.3 - MH (STORM)C-3.2 (STORM)48.0 0.005 20.6 0.013 17.65 100.03 5,022.17 5,022.07 5,031.51 5,031.40 5,023.40 5,023.45 5,023.85 5,023.78 0.600 6.00 3.6 - MH (STORM)C-3.5 (STORM)42.0 0.005 109.8 0.013 16.14 71.22 5,024.21 5,023.66 5,029.22 5,029.59 5,025.44 5,024.79 5,025.88 5,025.35 1.770 5.99 3.9 - INLET (STORM)C-3.9 (STORM)24.0 0.022 2.7 0.013 3.03 33.85 5,038.86 5,038.80 5,043.70 5,043.53 5,039.47 5,039.31 5,039.69 5,039.67 0.050 6.67 4.3 - MH (STORM)C-4.2 (STORM)48.0 0.030 120.2 0.013 23.59 248.92 5,015.23 5,011.62 5,030.52 5,020.00 5,016.66 5,012.46 5,017.19 5,014.81 0.500 12.47 4.6 - MH (STORM)C-4.5 (STORM)48.0 0.023 99.3 0.013 23.59 217.18 5,039.40 5,037.13 5,049.47 5,046.81 5,040.83 5,038.04 5,041.36 5,039.90 0.600 11.32 4.9 - MH (STORM)C-4.8 (STORM)-0.010 60.3 0.013 23.59 101.08 5,050.67 5,050.07 5,057.55 5,055.75 5,051.93 5,051.06 5,052.41 5,051.99 1.320 8.09 5.1 - MH (STORM)C-5.1 (STORM)24.0 0.015 54.3 0.013 4.86 27.63 5,033.79 5,032.98 5,038.38 5,038.27 5,034.57 5,034.50 5,034.86 5,034.56 1.520 6.62 7.1 - INLET (STORM)C-7.1 (STORM)18.0 0.092 72.6 0.013 1.26 31.89 5,032.50 5,025.81 5,038.19 5,029.22 5,032.92 5,026.01 5,033.07 5,027.21 0.050 8.78 8.3 - INLET (STORM)C-8.3 (STORM)24.0 0.030 30.7 0.013 2.17 39.18 5,036.78 5,035.86 5,040.55 5,039.62 5,037.29 5,036.18 5,037.47 5,036.85 0.640 6.70 9.3 - INLET (STORM)C-9.2 (STORM)18.0 0.032 65.6 0.013 0.39 18.79 5,023.60 5,021.50 5,028.36 5,025.82 5,023.83 5,021.65 5,023.91 5,021.93 0.100 4.25 11.2 - MH (STORM)C-11.2 (STORM)36.0 0.005 72.5 0.013 3.46 46.98 5,014.01 5,013.65 5,019.38 5,021.74 5,014.59 5,014.40 5,014.79 5,014.50 1.320 3.88 11.5 - INLET (STORM)C-11.5 (STORM)12.0 0.021 81.8 0.013 0.46 5.17 5,018.80 5,017.08 5,021.67 5,019.60 5,019.08 5,017.28 5,019.18 5,017.54 0.050 4.06 12.4 - MH (STORM)C-12.1 (STORM)30.0 0.006 38.4 0.013 12.70 32.44 5,001.90 5,001.66 5,007.25 5,004.26 5,003.10 5,002.75 5,003.56 5,003.34 0.400 6.21 12.1 - OULET STRUCTURE (STORM)C-12.4 (STORM)30.0 0.005 66.4 0.013 12.70 28.91 5,018.50 5,018.17 5,022.71 5,023.96 5,019.70 5,019.56 5,020.16 5,019.88 0.050 5.70 16.1 - INLET (STORM)C-16.1 (STORM)18.0 0.015 17.3 0.013 0.87 12.90 5,034.76 5,034.50 5,038.37 5,038.74 5,035.11 5,035.10 5,035.23 5,035.13 0.050 4.16 18.1 - INLET (STORM)C-18.1 (STORM)18.0 0.016 25.2 0.013 0.78 13.24 5,034.37 5,033.97 5,038.69 5,039.34 5,034.70 5,034.67 5,034.81 5,034.68 0.050 4.10 20.1 - INLET (STORM)C-20.1 (STORM)18.0 0.020 21.6 0.013 0.72 14.83 5,026.95 5,026.52 5,032.28 5,031.51 5,027.27 5,026.74 5,027.38 5,027.04 0.050 4.34 P363.2 - MH (STORM)C-363.2 (STORM)48.0 0.018 83.4 0.013 30.36 191.40 4,998.35 4,996.87 5,008.06 5,008.33 4,999.98 4,999.21 5,000.60 4,999.45 0.500 11.13 Page 1 of 1 6/25/2025file:///C:/Users/WaterR/AppData/Local/Temp/Bentley/StormCAD/2s2t4myo.xml Scenario: 2 Year Current Time Step: 0.000 h FlexTable: Manhole Table Label Flow (Known) (cfs) Elevation (Ground) (ft) Elevation (Invert) (ft)Headloss Method Hydraulic Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Velocity (Out) (ft/s) Flow (Total Out) (cfs) Headloss Coefficient (Standard) 1.5 - INLET (STORM)22.43 5,021.65 5,015.41 Standard 5,016.91 5,016.85 5.94 22.43 0.100 4.5 - MH (STORM)0.00 5,046.81 5,036.13 Standard 5,037.83 5,037.56 5.83 23.59 0.500 12.3 - MH (STORM)0.00 5,018.38 5,011.94 Standard 5,013.16 5,013.14 5.47 12.70 0.050 Page 1 of 2 6/25/2025file:///C:/Users/WaterR/AppData/Local/Temp/Bentley/StormCAD/xryi5yof.xml Scenario: 100 Year Current Time Step: 0.000 h FlexTable: Conduit Table X:\3970000.all\3979303\StormCAD\Model\3979303 StormCAD.stsw Upstream Structure Label Diameter (in) Slope (Calculated) (ft/ft) Length (User Defined) (ft) Manning's n Flow (cfs) Capacity (Full Flow) (cfs) Invert (Start) (ft) Invert (Stop) (ft) Elevation Ground (Start) (ft) Elevation Ground (Stop) (ft) Hydraulic Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Energy Grade Line (In) (ft) Energy Grade Line (Out) (ft) Upstream Structure Headloss Coefficient Velocity (ft/s) 1.2 - MH (STORM)C-1.1 (STORM)42.0 0.025 70.8 0.013 106.50 158.20 5,001.75 5,000.00 5,015.37 5,003.97 5,006.39 5,005.60 5,008.30 5,007.50 0.050 11.07 1.13 - MH (STORM)C-1.12 (STORM)18.0 0.023 28.8 0.013 2.30 16.03 5,035.90 5,035.23 5,040.48 5,039.65 5,037.30 5,037.29 5,037.33 5,037.31 1.020 6.45 1.15 - INLET (STORM)C-1.14 (STORM)18.0 0.012 47.4 0.013 1.17 11.72 5,037.59 5,037.00 5,041.36 5,041.43 5,037.99 5,037.32 5,038.14 5,037.60 0.100 4.24 1.5 - INLET (STORM)C-1.4 (STORM)42.0 0.019 29.1 0.013 91.70 138.38 5,015.40 5,014.85 5,021.65 5,021.94 5,018.37 5,017.88 5,020.10 5,019.55 0.100 15.38 1.8 - MH (STORM)C-1.7 (STORM)30.0 0.015 251.9 0.013 31.65 50.31 5,026.29 5,022.50 5,032.74 5,028.74 5,028.21 5,026.54 5,029.16 5,027.19 1.020 10.83 1.10 - MH (STORM)C-1.9 (STORM)24.0 0.017 230.2 0.013 14.95 29.45 5,032.90 5,029.00 5,038.47 5,034.54 5,034.29 5,031.33 5,034.93 5,031.68 1.320 9.41 2.4 - MH (STORM)C-2.3 (STORM)30.0 0.019 32.5 0.013 21.63 56.63 5,028.47 5,027.85 5,034.09 5,033.42 5,030.34 5,030.42 5,030.81 5,030.72 0.050 10.76 2.7 - INLET (STORM)C-2.6 (STORM)18.0 0.010 26.3 0.013 4.59 10.45 5,034.23 5,033.97 5,038.68 5,039.34 5,037.13 5,037.08 5,037.23 5,037.18 0.050 2.60 3.3 - MH (STORM)C-3.2 (STORM)48.0 0.005 20.6 0.013 74.08 100.03 5,022.17 5,022.07 5,031.51 5,031.40 5,025.23 5,025.21 5,026.03 5,025.97 0.600 8.71 3.6 - MH (STORM)C-3.5 (STORM)42.0 0.005 109.8 0.013 66.52 71.22 5,024.21 5,023.66 5,029.22 5,029.59 5,027.24 5,026.89 5,028.12 5,027.69 1.770 8.41 3.9 - INLET (STORM)C-3.9 (STORM)24.0 0.022 2.7 0.013 22.01 33.85 5,038.86 5,038.80 5,043.70 5,043.53 5,040.54 5,040.33 5,041.49 5,041.46 0.050 11.47 4.3 - MH (STORM)C-4.2 (STORM)48.0 0.030 120.2 0.013 102.63 248.92 5,015.23 5,011.62 5,030.52 5,020.00 5,018.30 5,013.58 5,019.83 5,017.94 0.500 18.85 4.6 - MH (STORM)C-4.5 (STORM)48.0 0.023 99.3 0.013 102.63 217.18 5,039.40 5,037.13 5,049.47 5,046.81 5,042.47 5,039.27 5,044.00 5,042.77 0.600 17.04 4.9 - MH (STORM)C-4.8 (STORM)-0.010 60.3 0.013 102.63 101.08 5,050.67 5,050.07 5,057.55 5,055.75 5,053.25 5,052.45 5,055.10 5,054.56 1.320 12.06 5.1 - MH (STORM)C-5.1 (STORM)24.0 0.015 54.3 0.013 15.84 27.63 5,033.79 5,032.98 5,038.38 5,038.27 5,036.56 5,036.29 5,036.96 5,036.69 1.520 5.04 7.1 - INLET (STORM)C-7.1 (STORM)18.0 0.092 72.6 0.013 6.27 31.89 5,032.50 5,025.81 5,038.19 5,029.22 5,033.47 5,028.79 5,033.89 5,028.99 0.050 14.02 8.3 - INLET (STORM)C-8.3 (STORM)24.0 0.030 30.7 0.013 2.97 39.18 5,036.78 5,035.86 5,040.55 5,039.62 5,038.20 5,038.21 5,038.23 5,038.22 0.640 7.35 9.3 - INLET (STORM)C-9.2 (STORM)18.0 0.032 65.6 0.013 1.95 18.79 5,023.60 5,021.50 5,028.36 5,025.82 5,025.62 5,025.60 5,025.64 5,025.62 0.100 1.10 11.2 - MH (STORM)C-11.2 (STORM)36.0 0.005 72.5 0.013 22.18 46.98 5,014.01 5,013.65 5,019.38 5,021.74 5,018.20 5,018.12 5,018.36 5,018.28 1.320 3.14 11.5 - INLET (STORM)C-11.5 (STORM)12.0 0.021 81.8 0.013 2.01 5.17 5,018.80 5,017.08 5,021.67 5,019.60 5,019.40 5,018.63 5,019.66 5,018.74 0.050 6.17 12.4 - MH (STORM)C-12.1 (STORM)30.0 0.006 38.4 0.013 51.59 32.44 5,001.90 5,001.66 5,007.25 5,004.26 5,006.21 5,005.60 5,007.92 5,007.32 0.400 10.51 12.1 - OULET STRUCTURE (STORM)C-12.4 (STORM)30.0 0.005 66.4 0.013 51.59 28.91 5,018.50 5,018.17 5,022.71 5,023.96 5,022.61 5,021.56 5,024.33 5,023.28 0.050 10.51 16.1 - INLET (STORM)C-16.1 (STORM)18.0 0.015 17.3 0.013 3.01 12.90 5,034.76 5,034.50 5,038.37 5,038.74 5,036.05 5,036.04 5,036.10 5,036.09 0.050 5.95 18.1 - INLET (STORM)C-18.1 (STORM)18.0 0.016 25.2 0.013 3.60 13.24 5,034.37 5,033.97 5,038.69 5,039.34 5,037.11 5,037.08 5,037.17 5,037.14 0.050 2.04 20.1 - INLET (STORM)C-20.1 (STORM)18.0 0.020 21.6 0.013 4.40 14.83 5,026.95 5,026.52 5,032.28 5,031.51 5,027.75 5,027.12 5,028.08 5,027.82 0.050 7.32 P363.2 - MH (STORM)C-363.2 (STORM)48.0 0.018 83.4 0.013 55.00 191.40 4,998.35 4,996.87 5,008.06 5,008.33 5,000.58 5,000.25 5,001.49 5,000.61 0.500 13.16 Page 1 of 1 6/25/2025file:///C:/Users/WaterR/AppData/Local/Temp/Bentley/StormCAD/rmegs1wu.xml Scenario: 100 Year Current Time Step: 0.000 h FlexTable: Manhole Table Label Flow (Known) (cfs) Elevation (Ground) (ft) Elevation (Invert) (ft)Headloss Method Hydraulic Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Velocity (Out) (ft/s) Flow (Total Out) (cfs) Headloss Coefficient (Standard) 1.5 - INLET (STORM)91.70 5,021.65 5,015.41 Standard 5,018.54 5,018.37 10.55 91.70 0.100 4.5 - MH (STORM)0.00 5,046.81 5,036.13 Standard 5,039.96 5,039.20 9.92 102.63 0.500 12.3 - MH (STORM)0.00 5,018.38 5,011.94 Standard 5,014.35 5,014.26 10.86 51.59 0.050 Page 1 of 2 6/25/2025file:///C:/Users/WaterR/AppData/Local/Temp/Bentley/StormCAD/us4jf5kd.xml Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.:39823.00 Calculated By:ARJ Checked By:0 Date:4/9/25 DESIGN POINT DESIGN POINT DESIGN POINT DESIGN POINT DESIGN POINT Notes 6.1 4.1 P366_WQCV_OUTLET 3.2 J828 Q100 (cfs):74.3 18.5 51.55 106.5 123.57 Conduit Pipe Pipe Pipe Pipe Pipe D c , Pipe Diameter (in):48 24 30 42 48 W , Box Width (ft):N/A N/A N/A N/A N/A H , Box Height (ft):N/A N/A N/A N/A N/A Y t , Tailwater Depth (ft):1.60 0.80 3.00 1.40 1.60 If unknown, use Y t /D c (or H )=0.4 Y t /Dc or Y t /H 0.40 0.40 1.20 0.40 0.40 Q/D2.5 or Q/(WH3/2)2.32 3.26 5.22 4.65 3.86 Supercritical?Yes Yes Yes Yes Yes Y n , Normal Depth (ft) [Supercritical]: D a ,H a (in) [Supercritical]:2.00 1.00 1.25 1.75 2.00 D a =(D c +Y n )/2 Riprap d 50 (in) [Supercritical]:9.48 6.66 3.56 16.60 15.76 Riprap d 50 (in) [Subcritical]:N/A N/A N/A N/A N/A Required Riprap Size:M L L H H Fig. 9-38 or Fig. 9-36 d 50 (in):12 9 9 15 15 Use Type M (MIN.) Expansion Factor, 1/(2 tan):6.00 6.00 7.00 6.00 6.00 Read from Fig. 9-35 or 9-36 0.08 0.08 0.07 0.08 0.08 Erosive Soils?No No No No No Area of Flow,A t (ft2):10.62 2.64 7.36 15.21 17.65 A t =Q/V Length of Protection, L p (ft):15.8 7.8 -0.3 44.2 42.2 L=(1/(2 tan ))(At/Yt - D) Min Length (ft)12.0 6.0 7.5 10.5 12.0 Min L=3D or 3H Max Length (ft)40.0 20.0 25.0 35.0 40.0 Max L=10D or 10H Min Bottom Width,T (ft):6.6 3.3 2.5 10.9 11.0 T=2*(Lp*tan)+W Design Length (ft)16.0 8.0 7.5 35.0 40.0 Design Width (ft)6.6 3.3 2.5 10.9 11.0 Riprap Depth (in)24 18 18 30 30 Depth=2(d50) Type II Bedding Depth (in)*6 6 6 8 8 *Not used if Soil Riprap Cutoff Wall Yes Yes Yes Yes Yes Cutoff Wall Depth (in)30.0 24.0 24.0 38.0 38.0 Depth of Riprap and Base Cutoff Wall Width (ft)10.0 7.3 8.3 9.5 10.0 * For use when the flow in the culvert is supercritical (and less than full). STORM DRAIN SYSTEM PIPE OUTFALL RIPRAP SIZING CALCULATIONS X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 3 4/10/2025 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 2 of 3 4/10/2025 For Supercritical X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 3 of 3 4/10/2025 College & Trilby Multi-Family Community Final Drainage Report APPENDIX D – WATER QUALITY CALCULATIONS Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.:39823.00 Calculated By:ARJ Checked By:0 Date:4/23/24 Basin (ac)% Imp. B1 0.63 77.5% B2 1.17 9.1% D1 0.29 81.4% D2 0.50 67.2% E1 0.42 81.3% E2 0.73 78.1% E3 0.23 78.1% E4 0.17 62.6% E5 0.38 36.2% E6 0.86 6.3% OS1 0.74 82.0% OS2 2.03 48.3% OS3 0.32 71.5% B770A 0.36 100.0% B770B 1.52 89.0% B900A 0.48 95.0% B900B 0.56 100.0% B910C 1.30 90.0% B920C 1.71 66.0% B910D 0.46 90.0% B920A 3.82 20.0% B920B 0.99 63.0% WQCV Drain Time (hr):40 Coefficient, a (Figure 3.2):1.0 WQCV (in):0.23 WQ Pond Tributary Areas POND 366 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 3 4/24/2024 Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.:39823.00 Calculated By:ARJ Checked By:0 Date:4/23/24 Basin (ac)Value % Imp. A1 1.90 0.16 15.6% A2 1.76 0.12 51.6% A3 0.31 0.07 72.3% A4 1.65 0.13 47.4% A5 0.42 0.10 59.3% A6 0.75 0.07 68.6% A7 0.47 0.09 71.2% A8 1.23 0.09 62.0% A9 0.30 0.09 65.6% C1.1 3.84 0.13 47.0% C1.2 0.72 0.19 37.8% C1.3 0.18 0.07 68.1% C2 1.12 0.11 55.2% C3 1.91 0.05 76.1% C4 2.55 0.10 58.0% C5 1.34 0.09 63.6% G1 1.49 0.05 72.2% G2 0.62 0.02 83.0% G3 1.06 0.08 52.4% G4 0.82 0.03 80.7% WQCV Drain Time (hr):12 Coefficient, a (Figure 3.2):0.8 WQCV (in):0.18 WQ Pond Tributary Areas ADS Isolator Rows X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 2 of 3 4/24/2024 X:\3970000.all\3979303\Excel\Drainage\3979303 Drainage_Calcs_Template_v2.07.xlsm Page 3 of 3 4/24/2024 Project: Basin ID: Depth Increment =1.00 ft Watershed Information Top of Micropool --0.00 ------0 0.000 Selected BMP Type =EDB 5020 --0.75 ------3,204 0.074 1,201 0.028 Watershed Area =19.66 acres 5021 --1.75 ------9,840 0.226 7,724 0.177 Watershed Length =1,677 ft 5022 --2.75 ------13,392 0.307 19,340 0.444 Watershed Length to Centroid =1,006 ft 5023 --3.75 ------15,949 0.366 34,010 0.781 Watershed Slope =0.029 ft/ft 5024 --4.75 ------18,716 0.430 51,343 1.179 Watershed Imperviousness =56.90%percent 5025 --5.75 ------22,031 0.506 71,716 1.646 Percentage Hydrologic Soil Group A =0.0%percent 5026 --6.75 ------25,665 0.589 95,564 2.194 Percentage Hydrologic Soil Group B =0.0%percent -------- Percentage Hydrologic Soil Groups C/D =100.0%percent -------- Target WQCV Drain Time =40.0 hours -------- Location for 1-hr Rainfall Depths = User Input -------- -------- -------- Optional User Overrides -------- Water Quality Capture Volume (WQCV) =0.444 acre-feet 0.444 acre-feet -------- Excess Urban Runoff Volume (EURV) =1.069 acre-feet acre-feet -------- 2-yr Runoff Volume (P1 = 0.82 in.) =0.699 acre-feet 0.82 inches -------- 5-yr Runoff Volume (P1 = 1.09 in.) =1.033 acre-feet inches -------- 10-yr Runoff Volume (P1 = 1.4 in.) =1.508 acre-feet 1.40 inches -------- 25-yr Runoff Volume (P1 = 1.69 in.) =2.050 acre-feet inches -------- 50-yr Runoff Volume (P1 = 1.99 in.) =2.552 acre-feet inches -------- 100-yr Runoff Volume (P1 = 2.86 in.) =4.103 acre-feet 2.86 inches -------- 500-yr Runoff Volume (P1 = 3.14 in.) =4.589 acre-feet inches -------- Approximate 2-yr Detention Volume =0.655 acre-feet -------- Approximate 5-yr Detention Volume =1.003 acre-feet -------- Approximate 10-yr Detention Volume =1.259 acre-feet -------- Approximate 25-yr Detention Volume =1.428 acre-feet -------- Approximate 50-yr Detention Volume =1.544 acre-feet -------- Approximate 100-yr Detention Volume =2.209 acre-feet -------- -------- Define Zones and Basin Geometry -------- Zone 1 Volume (WQCV) =0.444 acre-feet -------- Zone 2 Volume (User Defined - Zone 1) =0.000 acre-feet -------- 0.000 acre-feet -------- Total Detention Basin Volume =0.444 acre-feet -------- Initial Surcharge Volume (ISV) =user ft 3 -------- Initial Surcharge Depth (ISD) =user ft -------- Total Available Detention Depth (Htotal) =user ft -------- Depth of Trickle Channel (HTC) =user ft -------- Slope of Trickle Channel (STC) =user ft/ft -------- Slopes of Main Basin Sides (Smain) =user H:V -------- Basin Length-to-Width Ratio (RL/W) =user -------- -------- Initial Surcharge Area (AISV) =user ft 2 -------- Surcharge Volume Length (LISV) =user ft -------- Surcharge Volume Width (WISV) =user ft -------- Depth of Basin Floor (HFLOOR) =user ft -------- Length of Basin Floor (LFLOOR) =user ft -------- Width of Basin Floor (WFLOOR) =user ft -------- Area of Basin Floor (AFLOOR) =user ft 2 -------- Volume of Basin Floor (VFLOOR) =user ft 3 -------- Depth of Main Basin (HMAIN) =user ft -------- Length of Main Basin (LMAIN) =user ft -------- Width of Main Basin (WMAIN) =user ft -------- Area of Main Basin (AMAIN) =user ft 2 -------- Volume of Main Basin (VMAIN) =user ft 3 -------- Calculated Total Basin Volume (Vtotal) =user acre-feet -------- Total detention volume is less than 100-year volume. After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Override Area (ft 2) Length (ft) Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) College and Trilby WQ Pond 366. WQ by factor of 1.2 Pond 366 MHFD-Detention, Version 4.06 (July 2022) Example Zone Configuration (Retention Pond) Pond 366 MHFD-Detention_v4-06.xlsm, Basin 12/6/2024, 11:13 AM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 2.76 Zone 1 (WQCV)2.76 Zone 1 (WQCV) 2.76 Zone 2 (User)2.76 Zone 1 (WQCV) 2.76 Zone 3 (User)2.76 Zone 1 (WQCV) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.550 1.100 1.650 2.200 0.000 0.150 0.300 0.450 0.600 0.00 2.00 4.00 6.00 8.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 6500 13000 19500 26000 0 5 10 15 20 0.00 2.00 4.00 6.00 8.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) Pond 366 MHFD-Detention_v4-06.xlsm, Basin 12/6/2024, 11:13 AM Project: Basin ID: Estimated Estimated Stage (ft)Volume (ac-ft)Outlet Type Zone 1 (WQCV)2.76 0.444 Orifice Plate Zone 2 (User)2.76 0.000 Weir&Pipe (Restrict) Zone 3 (User)2.76 0.000 Weir&Pipe (Restrict) Total (all zones)0.444 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth =N/A ft (distance below the filtration media surface)Underdrain Orifice Area =N/A ft2 Underdrain Orifice Diameter =N/A inches Underdrain Orifice Centroid =N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice =0.00 ft (relative to basin bottom at Stage = 0 ft)WQ Orifice Area per Row =1.306E-02 ft2 Depth at top of Zone using Orifice Plate =2.76 ft (relative to basin bottom at Stage = 0 ft)Elliptical Half-Width =N/A feet Orifice Plate: Orifice Vertical Spacing =12.10 inches Elliptical Slot Centroid =N/A feet Orifice Plate: Orifice Area per Row =1.88 sq. inches (diameter = 1-9/16 inches)Elliptical Slot Area =N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required)Row 2 (optional)Row 3 (optional)Row 4 (optional)Row 5 (optional)Row 6 (optional)Row 7 (optional)Row 8 (optional) Stage of Orifice Centroid (ft)0.00 0.92 1.84 Orifice Area (sq. inches)1.88 1.88 1.88 Row 9 (optional)Row 10 (optional)Row 11 (optional)Row 12 (optional)Row 13 (optional)Row 14 (optional)Row 15 (optional)Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular) Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice =N/A N/A ft (relative to basin bottom at Stage = 0 ft)Vertical Orifice Area =N/A N/A Depth at top of Zone using Vertical Orifice =N/A N/A ft (relative to basin bottom at Stage = 0 ft)Vertical Orifice Centroid =N/A N/A Vertical Orifice Diameter =N/A N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe) grate Zone 2 Weir Zone 3 Weir Zone 2 Weir Zone 3 Weir Overflow Weir Front Edge Height, Ho =2.76 ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =4.26 Overflow Weir Front Edge Length =5.00 feet Overflow Weir Slope Length =6.18 Overflow Weir Grate Slope =4.00 H:V Grate Open Area / 100-yr Orifice Area =4.98 Horiz. Length of Weir Sides =6.00 feet Overflow Grate Open Area w/o Debris =24.46 Overflow Grate Type = Close Mesh Grate Overflow Grate Open Area w/ Debris =24.46 Debris Clogging % =0%% User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Zone 2 Restrictor Zone 3 Restrictor Zone 2 Restrictor Zone 3 Restrictor Depth to Invert of Outlet Pipe =0.75 ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area =4.91 Outlet Pipe Diameter =30.00 inches Outlet Orifice Centroid =1.25 Restrictor Plate Height Above Pipe Invert =30.00 inches Half-Central Angle of Restrictor Plate on Pipe =3.14 User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage=ft (relative to basin bottom at Stage = 0 ft)Spillway Design Flow Depth=feet Spillway Crest Length =feet Stage at Top of Freeboard =feet Spillway End Slopes =H:V Basin Area at Top of Freeboard =acres Freeboard above Max Water Surface =feet Basin Volume at Top of Freeboard =acre-ft Max Ponding Depth of Target Storage Volume =#N/A feet Discharge at Top of Freeboard =cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.09 1.40 1.69 1.99 2.86 CUHP Runoff Volume (acre-ft) =0.444 1.069 0.699 1.033 1.508 2.050 2.552 4.103 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.699 1.033 1.508 2.050 2.552 4.103 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.2 1.4 5.0 10.9 15.0 28.2 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.07 0.26 0.55 0.76 1.44 Peak Inflow Q (cfs) =N/A N/A 9.5 14.1 20.9 29.5 36.8 59.0 Peak Outflow Q (cfs) =0.2 37.9 2.1 5.7 11.0 20.9 28.2 47.2 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 4.0 2.2 1.9 1.9 1.7 Structure Controlling Flow =Overflow Weir 1 Outlet Plate 1 Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Overflow Weir 1 Outlet Plate 1 Max Velocity through Grate 1 (fps) =N/A 1.92 0.07 0.2 0.4 0.8 1.1 1.9 Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =37 36 39 37 35 32 30 25 Time to Drain 99% of Inflow Volume (hours) =40 41 43 42 41 40 39 35 Maximum Ponding Depth (ft) =2.76 4.49 3.02 3.25 3.49 3.79 3.97 4.48 Area at Maximum Ponding Depth (acres) =0.31 0.41 0.32 0.34 0.35 0.37 0.38 0.41 Maximum Volume Stored (acre-ft) =0.447 1.069 0.529 0.605 0.684 0.795 0.859 1.065 DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) College and Trilby WQ Pond 366. WQ by factor of 1.2 Pond 366 The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). Example Zone Configuration (Retention Pond) Pond 366 MHFD-Detention_v4-06.xlsm, Outlet Structure 12/6/2024, 11:14 AM COUNTA for Basin Tab =1 Ao Dia WQ Plate Type Vert Orifice 2 Count_Underdrain =0 0.11 2 1 1 Count_WQPlate =1 0.14 Count_VertOrifice1 =0 0.18 Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 =0 0.24 4 4 5yr, <72hr 0 Count_Weir1 =1 0.29 >5yr, <120hr 0 Count_Weir2 =0 0.36 Max Depth Row Count_OutletPipe1 =1 0.42 WQCV 277 Count_OutletPipe2 =0 0.50 2 Year 303 COUNTA_2 (Standard FSD Setup)=1 0.58 EURV 450 Hidden Parameters & Calculations 0.67 5 Year 326 MaxPondDepth_Error?FALSE 0.76 10 Year 350 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86 25 Year 380 WQ Plate Flow at 100yr depth =0.35 0.97 50 Year 398 CLOG #1=100%1.08 100 Year 449 1 Z1_Boolean n*Cdw #1 =0.44 1.20 500 Year 481 1 Z2_Boolean n*Cdo #1 =1.83 1.32 Zone3_Pulldown Message 0 Z3_Boolean Overflow Weir #1 Angle =0.245 1.45 1 Opening Message CLOG #2=100%1.59 Draintime Running n*Cdw #2 =0.00 1.73 Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 =0.00 1.88 Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle =0.000 2.03 Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth =0.00 2.20 Overflow Weir 1 1 1 0 Max Depth VertOrifice1 Q at 100yr depth =0.00 2.36 Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth =0.00 2.54 Outlet Pipe 1 1 1 0 Freeboard 2.72 Outlet Pipe 2 0 0 0 Spillway Count_User_Hydrographs 0 2.90 0 Spillway Length CountA_3 (EURV & 100yr) =1 3.09 FALSE Time Interval CountA_4 (100yr Only) =1 3.29 Button Visibility Boolean COUNTA_5 (FSD Weir Only)=0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)=1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 0 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 6.00 60,000 50 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) 0 10 20 30 40 50 60 70 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 5 10 15 20 25 30 35 40 45 50 0 10,000 20,000 30,000 40,000 50,000 60,000 0.00 1.00 2.00 3.00 4.00 5.00 6.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] Pond 366 MHFD-Detention_v4-06.xlsm, Outlet Structure 12/6/2024, 11:14 AM Outflow Hydrograph Workbook Filename: Inflow Hydrographs The user can override the calculated inflow hydrographs from this workbook with inflow hydrographs developed in a separate program. SOURCE CUHP CUHP CUHP CUHP CUHP CUHP CUHP CUHP CUHP Time Interval TIME WQCV [cfs]EURV [cfs]2 Year [cfs] 5 Year [cfs] 10 Year [cfs] 25 Year [cfs] 50 Year [cfs] 100 Year [cfs] 500 Year [cfs] 5.00 min 0:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.31 0.54 0:15:00 0.00 0.00 0.38 1.19 1.99 1.38 2.01 3.08 3.58 0:20:00 0.00 0.00 3.09 4.62 6.30 4.16 5.26 7.92 9.10 0:25:00 0.00 0.00 7.33 11.01 16.55 9.77 12.36 20.80 24.05 0:30:00 0.00 0.00 9.47 14.14 20.92 24.38 30.93 48.32 54.26 0:35:00 0.00 0.00 9.17 13.60 19.84 29.45 36.82 58.98 65.82 0:40:00 0.00 0.00 8.43 12.27 17.85 29.27 36.33 57.83 64.43 0:45:00 0.00 0.00 7.43 10.92 15.99 26.81 33.22 54.04 60.17 0:50:00 0.00 0.00 6.56 9.81 14.14 24.60 30.44 49.43 55.04 0:55:00 0.00 0.00 5.81 8.65 12.49 21.64 26.83 44.42 49.46 1:00:00 0.00 0.00 5.15 7.62 11.05 18.89 23.45 39.85 44.37 1:05:00 0.00 0.00 4.68 6.89 10.06 16.55 20.58 35.95 40.05 1:10:00 0.00 0.00 4.19 6.39 9.40 14.35 17.92 30.85 34.43 1:15:00 0.00 0.00 3.77 5.82 8.83 12.63 15.83 26.63 29.76 1:20:00 0.00 0.00 3.39 5.20 7.95 10.92 13.66 22.29 24.91 1:25:00 0.00 0.00 3.04 4.61 6.83 9.36 11.68 18.42 20.57 1:30:00 0.00 0.00 2.69 4.06 5.79 7.80 9.70 15.03 16.78 1:35:00 0.00 0.00 2.37 3.57 4.90 6.37 7.88 11.98 13.37 1:40:00 0.00 0.00 2.13 3.05 4.24 5.13 6.32 9.39 10.49 1:45:00 0.00 0.00 2.01 2.70 3.85 4.23 5.19 7.58 8.49 1:50:00 0.00 0.00 1.95 2.48 3.61 3.70 4.52 6.46 7.25 1:55:00 0.00 0.00 1.74 2.33 3.39 3.35 4.09 5.72 6.42 2:00:00 0.00 0.00 1.56 2.16 3.10 3.12 3.79 5.18 5.82 2:05:00 0.00 0.00 1.25 1.72 2.47 2.47 2.99 4.01 4.50 2:10:00 0.00 0.00 0.97 1.33 1.91 1.89 2.28 2.98 3.35 2:15:00 0.00 0.00 0.75 1.03 1.47 1.44 1.74 2.22 2.50 2:20:00 0.00 0.00 0.58 0.79 1.12 1.10 1.32 1.67 1.87 2:25:00 0.00 0.00 0.45 0.60 0.84 0.83 0.99 1.26 1.42 2:30:00 0.00 0.00 0.34 0.45 0.62 0.62 0.74 0.95 1.06 2:35:00 0.00 0.00 0.25 0.33 0.47 0.46 0.55 0.71 0.79 2:40:00 0.00 0.00 0.19 0.24 0.35 0.35 0.41 0.53 0.60 2:45:00 0.00 0.00 0.13 0.18 0.25 0.25 0.30 0.39 0.44 2:50:00 0.00 0.00 0.09 0.12 0.17 0.18 0.21 0.27 0.31 2:55:00 0.00 0.00 0.05 0.08 0.11 0.11 0.14 0.17 0.19 3:00:00 0.00 0.00 0.03 0.04 0.06 0.07 0.08 0.10 0.11 3:05:00 0.00 0.00 0.01 0.02 0.03 0.03 0.03 0.04 0.05 3:10:00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.01 0.01 3:15:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:20:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:25:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:30:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:35:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:40:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:45:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:15:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:20:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:25:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:30:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:35:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:40:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:45:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:15:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:20:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:25:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:30:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:35:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:40:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:45:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DETENTION BASIN OUTLET STRUCTURE DESIGN Pond 366 MHFD-Detention_v4-06.xlsm, Outlet Structure 12/6/2024, 11:14 AM Summary Stage-Area-Volume-Discharge Relationships The user can create a summary S-A-V-D by entering the desired stage increments and the remainder of the table will populate automatically. The user should graphically compare the summary S-A-V-D table to the full S-A-V-D table in the chart to confirm it captures all key transition points. Stage Area Area Volume Volume [ft][ft 2][acres][ft 3][ac-ft][cfs] 0.00 0 0.000 0 0.000 0.00 0.25 1,068 0.025 133 0.003 0.03 0.50 2,136 0.049 534 0.012 0.04 0.75 3,204 0.074 1,201 0.028 0.05 1.00 4,863 0.112 2,210 0.051 0.08 1.25 6,522 0.150 3,633 0.083 0.11 1.50 8,181 0.188 5,471 0.126 0.12 1.75 9,840 0.226 7,724 0.177 0.14 2.00 10,728 0.246 10,295 0.236 0.18 2.25 11,616 0.267 13,088 0.300 0.21 2.50 12,504 0.287 16,103 0.370 0.23 2.75 13,392 0.307 19,340 0.444 0.25 2.76 13,418 0.308 19,474 0.447 0.25 3.02 14,083 0.323 23,049 0.529 2.10 3.01 14,057 0.323 22,908 0.526 1.99 3.26 14,696 0.337 26,502 0.608 5.82 3.51 15,335 0.352 30,256 0.695 11.70 3.76 15,976 0.367 34,170 0.784 19.76 4.01 16,668 0.383 38,250 0.878 30.15 4.26 17,360 0.399 42,504 0.976 42.41 4.51 18,052 0.414 46,930 1.077 47.33 4.76 18,750 0.430 51,530 1.183 48.78 5.01 19,578 0.449 56,321 1.293 50.19 5.26 20,407 0.468 61,319 1.408 51.57 5.51 21,235 0.487 66,524 1.527 52.90 5.76 22,067 0.507 71,937 1.651 54.21 6.01 22,976 0.527 77,567 1.781 55.48 6.26 23,884 0.548 83,425 1.915 56.73 6.51 24,792 0.569 89,509 2.055 57.94 6.76 25,665 0.589 95,564 2.194 59.09 For best results, include the stages of all grade slope changes (e.g. ISV and Floor) from the S-A-V table on Sheet 'Basin'. Also include the inverts of all outlets (e.g. vertical orifice, overflow grate, and spillway, where applicable). 5024 -OVERFLOW SPILLWAY DETENTION BASIN OUTLET STRUCTURE DESIGN Stage - Storage Description 5019.25 MHFD-Detention, Version 4.06 (July 2022) 5022.01 WQ - Overflow Weir Pond 366 MHFD-Detention_v4-06.xlsm, Outlet Structure 12/6/2024, 11:14 AM Project: Chamber Model - MC-7200 Units -Imperial Number of Chambers -82 Number of End Caps -14 Voids in the stone (porosity) - 40 % Base of Stone Elevation -0.00 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers -9 in Area of system -5651 sf Min. Area - Height of System Incremental Single Chamber Incremental Single End Cap Incremental Chambers Incremental End Cap Incremental Stone Incremental Ch, EC and Stone Cumulative System Elevation (inches)(cubic feet)(cubic feet)(cubic feet)(cubic feet)(cubic feet)(cubic feet)(cubic feet)(feet) 81 0.00 0.00 0.00 0.00 188.37 188.37 24244.25 6.75 80 0.00 0.00 0.00 0.00 188.37 188.37 24055.88 6.67 79 0.00 0.00 0.00 0.00 188.37 188.37 23867.52 6.58 78 0.00 0.00 0.00 0.00 188.37 188.37 23679.15 6.50 77 0.00 0.00 0.00 0.00 188.37 188.37 23490.78 6.42 76 0.00 0.00 0.00 0.00 188.37 188.37 23302.42 6.33 75 0.00 0.00 0.00 0.00 188.37 188.37 23114.05 6.25 #VALUE! 74 0.00 0.00 0.00 0.00 188.37 188.37 22925.68 6.17 #VALUE! 73 0.00 0.00 0.00 0.00 188.37 188.37 22737.32 6.08 Volume between elevations and = 72 0.00 0.00 0.00 0.00 188.37 188.37 22548.95 6.00 #VALUE! 71 0.00 0.00 0.00 0.00 188.37 188.37 22360.58 5.92 #VALUE! 70 0.00 0.00 0.00 0.00 188.37 188.37 22172.22 5.83 WQ Volume achieved at elevation 69 0.06 0.01 4.87 0.18 186.35 191.40 21983.85 5.75 68 0.19 0.03 15.59 0.47 181.94 198.01 21792.45 5.67 67 0.28 0.05 22.56 0.72 179.05 202.34 21594.44 5.58 66 0.36 0.07 29.29 0.92 176.28 206.50 21392.10 5.50 65 0.46 0.08 37.59 1.16 172.87 211.62 21185.61 5.42 64 0.74 0.11 60.81 1.47 163.45 225.74 20973.99 5.33 63 1.10 0.13 89.90 1.85 151.66 243.42 20748.25 5.25 62 1.32 0.16 108.12 2.25 144.22 254.59 20504.83 5.17 61 1.50 0.19 122.86 2.64 138.17 263.66 20250.24 5.08 60 1.65 0.22 135.67 3.06 132.88 271.60 19986.57 5.00 59 1.79 0.25 147.11 3.46 128.14 278.70 19714.97 4.92 58 1.92 0.28 157.41 3.85 123.86 285.13 19436.27 4.83 57 2.04 0.30 167.07 4.23 119.85 291.14 19151.14 4.75 56 2.15 0.33 175.92 4.59 116.17 296.67 18860.00 4.67 55 2.25 0.35 184.31 4.96 112.66 301.93 18563.33 4.58 54 2.34 0.38 192.14 5.37 109.36 306.87 18261.40 4.50 53 2.43 0.41 199.54 5.73 106.26 311.53 17954.53 4.42 52 2.52 0.44 206.56 6.17 103.27 316.01 17643.00 4.33 51 2.60 0.47 213.25 6.56 100.44 320.25 17326.99 4.25 50 2.68 0.50 219.63 6.93 97.74 324.30 17006.74 4.17 49 2.75 0.52 225.71 7.29 95.17 328.17 16682.43 4.08 48 2.82 0.54 231.52 7.62 92.71 331.85 16354.26 4.00 47 2.89 0.57 237.10 7.93 90.35 335.38 16022.41 3.92 46 2.96 0.59 242.42 8.24 88.10 338.76 15687.03 3.83 45 3.02 0.61 247.54 8.54 85.93 342.01 15348.26 3.75 44 3.08 0.63 252.45 8.85 83.85 345.15 15006.25 3.67 43 3.14 0.64 257.17 9.00 81.90 348.07 14661.10 3.58 42 3.19 0.68 261.73 9.48 79.88 351.09 14313.03 3.50 41 3.25 0.70 266.09 9.80 78.01 353.90 13961.94 3.42 40 3.30 0.72 270.30 10.11 76.20 356.61 13608.04 3.33 39 3.35 0.74 274.34 10.41 74.47 359.22 13251.42 3.25 38 3.39 0.76 278.24 10.70 72.79 361.73 12892.21 3.17 37 3.44 0.79 281.99 11.00 71.17 364.16 12530.48 3.08 36 3.48 0.80 285.60 11.24 69.63 366.47 12166.32 3.00 35 3.53 0.82 289.08 11.48 68.14 368.70 11799.85 2.92 34 3.57 0.84 292.43 11.74 66.70 370.87 11431.15 2.83 33 3.61 0.85 295.66 11.92 65.34 372.91 11060.29 2.75 32 3.64 0.86 298.77 12.03 64.05 374.85 10687.37 2.67 31 3.68 0.89 301.76 12.45 62.68 376.89 10312.53 2.58 30 3.71 0.90 304.63 12.66 61.45 378.74 9935.64 2.50 29 3.75 0.92 307.39 12.84 60.27 380.51 9556.90 2.42 28 3.78 0.92 310.04 12.88 59.20 382.12 9176.39 2.33 27 3.81 0.94 312.59 13.21 58.05 383.84 8794.27 2.25 26 3.84 0.96 315.02 13.39 57.00 385.41 8410.43 2.17 25 3.87 0.97 317.35 13.56 56.00 386.92 8025.02 2.08 24 3.90 0.98 319.59 13.74 55.04 388.36 7638.10 2.00 23 3.92 0.97 321.72 13.60 54.24 389.56 7249.74 1.92 22 3.95 1.00 323.76 14.05 53.25 391.05 6860.18 1.83 21 3.97 1.01 325.70 14.16 52.42 392.28 6469.13 1.75 20 3.99 1.02 327.55 14.29 51.63 393.47 6076.85 1.67 19 4.02 1.03 329.31 14.42 50.87 394.61 5683.38 1.58 18 4.04 1.04 330.97 14.54 50.16 395.67 5288.78 1.50 17 4.06 1.05 332.54 14.65 49.49 396.68 4893.10 1.42 16 4.07 1.05 334.03 14.76 48.85 397.64 4496.42 1.33 15 4.09 1.05 335.42 14.71 48.32 398.44 4098.78 1.25 14 4.11 1.06 336.75 14.79 47.75 399.29 3700.34 1.17 13 4.12 1.08 338.01 15.06 47.14 400.21 3301.05 1.08 12 4.14 1.08 339.20 15.16 46.62 400.98 2900.84 1.00 11 4.15 1.09 340.30 15.23 46.15 401.69 2499.86 0.92 10 4.17 1.11 342.02 15.49 45.36 402.87 2098.17 0.83 9 0.00 0.00 0.00 0.00 188.37 188.37 1695.30 0.75 8 0.00 0.00 0.00 0.00 188.37 188.37 1506.93 0.67 7 0.00 0.00 0.00 0.00 188.37 188.37 1318.57 0.58 6 0.00 0.00 0.00 0.00 188.37 188.37 1130.20 0.50 5 0.00 0.00 0.00 0.00 188.37 188.37 941.83 0.42 4 0.00 0.00 0.00 0.00 188.37 188.37 753.47 0.33 3 0.00 0.00 0.00 0.00 188.37 188.37 565.10 0.25 2 0.00 0.00 0.00 0.00 188.37 188.37 376.73 0.17 1 0.00 0.00 0.00 0.00 188.37 188.37 188.37 0.08 REV0 College_Trilby (S442099) 12-06-24 5384 sf min. area StormTech MC-7200 Cumulative Storage Volumes Include Perimeter Stone in Calculations Click Here for Metric Click for Stage Area Data Click to Invert Stage Area Data A B C D E F G H I J K L M N VAULT ID TOTAL REQUIRED WQCV (CF) WQ FLOW (CFS)CHAMBER TYPE RELEASE RATE/ CHAMBER (CFS) CHAMBER VOLUME (CF) CHAMBER VOLUME + AGGREGATE (CF) NUMBER OF CHAMBERS RELEASE RATE WQCV METHOD (CFS) REQUIRED STORAGE VOLUME (CF) NUMBER OF CHAMBERS (FAA) VOLUME (CHAMBERS ONLY) (CF) RELEASE RATE FAA METHOD (CFS) TOTAL NUMBER OF CHAMBERS REQUIRED TOTAL SYSTEM VOLUME (CF) WQ A 15,651.83 12.35 MC-7200 0.043 175.9 267.3 59 2.53 14,325 82 14,424 3.51 CONFIRM CONFIRM A MHFD Extended Detention Basin Spreadsheet WQCV B 1/2 of the 2-year developed flow rate for the basin being sized C Chamber type based on site constraints D Flow rate thru the bottom of the isolator row chamber which is equal to the area of the bottom of the chamber multiplied by the flow rate per unit area (see calculations below) E Volume within chamber only, not accounting for void spaces in surrounding aggregate (standard spec) F Volume includes chamber and void space (40%) in surrounding aggregate , per chamber unit. (standard spec) G Number of chambers required to provide full WQCV within total installed system, include aggregate = A / F H Release rate per chamber times number of chambers = D * G I FAA calc based on Flow, WQ and Total Release Rate J Number of chambers required to provide required FAA staorage volume stored within the chamber only (no aggregate stone) = I / E K Volume provided in chambers only (no aggregate storage). This must meet or exceed the required FAA storage volume. Greater of G or J * E L Release rate per chamber times number of chambers = D * J M Total number of chambers (Greater of J or G) N Total system volume. Includes number of chambers plus aggregate. This must meet or exceed required WQCV MC-7200 60.0 60.0 45.0 30.0 16.0 12.0 HEIGHT (IN)5 100.0 100.0 77.0 51.0 34.0 25.0 WIDTH (IN)8.3333333 79.1 48.3 86.0 85.4 85.4 85.4 INSTALLED LENGTH (IN)6.5916667 54.9 33.5 46.0 30.2 20.2 14.8 FLOOR AREA (SF)54.9 175.9 106.5 109.9 45.9 14.7 6.9 CHAMBER VOLUME (CF)175.9 267.3 162.6 175.0 74.9 31.0 15.0 CHAMBER/AGGREGATE VOLUME (CF)267.3 CHAMBER FLOW RATE CONVERSION (GPM/SF TO CFS) 0.35 GPM/SF 1 CF =7.48052 GAL 1 GALLON =0.133681 CF 1 GPM =0.002228 CFS *FLOW RATE BASED ON 1/2 OF NOV 07 QMAX IN FIGURE 17 OF UNH TESTING REPORT MC-7200 MC-4500 MC-3500 SC-740 SC-310 SC-160LP 0.043 0.026 0.036 0.024 0.016 0.012 (COLUMN D)FLOW RATE / CHAMBER (CFS) STORMTECH CHAMBER VOLUME AND RELEASE RATE CALCULATIONS FLOOR AREA (SF) CHAMBER VOLUME (CF) CHAMBER/AGGREGATE VOLUME (CF) FLOW RATE* CHAMBER FLOW RATE WIDTH (IN) INSTALLED LENGTH (IN) HEIGHT (IN) STORMTECH CHAMBER DATA Subdivision:College and Trilby Project Name:College and Trilby Location:Fort Collins Project No.:39823.00 Calculated By:ARJ Checked By:0 Date:11/5/24 WQ Storm Composite 'C'0.64 ft3 acre-ft. Area 24.68 Modified Modified 14325.0 0.329 Release Rate 2.53 M. FATER D. JUDISH C. Li May-95 Apr-98 Nov-98 DETENTION POND SIZING TIME TIME INTENSITY Q 2 Runoff Release Required Required cum 1/2 of 2 year Volume Cum total Detention Detention (mins)(secs)(in/hr)(cfs)(ft^3)(ft^3)(ft^3)(ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 1.425 22.51 6752.448 759.0 5993.4 0.1376 10 600 1.105 17.45 10472.22 1518.0 8954.2 0.2056 15 900 0.935 14.77 13291.66 2277.0 11014.7 0.2529 20 1200 0.805 12.72 15258.16 3036.0 12222.2 0.2806 25 1500 0.715 11.29 16940.35 3795.0 13145.4 0.3018 30 1800 0.650 10.27 18480.38 4554.0 13926.4 0.3197 35 2100 0.585 9.24 19404.4 5313.0 14091.4 0.3235 40 2400 0.535 8.45 20281.04 6072.0 14209.0 0.3262 45 2700 0.495 7.82 21110.28 6831.0 14279.3 0.3278 50 3000 0.460 7.27 21797.38 7590.0 14207.4 0.3262 55 3300 0.435 6.87 22674.01 8349.0 14325.0 0.3289 60 3600 0.410 6.48 23313.72 9108.0 14205.7 0.3261 65 3900 0.385 6.08 23716.49 9867.0 13849.5 0.3179 70 4200 0.365 5.77 24214.04 10626.0 13588.0 0.3119 75 4500 0.345 5.45 24522.05 11385.0 13137.0 0.3016 80 4800 0.330 5.21 25019.6 12144.0 12875.6 0.2956 85 5100 0.315 4.98 25374.99 12903.0 12472.0 0.2863 90 5400 0.305 4.82 26014.69 13662.0 12352.7 0.2836 95 5700 0.290 4.58 26109.47 14421.0 11688.5 0.2683 100 6000 0.280 4.42 26535.94 15180.0 11355.9 0.2607 105 6300 0.270 4.26 26867.64 15939.0 10928.6 0.2509 110 6600 0.260 4.11 27104.56 16698.0 10406.6 0.2389 115 6900 0.255 4.03 27791.65 17457.0 10334.7 0.2373 120 7200 0.245 3.87 27862.73 18216.0 9646.7 0.2215 Required detention WQ Pond Tributary Areas SC-160 25 84.4 12 14.65 6.9 15 0.35 0.0007798 0.011 SC-310 34 85.4 16 20.16 14.7 31 0.35 0.0007798 0.016 SC-740 51 85.4 30 30.25 45.9 74 0.35 0.0007798 0.024 DC-780 51 85.4 30 30.25 46.2 78.4 0.35 0.0007798 0.024 MC-3500 77 90 45 48.13 109.9 46.9 0.35 0.0007798 0.038 * Flow Rate given by City of Fort Collins based on UNH Testing Report Using Highlighted row Chamber & Aggregate Volume (cf)Flow Rate* (gpm/sf) Flow Rate (cfs/sf) Flow Rate per Chamber (cfs)Chamber Type Width (in) Length (in) Height (in) Floor Area (sf)Chamber Volume (cf) This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Using this College & Trilby Multi-Family Community Final Drainage Report APPENDIX E – REFERENCES LEGEND EFFECTIVE SWMM DRAINAGE BASIN DIVIDE LINE DIRECTION OF FLOW SUBBASIN CONVEYANCE ELEMENT - PIPE DETENTION POND NODE CONVEYANCE ELEMENT - SURFACE FLOW CONVEYANCE ELEMENT - ORIFICE CONVEYANCE ELEMENT PORTION OF THE STONE CREEK EFFECTIVE SWMM SCHEMATIC 3-25-22 8 LEGEND CORRECTED EFFECTIVE SWMM DRAINAGE BASIN DIVIDE LINE (WITH DIRECTION OF FLOW) SUBBASIN CONVEYANCE ELEMENT - PIPE DETENTION POND NODE CONVEYANCE ELEMENT - SURFACE FLOW CONVEYANCE ELEMENT - ORIFICE CORRECTED CONVEYANCE ELEMENT EFFECTIVE SWMM DRAINAGE BASIN DIVIDE LINE CONVEYANCE ELEMENT CORRECTED EFFECTIVE SUBBASIN CORRECTED CONVEYANCE ELEMENT - PIPE CORRECTED CONVEYANCE ELEMENT - SURFACE FLOW CORRECTED CONVEYANCE ELEMENT - ORIFICE CORRECTED EFFECTIVE NODE CORRECTED EFFECTIVE DETENTION POND PORTION OF STONE CREEK CORRECTED EFFECTIVE SWMM SCHEMATIC 2-6-24 (WITH DIRECTION OF FLOW) 10 LEGEND PROPOSED SWMM DRAINAGE BASIN DIVIDE LINE SUBBASIN CONVEYANCE ELEMENT - PIPE DETENTION POND NODE CONVEYANCE ELEMENT - SURFACE FLOW CONVEYANCE ELEMENT - ORIFICE PROPOSED CONVEYANCE ELEMENT EFFECTIVE SWMM DRAINAGE BASIN DIVIDE LINE (WITH DIRECTION OF FLOW) CONVEYANCE ELEMENT PROPOSED SUBBASIN PROPOSED CONVEYANCE ELEMENT - PIPE PROPOSED CONVEYANCE ELEMENT - SURFACE FLOW PROPOSED CONVEYANCE ELEMENT - ORIFICE PROPOSED NODE PROPOSED DETENTION POND PORTION OF STONE CREEK PROPOSED CONDTIONS SWMM SCHEMATIC 2-6-24 (WITH DIRECTION OF FLOW) 12 PROPOSED SWMM DRAINAGE BASIN DIVIDE LINE PROPOSED DIRECTION OF FLOW SUBBASIN CONVEYANCE ELEMENT - PIPE DETENTION POND NODE CONVEYANCE ELEMENT - SURFACE FLOW CONVEYANCE ELEMENT - ORIFICE PROPOSED CONVEYANCE ELEMENT EFFECTIVE SWMM DRAINAGE BASIN DIVIDE LINE DIRECTION OF FLOW CONVEYANCE ELEMENT PROPOSED SUBBASIN PROPOSED CONVEYANCE ELEMENT - PIPE PROPOSED CONVEYANCE ELEMENT - SURFACE FLOW PROPOSED CONVEYANCE ELEMENT - ORIFICE PROPOSED NODE LEGEND PROPOSED DETENTION POND STONE CREEK PROPOSED CONDTIONS SWMM SCHEMATIC AREA OF COLLEGE AND TRILBY INTERSECTION ENHANCEMENTS STORM SYSTEM 2-6-24 13 Altitu d e : 0 . 0 0 0 0 _ _ _ _ _ _ _ _ _ Name : C o l l e g e _ T r i l b y _ G E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Lon g i t u d e : - 1 0 5 . 0 7 6 8 6 9 7 9 0 8 1 2 0 0 Latitu d e : 4 0 . 4 9 4 5 6 2 4 2 7 4 7 3 3 3 _ _ S. C O L L E G E A V E N U E S. C O L L E G E A V E N U E W. TRILBY ROAD E. TRILBY ROAD DE B R A DR I V E LY N N DR I V E RICK DRIVE NCOLLEGE AND TRILBY INTERSECTION ENHANCEMENTS STORM SYSTEM LAYOUT 9-1-23 0 SCALE: 1" =60' 60 6030 120 C3415 Portion of West Trilby Currently untreated. Treated within the onsite Pond P366 as basin OS2 Portion of West Trilby Currently untreated. Treated within the onsite Pond P366 as basin OS4. Runoff rom basin OS3 Drains onto site T T ST M ST M A1 A2 A3 A4 A5 A6 A7 A8 A9 B1 B2 B3 acres A1 0.83 1.00 0.09 acres A2 0.71 0.89 0.39 acres A3 0.29 0.37 0.52 acres A4 0.81 1.00 0.24 acres A5 0.86 1.00 0.48 acres A6 0.64 0.80 0.86 acres A7 0.83 1.00 0.18 acres A8 0.95 1.00 0.34 acres A9 0.95 1.00 0.34 acres B1 0.37 0.46 0.14 acres B3 0.62 0.78 0.01 acres B2 0.30 0.38 0.20 acres OS1 0.25 0.31 1.55 - - - - - - - - - - - - - - STAMP Date: Drawn By: Project No: Checked By: H: \ G o o d w i n K n i g h t \ C O , F o r t C o l l i n s - G N K 0 0 0 0 0 8 . 1 0 - M a r s L a n d i n g I S P \ C A D D \ 3 C D \ G N K 0 8 _ C 9 . 0 _ D r a i n a g e P l a n . d w g - Do n a l d C e c i l - 9/ 1 / 2 0 2 0 Init.#Issue / DescriptionDate MA R S L A N D I N G PR O J E C T D E V E L O P M E N T P L A N FO R T C O L L I N S , C O THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRE L I M I N A R Y NOT F O R B I D D I N G NOT F O R C O N S T R U C T I O N 09.09.2020 GNK000008 JEP DBC CAUTION - NOTICE TO CONTRACTOR 1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO CONSTRUCTION. 2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY, IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF SUCH EXISTING UTILITY, EITHER THROUGH POTHOLING OR ALTERNATIVE METHOD. REPORT INFORMATION TO THE ENGINEER PRIOR TO CONSTRUCTION. 3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS, TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING AGENCY. 4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED SURVEYOR REPLACE ANY DAMAGED OR DISTURBED MONUMENTATION AT THEIR COST. Know what's before you dig. DRAINAGE PLAN C8.0 SCALE: 1"=30' 0 15 30 LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED STORM INLET PROPOSED LOTLINE EASEMENT LINE EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPERTY BOUNDARY EXISTING MANHOLE DRAINAGE SYMBOLS: DESIGN POINT MAJOR BASIN BOUNDARY (i.e., C-STORE) SUB-BASIN BOUNDARY (i.e., RATIONAL METHOD) OVERLAND FLOW DIRECTION (I.E., LANDSCAPING) DIRECT FLOW DIRECTION (I.E., PAVEMENT, CURB AND GUTTER) BASIN ID MINOR (2YEAR) RUNOFF COEFFICIENT MAJOR (100YEAR) RUNOFF COEFFICIENT BASIN AREA (ACRES) acres A1 0.23 0.45 1.00 A1 HIGH POINT TRILBY ROAD TRILBY ROAD CO L L E G E A V E N U E LE M A Y A V E N U E SKYWAY DRIVE CO L B Y S T E E T C B A D NORTH TRIBUTARY MIDDL E HUN T I N G T O N H I L L S TRIB U T A R Y SOUTH TRIBUTARY E TRIBUTARY C1: PROPOSED STORM SEWER SYSTEM STON E C R E E K STON E C R E E K CO L L E G E A V E N U E D1: FLOODPLAIN REGULATIONS D2: CROWN RIDGE LANE CULVERT IMPROVEMENTS (10'W X 3'H BOX CULVERT) CROWN RIDGE LANE PROVINCETOWNE DEVELOPMENT RICK DRIVE A1: FLOODPLAIN DEVELOPMENT REGULATIONS A2: OVERFLOW CHANNEL TO POND 363 (RIPRAP LINED CHANNEL) E1: Ditch Crossing Structure B1: FLOODPLAIN DEVELOPMENT REGULATIONS B2: INCREASED CAPACITY UNDER COLLEGE AVE LEMAY AVENUE CROSSING IMPROVEMENTS A PROBLEM IDENTIFICATION AREA LOCATIONS COLLEGE AVENUE APPROXIMATELY 600-FEET NORTH OF TRILBY ROAD B COLLEGE AVENUE AT SKYWAY DRIVEC D E SPILL FLOW TO PROVINCETOWNE LOUDEN DITCH CROSSING COLLEGE AVENUE 1,500-FEET NORTH OF TRILBY ROAD NORTH 0 SCALE : 1" = 300 300 600 F: \ I c o n P r o j e c t s \ S t o n e C r e e k \ D w g \ 0 6 _ D W G \ 0 5 _ F I N A L _ S H E E T S \ S e l e c t e d I m p r o v e m e n t P l a n . d w g ; J m i c h a e l s e n ; P a g e S e t u p : - - - - ; ! C O N - H A L F - S I Z E . c t b ; 1 0 / 2 / 2 0 1 8 6 : 4 9 A M SELECTED PLAN IMPROVEMENTS PROJECT NO: 17-049-SCBAPPR.REVISIONSNo. DATE ICON ENGINEERING, INC. PREPARED BY: Know what's below. Call before you dig.1-1 VERIFY SCALE 0 1" BAR IS ONE INCH ON ORIGINAL DRAWINGS SEPT 2018 PREPARED FOR: 5000 50 0 0 501 0 50 0 0 50 0 5 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 EXISTING 30" RCP TO BE REPLACED WITH 48" RCP PROPOSED MANHOLE CO L L E G E A V E N U E EXISTING 48" RCP EXTEND EXISTING 48" RCP TO COLLEGE AVE LIMITS NORTH F: \ I c o n P r o j e c t s \ S t o n e C r e e k \ D w g \ 0 6 _ D W G \ 0 5 _ F I N A L _ S H E E T S \ L o c a t i o n i m p r o v e m e n t s . d w g ; J m i c h a e l s e n ; P a g e S e t u p : - - - - ; ! C O N - H A L F - S I Z E . c t b ; 1 0 / 1 / 2 0 1 8 1 0 : 2 8 A M LOCATION A: OVERFLOW CHANNEL FROM POND 366 TO POND 363 PROJECT NO: 17-049-SCBAPPR.REVISIONSNo. DATE ICON ENGINEERING, INC. PREPARED BY: Know what's below. Call before you dig.1 OF 1 VERIFY SCALE 0 1" BAR IS ONE INCH ON ORIGINAL DRAWINGS SEPT 2018 PREPARED FOR: NOT FOR CONSTRUCTION Conceptual Design. See JR design within Appendix F section CC in the Proposed Drainage Map. ST ST SO U T H C O L L E G E A V E N U E ST M M H - 4 4 ( 1 ) ST A : 1 + 0 2 . 0 0 RI M = 5 0 0 3 . 4 7 ' IN V . O U T ( 4 8 " R C P ) = 4 9 9 8 . 9 7 ' ( E ) ST M M H - 4 4 ST A : 2 + 1 8 . 0 0 RI M = 5 0 0 6 . 5 0 ' IN V . I N ( 4 8 " R C P ) = 4 9 9 6 . 8 7 ( W ) ' IN V . O U T ( 4 8 " R C P ) = 4 9 9 6 . 8 7 ' ( E ) ST M M H - 4 3 ST A : 6 + 2 5 . 0 0 RI M = 4 9 8 7 . 5 0 ' IN V . I N ( 4 8 " R C P ) = 4 9 8 3 . 0 0 ( W ) ' EXISTING GROUND 4960 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+508+74 F: \ I c o n P r o j e c t s \ S t o n e C r e e k \ D w g \ 0 6 _ D W G \ 0 5 _ F I N A L _ S H E E T S \ L O C A T I O N B . d w g ; J m i c h a e l s e n ; P a g e S e t u p : - - - - ; ! C O N - H A L F - S I Z E . c t b ; 1 0 / 1 / 2 0 1 8 1 2 : 0 1 P M LOCATION B: INCREASED CAPACITY UNDER COLLEGE AVENUE PROJECT NO: 17-049-SCBAPPR.REVISIONSNo. DATE ICON ENGINEERING, INC. PREPARED BY: Know what's below. Call before you dig. PREPARED FOR: 1 OF 1 VERIFY SCALE 0 1" BAR IS ONE INCH ON ORIGINAL DRAWINGS SEPT 2018 PLAN AND PROFILE NOTES: NORTH 0 SCALE : 1" = 100' 100 200 400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 April 24, 2024 Zocalo Community Development 455 Sherman Street, Suite 205 Denver, Colorado 80203 Attention: Subject:Supplementary Groundwater Monitoring Core Spaces Fort Collins, Colorado CTL|T Project Number: FC10864-112 CTL|Thompson, Inc. is performing a groundwater monitoring study at the above referenced project. This letter presents the most recent groundwater measurements from piezometers at the site. On June 19th through 26th, 2023, twelve borings were drilled at the locations shown on Figure 1 (TH-1 through TH-12) using solid-stem augers and a truck-mounted drill rig. The monitoring holes were fitted with temporary PVC piezometers to facilitate monthly groundwater measurements. Groundwater was measured relative to the existing ground surface by a representative from our firm. The table below summarizes our groundwater measurements to date. We appreciate the opportunity to work with you on this project. If you have any additional questions or concerns, please contact the undersigned. Sincerely, CTL|THOMPSON, INC. Jesus Martinez , PE Staff Geotechnical Technician Senior Engineer 04.24.2024 ZOCALO COMMUNITY DEVELOPMENT CORE SPACES CTL | T PROJECT NO. FC10864-112 2 ZO C A L O C O M M U N I T Y D E V E L O P M E N T CO R E S P A C E S CT L | T P R O J E C T N O . F C 1 0 8 6 4 - 1 1 2 3 6/ 2 6 / 2 3 6/ 3 0 / 2 3 7/ 2 4 / 2 3 8/ 2 4 / 2 3 9/ 2 7 / 2 3 10 / 2 4 / 2 3 12 / 4 / 2 3 12 / 2 0 / 2 3 1/ 2 2 / 2 4 2/ 2 7 / 2 4 3/ 2 9 / 2 4 4/ 2 3 / 2 4 TH - 1 DN E * 6. 9 7. 4 8. 2 9. 3 10 . 5 11 . 9 12 . 7 13 12 . 8 10 . 4 10 . 3 TH - 2 4 10 . 1 2. 5 7. 4 8. 2 9. 1 10 . 7 11 . 6 7. 8 6. 0 4. 8 5 TH - 3 23 10 . 9 11 . 0 11 . 6 12 . 5 14 . 4 14 . 9 15 . 4 15 . 9 15 . 3 13 . 9 13 . 6 TH - 4 DN E DN E 17 . 5 DN E DN E 18 . 7 19 . 7 20 . 9 21 . 8 21 . 5 20 . 2 19 . 5 TH - 5 DN E DN E DN E 24 . 1 24 . 2 23 . 9 24 . 3 23 . 5 DN E 23 DN E XX X TH - 6 DN E DN E DN E DN E DN E DN E D N E 2 3 . 3 D N E 2 3 . 1 D N E X X X TH - 7 DN E DN E DN E 23 . 9 DN E DN E DN E DN E DN E 23 . 8 24 DN E TH - 8 DN E DN E XX X XX X XX X XX X XX X XX X XX X XX X XX X XX X TH - 9 DN E DN E 13 . 5 15 . 8 16 . 4 19 . 0 20 . 3 20 . 9 21 . 5 20 . 6 17 . 4 17 TH - 1 0 DN E 22 . 1 14 11 . 8 12 . 1 12 . 3 11 . 6 12 . 1 11 . 7 11 . 0 12 . 1 11 . 2 TH - 1 1 12 10 . 6 10 . 8 10 . 8 11 . 7 DN E DN E DN E DN E DN E 11 11 . 1 TH - 1 2 24 19 . 4 20 . 7 21 . 5 21 . 6 21 . 8 22 . 1 21 . 8 21 . 8 21 . 6 21 . 8 21 . 6 *D N E D i d N o t E n c o u n t e r College & Trilby Multi-Family Community Final Drainage Report APPENDIX F – MAPS A W e s t r i a n C o m p a n y WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T Know what's below. before you dig.Call R WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T LEGEND EFFECTIVE SWMM DRAINAGE BASIN DIVIDE LINE (WITH DIRECTION OF FLOW) CONVEYANCE ELEMENT PROPOSED SWMM DRAINAGE BASIN DIVIDE LINE CIP PROPOSED CONVEYANCE ELEMENT (WITH DIRECTION OF FLOW) SUBBASIN CIP SUBBASIN CONVEYANCE ELEMENT - PIPE CIP PROPOSED CONVEYANCE ELEMENT - PIPE CONVEYANCE ELEMENT - SURFACE FLOW CIP PROPOSED CONVEYANCE ELEMENT - SURFACE FLOW CONVEYANCE ELEMENT - ORIFICE CIP PROPOSED CONVEYANCE ELEMENT - ORIFICE DETENTION POND CIP PROPOSED DETENTION POND NODE CIP PROPOSED NODE A W e s t r i a n C o m p a n y WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T Know what's below. before you dig.Call R LEGEND EFFECTIVE SWMM DRAINAGE BASIN DIVIDE LINE (WITH DIRECTION OF FLOW) CONVEYANCE ELEMENT PROPOSED SWMM DRAINAGE BASIN DIVIDE LINE CIP PROPOSED CONVEYANCE ELEMENT (WITH DIRECTION OF FLOW) SUBBASIN CIP SUBBASIN CONVEYANCE ELEMENT - PIPE CIP PROPOSED CONVEYANCE ELEMENT - PIPE CONVEYANCE ELEMENT - SURFACE FLOW CIP PROPOSED CONVEYANCE ELEMENT - SURFACE FLOW CONVEYANCE ELEMENT - ORIFICE CIP PROPOSED CONVEYANCE ELEMENT - ORIFICE DETENTION POND CIP PROPOSED DETENTION POND NODE CIP PROPOSED NODE A W e s t r i a n C o m p a n y WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T Know what's below. before you dig.Call R VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M VAULT VAULT M M M M VA U L T VA U L T M M M M M M M M M M M M M M M M VA U L T VA U L T VA U L T M M M M VAULT M M M M M M M B AA B B B C C RO V E R W A Y MA R S D R I V E GA L A C T I C L A N E GA L A C T I C L A N E NO V A L A N E NO V A L A N E LUNAR COURT RO V E R W A Y MA R S D R I V E STELLAR DRIVE MA R S D R I V E ST A R D U S T L A N E MO O N B E A M W A Y MO O N B E A M W A Y NO V A L A N E SEE SHEET 23 SEE SHEET 24 A W e s t r i a n C o m p a n y WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T Know what's below. before you dig.Call R VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M VA U L T M M M M M M M M M VA U L T VA U L T VA U L T M M M M VAULT M M M M M M AA B B GA L A C T I C L A N E GA L A C T I C L A N E RO V E R W A Y MA R S D R I V E MO O N B E A M W A Y NO V A L A N E A W e s t r i a n C o m p a n y WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M VAULT VAULT VA U L T M M M M M M M M B B C C RO V E R W A Y MA R S D R I V E NO V A L A N E NO V A L A N E LUNAR COURT MA R S D R I V E STELLAR DRIVE ST A R D U S T L A N E MO O N B E A M W A Y A W e s t r i a n C o m p a n y WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T VA U L T VA U L T M M M M M M M M M M VA U L T M M M MA R S D R I V E STELLAR DRIVE ST A R D U S T L A N E WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T A W e s t r i a n C o m p a n y M M M M M RO V E R W A Y A Westrian Company ONSITE BASIN LENGTHS - SWMM MAP COLLEGE & TRILBY MULTI-FAMILY COMMUNITY Altitud e : 0 . 0 0 0 0 _ _ _ _ _ _ _ _ _ Name: C o l l e g e _ T r i l b y _ G E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Longitu d e : - 1 0 5 . 0 7 6 8 6 9 7 9 0 8 1 2 0 0 Latitud e : 4 0 . 4 9 4 5 6 2 4 2 7 4 7 3 3 3 _ _ LEGEND (WITH DIRECTION OF FLOW) CONVEYANCE ELEMENT CIP SWMM DRAINAGE BASIN DIVIDE LINE CIP PROPOSED CONVEYANCE ELEMENT (WITH DIRECTION OF FLOW) SUBBASIN CIP SUBBASIN CONVEYANCE ELEMENT - PIPE CONVEYANCE ELEMENT - SURFACE FLOW CIP PROPOSED CONVEYANCE ELEMENT - SURFACE FLOW CONVEYANCE ELEMENT - ORIFICE CIP PROPOSED CONVEYANCE ELEMENT - ORIFICE DETENTION POND CIP PROPOSED DETENTION POND NODE CIP PROPOSED NODE JR MODIFIED BASIN BASIN DIVIDE LINE JR PROPOSED NODE JR MODIFIED SWMM DRAINAGE JR PROPOSED DETENTION / WQ POND JR PROPOSED CONVEYANCE ELEMENT - ORIFICE JR PROPOSED RATING CURVE JR PROPOSED CONVEYANCE ELEMENT (WITH DIRECTION OF FLOW) CIP PROPOSED CONVEYANCE ELEMENT - PIPE JR PROPOSED BASIN LENGTH A Westrian Company COLLEGE & TRILBY MULTI-FAMILY COMMUNITY # # # PROPOSED SWMM MAP Altitud e : 0 . 0 0 0 0 _ _ _ _ _ _ _ _ _ Name: C o l l e g e _ T r i l b y _ G E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Longitu d e : - 1 0 5 . 0 7 6 8 6 9 7 9 0 8 1 2 0 0 Latitud e : 4 0 . 4 9 4 5 6 2 4 2 7 4 7 3 3 3 _ _ LEGEND (WITH DIRECTION OF FLOW) CONVEYANCE ELEMENT CIP SWMM DRAINAGE BASIN DIVIDE LINE CIP PROPOSED CONVEYANCE ELEMENT (WITH DIRECTION OF FLOW) SUBBASIN CIP SUBBASIN CONVEYANCE ELEMENT - PIPE CONVEYANCE ELEMENT - SURFACE FLOW CIP PROPOSED CONVEYANCE ELEMENT - SURFACE FLOW CONVEYANCE ELEMENT - ORIFICE CIP PROPOSED CONVEYANCE ELEMENT - ORIFICE DETENTION POND CIP PROPOSED DETENTION POND NODE CIP PROPOSED NODE JR MODIFIED BASIN BASIN DIVIDE LINE JR PROPOSED NODE JR MODIFIED SWMM DRAINAGE JR PROPOSED DETENTION / WQ POND JR PROPOSED CONVEYANCE ELEMENT - ORIFICE JR PROPOSED RATING CURVE JR PROPOSED CONVEYANCE ELEMENT (WITH DIRECTION OF FLOW) CIP PROPOSED CONVEYANCE ELEMENT - PIPE A Westrian Company TRILBY / COLLEGE EX-DRAINAGE EXHIBT College & Trilby Multi-Family Community Final Drainage Report APPENDIX G –LID EXHIBIT WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M VA U L T M M M M M M M M M VA U L T VA U L T VA U L T M M M M VAULT AA B B GA L A C T I C L A N E GA L A C T I C L A N E RO V E R W A Y MA R S D R I V E MO O N B E A M W A Y NO V A L A N E WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T A W e s t r i a n C o m p a n y VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M VAULT VAULT VA U L T M M M M M M M B B C C RO V E R W A Y MA R S D R I V E NO V A L A N E NO V A L A N E LUNAR COURT MA R S D R I V E STELLAR DRIVE ST A R D U S T L A N E MO O N B E A M W A Y A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R Altitud e : 0 . 0 0 0 0 _ _ _ _ _ _ _ _ _ Name: C o l l e g e _ T r i l b y _ G E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Long i t u d e : - 1 0 5 . 0 7 6 8 6 9 7 9 0 8 1 2 0 0 Latitud e : 4 0 . 4 9 4 5 6 2 4 2 7 4 7 3 3 3 _ _ VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VAULT VAULT VA U L T MA R S D R I V E